MANAGING PRODUCTIONS
ACROSS SUPPLY CHAIN
SUSHANT SINHA
SUSHOVAN BEJ
PLANNING AND CONTROL
Sales and Operation Planning
Master Scheduling
Vendor order ManagementProduction Activity Control
Material Requirement Planning
MASTER SCHEDULING
It is a detailed planning process that tracks production output and
matches this output to actual custom orders. For e.g.
Month Demand Production Inventory
January 1500 1500 700
February 2500 2500 700
March 4000 5000 1700
April 5000 6000 2700
Partial salesand operation plan Master Schedule March
Week 1 Week 2 Week 3 Week 4
Demand 200 250 300 350
Push Mow ers Production 650 0 650 0
Inventory 200 650 400 750 400
Demand 400 500 600 700
Pow er Mow ers Production 0 1350 0 1350
Inventory 400 0 850 250 900
Demand 100 150 200 250
Law n tractors Production 250 250 250 250
Inventory 100 250 350 400 400
700
5000
4000
1700
Beginning Invetory
Total Monthly Production
Total Monthly Demand
Ending Inventory
MASTER SCHEDULE RECORD
Most master schedule or Master Production Schedule record track
several key pieces of information as following :
• Forecasted Demand
• Booked Orders
• Projected Inventory Levels
• Production Quantities
• Units still available to meet customer need (available to promise)
Forecasted Demand Vs. Booked
Orders
• In week 45, for instance, the estimated demand for snow blowers
is 150, yet the company already has the confirmed order for 170
• While in the month of December booked orders appear to be
lagging forecasted demand.
Now as there is considerable difference b/w demand and booked
orders. In that case this MSR will help manager to take decision,
whether to cut down the production or lower the price.
Month
Weeks 45 46 47 48 49 50 51 52
Forecasted demand 150 150 150 150 175 175 175 175
Booked Orders 170 165 140 120 85 42 20 0
Master Production schedule 300 0 300 0 350 0 350 0
November Decemeber
MeltoMatic Snow Blow er
Projected Ending Inventory
It is a conservative estimate of the inventory position at the end of each week, which
is calculated using formula
• EI(t) = EI(t-1) + MPS(t)- maximum{F(t), OB(t)}
• Where EI(t)=ending inventory in time period (t), EI(t-1)= ending inventory in time
period (t-1)
• MPS(t)=master prod. Schedule quantity available in time period (t),
• F(t)=Forecasted demand for the time period (t) and OB(t)=order booked for the
time period (t)
On-hand inventory at end of w eek 44 100
Month
Weeks 45 46 47 48 49 50 51 52
Forecasted demand 150 150 150 150 175 175 175 175
Booked Orders 170 165 140 120 85 42 20 0
Projected Ending Inventory 230 65 215 65 240 65 240 65
Master Production schedule 300 0 300 0 350 0 350 0
MeltoMatic Snow Blow er
November Decemeber
Available to Promise
It indicates the number of units that are available for sale each week, given those that
have already been promised to customer
• ATP(t) = EI(t) + MPS(t) - ∑OB(t)
• ATP(t)= Available to promise in week ‘t’
• ∑OB(t)= sum of all orders booked from week ‘t’ until week ‘z’
On-hand inventory at end of w eek 44 100
Month
Weeks 45 46 47 48 49 50 51 52
Forecasted demand 150 150 150 150 175 175 175 175
Booked Orders 170 165 140 120 85 42 20 0
Projected Ending Inventory 230 65 215 65 240 65 240 65
Master Production schedule 300 0 300 0 350 0 350 0
Available to Promise 65 40 223 330
MeltoMatic Snow Blow er
November Decemeber
Material Requirement Planning
Simply, calculates the timing and quantities of material orders
needed to support master schedule.
i.e translates the master production schedule into planned orders for
actual parts and components needed to make the ordered product.
• different from single inventory approach (independent inventory)
eg. Amazon
• dependant inventory approach
products and parts dependant on each other for complete
product.
eg. IKEA
MRP is different in managing inventory than EOQ ( Economic Order
Quantity ) i.e economic system in which the inventory is managed
using less space. MRP is based on :
• Bill of Material
• Backward Scheduling
• Explosion of Bill of Material
BILL OF MATERIAL
It is a listing of all the subassemblies, intermediate parts, and raw
materials that go into a parent assembly, showing the quantity of
each required to make an assembly.
• Involves PLANNING LEAD TIME i.e time from when a component
or material is ordered until it arrives and is ready to use
Bill of Materials
Chair
Seat
Back
Assembly
Leg
Assembly
Legs (2) Crossbar
Side rails
(2)
Crossbar
Back Slats
(3)
1 week
1 week
2 week
1 week
2 week 2 week 2 week 2 week 2 week
}Level 0
}Level 1
BACKWARD SCHEDULING
Calculating the deadline by working backward in time so that the
component or material is ready to use in time.
EXPLODING OF BILL OF MATERIAL
The process by which one works backward from master schedule to
determine the quantity and time for receiving all the various
components and sub- assemblies.
