SlideShare a Scribd company logo
1 of 6
Week 1—Episode 1 Who is needed Dates and Times Food Location Extra Information
Monday Directors, Producers, Filming Crew
09/10/17
10am-4pm
Food will be provided at
each location for all during
lunch time, between 12pm
to 1pm.
A catering company will be
hired in order to ensure
that everyone's needs are
met, for example, those
who are vegan, vegetarian,
etc.
This will also cut costs,
saving people from going
to different places for
lunch, as well as ensuring
that everyone stays on
location and are ready to
start work again once
lunch ends.
Studio—Liverpool Film Studios (L5
9YJ)
Planning and prepping the scenes for shooting
on Day 3.
As well as reviewing the script and making
changes (mostly to direction) to fit the design of
the studio.
Tuesday Directors, Producers, Filming Crew
10/10/17
10am-4pm
School Location—Deyes High
School
Getting shots for transitions during editing,
planning shooting for Day 4.
Wednesday
Two main characters
Film Crew, Hair and Makeup, Producers
and Directors
11/10/17
From 10am—4pm
Studio—Liverpool Film Studios (L5
9YJ)
Homes for both boys
Half day used to shoot Wyatt’s home scenes,
second half used to shoot Jamie’s home scenes.
Thursday
Main characters
Extras for school shots, e.g. within
classrooms, at lunch time, etc.
Film Crew, Hair and Makeup, Producers
and Directors
12/10/17
7am—2pm
School Location— Deyes High
School
Parts of the schools will be cordoned off.
All cast will be present for 7am to avoid rush of
children entering school.
Friday
Make all cast available to finish off shoots
if needed (Contingency)
13/10/17
Studio—Liverpool Film Studios (L5
9YJ)
Or
School Location—Deyes High
School
Analyse footage and see if we have everything
we need, if not use Friday to catch up/fix or
refilm any scenes that need to be done.
Emma Fraser - P2(E)
Week 2—Episode 2 Who is needed Dates and Times Food Location Extra Information
Monday Directors, Producers, Filming Crew
16/10/17
10am-4pm
Food will be provided at
each location for all
during lunch time,
between 12pm to 1pm.
A catering company will
be hired in order to
ensure that everyone's
needs are met, for
example, those who are
vegan, vegetarian, etc.
This will also cut costs,
saving people from going
to different places for
lunch, as well as
ensuring that everyone
stays on location and are
ready to start work again
once lunch ends.
Studio—Liverpool Film Studios
(L5 9YJ)
Planning and prepping the scenes for
shooting on Day 4.
As well as reviewing the script and making
changes (mostly to direction) to fit the
design of the studio.
Tuesday Directors, Producers, Filming Crew
17/10/17
10am-4pm
School Location—Deyes High
School
Getting shots for transitions during editing,
planning shooting for Day 3.
Wednesday
Two main characters
Extras for school shots, e.g. within
classrooms, at lunch time, etc.
Film Crew, Hair and Makeup, Producers
and Directors
18/10/17
7am—2pm
School Location— Deyes High
School
Parts of the schools will be cordoned off.
All cast will be present for 7am to avoid rush
of children entering school.
Canteen scene shot—with many extras
Thursday
Two main characters
Extras for school shots, e.g. within
classrooms, at lunch time, etc.
Film Crew, Hair and Makeup, Producers
and Directors
19/10/17
7am—2pm
School Location— Deyes High
School
Parts of the schools will be cordoned off.
All cast will be present for 7am to avoid rush
of children entering school.
Classroom scenes shot—15 other extras to
make up class, including teacher.
Friday
Extras for Politicians to film news scene
announcing the new laws to be
enforced.
Make all cast available to finish off
shoots if needed (Contingency)
20/10/17
10am-4pm
Studio—Liverpool Film Studios
(L5 9YJ) - Definite for shooting
news scene
Or
School Location—Deyes High
School (if needed)
Analyse footage and see if we have
everything we need, if not use Friday to
catch up/fix or refilm any scenes that need
to be done.
Emma Fraser - P2(E)
Week 3—Episode 3 Who is needed Dates and Times Food Location Extra Information
Monday Directors, Producers, Filming Crew
23/10/17
