CDS COMBUSTION INCINERATOR
& PLANT SYSTEM FOR MEDICAL WASTE
INNOVATIVE WASTE COMBUSTION TECHNOLOGY
Mr. EVAN RYU (Overseas Marketing) / +82 10 6357 1398 / evanryu79@gmail.com
#1218 Rosedeil Office, 724 Suseo-dong Gangnam-gu Seoul, Republic of Korea
1
INTRODUCING OUR TECHNOLOGY
Innovative AIR-COUTAIN combustion system:
Over 40 years’ study on combustion system, Mr. Kim brothers invented innovative combustion system
which has more than 90% efficiency with our AIR-CURTIAN technology. This AIR-COURTAIN prevent
burning heat come out of chamber, and let the burning heat go around inside so the inside heat
temperature can go up to 2,000 degrees(C).
 This technology makes many kinds of FIRE RETARDANT WASTE and MEDICAL WASTE burn out
almost complete combustion. (Over 90% energy efficiency)
< Concept features of our patent AIR-CURTAIN combustion system >
The air waved curtain let the burning heat circle around in the middle, making all the waste completely combusted.
< The CDS system in the whole waste Combustion & Energize process >
 Over the whole waste(ex: for medical) combustion, our CDS system(A) will take the smallest install space
among all the other combustion chambers
 In the section (B), you can install steam boiler system and electricity generator plant facility.
2
WHY OUR WASTE COMBUSTION SYSTEM EXCEED OTHERS?
Our patent air-curtain combustion system extremely exceeds
all the other conventional combustion systems like STOKER combustion.
 No need for firebricks in the combustion system
 No emission of noxious gases, smoke & odour
 No large space to install the system
 No clinker comes out after the burn
 Over 90% burn-out of waste
< WORLDWIDE PATENT in waste combustion system >
The patents for our system is registered over 12 countries: Korea, USA, Canada, Japan, China,
German, France, Switzerland, Russia, Australia, New Zealand, Hong Kong
Some facts comparing with other combustion systems
This table is relative evaluation for combusting same amount and type of waste
For the Chamber size comparison: Supposing the size of CDS combustor is ‘1’
3
Medical Waste Incinerator & Energy Plant
BIO HAZARD & FIRE RETADANT WASTES
 How to dispose Cost-efficiently & Environmental-friendly & Energy reuse
Our Medical Waste combustion system
5 tons for 10 Hours / Temperature up to 2,000 degrees Celsius or more
Volume of controlled burn medical wastes with a capacity of
 5 tons per day for 10 hours to burn in the combustion (300kg per hour)
 temperature range up to 2000 degrees Celsius or more
No need of FIREBRICKS due to our innovative air-curtain technology
Incinerator does not need the firebricks inside the burner because of air-curtain between the pillar of
fire and the wall of the burner.
Incinerator machine has a good efficiency up to 90%
Virtually smoke and odour free.
Rapid warm up to operating temperature and Easy-to-Operate system
The medical waste is burning by itself without oil and possible to see the inside by window on the
incinerator.
Our system can burn the wastes without oil during burning. Just supply the air contained oxygen into
the combustor by motor. But on the starting time, use just few oil for starting. In the future the thermal
energy from the combustion system can supply to any other place where need the steam energy like
house, factory, building, school, hospital or company. It needs to attach the turbine system. It can change
the electrical energy also. So the Medical wastes can change to energy. The turbine system attached
refer to the below picture.
4
< Possible Power Plant structure with our CDS combustion system >
 The Combustor has been designed to have a good transfer oxygen system. The combustor
can heat up to 2,000 degree Celsius. Due to the high temperature, the pollution gas
emission is very little. Inside of combustor doesn’t need firebricks on the inside wall so it
can make faster cooling and starting than other types.
 Light ash residuals from the burning can be used to fill land.
 Fuel energy saving (without Oil or other Fuel during burning) and can make the Electronic
Power if connected the turbine system in the future. Enhance the quality of life for members
of the community as a result of good health and safe from direct and indirect harms of waste.
< POSSIBLE SPECIFICATION OF POWER PLANT WITH CDS SYSTEM>
The actual specification and detail system requirements are depending on situation
NO 5 TON / DAY SPECIFICATION
1 Model(CDS-5000) 5 Tons per day(10 hours)
2 IN-PUT Capacity 25KVA,MAX.(25KW)
3 IN-PUT Voltage 380Vх3∅х4Cable
4 IN-PUT Current 35A,MAX.
5 Duty Cycle 100%
6 First Burning Chamber 0.95 ㎥(=125kg)
7 Second Burning Room
8 Third Burning & Cooling Room
9 Scattering Dust Cyclone
10 FD FAN 30HPх380Vх3Ø(50Hz)
11 Operating Controller Inverter-20kw
12 Temperature Sensor A'ssy 2000°C, MAX.
13 Burning System Base
14 Burning Capacity MAX 125kg / 1chamber
15 Burning Time Average 30min.
16 Operating Capacity 5,000kg/Day(10h)
17 Price To be discussed (Around 220,000 USD / Ex-Work)

