Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestrian Improvements
1. County of Fairfax, Virginia
1
Community Meeting
for
Bicycle & Pedestrian Improvements
March 9, 2017
Fairfax County
Braddock District
Burke Centre VRE Connector Ph. IV
2. County of Fairfax, Virginia
2
Department of Transportation
Fairfax County Team
• Department of Transportation
– Planning
– Scoping
– Design
• Rinker Design Associates, P.C.
• Department of Public Works
– Land Acquisition
– Construction
– Maintenance
3. County of Fairfax, Virginia
3
Agenda
• Purpose & Need
• Summary of Current Design
• Schedule
• Q & A
• Open House
Sign-In Sheet
Comment Response Form
http://www.fairfaxcounty.gov/fcdot/
Department of Transportation
4. County of Fairfax, Virginia
4
Vicinity Map
Department of Transportation
PROJECT
SITE
MEETING
LOCATION
Oak
Burke
Station
Oak Bluff Ct.
5. County of Fairfax, Virginia
5
Project Site Map
Department of Transportation
6. County of Fairfax, Virginia
6
Existing Conditions
Department of Transportation
7. County of Fairfax, Virginia
7
Existing Conditions
Department of Transportation
8. County of Fairfax, Virginia
8
Existing Conditions
Department of Transportation
9. County of Fairfax, Virginia
9
• Pedestrian and Bicycle
Improvements
– Connectivity
– ADA Compliance
– Safety
– Public Facility
• Other Improvements
– New Pavement
– Retaining Wall(s)
– Drainage System
Purpose & Need
Department of Transportation
10. County of Fairfax, Virginia
10
Department of Transportation
Part 1
• 10’ Asphalt Shared Use Path
– Connection Points
– Alignment
– Retaining Wall
– Drainage
– Signage/Vehicular Traffic
– Easements
11. County of Fairfax, Virginia
11
Department of Transportation
Part 1 Typical Section
12. County of Fairfax, Virginia
12
Department of Transportation
Part 2
• 5’ Concrete Sidewalk
– Mill & Overlay Existing Parking Lot
– Mill & Overlay
Premier Ct.
– Parking
Spaces
– Speed
Humps &
Sharrows
– Storm Sewer
13. County of Fairfax, Virginia
13
Department of Transportation
Part 2 Typical Section
14. County of Fairfax, Virginia
14
Department of Transportation
Part 3
• Sharrows placed every 250’
Sharrows (Typical)
(VA Supplement to the 2009 MUTCD – Revision 1)
15. County of Fairfax, Virginia
15
• Redevelopment and Housing Authority
– Wooded Area
– Summit Oaks Apartments
• Burke Centre Conservancy
– Wooded Area
– Maintenance Facility, Parking
• HSM, LLC
– Wooded Area
– Recycling Center, Gyms, Parking
Property Owners
Department of Transportation
16. County of Fairfax, Virginia
16
Anticipated Schedule
• Pre-Final Design: Summer 2017
• Begin Right of Way: Winter 2017-18
• Final Design Approval: Fall 2018
• Bid Advertisement & Award: Spring 2019
• Begin Construction: Summer 2019
Department of Transportation
17. County of Fairfax, Virginia
17
Questions?
Department of Transportation
Scott.Ruffner@fairfaxcounty.gov