In-water timing restrictions are used to protect fish during critical periods of their lifecycle like spawning. They prohibit construction work within water bodies during specified dates to avoid disturbances. The restricted dates correspond to regional spawning windows and are usually not flexible, but exceptions may be made if critical habitats are not present near the work area. Contractors must carefully plan projects around these timing restrictions through consultation with fisheries specialists.