MRP RECORD
A record needs to be maintained for the various components and
sub-assemblies.
GROSS REQUIREMENT (GR)
The number of products needed for the order.
Eg. 500 wooden chairs is the gross requirement
This depends on:
• Inventory carried over / closing stock (EI)
• Scheduled receipts / units already on order (SR)
• Planned receipts / new orders
This helps to determine any new orders need to be placed
i.e NET REQUIREMENTS (NR)
NR(t) = GR(t) - EI(t) – SR(t)
ADVANTAGES OF MRP
• Directly tied to the master production and indicates exact timing
and quantity of orders of all components.
• Allows managers to trace every order for lower level items through
all the levels of the BOM.
• Tells precisely to the firm and the supplier what needs to be made
when.
CONSIDERATIONS FOR MRP
• Requires organizational discipline.
• Must have accurate information ( Master schedule, BOM etc. ).
• Must also incorporate uncertainty so as to offer reliable service.
Because a change in a single step can cause drastic effects on the
complete procedure ( MRP nervousness ).
Production Activity Control & Vendor
Order Mgmt. System
• In this emphasis shifts from planning to execution
• Other capabilities of the system
• Route & prioritize jobs going through the supply chain
• Coordinate the flow of goods and materials b/w a facility and other
supply chain partners
• Provide supply chain partners with performance data on operation
and supply chain activities
Job Sequencing
• Job sequencing rules have been used for decades to determine the
order in which job should be processed when resources are limited
and multiple jobs are waiting to done.
• Critical Ratio =(Total task time remaining)/(days until due)
CarlosRestoration Services
Total Task Days Crticial
JOB Step 1 Step 2 Step 3 Time Until Due Ratio
Uptow n Gallery 3 2 3.5 8.5 21 0.405
High Museum 5 2 1 8 20 0.400
Chester College 3 2 5 10 10 1.000
Smith 6 4 1 11 15 0.733
Estimated Days
Which is BEST?
First come-first served Days
JOB Start End Start End Start End Late
Uptow n Gallery 0 3 3 5 5 8.5 0
High M useum 3 8 8 10 10 11 0
Chester College 8 11 11 13 13 18 8
Smith 11 17 17 21 21 22 7
Av erage Lateness 3.75
Earliest Due Date Days
JOB Start End Start End Start End Late
Chester College 0 3 3 5 5 10 0
Smith 3 9 9 13 13 14 0
High M useum 9 14 14 16 16 17 0
Uptow n Gallery 14 17 17 19 19 22.5 1.5
Av erage Lateness 0.375
Earliest Due Date Days
JOB Start End Start End Start End Late
Chester College 0 3 3 5 5 10 0
Smith 3 9 9 13 13 14 0
Uptow n Gallery 9 12 12 15 15 18.5 0
High M useum 12 17 17 19 19 20 0
Av erage Lateness 0.000
Step 1 Step 2 Step 3
Step 1 Step 2 Step 3
Step 1 Step 2 Step 3
Monitoring & Tracking Technology
• Recently, Radio Frequency Identification (RFID), bar coding and
online order tracking system have been developed to trace the
movement and location of materials in the supply chain and report
on the progress of specific jobs.
• Beside helping the company to control its operation and supply
chain activities, these system also alert managers to potential
problems.
• For e.g. It could help in provide users with real-time information about
the status of manufacturing jobs and required materials. If a shortage
of materials threatens to delay job, the system flags the problem and
indicates which jobs will be affected.
SYNCHRONISING PLANNING AND CONTROL
ACROSS SUPPLY CHAIN
This is done using:
• Distribution Requirement Planning (DRP)
• KANBAN
 DRP helps to synchronize supply chain partners at the MASTER
SCHEDULE level.
 Kanban helps to synchronize supply chain partners at the
PRODUCTION ACTIVITY CONTROL and VENDOR ORDER
MANAGEMENT level.
SYNCHRONIZINGPLANNINGANDCONTROL
PLANNING AND CONTROL
PRODUCTION ACTIVITY CONTROL (PAC) VENDOR ORDER MANAGEMENT SYSTEM
MATERIAL REQUIREMENT PLANNING
MASTER SCHEDULING
SALES AND OPERATION PLANNING ( S&OP)
DISTRIBUTION REQUIREMENT PLANNING
• Time based planning approach similar to MRP
• Observe planned orders at the point of demand ( warehouse ) to
determine forecaster demand at source level ( plant )
• Uses MRP style logic to feed accurate demand information into
the master schedule
DISTRIBUTION REQUIREMENT PLANNING
KANBAN SYSTEM
Uses cards, containers or visual cues to control the production and
movement in the supply chain
• Production Activity Control
• Vendor Order Management Systems
PRODUCTION ACTIVITY CONTROL
Assures that the in-house manufacturing takes place according to
plan
VENDOR ORDER MANAGEMENT
Assures that the materials ordered from the supply chain partners
are received when needed
KANBAN SYSTEM
Simply a pull system
i.e Actual downstream demand sets off a chain of events that pull
materials through the various process steps.
i.e When a finished product goes out, it pulls the materials from the
previous steps.
Managing productions across Supply Chain