More Related Content

What's hot

Accelerate ad 3 - WEB
Accelerate ad 3 - WEBAccelerate ad 3 - WEB
Accelerate ad 3 - WEB
laurettalynne
 
Technip Large Scale Vortex™ Burner Flyer V06-09-2013
Technip Large Scale Vortex™ Burner Flyer V06-09-2013Technip Large Scale Vortex™ Burner Flyer V06-09-2013
Technip Large Scale Vortex™ Burner Flyer V06-09-2013
Jan A. de Jager
 
160425_ITM_Image_brochure_eng
160425_ITM_Image_brochure_eng160425_ITM_Image_brochure_eng
160425_ITM_Image_brochure_eng
Daniel Ruell
 
Main features of lignite coal fired boiler
Main features of lignite coal fired boilerMain features of lignite coal fired boiler
Main features of lignite coal fired boiler
zgboilers
 

What's hot (20)

Soft stop optimal trajectory control for improved performance of the series r...
Soft stop optimal trajectory control for improved performance of the series r...Soft stop optimal trajectory control for improved performance of the series r...
Soft stop optimal trajectory control for improved performance of the series r...
 
DTS-i
DTS-iDTS-i
DTS-i
 
Accelerate ad 3 - WEB
Accelerate ad 3 - WEBAccelerate ad 3 - WEB
Accelerate ad 3 - WEB
 
700 watt new marihuana unit specification with changable lighting system
700 watt new marihuana unit specification with changable lighting system 700 watt new marihuana unit specification with changable lighting system
700 watt new marihuana unit specification with changable lighting system
 
Aepl solar thermal germany
Aepl solar thermal germanyAepl solar thermal germany
Aepl solar thermal germany
 
Livestock and Poultry Presentation1.pptx Final Draft
Livestock and Poultry Presentation1.pptx Final DraftLivestock and Poultry Presentation1.pptx Final Draft
Livestock and Poultry Presentation1.pptx Final Draft
 
Technip Large Scale Vortex™ Burner Flyer V06-09-2013
Technip Large Scale Vortex™ Burner Flyer V06-09-2013Technip Large Scale Vortex™ Burner Flyer V06-09-2013
Technip Large Scale Vortex™ Burner Flyer V06-09-2013
 
160425_ITM_Image_brochure_eng
160425_ITM_Image_brochure_eng160425_ITM_Image_brochure_eng
160425_ITM_Image_brochure_eng
 
Reduce Energy Consumption with LED Lighting, Co-generation, & Wireless Automa...
Reduce Energy Consumption with LED Lighting, Co-generation, & Wireless Automa...Reduce Energy Consumption with LED Lighting, Co-generation, & Wireless Automa...
Reduce Energy Consumption with LED Lighting, Co-generation, & Wireless Automa...
 
BAIYILED LSA LED HIGH CEILING LUMINAIRE
BAIYILED LSA LED HIGH CEILING LUMINAIREBAIYILED LSA LED HIGH CEILING LUMINAIRE
BAIYILED LSA LED HIGH CEILING LUMINAIRE
 
P Sundelin: Econet - matalaenergiajärjestelmä ilmanvaihtoon
P Sundelin: Econet - matalaenergiajärjestelmä ilmanvaihtoonP Sundelin: Econet - matalaenergiajärjestelmä ilmanvaihtoon
P Sundelin: Econet - matalaenergiajärjestelmä ilmanvaihtoon
 
Eco Model
Eco ModelEco Model
Eco Model
 
Viessmann biomass brochure
Viessmann   biomass brochureViessmann   biomass brochure
Viessmann biomass brochure
 
Energyes division ener termopac line 2015 ev v02
Energyes division ener termopac line 2015 ev v02Energyes division ener termopac line 2015 ev v02
Energyes division ener termopac line 2015 ev v02
 
Sowbal Intro new PPT-EME (2A-1
Sowbal  Intro  new  PPT-EME (2A-1Sowbal  Intro  new  PPT-EME (2A-1
Sowbal Intro new PPT-EME (2A-1
 
Main features of lignite coal fired boiler
Main features of lignite coal fired boilerMain features of lignite coal fired boiler
Main features of lignite coal fired boiler
 
Samsung ehs catalogue
Samsung ehs catalogueSamsung ehs catalogue
Samsung ehs catalogue
 
Introduction to induction heating by stead fast engineers pvt ltd
Introduction to induction heating by stead fast engineers pvt ltdIntroduction to induction heating by stead fast engineers pvt ltd
Introduction to induction heating by stead fast engineers pvt ltd
 
