This document contains a diagram showing 3 proposed routes (Routes 1-3) for a new transmission line between Datia and Bhander, as well as symbols for existing infrastructure including a bee line, 132kV transmission line, forest area, and gantry. The diagram includes labels for 9 points along Route 1 (AP-1 through AP-9), 3 points along Route 2 (AP-3_R2 through AP-5_R2), and 3 points along Route 3 (AP-3_R3 through AP-5_R3).