More Related Content

What's hot

Bill of material
Bill of materialBill of material
Bill of materialBhaskar Das
 
Co product costing master data
Co product costing master dataCo product costing master data
Co product costing master dataHema Latha
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)Dipesh Pandey
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulationavijit biswas
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementSuryakumar Thangarasu
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationDelwin Arikatt
 
Material Requirement planning (factors,inputs,outputs,benifits)
Material Requirement planning  (factors,inputs,outputs,benifits)Material Requirement planning  (factors,inputs,outputs,benifits)
Material Requirement planning (factors,inputs,outputs,benifits)razinbabaria786
 
Material resource planning (mrp)
Material resource planning (mrp)Material resource planning (mrp)
Material resource planning (mrp)VaibhaveeShetty
 
MRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPMRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPTom Matys
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationjhanakshah
 

What's hot (20)

Ch16 mrp
Ch16 mrpCh16 mrp
Ch16 mrp
 
Bill of material
Bill of materialBill of material
Bill of material
 
MRP
MRPMRP
MRP
 
Co product costing master data
Co product costing master dataCo product costing master data
Co product costing master data
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
 
MRP and ERP
MRP and ERPMRP and ERP
MRP and ERP
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Material Requirement planning (factors,inputs,outputs,benifits)
Material Requirement planning  (factors,inputs,outputs,benifits)Material Requirement planning  (factors,inputs,outputs,benifits)
Material Requirement planning (factors,inputs,outputs,benifits)
 
Material resource planning (mrp)
Material resource planning (mrp)Material resource planning (mrp)
Material resource planning (mrp)
 
MRP exercises
MRP exercisesMRP exercises
MRP exercises
 
Brunswick motors, inc
Brunswick motors, incBrunswick motors, inc
Brunswick motors, inc
 
MRP
MRP MRP
MRP
 
MRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPMRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERP
 
Heizer 14
Heizer 14Heizer 14
Heizer 14
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Material requirement planning
Material requirement planningMaterial requirement planning
Material requirement planning
 
Mrp
MrpMrp
Mrp
 
Line balancing
Line balancing Line balancing
Line balancing
 

Viewers also liked

Chemical Supply Chain
Chemical Supply ChainChemical Supply Chain
Chemical Supply ChainNatashaS7
 
Integrating Cybersecurity into Supply Chain Risk Management
Integrating Cybersecurity into Supply Chain Risk ManagementIntegrating Cybersecurity into Supply Chain Risk Management
Integrating Cybersecurity into Supply Chain Risk ManagementPriyanka Aash
 
Business design and planning - value chain map and matrix (furniture industry)
Business design and planning - value chain map and matrix (furniture industry)Business design and planning - value chain map and matrix (furniture industry)
Business design and planning - value chain map and matrix (furniture industry)Sarah Lee
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 
IKEA Supply Chain Mangament
IKEA Supply Chain MangamentIKEA Supply Chain Mangament
IKEA Supply Chain MangamentManish Roy
 
Role of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain ManageentRole of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain ManageentAnand Jha
 
Use of ict for effective teaching and learning
Use of ict for effective teaching and learningUse of ict for effective teaching and learning
Use of ict for effective teaching and learningAjith Janardhanan T J
 
Role of IT in supply chain management
Role of IT in supply chain managementRole of IT in supply chain management
Role of IT in supply chain managementNeelam Yadav
 

Viewers also liked (10)

Chemical Supply Chain
Chemical Supply ChainChemical Supply Chain
Chemical Supply Chain
 
Integrating Cybersecurity into Supply Chain Risk Management
Integrating Cybersecurity into Supply Chain Risk ManagementIntegrating Cybersecurity into Supply Chain Risk Management
Integrating Cybersecurity into Supply Chain Risk Management
 
Physical Distribution process (Distribution Budgets)
Physical Distribution process (Distribution Budgets)Physical Distribution process (Distribution Budgets)
Physical Distribution process (Distribution Budgets)
 
Business design and planning - value chain map and matrix (furniture industry)
Business design and planning - value chain map and matrix (furniture industry)Business design and planning - value chain map and matrix (furniture industry)
Business design and planning - value chain map and matrix (furniture industry)
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
IKEA Supply Chain Mangament
IKEA Supply Chain MangamentIKEA Supply Chain Mangament
IKEA Supply Chain Mangament
 
