1. Eslam Mohamed Mustafa
1,Ahmed lakooz St. , zagazig , Elsharkia ,Egypt.
EGYPT Cell1: +201222478080 Cell2: +201016867079
IRAQ CELL3: +9647830101640
Eslam.mostafa.1982@gmail.com
Mechanical Power Engineer
Highly analytical, Performance-driven engineering professional with 6+ years'
experience, Cost-efficient designs. Expertise in applied research, new
concept development, Simulation, and validation. Superior problem-solving
and time-management abilities. Team spirited with effective communication
and presentation skills. Proficient with AutoCAD, solid works , Microsoft
project, MS Office (ICDL), Primavera.
Research& design strengths
• Design, analysis, and validation
• Projectqualification planning
• Manufacturing requirement specification
• Safety compliance
• Process analysis
PROFESSIONAL EXPERIENCE
THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.)
Ω Basrah Water Supply Improvement Project (BWSIP-package 3 &4)
From 1ST JAN 2016 until now with capacity 200000 Meter cube per day with UF-RO system
worked as a mechanical engineer for all process buildings .
THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.)
FROM 1 ST OF JULY 2014 SINCE 1st JANΩ Al- DIWANYA POWER PLANT
(4*125)MW IN IRAQ2016
ʘ INSTALL WATER TREATMENT PLANT (UF – RO) SYSTEM PRODUCE 100 M³/H DEMIN
WATER FOR COOLING TURBINES AND POTABLE WATER FOR DRINKING AND TREATMENT
SYSTEM SUPPLYING By GE (GENERA L ELECTRIC WATER COMPANY ).
ʘ WASTE AND SAINNATRY WATER TREATMENT PLANT BY GE
ʘ STEEL STRUCTURE BUILDINGS
ʘ INSTALL FIRE FIGHTING SYSTEM INCLUDING ELECTRICAL AND JOKI and diesel PUMPS
supplied by Patterson company AND THE SYSTEM IN ALL BUILDING AND TRANSFORMERS.
2. THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.)
Mechanical&Electrical Project Division. 2013 – since 30 JUNE 2014
Director of Electromechanical works in WTP {ABOTESHT Plant 1200 l/s} – { DAR EL SALAM
Plant 1400 l/s}
THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.)
Mechanical&Electrical Project Division. 2010 – 2013
Mechanical site engineer (Bellies water treatment station 2400 l/s)
Studying the Site correctly, review the units drawings, then studying the Technical
Specification and Bill of quantities, comparing it with Design drawing. If there are
any divisions I draw as built drawing and install it.
I install water treatment components as:
• Intake building with mechanical screen.
• Raw water pumping station ( 8 centrifugal pumps 660 l/s at 12 m head with
suction and delivery pipes and valves and special pieces ).
• Flocculation building (flash mixer – slow mixer –scrappers –pumping systems).
• Filters House Equipment (22 unit filter media with operating desk –control
butterfly valves-Complete system Air blowers-pneumatic systems complete with
compressor, tanks, other accessories –backwash pumps-control room equipment.
• Underground reservoir building.
• Chlorination building.
• Alum building
• Treated water pumping station
• GENRATOR building
I install this site as electromechanical engineer .I'm experienced in plumbing and
network pipes,. I install this site as a turnkey .I did everything in this site with my
good efficient group so ,I have a good experience with water like a fluid .
THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.)
Mechanical&Electrical Project Division. 2009 – 2010
Tanta potable water treatment station 1400 - 2000 l/s
Mechanical site engineer
I install this site as electromechanical engineer .I'm experienced in plumbing and
network pipes,. I install this site as a turnkey .I did everything in this site with my
good efficient group.
3. 2009-2008Environmental civil engineering consulting center (ENVIRO CIVEC)
DESIGN AND SUPERVISOR ENGINEER
• New Cairo waste water pumping stations
• Abu Rawash waste water treatment planet
• El Tal Elkber -Elbakarsha Waste water pumping station
• Samalot potable water treatment planet
• 15 of May potable water pumping station
AL-REHAB CITY _ MADINTY CITY 2007 - 2008
Piping, plumping and HVAC system
Fire fighting systems
EDUCATION ASSOCIATION
Bachelor of science in Mechanical Power Engineering (BSMPE), 2006
Zagazig University,Elsharkya , Egypt.
Cumulative grade: Pass
Professional Development:
~ Advanced Design in Fluid Mechanics
~ Heat Transfer and Thermodynamics Simulation
Courses & Training :
• Take OSHA safety course ( March - 2011 )
• ICDL Certification (November - 2008)
• TOEFL Certification test (April – 2010 )
• (Institute for Construction Engineering and
Management) :
• Preparation and Rehabilitation of a Modern Mechanics and Electricity
Engineer
• (1st
stage 2/5/2011 – 12/5/2011 )
(2nd
stage 2/10/2011-13/10/2011)
(3rd
stage 11/12/2011-22/12/2011)
• Centrifugal Pumps ( 19/10/2011- 20/10/2011)
• ALLIMENT OF PUMPS