SlideShare a Scribd company logo
1 of 3
Download to read offline
Eslam Mohamed Mustafa
1,Ahmed lakooz St. , zagazig , Elsharkia ,Egypt.
EGYPT Cell1: +201222478080 Cell2: +201016867079
IRAQ CELL3: +9647830101640
Eslam.mostafa.1982@gmail.com
Mechanical Power Engineer
Highly analytical, Performance-driven engineering professional with 6+ years'
experience, Cost-efficient designs. Expertise in applied research, new
concept development, Simulation, and validation. Superior problem-solving
and time-management abilities. Team spirited with effective communication
and presentation skills. Proficient with AutoCAD, solid works , Microsoft
project, MS Office (ICDL), Primavera.
Research& design strengths
• Design, analysis, and validation
• Projectqualification planning
• Manufacturing requirement  specification
• Safety compliance
• Process analysis
PROFESSIONAL EXPERIENCE
THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.)
Ω Basrah Water Supply Improvement Project (BWSIP-package 3 &4)
From 1ST JAN 2016 until now with capacity 200000 Meter cube per day with UF-RO system
worked as a mechanical engineer for all process buildings .
THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.)
FROM 1 ST OF JULY 2014 SINCE 1st JANΩ Al- DIWANYA POWER PLANT
(4*125)MW IN IRAQ2016
ʘ INSTALL WATER TREATMENT PLANT (UF – RO) SYSTEM PRODUCE 100 M³/H DEMIN
WATER FOR COOLING TURBINES AND POTABLE WATER FOR DRINKING AND TREATMENT
SYSTEM SUPPLYING By GE (GENERA L ELECTRIC WATER COMPANY ).
ʘ WASTE AND SAINNATRY WATER TREATMENT PLANT BY GE
ʘ STEEL STRUCTURE BUILDINGS
ʘ INSTALL FIRE FIGHTING SYSTEM INCLUDING ELECTRICAL AND JOKI and diesel PUMPS
supplied by Patterson company AND THE SYSTEM IN ALL BUILDING AND TRANSFORMERS.
THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.)
Mechanical&Electrical Project Division. 2013 – since 30 JUNE 2014
Director of Electromechanical works in WTP {ABOTESHT Plant 1200 l/s} – { DAR EL SALAM
Plant 1400 l/s}
THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.)
Mechanical&Electrical Project Division. 2010 – 2013
Mechanical site engineer (Bellies water treatment station 2400 l/s)
Studying the Site correctly, review the units drawings, then studying the Technical
Specification and Bill of quantities, comparing it with Design drawing. If there are
any divisions I draw as built drawing and install it.
I install water treatment components as:
• Intake building with mechanical screen.
• Raw water pumping station ( 8 centrifugal pumps 660 l/s at 12 m head with
suction and delivery pipes and valves and special pieces ).
• Flocculation building (flash mixer – slow mixer –scrappers –pumping systems).
• Filters House Equipment (22 unit filter media with operating desk –control
butterfly valves-Complete system Air blowers-pneumatic systems complete with
compressor, tanks, other accessories –backwash pumps-control room equipment.
• Underground reservoir building.
• Chlorination building.
• Alum building
• Treated water pumping station
• GENRATOR building
I install this site as electromechanical engineer .I'm experienced in plumbing and
network pipes,. I install this site as a turnkey .I did everything in this site with my
good efficient group so ,I have a good experience with water like a fluid .
THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.)
Mechanical&Electrical Project Division. 2009 – 2010
Tanta potable water treatment station 1400 - 2000 l/s
Mechanical site engineer
I install this site as electromechanical engineer .I'm experienced in plumbing and
network pipes,. I install this site as a turnkey .I did everything in this site with my
good efficient group.
2009-2008Environmental civil engineering consulting center (ENVIRO CIVEC)
DESIGN AND SUPERVISOR ENGINEER
• New Cairo waste water pumping stations
• Abu Rawash waste water treatment planet
• El Tal Elkber -Elbakarsha Waste water pumping station
• Samalot potable water treatment planet
• 15 of May potable water pumping station
AL-REHAB CITY _ MADINTY CITY 2007 - 2008
Piping, plumping and HVAC system
Fire fighting systems
EDUCATION  ASSOCIATION
Bachelor of science in Mechanical Power Engineering (BSMPE), 2006
Zagazig University,Elsharkya , Egypt.
Cumulative grade: Pass
Professional Development:
~ Advanced Design in Fluid Mechanics
~ Heat Transfer and Thermodynamics Simulation
Courses & Training :
• Take OSHA safety course ( March - 2011 )
• ICDL Certification (November - 2008)
• TOEFL Certification test (April – 2010 )
• (Institute for Construction Engineering and
Management) :
• Preparation and Rehabilitation of a Modern Mechanics and Electricity
Engineer
• (1st
stage 2/5/2011 – 12/5/2011 )
(2nd
stage 2/10/2011-13/10/2011)
(3rd
stage 11/12/2011-22/12/2011)
• Centrifugal Pumps ( 19/10/2011- 20/10/2011)
• ALLIMENT OF PUMPS