10am-4pm
Food will be provided at
each location for all
during lunch time,
between 12pm to 1pm.
A catering company will
be hired in order to
ensure that everyone's
needs are met, for
example, those who are
vegan, vegetarian, etc.
This will also cut costs,
saving people from going
to different places for
lunch, as well as ensuring
that everyone stays on
location and are ready to
start work again once
lunch ends.
Studio—Liverpool Film Studios
(L5 9YJ)
Planning and prepping the scenes for
shooting on Day 3.
As well as reviewing the script and making
changes (mostly to direction) to fit the design
of the studio.
Tuesday Directors, Producers, Filming Crew
24/10/17
10am-4pm
School Location—Deyes High
School
Getting shots for transitions during editing,
planning shooting for Day 4.
Wednesday
Two main characters
Film Crew, Hair and Makeup, Producers
and Directors
25/10/17
From 10am—4pm
Studio—Liverpool Film Studios
(L5 9YJ)
Homes for both boys
Filming scene in the bedroom where boys
discover the laws have been changed.
Scenes of them talking about attacking their
school.
Thursday
Main characters
Extras for school shots, e.g. within
classrooms, at lunch time, etc.
Film Crew, Hair and Makeup, Producers
and Directors
26/10/17
7am—2pm
School Location— Deyes High
School
Parts of the schools will be cordoned off.
All cast will be present for 7am to avoid rush
of children entering school.
Filming scenes in different parts of the
school, e.g. Library, Science Labs,
Classrooms, etc.
Friday
Make all cast available to finish off
shoots if needed (Contingency)
27/10/17
Studio—Liverpool Film Studios
(L5 9YJ)
Or
School Location—Deyes High
School
Analyse footage and see if we have
everything we need, if not use Friday to
catch up/fix or refilm any scenes that need to
be done.
Emma Fraser - P2(E)
Week 4—Episode 4 Who is needed Dates and Times Food Location Extra Information
Monday Directors, Producers, Filming Crew
30/10/17
10am-4pm
Food will be provided at
each location for all
during lunch time,
between 12pm to 1pm.
A catering company will
be hired in order to
ensure that everyone's
needs are met, for
example, those who are
vegan, vegetarian, etc.
This will also cut costs,
saving people from going
to different places for
lunch, as well as ensuring
that everyone stays on
location and are ready to
start work again once
lunch ends.
Studio—Liverpool Film Studios
(L5 9YJ)
Planning and prepping the scenes for
shooting on Day 3.
As well as reviewing the script and making
changes (mostly to direction) to fit the design
of the studio.
Tuesday Directors, Producers, Filming Crew
31/10/17
10am-4pm
School Location—Deyes High
School
Getting shots for transitions during editing,
planning shooting for Day 4.
Wednesday
All Cast—including both main
characters and additional actors for
family.
Film Crew, Hair and Makeup, Producers
and Directors
01/11/17
From 10am—4pm
Studio—Liverpool Film Studios
(L5 9YJ)
Half day used to shoot Wyatts home scenes,
second half used to shoot Jamie’s.
Saturday
Main characters
Extras for school shots—students—
many to flee during attack etc.
Film Crew, Hair and Makeup, Producers
and Directors
04/11/17
6am—4pm
School Location— Deyes High
School
Massacre scene shot—done on Saturday to
avoid all school children/staff, etc.
Sunday
Make all cast available, as well as some
extras (around 20) to finish off shoots if
needed (Contingency)
05/11/17
Studio—Liverpool Film Studios
(L5 9YJ)
School Location—Deyes High
School (if needed)
Analyse footage and see if we have
everything we need, if not use Friday to catch
up/fix or refilm any scenes that need to be
done.
Emma Fraser - P2(E)
Week 5—Episode 5 Who is needed Dates and Times Food Location Extra Information
Monday Directors, Producers, Filming Crew
06/11/17
10am-4pm
Food will be provided at
each location for all
during lunch time,
between 12pm to 1pm.
A catering company will
be hired in order to
ensure that everyone's
needs are met, for
example, those who are
vegan, vegetarian, etc.
This will also cut costs,
saving people from going
to different places for
lunch, as well as ensuring
