1. NATURALSOLUTIONSTOMAN-MADEPROBLEMS
Citadel Environmental Solutions
RAY LONG, MANAGING DIRECTOR // +44 7825248884 // ray@citadel-biocat.com
HENRY MADDERS, DIRECTOR // +44 7832 384223 // henry@citadel-biocat.com
NEW CITADEL BIOCAT+1™ PROJECT
IN SLOVENIA
Over 18% output increase with the addition of Citadel BioCat+1™
at the Panvita Jezera Plant in Slovenia, since the installation
by Decos-re d.o.o, our Slovenian based JV partner.
As a result of the outstanding Citadel BioCat+1™ perfomance, 2 new Panvita projects have started.
Installed Power: 999 kW with 2 Digesters in Series D1: 3.500 m3
D2: 2.000 m3
Feedstock: Maize Silage, Pig Slurry, Maize Whole Corn (below 10% of total oDM)
Feed mix as follows:
MAIZE SILAGE PIG SLURRY CORN
January 35,1t 53m3
0,83t Feed equates to 39-40 tons of Maize Silage per day.
February 34,5t 42m3
1,36t
At commencement of Citadel BioCat+1™ the power production was 19,6MWh/day increased to
23,3MWh/day.This represents an increase of 18,87% Feed oDM: 15,7t/day to 15,2 t/day this
equates to a reduction of 3,2% kWh/oDM: 1.260 kWh/t to 1.540 kWh/t represents an increase of
22,2%
Not the actual site
2. NATURALSOLUTIONSTOMAN-MADEPROBLEMS
Citadel Environmental Solutions
RAY LONG, MANAGING DIRECTOR // +44 7825248884 // ray@citadel-biocat.com
HENRY MADDERS, DIRECTOR // +44 7832 384223 // henry@citadel-biocat.com
Citadel BioCat+™
Now applied in many countries, providing
AD plant operators with increased reveue,
derived from reduced input in feed stock
and or increased output.
APPLICATIONS
Different BioCat+™ formulations can be
utilised in the following areas.
• Waste water Treatment
• Bioremediation
• Agriculture
• Animal feed enhancement
• Composting
• Treatment lagoons
• Odour control
For further information on how Citadel BioCat+™
can help you, please contact us for an
assesment of your project.
INSTALLATION
CPU
The Citadel BioCat+™ range of
products are generated on site in our
Catalyst Production Units (CPU’s).
The CPU’s are manufactured at
our factory in the UK partially from
recycled materials.
CPU measurements:
HEIGHT: 2400mm BASE: 900mm
x1200mm
Installation requirements:
• A SUPPLY OF POTABLE WATER
• A 230 - 240V POWER SUPPLY
• A LEVEL BASE (a structure to
support 1000Kg)
• A full site survey will be
undertaken prior to installtion.