More Related Content

What's hot

What's hot (20)

Mohmoud-Abdelrahem----------
Mohmoud-Abdelrahem----------Mohmoud-Abdelrahem----------
Mohmoud-Abdelrahem----------
 
TECHNICAL SKILLS SUMMARY
TECHNICAL SKILLS SUMMARYTECHNICAL SKILLS SUMMARY
TECHNICAL SKILLS SUMMARY
 
CV - Mechanical Engineer
CV - Mechanical EngineerCV - Mechanical Engineer
CV - Mechanical Engineer
 
Ehab
EhabEhab
Ehab
 
CV 2016 .
CV 2016 .CV 2016 .
CV 2016 .
 
RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015
 
SYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUMESYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUME
 
JEFFREY RESUME
JEFFREY RESUMEJEFFREY RESUME
JEFFREY RESUME
 
Islam Emam
Islam EmamIslam Emam
Islam Emam
 
Ali Al-Hamdadah - Resume
Ali Al-Hamdadah - ResumeAli Al-Hamdadah - Resume
Ali Al-Hamdadah - Resume
 
vivekResume
vivekResumevivekResume
vivekResume
 
Electrical Design Engineer
Electrical Design EngineerElectrical Design Engineer
Electrical Design Engineer
 
ali ahmed ali borai CV
ali ahmed ali borai CVali ahmed ali borai CV
ali ahmed ali borai CV
 
Ahmed-shawky
Ahmed-shawkyAhmed-shawky
Ahmed-shawky
 
KBR Projects
KBR ProjectsKBR Projects
KBR Projects
 
CV for Linkedin
CV for LinkedinCV for Linkedin
CV for Linkedin
 
Mohammed ABDELGHANI2015
Mohammed  ABDELGHANI2015Mohammed  ABDELGHANI2015
Mohammed ABDELGHANI2015
 
farhan cv with passport detail
farhan cv with passport detailfarhan cv with passport detail
farhan cv with passport detail
 
Jamil_cv new
Jamil_cv newJamil_cv new
Jamil_cv new
 
Engineer tamer kadry resume
Engineer tamer kadry resumeEngineer tamer kadry resume
Engineer tamer kadry resume
 

Similar to eslam moustafa CV 2016

Similar to eslam moustafa CV 2016 (20)

Eng. Ahmed Maher - Electrical Engineer
Eng. Ahmed Maher - Electrical EngineerEng. Ahmed Maher - Electrical Engineer
Eng. Ahmed Maher - Electrical Engineer
 
Cv sameh selim
Cv   sameh selimCv   sameh selim
Cv sameh selim
 
Ahmad Alfahom CV
Ahmad Alfahom CVAhmad Alfahom CV
Ahmad Alfahom CV
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
Ramy Ansis
Ramy AnsisRamy Ansis
Ramy Ansis
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
My Cv 05-2014
My Cv 05-2014My Cv 05-2014
My Cv 05-2014
 
CV EMAD EN
CV EMAD ENCV EMAD EN
CV EMAD EN
 
Mohamed 3wad
Mohamed 3wadMohamed 3wad
Mohamed 3wad
 
Mostafa Yunis_original
Mostafa Yunis_originalMostafa Yunis_original
Mostafa Yunis_original
 
HVAC design engineer
HVAC design engineerHVAC design engineer
HVAC design engineer
 
Ayman mohamed11 (2)
Ayman mohamed11 (2)Ayman mohamed11 (2)
Ayman mohamed11 (2)
 
Electrical - Sabry Soliman
Electrical - Sabry SolimanElectrical - Sabry Soliman
Electrical - Sabry Soliman
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)
 
Copy of Eng.OMARA CV
Copy of Eng.OMARA CVCopy of Eng.OMARA CV
Copy of Eng.OMARA CV
 