that everyone stays on
location and are ready to
start work again once
lunch ends.
Studio—Liverpool Film Studios
(L5 9YJ)
Planning and prepping the scenes for
shooting on Day 3.
As well as reviewing the script and making
changes (mostly to direction) to fit the design
of the studio.
Tuesday
All Cast—Family of both boys and Extras
Film Crew, Hair and Makeup, Producers
and Directors
07/11/17
10am-4pm
Studio—Liverpool Film Studios
(L5 9YJ)
Homes for both boys
Filming family relationships within the homes
(of both main characters after their death and
homes of the victims)
Wednesday
All Cast—Family of both boys and Extras
Film Crew, Hair and Makeup, Producers
and Directors
08/11/17
From 10am—4pm
Studio—Liverpool Film Studios
(L5 9YJ)
School Location—Deyes High
School (Outside for memorial)
Others scenes for news shows and scenes
within the homes of the victims. Including
memorial outside of school.
Thursday
Make all cast available to finish off
shoots if needed (Contingency)
09/11/17
10am—4pm
Studio—Liverpool Film Studios
(L5 9YJ)
Or
School Location—Deyes High
School
Analyse footage and see if we have
everything we need, if not use Friday to catch
up/fix or refilm any scenes that need to be
done.
Emma Fraser - P2(E)
Contingency Plan: Throughout creating the production, the crew could face some factors that may effect the rate of production, for example, during filming in the school, there may be practise fire
alarm which could cause all of the crew to evacuate the building, this would take up around 30-40 minutes away from the filming time and could result in parts of the production being un-filmed.
Therefore at the end of each week, there is a day set aside to re-film or film any scenes that we didn't get throughout the week. The scenes that will need to be filmed or re-filmed will be figured out
the day before and the crew and cast can be notified on what location to at the next day, for example the school or filming.
Who is needed
Dates and
Times
Food Location Extra Information
Friday
Make all cast available to finish off
shoots if needed (Contingency)
13/10/17
Food will be provided at each
location for all during lunch
time, between 12pm to 1pm.
A catering company will be
hired in order to ensure that
everyone's needs are met, for
example, those who are
vegan, vegetarian, etc.
This will also cut costs, saving
people from going to different
places for lunch, as well as
ensuring that everyone stays
on location and are ready to
start work again once lunch
ends.
Studio—Liverpool Film Studios (L5 9YJ)
Or
School Location—Deyes High School
Analyse footage and see if we have
everything we need, if not use Friday to
catch up/fix or refilm any scenes that need
to be done.
Friday
Extras for Politicians to film news
scene announcing the new laws to
be enforced.
Make all cast available to finish off
shoots if needed (Contingency)
20/10/17
10am-4pm
Studio—Liverpool Film Studios (L5 9YJ) -
Definite for shooting news scene
Or
School Location—Deyes High School (if
needed)
Analyse footage and see if we have
everything we need, if not use Friday to
catch up/fix or refilm any scenes that need
to be done.
Friday
Make all cast available to finish off
shoots if needed (Contingency)
27/10/17
Studio—Liverpool Film Studios (L5 9YJ)
Or
School Location—Deyes High School
Analyse footage and see if we have
everything we need, if not use Friday to
catch up/fix or refilm any scenes that need
to be done.
Sunday
Make all cast available, as well as
some extras (around 20) to finish
off shoots if needed (Contingency)
05/11/17
Studio—Liverpool Film Studios (L5 9YJ)
School Location—Deyes High School (if
needed)
Analyse footage and see if we have
everything we need, if not use Friday to
catch up/fix or refilm any scenes that need
to be done.
Thursday
Make all cast available to finish off
shoots if needed (Contingency)
09/11/17
10am—4pm
Studio—Liverpool Film Studios (L5 9YJ)
Or
School Location—Deyes High School
Analyse footage and see if we have
everything we need, if not use Friday to
catch up/fix or refilm any scenes that need
to be done.
Emma Fraser - P2(E)

