Knowledge Area Quiz—Project Integration Management

  1.  What is a recommended method for controlling change within a project?
          a.     Have only the project manager able to initiate change
          b.     Have each change approved or rejected by a board
          c.     Allow each project member ultimate control of changes within their realm of the project
               without a review process
          d.     Freeze scope and allow absolutely no changes
  2.    The project manager of a project calls you in as a consultant to provide inputs on developing the
      Project Charter. Your contribution to the project could be best termed as:
          a.     Professional Consultant
          b.     Expert Judgment
          c.     Charter Consultant
          d.     Expert Consultancy
  3. Which process is concerned with providing forecasts to update current cost information?
          a.     Monitor and Control Project Work
          b.     Project Management Information System
          c.     Close Project or Phase
          d.     Direct and Manage Project Execution
  4.    Which of the following would not be considered as an Enterprise Environmental Factor during the
      Develop Project Charter process?
          a.     Scope Statement
          b.     Organizational infrastructure
          c.     Governmental standards
          d.     Marketplace conditions
  5.    Which of these activities would the Close Project or Phase process be applicable to?
          a.     Cancelled projects
          b.     Completed projects
          c.     Completed phases in a multi- phase project
          d.     All of the above
  6. Which of these tools and techniques are common to all six Project Integration Management
      processes?
          a.     Project management Information System
          b.     Earned value technique
          c.     Project management methodology
          d.     Expert Judgment
  7.    You are beginning a new project. When should you use the Perform Integrated Change Control
      process?
          a.     Throughout the entire project
          b.     Only when closing out the project
          c.     Only after the project is completely funded
          d.     Only after the project scope is clearly defined
  8.    The project management team has determined that there some changes to the Scope of the
      project. Who would be responsible for reviewing, evaluating and approving documented changes to
      the project?
          a.     Change Control Board (CCB)
          b.     Change Configuration Board (CCB)
          c.     Scope Control Board (SCB)
          d.     Configuration Control Board (CCB)
  9. What is the difference between the Monitor and Control Project Work process and the Direct and
      Manage Project Execution process?
          a.     The Monitor and Control Project Work process and the Direct and Manage Project
               Execution process are the same.
          b.     The Monitor and Control Project Work process monitors the project performance while the
               Direct and Manage Project Execution process is concerned with performing the activities to
               accomplish project requirements.
          c.     The Monitor and Control Project Work process is a sub-process of the Direct and Manage
               Project Execution process.
          d.     There is no such thing as the Monitor and Control Project Work process.
  10.   Which of these Direct and Manage Project Execution items is not an output of the process?
a.    Deliverables
          b.    Work Performance Information
          c.    Project management plan
          d.    Change requests



Answer Key and Explanations

  1.  B - It often works best for all project changes to be reviewed by a consistent group of people so
      that the changes are integrated and the project deliverables can be appropriately updated. [PMBOK
      Page 94] [Project Integration Management]
  2.    B - Expert judgment is the judgment provided, based upon the expertise in an application area,
      knowledge area, discipline, industry etc. This is available from many sources including consultants.
      [Project Integration Management]
  3.    A - The Monitor and Control Project Work process is responsible for keeping track of the project's
      measures, including cost. [PMBOK Page 89] [Project Integration Management]
  4.    A - The Scope statement is clearly not an enterprise environmental factor whereas the other three
      choices -Governmental standards, Organizational infrastructure, and Marketplace conditions are
      enterprise environmental factors. [Project Integration Management]
  5.    D - The Close Project or Phase process allows the project manager to close or finish a specific
      portion of the project. [PMBOK Page 99] [Project Integration Management]
  6.    D - All six processes of Project Integration Management use Expert judgment as a tool and
      technique. [PMBOK Page 73] [Project Integration Management]
  7.    A - Changes can occur in the project at any time, therefore the Perform Integrated Change
      Control process is valuable for managing and tracking those changes. [PMBOK Page 93] [Project
      Integration Management]
  8.    A - The Change Control Board is a group of formally constituted stakeholders responsible for
      reviewing, evaluating, approving, delaying or rejecting changes to the project. [Project Integration
      Management]
  9.    B - The Monitor and Control Project Work process monitors the other project processes, including
      the Direct and Manage Project Execution process, while the Direct and Manage Project Execution
      process completes the project scope. [PMBOK Page 83, 89] [Project Integration Management]
  10.   C - The Direct and Manage Project Execution has several outputs, including deliverables, work
      performance information, change requests, project management plan updates, and project
      document updates. The project management plan is an input to the process. [PMBOK Page 84]
      [Project Integration Management]