C.V
C.VC.V
C.V
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
 

eslam moustafa CV 2016

  • 1. Eslam Mohamed Mustafa 1,Ahmed lakooz St. , zagazig , Elsharkia ,Egypt. EGYPT Cell1: +201222478080 Cell2: +201016867079 IRAQ CELL3: +9647830101640 Eslam.mostafa.1982@gmail.com Mechanical Power Engineer Highly analytical, Performance-driven engineering professional with 6+ years' experience, Cost-efficient designs. Expertise in applied research, new concept development, Simulation, and validation. Superior problem-solving and time-management abilities. Team spirited with effective communication and presentation skills. Proficient with AutoCAD, solid works , Microsoft project, MS Office (ICDL), Primavera. Research& design strengths • Design, analysis, and validation • Projectqualification planning • Manufacturing requirement specification • Safety compliance • Process analysis PROFESSIONAL EXPERIENCE THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.) Ω Basrah Water Supply Improvement Project (BWSIP-package 3 &4) From 1ST JAN 2016 until now with capacity 200000 Meter cube per day with UF-RO system worked as a mechanical engineer for all process buildings . THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.) FROM 1 ST OF JULY 2014 SINCE 1st JANΩ Al- DIWANYA POWER PLANT (4*125)MW IN IRAQ2016 ʘ INSTALL WATER TREATMENT PLANT (UF – RO) SYSTEM PRODUCE 100 M³/H DEMIN WATER FOR COOLING TURBINES AND POTABLE WATER FOR DRINKING AND TREATMENT SYSTEM SUPPLYING By GE (GENERA L ELECTRIC WATER COMPANY ). ʘ WASTE AND SAINNATRY WATER TREATMENT PLANT BY GE ʘ STEEL STRUCTURE BUILDINGS ʘ INSTALL FIRE FIGHTING SYSTEM INCLUDING ELECTRICAL AND JOKI and diesel PUMPS supplied by Patterson company AND THE SYSTEM IN ALL BUILDING AND TRANSFORMERS.
  • 2. THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.) Mechanical&Electrical Project Division. 2013 – since 30 JUNE 2014 Director of Electromechanical works in WTP {ABOTESHT Plant 1200 l/s} – { DAR EL SALAM Plant 1400 l/s} THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.) Mechanical&Electrical Project Division. 2010 – 2013 Mechanical site engineer (Bellies water treatment station 2400 l/s) Studying the Site correctly, review the units drawings, then studying the Technical Specification and Bill of quantities, comparing it with Design drawing. If there are any divisions I draw as built drawing and install it. I install water treatment components as: • Intake building with mechanical screen. • Raw water pumping station ( 8 centrifugal pumps 660 l/s at 12 m head with suction and delivery pipes and valves and special pieces ). • Flocculation building (flash mixer – slow mixer –scrappers –pumping systems). • Filters House Equipment (22 unit filter media with operating desk –control butterfly valves-Complete system Air blowers-pneumatic systems complete with compressor, tanks, other accessories –backwash pumps-control room equipment. • Underground reservoir building. • Chlorination building. • Alum building • Treated water pumping station • GENRATOR building I install this site as electromechanical engineer .I'm experienced in plumbing and network pipes,. I install this site as a turnkey .I did everything in this site with my good efficient group so ,I have a good experience with water like a fluid . THE ARAB CONTRACTORS (OSMAN AHMED OSMAN &CO.) Mechanical&Electrical Project Division. 2009 – 2010 Tanta potable water treatment station 1400 - 2000 l/s Mechanical site engineer I install this site as electromechanical engineer .I'm experienced in plumbing and network pipes,. I install this site as a turnkey .I did everything in this site with my good efficient group.
  • 3. 2009-2008Environmental civil engineering consulting center (ENVIRO CIVEC) DESIGN AND SUPERVISOR ENGINEER • New Cairo waste water pumping stations • Abu Rawash waste water treatment planet • El Tal Elkber -Elbakarsha Waste water pumping station • Samalot potable water treatment planet • 15 of May potable water pumping station AL-REHAB CITY _ MADINTY CITY 2007 - 2008 Piping, plumping and HVAC system Fire fighting systems EDUCATION ASSOCIATION Bachelor of science in Mechanical Power Engineering (BSMPE), 2006 Zagazig University,Elsharkya , Egypt. Cumulative grade: Pass Professional Development: ~ Advanced Design in Fluid Mechanics ~ Heat Transfer and Thermodynamics Simulation Courses & Training : • Take OSHA safety course ( March - 2011 ) • ICDL Certification (November - 2008) • TOEFL Certification test (April – 2010 ) • (Institute for Construction Engineering and Management) : • Preparation and Rehabilitation of a Modern Mechanics and Electricity Engineer • (1st stage 2/5/2011 – 12/5/2011 ) (2nd stage 2/10/2011-13/10/2011) (3rd stage 11/12/2011-22/12/2011) • Centrifugal Pumps ( 19/10/2011- 20/10/2011) • ALLIMENT OF PUMPS