Role of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain ManageentRole of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain Manageent
 
Use of ict for effective teaching and learning
Use of ict for effective teaching and learningUse of ict for effective teaching and learning
Use of ict for effective teaching and learning
 
Role of IT in supply chain management
Role of IT in supply chain managementRole of IT in supply chain management
Role of IT in supply chain management
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 

Similar to Managing productions across Supply Chain

Managing production across supply chain
Managing production across supply chainManaging production across supply chain
Managing production across supply chainSushant Kumar Sinha
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Snehav Sharma
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)Mostafa Ewees
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBDrDeeptiSharma12
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Akash Maurya
 
ERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of ManufacturingERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of ManufacturingRootstock Software
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource PlanningBiswajit Ghosh
 
Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdfJOHN PAUL ROBERTO
 
Mba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aMba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aRai University
 
MASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptxMASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptxGulaHangus
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps omfatuma ahmed
 
Aminullah Assagaf_P12-Ch.15_Resources Planning-32.pptx
Aminullah Assagaf_P12-Ch.15_Resources Planning-32.pptxAminullah Assagaf_P12-Ch.15_Resources Planning-32.pptx
Aminullah Assagaf_P12-Ch.15_Resources Planning-32.pptxAminullah Assagaf
 
Session 5
Session 5Session 5
Session 5thangv
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaainfinitepestcontrol
 
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...Rootstock Software
 
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...Rootstock Software
 

Similar to Managing productions across Supply Chain (20)

Managing production across supply chain
Managing production across supply chainManaging production across supply chain
Managing production across supply chain
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
 
ERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of ManufacturingERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of Manufacturing
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
5089529.ppt
5089529.ppt5089529.ppt
5089529.ppt
 
Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdf
 
Mba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aMba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp a
 
MASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptxMASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptx
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
 
Aminullah Assagaf_P12-Ch.15_Resources Planning-32.pptx
Aminullah Assagaf_P12-Ch.15_Resources Planning-32.pptxAminullah Assagaf_P12-Ch.15_Resources Planning-32.pptx
Aminullah Assagaf_P12-Ch.15_Resources Planning-32.pptx
 
Session 5
Session 5Session 5
Session 5
 
Chapter 5_OM
Chapter 5_OMChapter 5_OM
Chapter 5_OM
 
zone 3 ppt.pptx
zone 3 ppt.pptxzone 3 ppt.pptx
zone 3 ppt.pptx
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
 
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
 
MRP MPS.ppt
MRP MPS.pptMRP MPS.ppt
MRP MPS.ppt
 
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
 

More from Sushovan Bej

The balanced scorecard method - strategy
The balanced scorecard method - strategyThe balanced scorecard method - strategy
The balanced scorecard method - strategySushovan Bej
 
Tesla motors presentation
Tesla motors presentationTesla motors presentation
Tesla motors presentationSushovan Bej
 
South korea work culture
South korea work cultureSouth korea work culture
South korea work cultureSushovan Bej
 
Royal enfield presentation
Royal enfield presentationRoyal enfield presentation
Royal enfield presentationSushovan Bej
 
Magneto-optic-current-transformer
Magneto-optic-current-transformerMagneto-optic-current-transformer
Magneto-optic-current-transformerSushovan Bej
 
Feasibility analysis of electric vehicles in India
Feasibility analysis of electric vehicles in IndiaFeasibility analysis of electric vehicles in India
Feasibility analysis of electric vehicles in IndiaSushovan Bej
 
Hindustan zinc limited - HR
Hindustan zinc limited - HRHindustan zinc limited - HR
Hindustan zinc limited - HRSushovan Bej
 
Book review : Steve Jobs
Book review : Steve JobsBook review : Steve Jobs
Book review : Steve JobsSushovan Bej
 
Book presentation : Fahrenheit 451
Book presentation : Fahrenheit 451Book presentation : Fahrenheit 451
Book presentation : Fahrenheit 451Sushovan Bej
 
Autonomous and electric vehicles
Autonomous and electric vehiclesAutonomous and electric vehicles
Autonomous and electric vehiclesSushovan Bej
 

More from Sushovan Bej (11)

The balanced scorecard method - strategy
The balanced scorecard method - strategyThe balanced scorecard method - strategy
The balanced scorecard method - strategy
 
Tesla motors presentation
Tesla motors presentationTesla motors presentation
Tesla motors presentation
 
South korea work culture
South korea work cultureSouth korea work culture
South korea work culture
 
Royal enfield presentation
Royal enfield presentationRoyal enfield presentation
Royal enfield presentation
 