More Related Content

What's hot

12 pmp procurement management exam
12 pmp procurement management exam12 pmp procurement management exam
12 pmp procurement management examJamil Faraj , PMP
 
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process GroupsVanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groupsvanessahartsfield
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPTbletindia
 
Pmi sp questions with answers
Pmi sp questions with answersPmi sp questions with answers
Pmi sp questions with answersMohamed Saeed
 
Monitor and Control Process Group - Part One
Monitor and Control Process Group - Part OneMonitor and Control Process Group - Part One
Monitor and Control Process Group - Part OneHossam Maghrabi
 
Leed green associate vii. project surroundings and public outreach question
Leed green associate vii. project surroundings and public outreach   questionLeed green associate vii. project surroundings and public outreach   question
Leed green associate vii. project surroundings and public outreach questionBilal Mohamed
 
Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Dr. Mahmoud Al-Naimi
 
09 pmp human resource management exam
09 pmp human resource  management exam09 pmp human resource  management exam
09 pmp human resource management examJamil Faraj , PMP
 
PMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - FormulasPMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - FormulasAnand Bobade
 
RASCO MEP Company Profile.pdf
RASCO MEP Company Profile.pdfRASCO MEP Company Profile.pdf
RASCO MEP Company Profile.pdfFathy19
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementAnand Bobade
 
10 pmp communication management exam
10 pmp communication  management exam10 pmp communication  management exam
10 pmp communication management examJamil Faraj , PMP
 
Đáp án chính thức môn Sinh - Khối B - Kỳ thi Đại học năm 2010
Đáp án chính thức môn Sinh - Khối B - Kỳ thi Đại học năm 2010Đáp án chính thức môn Sinh - Khối B - Kỳ thi Đại học năm 2010
Đáp án chính thức môn Sinh - Khối B - Kỳ thi Đại học năm 2010dethinet
 

What's hot (20)

12 pmp procurement management exam
12 pmp procurement management exam12 pmp procurement management exam
12 pmp procurement management exam
 
Exam1
Exam1Exam1
Exam1
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
 
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process GroupsVanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPT
 
Pmi sp questions with answers
Pmi sp questions with answersPmi sp questions with answers
Pmi sp questions with answers
 
Project charter template
Project charter templateProject charter template
Project charter template
 
Pmp exam q&a
Pmp exam q&aPmp exam q&a
Pmp exam q&a
 
06 pmp time management exam
06 pmp time  management exam06 pmp time  management exam
06 pmp time management exam
 
Monitor and Control Process Group - Part One
Monitor and Control Process Group - Part OneMonitor and Control Process Group - Part One
Monitor and Control Process Group - Part One
 
Ddam (1)
Ddam (1)Ddam (1)
Ddam (1)
 
11 pmp risk management exam
11 pmp risk management exam11 pmp risk management exam
11 pmp risk management exam
 
Leed green associate vii. project surroundings and public outreach question
Leed green associate vii. project surroundings and public outreach   questionLeed green associate vii. project surroundings and public outreach   question
Leed green associate vii. project surroundings and public outreach question
 
Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations
 
09 pmp human resource management exam
09 pmp human resource  management exam09 pmp human resource  management exam
09 pmp human resource management exam
 
PMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - FormulasPMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - Formulas
 
RASCO MEP Company Profile.pdf
RASCO MEP Company Profile.pdfRASCO MEP Company Profile.pdf
RASCO MEP Company Profile.pdf
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
10 pmp communication management exam
10 pmp communication  management exam10 pmp communication  management exam
10 pmp communication management exam
 
Đáp án chính thức môn Sinh - Khối B - Kỳ thi Đại học năm 2010
Đáp án chính thức môn Sinh - Khối B - Kỳ thi Đại học năm 2010Đáp án chính thức môn Sinh - Khối B - Kỳ thi Đại học năm 2010
Đáp án chính thức môn Sinh - Khối B - Kỳ thi Đại học năm 2010
 

Similar to Project integration management quiz

1.            This Project Management concept ensures the various e.pdf
1.            This Project Management concept ensures the various e.pdf1.            This Project Management concept ensures the various e.pdf
1.            This Project Management concept ensures the various e.pdfsuhshbhosale
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management Qussay Karam
 