More Related Content

What's hot

Evaluation Project Progresion
Evaluation Project ProgresionEvaluation Project Progresion
Evaluation Project ProgresionHarryPennington
 
P2 e production schedule pt 2
P2 e  production schedule pt 2 P2 e  production schedule pt 2
P2 e production schedule pt 2 kieren1carmichael
 
Reflection on preliminary task - hibba sayeed
Reflection on preliminary task - hibba sayeedReflection on preliminary task - hibba sayeed
Reflection on preliminary task - hibba sayeedhaverstockmedia
 
Shooting sch
Shooting schShooting sch
Shooting schhallm04
 

What's hot (6)

Evaluation Project Progresion
Evaluation Project ProgresionEvaluation Project Progresion
Evaluation Project Progresion
 
Production schedule
Production schedule Production schedule
Production schedule
 
P2 e production schedule pt 2
P2 e  production schedule pt 2 P2 e  production schedule pt 2
P2 e production schedule pt 2
 
P2 e production schedule
P2 e  production scheduleP2 e  production schedule
P2 e production schedule
 
Reflection on preliminary task - hibba sayeed
Reflection on preliminary task - hibba sayeedReflection on preliminary task - hibba sayeed
Reflection on preliminary task - hibba sayeed
 
Shooting sch
Shooting schShooting sch
Shooting sch
 

Similar to P2(E)

Evangeline Production Diary
Evangeline Production DiaryEvangeline Production Diary
Evangeline Production Diaryoliviaplumpton
 
Production schedule
Production schedule Production schedule
Production schedule timmyb234
 
Risk assessment and film schedule
Risk assessment and film scheduleRisk assessment and film schedule
Risk assessment and film scheduleMariyaA123
 
Ig3 music video_production_diary_template
Ig3 music video_production_diary_templateIg3 music video_production_diary_template
Ig3 music video_production_diary_templatechloewhittle2
 
Trại đông trường Anh ngữ CIEC
Trại đông trường Anh ngữ CIECTrại đông trường Anh ngữ CIEC
Trại đông trường Anh ngữ CIECPHILENTER
 

Similar to P2(E) (11)

Location Recce
Location RecceLocation Recce
Location Recce
 
Evangeline Production Diary
Evangeline Production DiaryEvangeline Production Diary
Evangeline Production Diary
 
Pitch
PitchPitch
Pitch
 
Production schedule
Production schedule Production schedule
Production schedule
 
Risk assessment and film schedule
Risk assessment and film scheduleRisk assessment and film schedule
Risk assessment and film schedule
 
Blog table weekly
Blog table weeklyBlog table weekly
Blog table weekly
 
Presentation 2
Presentation 2Presentation 2
Presentation 2
 
James Grimley CV
James Grimley CVJames Grimley CV
James Grimley CV
 
Ig3 music video_production_diary_template
Ig3 music video_production_diary_templateIg3 music video_production_diary_template
Ig3 music video_production_diary_template
 
Presentation
Presentation Presentation
Presentation
 
Trại đông trường Anh ngữ CIEC
Trại đông trường Anh ngữ CIECTrại đông trường Anh ngữ CIEC
Trại đông trường Anh ngữ CIEC
 

Recently uploaded

psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 

Recently uploaded (20)

psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

P2(E)

