2. INDEX
1- Group members and responsibilities
2-School location
3-Project development: Looking for 2D shapes and buildings around
the school
4-Project development: Buildings construction with 3D shapes
5-Project consolidation: Map description
6-Ending the project
5. 3-PROJECT DEVELOPMENT: LOOKING
FOR 2D SHAPES AND BUILDINGS
AROUND THE SCHOOL
1.Library/biblioteca.
2. Can Fabra school/escola Can Fabra.
3.School/escola Salesianas..
4.Bank/banc.
5.Supermarket/super mercat.
6.Hospital/hospital.
7.Fabra coats factory /fábrica
6. 4-PROJECT DEVELOPMENT:
BUILDINGS CONSTRUCTION
WITH 3D SHAPES
Can Fabra school: rectangular prism and cube.
Library: rectangular prism and triangular prism.
Salesianes school: rectangular prism.
Bank: rectangular prism.
Supermarket: small rectangular prism.
7. 5-PROJECT CONSOLIDATION:
MAP DESCRIPTION
BUILDINGS
In my map there are 5 buildings, there
is Can fabra school at Sant Adrià Street,
opossite Can Fabra there is Salesianes
school, next to Can Fabra there is a
library. At Gran the Sant Andreu street
there is a bank, finally at Doctor Sant
Ponç street there is a supermarket.
8. 5-PROJECT
CONSOLIDATION: JOBS
At Can Fabra school there are :cooks teachers, monitors, a
school keeper, cleaning staff, students, teacher trainees and a
seccretay.
The librarian works in the library.
The bank-accounter works in the bank.
In the supermarket there are butchers, fishmongers and
shop-assistants.
9. 6- ENDING OF THE
PROJECT
We can describe the
surroundings of the school.