Congress 2012: Building Trust in the Cloud: Working Towards Global Standards – Margot Dor

261 views

Published on

Tuesday 11:25 presentation by Margot Dor, Strategy Development, ETSI

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
261
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Congress 2012: Building Trust in the Cloud: Working Towards Global Standards – Margot Dor

  1. 1. CLOUD STANDARDS COORDINATION MARGOT DOR, ETSI EUROCLOUD CONGRESS 20121
  2. 2. ETSI ― ICT standards organization based in France ― Telecoms, IT and « ICT inside » e.g. transports, mobile payments, smart grids, etc ― Global membership (760 Members/62 countries) with direct participation ― “Made in EU for global use”  enabler of a series of worldwide industrial hits ― Partnership is the preferred way (3GPP, M2M…) ― Interoperability (CTI)
  3. 3. Membership Associate
  4. 4. EC Communication (Sept. 2012)  Legal Framework  Contractual issues  A « jungle of standards » « (…) tasking ETSI to coordinate with stakeholders (…) to identify by 2013 a detailed map of the necessary standards inter alia for security, interoperability, data portability and reversibility »4
  5. 5. Cloud Standards Coordination  Launch on December 4-5, in Cannes (France)  Coordination - production comes later/dispatched  Openness & participation  CTI and TCs (Cloud, LI, EE, ESI) are the technical kernel  Roadmap standards in support of policy-specific and timed5
  6. 6. Launchpad: rough sketch Plenary: Setting the scene IDATE, EC, ETSI Breakout 1 Breakout 2 Day 1 Security & Privacy Interoperability Dec. 4 Co faciliatators: xxxx Co-F: Board xxxx Rapporteur: xxx Rapp: xxxx Social event Keynote (?) Breakout 3 Breakout 4 Breakout 5 Data portability SLAs Reversibility Day 2 Co-F: Board xxxx Co-F: xxxx Co-F: xxxx Dec. 5 Rapp: xxxx Rapp: Eurocloud Rapp: xxx Plenary (Chair xxxx) Report breakouts (rapporteurs) Roadmapping Next steps incl; WGs, organization etc  ACTION!6
  7. 7. Take away →The toughest part starts on Dec 5 @ 5pm →Output depends on participation (open) and quality of requirements7

×