Verdicorp Brochure
Verdicorp BrochureVerdicorp Brochure
Verdicorp Brochure
 
Biomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWth
Biomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWthBiomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWth
Biomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWth
 

Similar to Innovative waste combustion system with global patent AIR-CURTAIN technology : CDS incinerator

Super inverter epcen08 114-catalogues_english (2)
Super inverter epcen08 114-catalogues_english (2)Super inverter epcen08 114-catalogues_english (2)
Super inverter epcen08 114-catalogues_english (2)
Henry Hollands
 
On-line Heater & Boiler Chemical Cleaning Technology
On-line Heater & Boiler Chemical Cleaning TechnologyOn-line Heater & Boiler Chemical Cleaning Technology
On-line Heater & Boiler Chemical Cleaning Technology
GTC Technology
 

Similar to Innovative waste combustion system with global patent AIR-CURTAIN technology : CDS incinerator (20)

Boilers & Boiler Accessories By Bright Engineering
Boilers & Boiler Accessories By Bright EngineeringBoilers & Boiler Accessories By Bright Engineering
Boilers & Boiler Accessories By Bright Engineering
 
Kalsi industries
Kalsi industriesKalsi industries
Kalsi industries
 
Super inverter epcen08 114-catalogues_english (2)
Super inverter epcen08 114-catalogues_english (2)Super inverter epcen08 114-catalogues_english (2)
Super inverter epcen08 114-catalogues_english (2)
 
O2E Wood Recycling
O2E Wood RecyclingO2E Wood Recycling
O2E Wood Recycling
 
Daikin heating and renewables brochure
Daikin heating and renewables brochureDaikin heating and renewables brochure
Daikin heating and renewables brochure
 
Infrared Heating System
Infrared Heating SystemInfrared Heating System
Infrared Heating System
 
EXHEAT - Hazardous Area Process Heaters (Zone 1 & Zone 2) - Brochure
EXHEAT - Hazardous Area Process Heaters (Zone 1 & Zone 2) - BrochureEXHEAT - Hazardous Area Process Heaters (Zone 1 & Zone 2) - Brochure
EXHEAT - Hazardous Area Process Heaters (Zone 1 & Zone 2) - Brochure
 
Isotex Corporation Pvt Ltd, Ahmedabad, Thermic Fluid Heaters
Isotex Corporation Pvt Ltd, Ahmedabad, Thermic Fluid HeatersIsotex Corporation Pvt Ltd, Ahmedabad, Thermic Fluid Heaters
Isotex Corporation Pvt Ltd, Ahmedabad, Thermic Fluid Heaters
 
Microwave Heating Systems
Microwave Heating SystemsMicrowave Heating Systems
Microwave Heating Systems
 
Conserve energy
Conserve energyConserve energy
Conserve energy
 
Kerone Engineering Solutions Limited
Kerone Engineering Solutions LimitedKerone Engineering Solutions Limited
Kerone Engineering Solutions Limited
 
IDEALIN FOGGING SYSTEMS : FOGMAX Humidifier
IDEALIN FOGGING SYSTEMS : FOGMAX HumidifierIDEALIN FOGGING SYSTEMS : FOGMAX Humidifier
IDEALIN FOGGING SYSTEMS : FOGMAX Humidifier
 
HEAT TREATMENT: precision fumigation with benefits
HEAT TREATMENT: precision fumigation with benefitsHEAT TREATMENT: precision fumigation with benefits
HEAT TREATMENT: precision fumigation with benefits
 
Gard analytics DOE energy modeling
Gard analytics DOE energy modelingGard analytics DOE energy modeling
Gard analytics DOE energy modeling
 
CDS R-02 Presentation
CDS R-02 PresentationCDS R-02 Presentation
CDS R-02 Presentation
 
ThermaQ Innovative Heating System overview
ThermaQ Innovative Heating System overviewThermaQ Innovative Heating System overview
ThermaQ Innovative Heating System overview
 
On-line Heater & Boiler Chemical Cleaning Technology
On-line Heater & Boiler Chemical Cleaning TechnologyOn-line Heater & Boiler Chemical Cleaning Technology
On-line Heater & Boiler Chemical Cleaning Technology
 
Combined heat power plant (chp)
Combined heat power plant (chp)Combined heat power plant (chp)
Combined heat power plant (chp)
 
Window Air Conditioners
Window Air ConditionersWindow Air Conditioners
Window Air Conditioners
 
Selas Energy Solutions
Selas Energy SolutionsSelas Energy Solutions
Selas Energy Solutions
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Recently uploaded (20)

Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 

Innovative waste combustion system with global patent AIR-CURTAIN technology : CDS incinerator

