TOPS Offshore
                       Production Systems
                            (TOPS)
                             4th April 2011




Thursday, 28 July 11
Contact
                       • Inventor: Pat Haynes
                       • Organisations: A.P.Haynes Consulting/
                         Eboroil Ltd
                       • Norwegian Org nr 986455744
                       • Address: Jon Smørsv 4A, 1397 Nesøya
                       • Tel: +47 66847068 Mob Tel: +47 45275598
                       • Skype name : eboroil
                       • E-mail eboroil@me.com
Thursday, 28 July 11
The TOPS Concept
                       • The average water depth in the world is
                         3795m and this is a solution for the future
                       • all offshore oil and gas will based on having
                         a continuous process including exploration,
                         production, and refining and for certain
                         fields, transport ship (TOPS)
                       • most of the patents have lapsed
Thursday, 28 July 11
TOPS Eliminates
                 • delay in appraisal and development
                 • conventional rigs and platforms
                 • refineries
                 • over balanced drilling as per the BP GOM
                       blow-out
                 • significantly lowers blow out and pollution risk
                       in arctic areas and in deep water

Thursday, 28 July 11
Schedule
        •      Site survey and studies -
               15 months

        •      Construct Mooring
               tower - six months

        •      Install riser tower - 1
               day weather window

        •      Pre-Install production
               template - 60 days

        •      Drill - 15 plus days

        •      Start Production
                                           5
Thursday, 28 July 11
Preliminaries
                       • establish bottom conditions, sea water
                         properties as well as wave and current
                         profile at the site (GEMS)
                       • establish if affecting marine mammals,
                         seabed corals and migratory bird paths
                         (NPL)
                       • shoot 3D seismic of the area
                       • establish that when the reservoir is de-
                         pressurised that there is no earthquake risk
                         (Geomec)

Thursday, 28 July 11
Components
                       • Mooring tower in steel in shallower waters
                         and Titanium in deep water (Mercon)
                       • Well template with co-mingled production,
                         water and gas injection services and heavy
                         oil splitting services together with subsea
                         processing (FMC/others ?)
                       • Aframax sized TOPS with dp 2 providing
                         direct well access for drilling and
                         intervening throughout the field life


Thursday, 28 July 11
Exploration Phase
                       • Design site specific TOPS mooring tower in
                         steel/Ti with 2000 ton barytes ballasted
                         base and hydrogen generators to suit
                         location (Mercon with SBM as
                         subcontractor)
                       • Install ocean energy generators, template
                         and flowlines (Technip/others?)
                       • Mobilise the TOPS ship and drill first well
                       • In event of dry well redeploy equipment
Thursday, 28 July 11
Financing
                       • in 1980 TOPS was based on paying the
                         shipowner 20% rate of return on the equity
                         in the original acquisition cost of the
                         reuseable components of the project
                       • The oilco requires to pay for the lower
                         buoy, the installation work and 90 days of
                         operations
                       • The leasing partners in TOPS are sought
Thursday, 28 July 11
TOPS Mooring Tower
                       • 2000 tons of barytes ballast in the base
                       • Upper buoy contains ballast tanks to allow
                         for installation and removal - reuseable
                       • Lower buoy at minus 160 ft have hose take
                         offs to the TOPS ship - site specific
                         ( Contitech)
                       • Ocean power to generate H2
                         (Magnomatics/ITM Power)


Thursday, 28 July 11
TOPS Template (FMC)
                       • 4 by 8 on 8’6” centres well slots
                       • each Christmas tree to incorporate shear
                         and blind rams and to be connected to a
                         co-mingling distribution manifold on the
                         central two rows for production at the
                         flowing wellhead pressure of the best well
                         and subsea separation.
                       • use duplex acoustic controls with hydraulic
                         accumulators on the template


Thursday, 28 July 11
Subcontractors to FMC
                       • Advance Energy Systems to crack heavy oil
                         to C13 and gases as appropriate
                       • Nemo Engineering - pipeline sledges
                       • Acoustic controls - used Cameron
                         successfully before and Kongsberg
                       • Water injection pumps, artificial lift, gas
                         injection and compression - Clavis are
                         developing a unique pump technology