Magneto-optic-current-transformer
Magneto-optic-current-transformerMagneto-optic-current-transformer
Magneto-optic-current-transformer
 
Feasibility analysis of electric vehicles in India
Feasibility analysis of electric vehicles in IndiaFeasibility analysis of electric vehicles in India
Feasibility analysis of electric vehicles in India
 
Hindustan zinc limited - HR
Hindustan zinc limited - HRHindustan zinc limited - HR
Hindustan zinc limited - HR
 
Electric Vehicles
Electric VehiclesElectric Vehicles
Electric Vehicles
 
Book review : Steve Jobs
Book review : Steve JobsBook review : Steve Jobs
Book review : Steve Jobs
 
Book presentation : Fahrenheit 451
Book presentation : Fahrenheit 451Book presentation : Fahrenheit 451
Book presentation : Fahrenheit 451
 
Autonomous and electric vehicles
Autonomous and electric vehiclesAutonomous and electric vehicles
Autonomous and electric vehicles
 

Recently uploaded

Mysore ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Mysore ESCORT SERVICE❤CALL GIRL
Mysore ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Mysore ESCORT SERVICE❤CALL GIRLMysore ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Mysore ESCORT SERVICE❤CALL GIRL
Mysore ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Mysore ESCORT SERVICE❤CALL GIRLsiyak7254
 
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...aakahthapa70
 
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...aakahthapa70
 
9891550660 Call Girls In Noida Sector 62 Short 1500 Night 6000
9891550660 Call Girls In Noida Sector 62 Short 1500 Night 60009891550660 Call Girls In Noida Sector 62 Short 1500 Night 6000
9891550660 Call Girls In Noida Sector 62 Short 1500 Night 6000teencall080
 
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋Sheetaleventcompany
 
Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...
Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...
Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...aakahthapa70
 
Jamshedpur ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Jamshedpur ESCORT SERVICE❤CA...
Jamshedpur ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Jamshedpur ESCORT SERVICE❤CA...Jamshedpur ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Jamshedpur ESCORT SERVICE❤CA...
Jamshedpur ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Jamshedpur ESCORT SERVICE❤CA...siyak7254
 
Radhika Call Girls In Jaipur 9358660226 Escorts service
Radhika Call Girls In Jaipur 9358660226 Escorts serviceRadhika Call Girls In Jaipur 9358660226 Escorts service
Radhika Call Girls In Jaipur 9358660226 Escorts servicerahul222jai
 
CALL GIRLS 9999288940 women seeking men Locanto No Advance North Goa
CALL GIRLS 9999288940 women seeking men Locanto No Advance North GoaCALL GIRLS 9999288940 women seeking men Locanto No Advance North Goa
CALL GIRLS 9999288940 women seeking men Locanto No Advance North Goadelhincr993
 
Bhubaneswar ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Bhuneshwar ESCORT SERVICE❤C...
Bhubaneswar ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Bhuneshwar ESCORT SERVICE❤C...Bhubaneswar ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Bhuneshwar ESCORT SERVICE❤C...
Bhubaneswar ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Bhuneshwar ESCORT SERVICE❤C...siyak7254
 
Call Now ☎9870417354|| Call Girls in Dwarka Escort Service Delhi N.C.R.
Call Now ☎9870417354|| Call Girls in Dwarka Escort Service Delhi N.C.R.Call Now ☎9870417354|| Call Girls in Dwarka Escort Service Delhi N.C.R.
Call Now ☎9870417354|| Call Girls in Dwarka Escort Service Delhi N.C.R.riyadelhic riyadelhic
 
Malda ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Malda ESCORT SERVICE❤CALL GIRL
Malda ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Malda ESCORT SERVICE❤CALL GIRLMalda ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Malda ESCORT SERVICE❤CALL GIRL
Malda ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Malda ESCORT SERVICE❤CALL GIRLsiyak7254
 
Call US Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
Call US  Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...Call US  Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
Call US Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...Pooja Nehwal
 
Girls For Night in Islamabad | 03274100048 🔞
Girls For Night in Islamabad | 03274100048 🔞Girls For Night in Islamabad | 03274100048 🔞
Girls For Night in Islamabad | 03274100048 🔞Ifra Zohaib
 
RAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
RAJKOT CALL GIRLS 92628/71154 RAJKOT CALRAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
RAJKOT CALL GIRLS 92628/71154 RAJKOT CALNiteshKumar82226
 
SURAT CALL GIRL 92628/71154 SURAT CALL G
SURAT CALL GIRL 92628/71154 SURAT CALL GSURAT CALL GIRL 92628/71154 SURAT CALL G
SURAT CALL GIRL 92628/71154 SURAT CALL GNiteshKumar82226
 