  • 1. Week 1—Episode 1 Who is needed Dates and Times Food Location Extra Information Monday Directors, Producers, Filming Crew 09/10/17 10am-4pm Food will be provided at each location for all during lunch time, between 12pm to 1pm. A catering company will be hired in order to ensure that everyone's needs are met, for example, those who are vegan, vegetarian, etc. This will also cut costs, saving people from going to different places for lunch, as well as ensuring that everyone stays on location and are ready to start work again once lunch ends. Studio—Liverpool Film Studios (L5 9YJ) Planning and prepping the scenes for shooting on Day 3. As well as reviewing the script and making changes (mostly to direction) to fit the design of the studio. Tuesday Directors, Producers, Filming Crew 10/10/17 10am-4pm School Location—Deyes High School Getting shots for transitions during editing, planning shooting for Day 4. Wednesday Two main characters Film Crew, Hair and Makeup, Producers and Directors 11/10/17 From 10am—4pm Studio—Liverpool Film Studios (L5 9YJ) Homes for both boys Half day used to shoot Wyatt’s home scenes, second half used to shoot Jamie’s home scenes. Thursday Main characters Extras for school shots, e.g. within classrooms, at lunch time, etc. Film Crew, Hair and Makeup, Producers and Directors 12/10/17 7am—2pm School Location— Deyes High School Parts of the schools will be cordoned off. All cast will be present for 7am to avoid rush of children entering school. Friday Make all cast available to finish off shoots if needed (Contingency) 13/10/17 Studio—Liverpool Film Studios (L5 9YJ) Or School Location—Deyes High School Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or refilm any scenes that need to be done. Emma Fraser - P2(E)
  • 2. Week 2—Episode 2 Who is needed Dates and Times Food Location Extra Information Monday Directors, Producers, Filming Crew 16/10/17 10am-4pm Food will be provided at each location for all during lunch time, between 12pm to 1pm. A catering company will be hired in order to ensure that everyone's needs are met, for example, those who are vegan, vegetarian, etc. This will also cut costs, saving people from going to different places for lunch, as well as ensuring that everyone stays on location and are ready to start work again once lunch ends. Studio—Liverpool Film Studios (L5 9YJ) Planning and prepping the scenes for shooting on Day 4. As well as reviewing the script and making changes (mostly to direction) to fit the design of the studio. Tuesday Directors, Producers, Filming Crew 17/10/17 10am-4pm School Location—Deyes High School Getting shots for transitions during editing, planning shooting for Day 3. Wednesday Two main characters Extras for school shots, e.g. within classrooms, at lunch time, etc. Film Crew, Hair and Makeup, Producers and Directors 18/10/17 7am—2pm School Location— Deyes High School Parts of the schools will be cordoned off. All cast will be present for 7am to avoid rush of children entering school. Canteen scene shot—with many extras Thursday Two main characters Extras for school shots, e.g. within classrooms, at lunch time, etc. Film Crew, Hair and Makeup, Producers and Directors 19/10/17 7am—2pm School Location— Deyes High School Parts of the schools will be cordoned off. All cast will be present for 7am to avoid rush of children entering school. Classroom scenes shot—15 other extras to make up class, including teacher. Friday Extras for Politicians to film news scene announcing the new laws to be enforced. Make all cast available to finish off shoots if needed (Contingency) 20/10/17 10am-4pm Studio—Liverpool Film Studios (L5 9YJ) - Definite for shooting news scene Or School Location—Deyes High School (if needed) Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or refilm any scenes that need to be done. Emma Fraser - P2(E)
  • 3. Week 3—Episode 3 Who is needed Dates and Times Food Location Extra Information Monday Directors, Producers, Filming Crew 23/10/17 10am-4pm Food will be provided at each location for all during lunch time, between 12pm to 1pm. A catering company will be hired in order to ensure that everyone's needs are met, for example, those who are vegan, vegetarian, etc. This will also cut costs, saving people from going to different places for lunch, as well as ensuring that everyone stays on location and are ready to start work again once lunch ends. Studio—Liverpool Film Studios (L5 9YJ) Planning and prepping the scenes for shooting on Day 3. As well as reviewing the script and making changes (mostly to direction) to fit the design of the studio. Tuesday Directors, Producers, Filming Crew 24/10/17 10am-4pm School Location—Deyes High School Getting shots for transitions during editing, planning shooting for Day 4. Wednesday Two main characters Film Crew, Hair and Makeup, Producers and Directors 25/10/17 From 10am—4pm Studio—Liverpool Film Studios (L5 9YJ) Homes for both boys Filming scene in the bedroom where boys discover the laws have been changed. Scenes of them talking about attacking their school. Thursday Main characters Extras for school shots, e.g. within classrooms, at lunch time, etc. Film Crew, Hair and Makeup, Producers and Directors 26/10/17 7am—2pm School Location— Deyes High School Parts of the schools will be cordoned off. All cast will be present for 7am to avoid rush of children entering school. Filming scenes in different parts of the school, e.g. Library, Science Labs, Classrooms, etc. Friday Make all cast available to finish off shoots if needed (Contingency) 27/10/17 Studio—Liverpool Film Studios (L5 9YJ) Or School Location—Deyes High School Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or refilm any scenes that need to be done. Emma Fraser - P2(E)
