Bold City: Students rethink the bus station

  1. THE LOOP STATION PRESENTED BY: 02.11.2013 – FUTURECAPETOWN ALEXANDER FREHSE LAWDEN HOLMES ALEKSANDAR STOJAKOVIC (absent) BAYO WINDAPO
  2. BRIEF
  3. + TEAM
  4. SITE
  5. WHY HERE? EXISITING BUS TERMINUS IN CLAREMONT
  6. 1. IMPROVE, CREATE, AND CONNECT PUBLIC SPACES
  7. 2. PLATFORMS FOR FUTURE INFRASTRUCTURE
  8. 3. SITUATED IN A TRANSIT HUB
  9. 4. THE OPPORTUNITY TO REVIVE THE WERDMUELLER
  10. SITE CONSTRAINTS
  11. SITE CONSTRAINTS
  12. SITE CONSTRAINTS
  13. SITE CONSTRAINTS
  14. SITE CONSTRAINTS
  15. SITE CONSTRAINTS
  16. SITE CONSTRAINTS
  17. SITE CONSTRAINTS
  18. SITE CONSTRAINTS
  19. SITE CONSTRAINTS
  20. SITE OPPORTUNITIES
  21. SITE OPPORTUNITIES
  22. SITE OPPORTUNITIES
  23. SITE OPPORTUNITIES
  24. SITE OPPORTUNITIES
  25. SITE OPPORTUNITIES
  26. SITE OPPORTUNITIES
  27. SITE OPPORTUNITIES
  28. DESIGN: plan view
  29. - Simple use of textures on the horizontal plane - Activation of edge, creating vibrancy in front of previous dead spaces - Hierarchy of space DESIGN: creating a public square; activating dead edges
  30. CONCEPT
  31. ROOF
  32. DESIGN: concept of pod + roof
  33. ELEVATIONS
  34. Exploded axo of refined pod What is BIM?
  35. Collaborate and simulate
  36. Collaborate and simulate
  37. 2D vs 3D and 4D
  38. “exoskeleton” – aerial view of design, with certain elements transparent
  39. “the catalyst” – view from public square
  40. “The Loop: Platform 7” – interior perspective
  41. 2030 plan
  42. Google map image 2030 plan – connect spaces
  43. The 2030 dream of our site Roscommon street 2030 2030 plan – ignite urban upliftment in its immediate context
  44. 2030 plan – a catalyst for change and revival
  45. Thank you – Q&A.

Editor's Notes

  1. Situated below main road, above the railway, with shoprite to the right, and werdmueller on the left. (explain about the context).It is geographically well placed, closely located to the main road, to residential area, located on arterial routes, and within walking distance of an economic hub.
  2. transit stations are social and commercial hubs.
  3. 4. The station as a catalyst. The Werdmueller stands an elephant in the mud, it never having been provided with the planned artery road it was designed in mind with.. By uplifting and reinstating the context with a notion of development and improvement, we can begin to infect the Werdmueller with life.
  4. We first decided on the form of the building, and how it would sit on site: creating the public square, the loop along with Roscommon to become a purely pedestrian space, and servicing the buses in this distinct in/out method.
  5. Here we take focus on what we wanted to do with the public space, while simultaneously working on the design of the station itself. This is what we came up with.
  6. The concept was to divide the design into two elements: a refined pod, the ultimate bus station serving device; and the roof, which harvested rain and solar energy, provided shade, protected the pod from heat gain and allowed for easy ventilation.Prioritized our goals:Low energy use (devoid the need for fancy technology)Fairly low maintenanceRetail space (economic sustainability)Bus logisticsImprove public space, create a public square: activate edges
  7. The concept was to divide the design into two elements: a refined pod, the ultimate bus station serving device; and the roof, which harvested rain and solar energy, provided shade, protected the pod from heat gain and allowed for easy ventilation.
  8. Some sketches of initial designs/concepts
  9. Now we start explaining how BIM helped us go through these stages
  10. Solar heat gain testing – for surface heat and to calculate possible solar energy that could be produced
  11. Wind tunnel testing with accurate prevailing wind direction and speeds
  12. Renders of final design
  13. Renders of final design
  14. Renders of final design
  15. - connect the suburbs across the train tracks to Claremont’s public transit stations- uplift surrounding contextrevive the Werdmueller by providing it with the context it deservesThe new public space and transit centre the first step to revive the Werdmueller centre (partial contributor to Wermuellers decline was the proposed road artery that was supposed to connect to with the werdmueller.. By regenerating a public space and transit hub in the area, we would hope to reinstate the werdmueller with a context that is for the public and economic activity as much as it is for transport)CATALYST: (n) a substance that increases the rate of a chemical reaction without itself undergoing any permanent chemical change
  16. A plan view of site showing how werdmueller is wedged between TAXI, BUS, TRAIN and MAIN ROAD. It is bound to no longer be an elephant stuck in the mud, but a thriving bull proud and iconic, the way it should be.Importance of a public forecourt
  17. CLOSING LINE: The important notion is that we need to activate this space, inspire the urban context, and reconnect divided spaces. Our design was one of million architectural possibilities; now lets evolve it.