2. Aims
• We will be attempting to gain good lighting shots
and a variety of angles. We hope to achieve this
by going to locations that are well lit eg house or
indoor car park
• We are aiming to re-do the main chorus lip
syncing base track
• And most importantly our time management. As
we only have 1 more day to film all of this must
be done in that day. So our time keeping should
be precise and realistic
3. Schedule
• Because previously lighting has been a problem ,
we would allow 30 minutes prior to meet up time
to arrange everything
• As a group we will meet at 6:30 pm on Tuesday
• We will then head to our first location –
(supermarket car pack) and shoot the base tracks
• Our next location will be in a home set in the
living room
• After our necessary scenes have been recorded
we will unpack all our equipment and have it
ready for the next morning
4. Risk Assessment
Car park – The car park will obviously be full of moving vehicles , we must move quickly and
find a spot that is not as busy and try and work with it. We must also consider the
equipment and the safety of others whilst filming. We hope to have at least one person out
as the look out to prevent any accidents
House – There is a slight possibility an accident could occur with equipment but i believe by
simply placing the equipment in a reasonable area and being aware of its surroundings. All
accidents can be avoided
Costume and Planning
On this particular occasion we are going to be lenient with costumes because , we
want the scenes that we are planning to shoot to reflect realism and seem more
natural. Furthermore if our artists are more comfortable they are more likely to work
better