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...aakahthapa70
 
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579diyaspanoida
 
Nainital ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Nainital ESCORT SERVICE❤CALL GIRL
Nainital ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Nainital ESCORT SERVICE❤CALL GIRLNainital ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Nainital ESCORT SERVICE❤CALL GIRL
Nainital ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Nainital ESCORT SERVICE❤CALL GIRLsiyak7254
 

Recently uploaded (20)

Mysore ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Mysore ESCORT SERVICE❤CALL GIRL
Mysore ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Mysore ESCORT SERVICE❤CALL GIRLMysore ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Mysore ESCORT SERVICE❤CALL GIRL
Mysore ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Mysore ESCORT SERVICE❤CALL GIRL
 
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
 
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
 
9891550660 Call Girls In Noida Sector 62 Short 1500 Night 6000
9891550660 Call Girls In Noida Sector 62 Short 1500 Night 60009891550660 Call Girls In Noida Sector 62 Short 1500 Night 6000
9891550660 Call Girls In Noida Sector 62 Short 1500 Night 6000
 
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
 
Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...
Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...
Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...
 
Jamshedpur ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Jamshedpur ESCORT SERVICE❤CA...
Jamshedpur ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Jamshedpur ESCORT SERVICE❤CA...Jamshedpur ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Jamshedpur ESCORT SERVICE❤CA...
Jamshedpur ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Jamshedpur ESCORT SERVICE❤CA...
 
Radhika Call Girls In Jaipur 9358660226 Escorts service
Radhika Call Girls In Jaipur 9358660226 Escorts serviceRadhika Call Girls In Jaipur 9358660226 Escorts service
Radhika Call Girls In Jaipur 9358660226 Escorts service
 
CALL GIRLS 9999288940 women seeking men Locanto No Advance North Goa
CALL GIRLS 9999288940 women seeking men Locanto No Advance North GoaCALL GIRLS 9999288940 women seeking men Locanto No Advance North Goa
CALL GIRLS 9999288940 women seeking men Locanto No Advance North Goa
 
Bhubaneswar ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Bhuneshwar ESCORT SERVICE❤C...
Bhubaneswar ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Bhuneshwar ESCORT SERVICE❤C...Bhubaneswar ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Bhuneshwar ESCORT SERVICE❤C...
Bhubaneswar ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Bhuneshwar ESCORT SERVICE❤C...
 
Call Now ☎9870417354|| Call Girls in Dwarka Escort Service Delhi N.C.R.
Call Now ☎9870417354|| Call Girls in Dwarka Escort Service Delhi N.C.R.Call Now ☎9870417354|| Call Girls in Dwarka Escort Service Delhi N.C.R.
Call Now ☎9870417354|| Call Girls in Dwarka Escort Service Delhi N.C.R.
 
Call Girls In Saket Delhi 9953056974 (Low Price) Escort Service Saket Delhi
Call Girls In Saket Delhi 9953056974 (Low Price) Escort Service Saket DelhiCall Girls In Saket Delhi 9953056974 (Low Price) Escort Service Saket Delhi
Call Girls In Saket Delhi 9953056974 (Low Price) Escort Service Saket Delhi
 
Malda ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Malda ESCORT SERVICE❤CALL GIRL
Malda ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Malda ESCORT SERVICE❤CALL GIRLMalda ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Malda ESCORT SERVICE❤CALL GIRL
Malda ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Malda ESCORT SERVICE❤CALL GIRL
 
Call US Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
Call US  Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...Call US  Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
Call US Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
 
Girls For Night in Islamabad | 03274100048 🔞
Girls For Night in Islamabad | 03274100048 🔞Girls For Night in Islamabad | 03274100048 🔞
Girls For Night in Islamabad | 03274100048 🔞
 
RAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
RAJKOT CALL GIRLS 92628/71154 RAJKOT CALRAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
RAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
 
SURAT CALL GIRL 92628/71154 SURAT CALL G
SURAT CALL GIRL 92628/71154 SURAT CALL GSURAT CALL GIRL 92628/71154 SURAT CALL G
SURAT CALL GIRL 92628/71154 SURAT CALL G
 
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
 
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
 
Nainital ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Nainital ESCORT SERVICE❤CALL GIRL
Nainital ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Nainital ESCORT SERVICE❤CALL GIRLNainital ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Nainital ESCORT SERVICE❤CALL GIRL
Nainital ❤CALL GIRL 89101*77447 ❤CALL GIRLS IN Nainital ESCORT SERVICE❤CALL GIRL
 