Thursday, 28 July 11
TOPS
                       • station keeping by Dp2 with constant
                         tension mooring winch working at between
                         70 and 90 tons (Huismann/AXTech)
                       • Converted Aframax or OBO which can
                         have LNG tanks put in the holds for later
                         life operations (previous model in Eboroil jv
                         m.v.Arctic which was 25,000 dwt)
                       • Receive oil, gas, water and distribute oil,
                         gas, drill cuttings removal and pigging
                         services

Thursday, 28 July 11
Drilling
                       • 30” conductors installed on all wells in the
                         construction phase (Technip)
                       • use Casing Drilling technology to drill
                         underbalanced in a closed loop to contain
                         kicks (Schlumberger)
                       • use composite cable based push/pull
                         wireline (supplier yet to be chosen) to
                         retrieve bits etc


Thursday, 28 July 11
Drilling Operations
                       • Mount Helirig on the Port side of the ship
                         to work in the lee based on heading bow
                         quarter into the weather
                       • Have top drive and coil for intervention
                       • Recover and treat drill cuttings with
                         biodegradable oil solvent and dump cuttings
                       • have slip joint design by Aker accepted by
                         Schlumberger

Thursday, 28 July 11
Thoughts
                       • Stern into weather towards SALM
                       • Accommodation at stern
                       • Shottels bow and stern instead of Becker/
                         other rudders such as Schilling from main
                         engines
                       • New build
                       •

Thursday, 28 July 11
Process plant
                       • Have main processing subsea for separation
                         of oil, gas and water
                       • Mount equipment 3 m above cargo holds
                       • Have surface oil treatment as heating to 80
                         deg C to remove metals with activated
                         charcoal and then crack at 400 deg C to
                         diesel product specifications with a catalyst
                       • Have chemical injection and pigging services
Thursday, 28 July 11
Maximise Oil Recovery
                       •   Continuous monitoring of reservoir behaviour and
                           optimisation of offtake using multiple realisation of
                           static and dynamic reservoir models.

                       •   Continuously drill and intervene guided by 4D
                           seismic

                       •   To inject gas super critically until reservoir until
                           dry

                       •   Inject cation rich sea water to recover oil prior to
                           low surface tension water to break up macro oil in
                           water emulsions


Thursday, 28 July 11
Ship Operations
                       • Have Captain in charge of all operations
                       • Change crew every three weeks and
                         recharge activated charcoal using the dry
                         evacuation system (GEC)
                       • Have unidirectional currents and wave
                         energy generate hydrogen for dp system
                         (Magnomatics/Pulse Tidal/Green Fuel/ITM
                         Power)
                       • Be a zero emission ship
                       • Have shuttle tankers use a Remora unit
Thursday, 28 July 11
Ocean Energy
       •      Install wave energy
              generators to
              provide power in
              storms

       •      Install
              unidirectional
              current generators
              for mid-water
              installations for
              constant power
              load

       •      install in 90deg arc


Thursday, 28 July 11
Contingencies
               • Have two dp UT 705 offshore platform support
                       vessels with active stability tanks and acoustic
                       responders to shut down the template in case
                       of problems
               • Have oil skimming with a biodegradable oil
                       dispersant, bulk barytes, cement, fi-fi services,
                       anti collision radar, dry evacuation transfer
                       services
               • in the arctic amphibious life-boats and infra red
                       satellite based radar to navigate in minimum ice

Thursday, 28 July 11
The First Project
                       • The Irish Authorities have been approached
                         to develop Barryroe in conjunction with
                         the current Option holders
                       • All contracts will be at cost plus 20% and
                         there will be no bidding with technical
                         excellence deciding the contract award
                       • Intend to work with Lloyds Registry and
                         have IOM flag


Thursday, 28 July 11

More Related Content

Similar to 110515 0445 Tops

Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
robinking277
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
Richard Turnbull
 
INPO Presentation - Sequoyah SGRP
INPO Presentation - Sequoyah SGRPINPO Presentation - Sequoyah SGRP
INPO Presentation - Sequoyah SGRP
D. Alan Day
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_Mast
Doug Mast
 
Miclyn Endurance Jan 2010 Rev 3 (Ps)
Miclyn Endurance Jan 2010 Rev 3 (Ps)Miclyn Endurance Jan 2010 Rev 3 (Ps)
Miclyn Endurance Jan 2010 Rev 3 (Ps)
philipsim
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
Chieu Nguyen
 
Conceptual design study Kriegers Flak 090618 redused
Conceptual design study Kriegers Flak 090618 redusedConceptual design study Kriegers Flak 090618 redused
Conceptual design study Kriegers Flak 090618 redused
Thomas Stalin
 

Similar to 110515 0445 Tops (20)

Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Offshore platforms
Offshore platformsOffshore platforms
Offshore platforms
 
Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!
 
The Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdfThe Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdf
 
Navion Saga FSO
Navion Saga FSONavion Saga FSO
Navion Saga FSO
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
INPO Presentation - Sequoyah SGRP
INPO Presentation - Sequoyah SGRPINPO Presentation - Sequoyah SGRP
INPO Presentation - Sequoyah SGRP
 
Revista en ingles miguel lugo
Revista en ingles miguel lugoRevista en ingles miguel lugo
Revista en ingles miguel lugo
 
Katleho P LETELE CV with picture
Katleho P LETELE CV with pictureKatleho P LETELE CV with picture
Katleho P LETELE CV with picture
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_Mast
 
Miclyn Endurance Jan 2010 Rev 3 (Ps)
Miclyn Endurance Jan 2010 Rev 3 (Ps)Miclyn Endurance Jan 2010 Rev 3 (Ps)
Miclyn Endurance Jan 2010 Rev 3 (Ps)
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
Innovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellngInnovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellng
 
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
 
Takraf ipcc 2014_compressed
Takraf ipcc 2014_compressedTakraf ipcc 2014_compressed
Takraf ipcc 2014_compressed
 
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case StudyPremier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
 
Compressed Air Wind Energy Storage
Compressed Air Wind Energy StorageCompressed Air Wind Energy Storage
Compressed Air Wind Energy Storage
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) Presentation
 
Conceptual design study Kriegers Flak 090618 redused
Conceptual design study Kriegers Flak 090618 redusedConceptual design study Kriegers Flak 090618 redused
Conceptual design study Kriegers Flak 090618 redused
 