  • 4. Week 4—Episode 4 Who is needed Dates and Times Food Location Extra Information Monday Directors, Producers, Filming Crew 30/10/17 10am-4pm Food will be provided at each location for all during lunch time, between 12pm to 1pm. A catering company will be hired in order to ensure that everyone's needs are met, for example, those who are vegan, vegetarian, etc. This will also cut costs, saving people from going to different places for lunch, as well as ensuring that everyone stays on location and are ready to start work again once lunch ends. Studio—Liverpool Film Studios (L5 9YJ) Planning and prepping the scenes for shooting on Day 3. As well as reviewing the script and making changes (mostly to direction) to fit the design of the studio. Tuesday Directors, Producers, Filming Crew 31/10/17 10am-4pm School Location—Deyes High School Getting shots for transitions during editing, planning shooting for Day 4. Wednesday All Cast—including both main characters and additional actors for family. Film Crew, Hair and Makeup, Producers and Directors 01/11/17 From 10am—4pm Studio—Liverpool Film Studios (L5 9YJ) Half day used to shoot Wyatts home scenes, second half used to shoot Jamie’s. Saturday Main characters Extras for school shots—students— many to flee during attack etc. Film Crew, Hair and Makeup, Producers and Directors 04/11/17 6am—4pm School Location— Deyes High School Massacre scene shot—done on Saturday to avoid all school children/staff, etc. Sunday Make all cast available, as well as some extras (around 20) to finish off shoots if needed (Contingency) 05/11/17 Studio—Liverpool Film Studios (L5 9YJ) School Location—Deyes High School (if needed) Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or refilm any scenes that need to be done. Emma Fraser - P2(E)
  • 5. Week 5—Episode 5 Who is needed Dates and Times Food Location Extra Information Monday Directors, Producers, Filming Crew 06/11/17 10am-4pm Food will be provided at each location for all during lunch time, between 12pm to 1pm. A catering company will be hired in order to ensure that everyone's needs are met, for example, those who are vegan, vegetarian, etc. This will also cut costs, saving people from going to different places for lunch, as well as ensuring that everyone stays on location and are ready to start work again once lunch ends. Studio—Liverpool Film Studios (L5 9YJ) Planning and prepping the scenes for shooting on Day 3. As well as reviewing the script and making changes (mostly to direction) to fit the design of the studio. Tuesday All Cast—Family of both boys and Extras Film Crew, Hair and Makeup, Producers and Directors 07/11/17 10am-4pm Studio—Liverpool Film Studios (L5 9YJ) Homes for both boys Filming family relationships within the homes (of both main characters after their death and homes of the victims) Wednesday All Cast—Family of both boys and Extras Film Crew, Hair and Makeup, Producers and Directors 08/11/17 From 10am—4pm Studio—Liverpool Film Studios (L5 9YJ) School Location—Deyes High School (Outside for memorial) Others scenes for news shows and scenes within the homes of the victims. Including memorial outside of school. Thursday Make all cast available to finish off shoots if needed (Contingency) 09/11/17 10am—4pm Studio—Liverpool Film Studios (L5 9YJ) Or School Location—Deyes High School Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or refilm any scenes that need to be done. Emma Fraser - P2(E)
  • 6. Contingency Plan: Throughout creating the production, the crew could face some factors that may effect the rate of production, for example, during filming in the school, there may be practise fire alarm which could cause all of the crew to evacuate the building, this would take up around 30-40 minutes away from the filming time and could result in parts of the production being un-filmed. Therefore at the end of each week, there is a day set aside to re-film or film any scenes that we didn't get throughout the week. The scenes that will need to be filmed or re-filmed will be figured out the day before and the crew and cast can be notified on what location to at the next day, for example the school or filming. Who is needed Dates and Times Food Location Extra Information Friday Make all cast available to finish off shoots if needed (Contingency) 13/10/17 Food will be provided at each location for all during lunch time, between 12pm to 1pm. A catering company will be hired in order to ensure that everyone's needs are met, for example, those who are vegan, vegetarian, etc. This will also cut costs, saving people from going to different places for lunch, as well as ensuring that everyone stays on location and are ready to start work again once lunch ends. Studio—Liverpool Film Studios (L5 9YJ) Or School Location—Deyes High School Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or refilm any scenes that need to be done. Friday Extras for Politicians to film news scene announcing the new laws to be enforced. Make all cast available to finish off shoots if needed (Contingency) 20/10/17 10am-4pm Studio—Liverpool Film Studios (L5 9YJ) - Definite for shooting news scene Or School Location—Deyes High School (if needed) Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or refilm any scenes that need to be done. Friday Make all cast available to finish off shoots if needed (Contingency) 27/10/17 Studio—Liverpool Film Studios (L5 9YJ) Or School Location—Deyes High School Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or refilm any scenes that need to be done. Sunday Make all cast available, as well as some extras (around 20) to finish off shoots if needed (Contingency) 05/11/17 Studio—Liverpool Film Studios (L5 9YJ) School Location—Deyes High School (if needed) Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or refilm any scenes that need to be done. Thursday Make all cast available to finish off shoots if needed (Contingency) 09/11/17 10am—4pm Studio—Liverpool Film Studios (L5 9YJ) Or School Location—Deyes High School Analyse footage and see if we have everything we need, if not use Friday to catch up/fix or refilm any scenes that need to be done. Emma Fraser - P2(E)