Managing productions across Supply Chain

  • 1. MANAGING PRODUCTIONS ACROSS SUPPLY CHAIN SUSHANT SINHA SUSHOVAN BEJ
  • 2. PLANNING AND CONTROL Sales and Operation Planning Master Scheduling Vendor order ManagementProduction Activity Control Material Requirement Planning
  • 3. MASTER SCHEDULING It is a detailed planning process that tracks production output and matches this output to actual custom orders. For e.g. Month Demand Production Inventory January 1500 1500 700 February 2500 2500 700 March 4000 5000 1700 April 5000 6000 2700 Partial salesand operation plan Master Schedule March Week 1 Week 2 Week 3 Week 4 Demand 200 250 300 350 Push Mow ers Production 650 0 650 0 Inventory 200 650 400 750 400 Demand 400 500 600 700 Pow er Mow ers Production 0 1350 0 1350 Inventory 400 0 850 250 900 Demand 100 150 200 250 Law n tractors Production 250 250 250 250 Inventory 100 250 350 400 400 700 5000 4000 1700 Beginning Invetory Total Monthly Production Total Monthly Demand Ending Inventory
  • 4. MASTER SCHEDULE RECORD Most master schedule or Master Production Schedule record track several key pieces of information as following : • Forecasted Demand • Booked Orders • Projected Inventory Levels • Production Quantities • Units still available to meet customer need (available to promise)
  • 5. Forecasted Demand Vs. Booked Orders • In week 45, for instance, the estimated demand for snow blowers is 150, yet the company already has the confirmed order for 170 • While in the month of December booked orders appear to be lagging forecasted demand. Now as there is considerable difference b/w demand and booked orders. In that case this MSR will help manager to take decision, whether to cut down the production or lower the price. Month Weeks 45 46 47 48 49 50 51 52 Forecasted demand 150 150 150 150 175 175 175 175 Booked Orders 170 165 140 120 85 42 20 0 Master Production schedule 300 0 300 0 350 0 350 0 November Decemeber MeltoMatic Snow Blow er
  • 6. Projected Ending Inventory It is a conservative estimate of the inventory position at the end of each week, which is calculated using formula • EI(t) = EI(t-1) + MPS(t)- maximum{F(t), OB(t)} • Where EI(t)=ending inventory in time period (t), EI(t-1)= ending inventory in time period (t-1) • MPS(t)=master prod. Schedule quantity available in time period (t), • F(t)=Forecasted demand for the time period (t) and OB(t)=order booked for the time period (t) On-hand inventory at end of w eek 44 100 Month Weeks 45 46 47 48 49 50 51 52 Forecasted demand 150 150 150 150 175 175 175 175 Booked Orders 170 165 140 120 85 42 20 0 Projected Ending Inventory 230 65 215 65 240 65 240 65 Master Production schedule 300 0 300 0 350 0 350 0 MeltoMatic Snow Blow er November Decemeber
  • 7. Available to Promise It indicates the number of units that are available for sale each week, given those that have already been promised to customer • ATP(t) = EI(t) + MPS(t) - ∑OB(t) • ATP(t)= Available to promise in week ‘t’ • ∑OB(t)= sum of all orders booked from week ‘t’ until week ‘z’ On-hand inventory at end of w eek 44 100 Month Weeks 45 46 47 48 49 50 51 52 Forecasted demand 150 150 150 150 175 175 175 175 Booked Orders 170 165 140 120 85 42 20 0 Projected Ending Inventory 230 65 215 65 240 65 240 65 Master Production schedule 300 0 300 0 350 0 350 0 Available to Promise 65 40 223 330 MeltoMatic Snow Blow er November Decemeber
  • 8. Material Requirement Planning Simply, calculates the timing and quantities of material orders needed to support master schedule. i.e translates the master production schedule into planned orders for actual parts and components needed to make the ordered product. • different from single inventory approach (independent inventory) eg. Amazon • dependant inventory approach products and parts dependant on each other for complete product. eg. IKEA
  • 9. MRP is different in managing inventory than EOQ ( Economic Order Quantity ) i.e economic system in which the inventory is managed using less space. MRP is based on : • Bill of Material • Backward Scheduling • Explosion of Bill of Material BILL OF MATERIAL It is a listing of all the subassemblies, intermediate parts, and raw materials that go into a parent assembly, showing the quantity of each required to make an assembly. • Involves PLANNING LEAD TIME i.e time from when a component or material is ordered until it arrives and is ready to use
  • 10. Bill of Materials Chair Seat Back Assembly Leg Assembly Legs (2) Crossbar Side rails (2) Crossbar Back Slats (3) 1 week 1 week 2 week 1 week 2 week 2 week 2 week 2 week 2 week }Level 0 }Level 1
  • 11. BACKWARD SCHEDULING Calculating the deadline by working backward in time so that the component or material is ready to use in time. EXPLODING OF BILL OF MATERIAL The process by which one works backward from master schedule to determine the quantity and time for receiving all the various components and sub- assemblies.