110515 0445 Tops

  • 1. TOPS Offshore Production Systems (TOPS) 4th April 2011 Thursday, 28 July 11
  • 2. Contact • Inventor: Pat Haynes • Organisations: A.P.Haynes Consulting/ Eboroil Ltd • Norwegian Org nr 986455744 • Address: Jon Smørsv 4A, 1397 Nesøya • Tel: +47 66847068 Mob Tel: +47 45275598 • Skype name : eboroil • E-mail eboroil@me.com Thursday, 28 July 11
  • 3. The TOPS Concept • The average water depth in the world is 3795m and this is a solution for the future • all offshore oil and gas will based on having a continuous process including exploration, production, and refining and for certain fields, transport ship (TOPS) • most of the patents have lapsed Thursday, 28 July 11
  • 4. TOPS Eliminates • delay in appraisal and development • conventional rigs and platforms • refineries • over balanced drilling as per the BP GOM blow-out • significantly lowers blow out and pollution risk in arctic areas and in deep water Thursday, 28 July 11
  • 5. Schedule • Site survey and studies - 15 months • Construct Mooring tower - six months • Install riser tower - 1 day weather window • Pre-Install production template - 60 days • Drill - 15 plus days • Start Production 5 Thursday, 28 July 11
  • 6. Preliminaries • establish bottom conditions, sea water properties as well as wave and current profile at the site (GEMS) • establish if affecting marine mammals, seabed corals and migratory bird paths (NPL) • shoot 3D seismic of the area • establish that when the reservoir is de- pressurised that there is no earthquake risk (Geomec) Thursday, 28 July 11
  • 7. Components • Mooring tower in steel in shallower waters and Titanium in deep water (Mercon) • Well template with co-mingled production, water and gas injection services and heavy oil splitting services together with subsea processing (FMC/others ?) • Aframax sized TOPS with dp 2 providing direct well access for drilling and intervening throughout the field life Thursday, 28 July 11
  • 8. Exploration Phase • Design site specific TOPS mooring tower in steel/Ti with 2000 ton barytes ballasted base and hydrogen generators to suit location (Mercon with SBM as subcontractor) • Install ocean energy generators, template and flowlines (Technip/others?) • Mobilise the TOPS ship and drill first well • In event of dry well redeploy equipment Thursday, 28 July 11
  • 9. Financing • in 1980 TOPS was based on paying the shipowner 20% rate of return on the equity in the original acquisition cost of the reuseable components of the project • The oilco requires to pay for the lower buoy, the installation work and 90 days of operations • The leasing partners in TOPS are sought Thursday, 28 July 11
  • 10. TOPS Mooring Tower • 2000 tons of barytes ballast in the base • Upper buoy contains ballast tanks to allow for installation and removal - reuseable • Lower buoy at minus 160 ft have hose take offs to the TOPS ship - site specific ( Contitech) • Ocean power to generate H2 (Magnomatics/ITM Power) Thursday, 28 July 11
  • 11. TOPS Template (FMC) • 4 by 8 on 8’6” centres well slots • each Christmas tree to incorporate shear and blind rams and to be connected to a co-mingling distribution manifold on the central two rows for production at the flowing wellhead pressure of the best well and subsea separation. • use duplex acoustic controls with hydraulic accumulators on the template Thursday, 28 July 11
  • 12. Subcontractors to FMC • Advance Energy Systems to crack heavy oil to C13 and gases as appropriate • Nemo Engineering - pipeline sledges • Acoustic controls - used Cameron successfully before and Kongsberg • Water injection pumps, artificial lift, gas injection and compression - Clavis are developing a unique pump technology Thursday, 28 July 11
  • 13. TOPS • station keeping by Dp2 with constant tension mooring winch working at between 70 and 90 tons (Huismann/AXTech) • Converted Aframax or OBO which can have LNG tanks put in the holds for later life operations (previous model in Eboroil jv m.v.Arctic which was 25,000 dwt) • Receive oil, gas, water and distribute oil, gas, drill cuttings removal and pigging services Thursday, 28 July 11
  • 14. Drilling • 30” conductors installed on all wells in the construction phase (Technip) • use Casing Drilling technology to drill underbalanced in a closed loop to contain kicks (Schlumberger) • use composite cable based push/pull wireline (supplier yet to be chosen) to retrieve bits etc Thursday, 28 July 11
  • 15. Drilling Operations • Mount Helirig on the Port side of the ship to work in the lee based on heading bow quarter into the weather • Have top drive and coil for intervention • Recover and treat drill cuttings with biodegradable oil solvent and dump cuttings • have slip joint design by Aker accepted by Schlumberger Thursday, 28 July 11
  • 16. Thoughts • Stern into weather towards SALM • Accommodation at stern • Shottels bow and stern instead of Becker/ other rudders such as Schilling from main engines • New build • Thursday, 28 July 11
  • 17. Process plant • Have main processing subsea for separation of oil, gas and water • Mount equipment 3 m above cargo holds • Have surface oil treatment as heating to 80 deg C to remove metals with activated charcoal and then crack at 400 deg C to diesel product specifications with a catalyst • Have chemical injection and pigging services Thursday, 28 July 11
  • 18. Maximise Oil Recovery • Continuous monitoring of reservoir behaviour and optimisation of offtake using multiple realisation of static and dynamic reservoir models. • Continuously drill and intervene guided by 4D seismic • To inject gas super critically until reservoir until dry • Inject cation rich sea water to recover oil prior to low surface tension water to break up macro oil in water emulsions Thursday, 28 July 11
  • 19. Ship Operations • Have Captain in charge of all operations • Change crew every three weeks and recharge activated charcoal using the dry evacuation system (GEC) • Have unidirectional currents and wave energy generate hydrogen for dp system (Magnomatics/Pulse Tidal/Green Fuel/ITM Power) • Be a zero emission ship • Have shuttle tankers use a Remora unit Thursday, 28 July 11
  • 20. Ocean Energy • Install wave energy generators to provide power in storms • Install unidirectional current generators for mid-water installations for constant power load • install in 90deg arc Thursday, 28 July 11
  • 21. Contingencies • Have two dp UT 705 offshore platform support vessels with active stability tanks and acoustic responders to shut down the template in case of problems • Have oil skimming with a biodegradable oil dispersant, bulk barytes, cement, fi-fi services, anti collision radar, dry evacuation transfer services • in the arctic amphibious life-boats and infra red satellite based radar to navigate in minimum ice Thursday, 28 July 11
  • 22. The First Project • The Irish Authorities have been approached to develop Barryroe in conjunction with the current Option holders • All contracts will be at cost plus 20% and there will be no bidding with technical excellence deciding the contract award • Intend to work with Lloyds Registry and have IOM flag Thursday, 28 July 11