  • 1. 0 CDS COMBUSTION INCINERATOR & PLANT SYSTEM FOR MEDICAL WASTE INNOVATIVE WASTE COMBUSTION TECHNOLOGY Mr. EVAN RYU (Overseas Marketing) / +82 10 6357 1398 / evanryu79@gmail.com #1218 Rosedeil Office, 724 Suseo-dong Gangnam-gu Seoul, Republic of Korea
  • 2. 1 INTRODUCING OUR TECHNOLOGY Innovative AIR-COUTAIN combustion system: Over 40 years’ study on combustion system, Mr. Kim brothers invented innovative combustion system which has more than 90% efficiency with our AIR-CURTIAN technology. This AIR-COURTAIN prevent burning heat come out of chamber, and let the burning heat go around inside so the inside heat temperature can go up to 2,000 degrees(C).  This technology makes many kinds of FIRE RETARDANT WASTE and MEDICAL WASTE burn out almost complete combustion. (Over 90% energy efficiency) < Concept features of our patent AIR-CURTAIN combustion system > The air waved curtain let the burning heat circle around in the middle, making all the waste completely combusted. < The CDS system in the whole waste Combustion & Energize process >  Over the whole waste(ex: for medical) combustion, our CDS system(A) will take the smallest install space among all the other combustion chambers  In the section (B), you can install steam boiler system and electricity generator plant facility.
  • 3. 2 WHY OUR WASTE COMBUSTION SYSTEM EXCEED OTHERS? Our patent air-curtain combustion system extremely exceeds all the other conventional combustion systems like STOKER combustion.  No need for firebricks in the combustion system  No emission of noxious gases, smoke & odour  No large space to install the system  No clinker comes out after the burn  Over 90% burn-out of waste < WORLDWIDE PATENT in waste combustion system > The patents for our system is registered over 12 countries: Korea, USA, Canada, Japan, China, German, France, Switzerland, Russia, Australia, New Zealand, Hong Kong Some facts comparing with other combustion systems This table is relative evaluation for combusting same amount and type of waste For the Chamber size comparison: Supposing the size of CDS combustor is ‘1’
  • 4. 3 Medical Waste Incinerator & Energy Plant BIO HAZARD & FIRE RETADANT WASTES  How to dispose Cost-efficiently & Environmental-friendly & Energy reuse Our Medical Waste combustion system 5 tons for 10 Hours / Temperature up to 2,000 degrees Celsius or more Volume of controlled burn medical wastes with a capacity of  5 tons per day for 10 hours to burn in the combustion (300kg per hour)  temperature range up to 2000 degrees Celsius or more No need of FIREBRICKS due to our innovative air-curtain technology Incinerator does not need the firebricks inside the burner because of air-curtain between the pillar of fire and the wall of the burner. Incinerator machine has a good efficiency up to 90% Virtually smoke and odour free. Rapid warm up to operating temperature and Easy-to-Operate system The medical waste is burning by itself without oil and possible to see the inside by window on the incinerator. Our system can burn the wastes without oil during burning. Just supply the air contained oxygen into the combustor by motor. But on the starting time, use just few oil for starting. In the future the thermal energy from the combustion system can supply to any other place where need the steam energy like house, factory, building, school, hospital or company. It needs to attach the turbine system. It can change the electrical energy also. So the Medical wastes can change to energy. The turbine system attached refer to the below picture.
  • 5. 4 < Possible Power Plant structure with our CDS combustion system >  The Combustor has been designed to have a good transfer oxygen system. The combustor can heat up to 2,000 degree Celsius. Due to the high temperature, the pollution gas emission is very little. Inside of combustor doesn’t need firebricks on the inside wall so it can make faster cooling and starting than other types.  Light ash residuals from the burning can be used to fill land.  Fuel energy saving (without Oil or other Fuel during burning) and can make the Electronic Power if connected the turbine system in the future. Enhance the quality of life for members of the community as a result of good health and safe from direct and indirect harms of waste. < POSSIBLE SPECIFICATION OF POWER PLANT WITH CDS SYSTEM> The actual specification and detail system requirements are depending on situation NO 5 TON / DAY SPECIFICATION 1 Model(CDS-5000) 5 Tons per day(10 hours) 2 IN-PUT Capacity 25KVA,MAX.(25KW) 3 IN-PUT Voltage 380Vх3∅х4Cable 4 IN-PUT Current 35A,MAX. 5 Duty Cycle 100% 6 First Burning Chamber 0.95 ㎥(=125kg) 7 Second Burning Room 8 Third Burning & Cooling Room 9 Scattering Dust Cyclone 10 FD FAN 30HPх380Vх3Ø(50Hz) 11 Operating Controller Inverter-20kw 12 Temperature Sensor A'ssy 2000°C, MAX. 13 Burning System Base 14 Burning Capacity MAX 125kg / 1chamber 15 Burning Time Average 30min. 16 Operating Capacity 5,000kg/Day(10h) 17 Price To be discussed (Around 220,000 USD / Ex-Work)