  • 12. MRP RECORD A record needs to be maintained for the various components and sub-assemblies. GROSS REQUIREMENT (GR) The number of products needed for the order. Eg. 500 wooden chairs is the gross requirement This depends on: • Inventory carried over / closing stock (EI) • Scheduled receipts / units already on order (SR) • Planned receipts / new orders This helps to determine any new orders need to be placed i.e NET REQUIREMENTS (NR) NR(t) = GR(t) - EI(t) – SR(t)
  • 13. ADVANTAGES OF MRP • Directly tied to the master production and indicates exact timing and quantity of orders of all components. • Allows managers to trace every order for lower level items through all the levels of the BOM. • Tells precisely to the firm and the supplier what needs to be made when.
  • 14. CONSIDERATIONS FOR MRP • Requires organizational discipline. • Must have accurate information ( Master schedule, BOM etc. ). • Must also incorporate uncertainty so as to offer reliable service. Because a change in a single step can cause drastic effects on the complete procedure ( MRP nervousness ).
  • 15. Production Activity Control & Vendor Order Mgmt. System • In this emphasis shifts from planning to execution • Other capabilities of the system • Route & prioritize jobs going through the supply chain • Coordinate the flow of goods and materials b/w a facility and other supply chain partners • Provide supply chain partners with performance data on operation and supply chain activities
  • 16. Job Sequencing • Job sequencing rules have been used for decades to determine the order in which job should be processed when resources are limited and multiple jobs are waiting to done. • Critical Ratio =(Total task time remaining)/(days until due) CarlosRestoration Services Total Task Days Crticial JOB Step 1 Step 2 Step 3 Time Until Due Ratio Uptow n Gallery 3 2 3.5 8.5 21 0.405 High Museum 5 2 1 8 20 0.400 Chester College 3 2 5 10 10 1.000 Smith 6 4 1 11 15 0.733 Estimated Days
  • 17. Which is BEST? First come-first served Days JOB Start End Start End Start End Late Uptow n Gallery 0 3 3 5 5 8.5 0 High M useum 3 8 8 10 10 11 0 Chester College 8 11 11 13 13 18 8 Smith 11 17 17 21 21 22 7 Av erage Lateness 3.75 Earliest Due Date Days JOB Start End Start End Start End Late Chester College 0 3 3 5 5 10 0 Smith 3 9 9 13 13 14 0 High M useum 9 14 14 16 16 17 0 Uptow n Gallery 14 17 17 19 19 22.5 1.5 Av erage Lateness 0.375 Earliest Due Date Days JOB Start End Start End Start End Late Chester College 0 3 3 5 5 10 0 Smith 3 9 9 13 13 14 0 Uptow n Gallery 9 12 12 15 15 18.5 0 High M useum 12 17 17 19 19 20 0 Av erage Lateness 0.000 Step 1 Step 2 Step 3 Step 1 Step 2 Step 3 Step 1 Step 2 Step 3
  • 18. Monitoring & Tracking Technology • Recently, Radio Frequency Identification (RFID), bar coding and online order tracking system have been developed to trace the movement and location of materials in the supply chain and report on the progress of specific jobs. • Beside helping the company to control its operation and supply chain activities, these system also alert managers to potential problems. • For e.g. It could help in provide users with real-time information about the status of manufacturing jobs and required materials. If a shortage of materials threatens to delay job, the system flags the problem and indicates which jobs will be affected.
  • 19. SYNCHRONISING PLANNING AND CONTROL ACROSS SUPPLY CHAIN This is done using: • Distribution Requirement Planning (DRP) • KANBAN  DRP helps to synchronize supply chain partners at the MASTER SCHEDULE level.  Kanban helps to synchronize supply chain partners at the PRODUCTION ACTIVITY CONTROL and VENDOR ORDER MANAGEMENT level.
  • 20. SYNCHRONIZINGPLANNINGANDCONTROL PLANNING AND CONTROL PRODUCTION ACTIVITY CONTROL (PAC) VENDOR ORDER MANAGEMENT SYSTEM MATERIAL REQUIREMENT PLANNING MASTER SCHEDULING SALES AND OPERATION PLANNING ( S&OP)
  • 21. DISTRIBUTION REQUIREMENT PLANNING • Time based planning approach similar to MRP • Observe planned orders at the point of demand ( warehouse ) to determine forecaster demand at source level ( plant ) • Uses MRP style logic to feed accurate demand information into the master schedule
  • 23. KANBAN SYSTEM Uses cards, containers or visual cues to control the production and movement in the supply chain • Production Activity Control • Vendor Order Management Systems PRODUCTION ACTIVITY CONTROL Assures that the in-house manufacturing takes place according to plan VENDOR ORDER MANAGEMENT Assures that the materials ordered from the supply chain partners are received when needed
  • 24. KANBAN SYSTEM Simply a pull system i.e Actual downstream demand sets off a chain of events that pull materials through the various process steps. i.e When a finished product goes out, it pulls the materials from the previous steps.