Overall project management
Overall project managementOverall project management
Overall project managementDesh Kapoor
 
PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfMoncefMakni1
 
P2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadf
P2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadfP2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadf
P2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadfAnne Starr
 
2 Project Management Life CycleKemaltaneriStockThinkstoc.docx
2 Project Management Life CycleKemaltaneriStockThinkstoc.docx2 Project Management Life CycleKemaltaneriStockThinkstoc.docx
2 Project Management Life CycleKemaltaneriStockThinkstoc.docxeugeniadean34240
 
APMP More MC Questions
APMP More MC QuestionsAPMP More MC Questions
APMP More MC QuestionsMonica Waters
 
04 pmp integration management exam
04 pmp integration management exam04 pmp integration management exam
04 pmp integration management examJamil Faraj , PMP
 
04 pmp integration management exam
04 pmp integration management exam04 pmp integration management exam
04 pmp integration management examJamil Faraj , PMP
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01Amy Roman
 
1.7 project management
1.7 project management1.7 project management
1.7 project managementexemplar2401
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration managementIrefuser1
 
1.7 project management
1.7 project management1.7 project management
1.7 project managementchaithanya1025
 
1.2 project management by bee 2
1.2 project management by bee 21.2 project management by bee 2
1.2 project management by bee 2Narayan Mane
 
Free pmp answers
Free pmp answersFree pmp answers
Free pmp answersdsshsrinu
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management ProjectMary Stevenson
 

Similar to Project integration management quiz (20)

1.            This Project Management concept ensures the various e.pdf
1.            This Project Management concept ensures the various e.pdf1.            This Project Management concept ensures the various e.pdf
1.            This Project Management concept ensures the various e.pdf
 
Entra lecture6 PM1.pdf
Entra lecture6 PM1.pdfEntra lecture6 PM1.pdf
Entra lecture6 PM1.pdf
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management
 
Overall project management
Overall project managementOverall project management
Overall project management
 
PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdf
 
P2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadf
P2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadfP2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadf
P2fdumps_2021_71304130-dc2f-4f28-955d-be322d25dadf
 
2 Project Management Life CycleKemaltaneriStockThinkstoc.docx
2 Project Management Life CycleKemaltaneriStockThinkstoc.docx2 Project Management Life CycleKemaltaneriStockThinkstoc.docx
2 Project Management Life CycleKemaltaneriStockThinkstoc.docx
 
APMP More MC Questions
APMP More MC QuestionsAPMP More MC Questions
APMP More MC Questions
 
04 pmp integration management exam
04 pmp integration management exam04 pmp integration management exam
04 pmp integration management exam
 
04 pmp integration management exam
04 pmp integration management exam04 pmp integration management exam
04 pmp integration management exam
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01
 
1.7 project management
1.7 project management1.7 project management
1.7 project management
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
1.7 project management
1.7 project management1.7 project management
1.7 project management
 
1.2 project management by bee 2
1.2 project management by bee 21.2 project management by bee 2
1.2 project management by bee 2
 
Free pmp answers
Free pmp answersFree pmp answers
Free pmp answers
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management Project
 
Session 4 gdas pmp study group presentation
Session 4   gdas pmp study group presentationSession 4   gdas pmp study group presentation
Session 4 gdas pmp study group presentation
 
4 integration
4 integration4 integration
4 integration
 

Recently uploaded

➥🔝 7737669865 🔝▻ Tirupati Call-girls in Women Seeking Men 🔝Tirupati🔝 Escor...
➥🔝 7737669865 🔝▻ Tirupati Call-girls in Women Seeking Men  🔝Tirupati🔝   Escor...➥🔝 7737669865 🔝▻ Tirupati Call-girls in Women Seeking Men  🔝Tirupati🔝   Escor...
➥🔝 7737669865 🔝▻ Tirupati Call-girls in Women Seeking Men 🔝Tirupati🔝 Escor...amitlee9823
 
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...amitlee9823
 
Call Girls Hosur Road Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Hosur Road Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...Call Girls Hosur Road Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Hosur Road Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...amitlee9823
 
Gabriel_Carter_EXPOLRATIONpp.pptx........
Gabriel_Carter_EXPOLRATIONpp.pptx........Gabriel_Carter_EXPOLRATIONpp.pptx........
Gabriel_Carter_EXPOLRATIONpp.pptx........deejay178
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineBruce Bennett
 
Personal Brand Exploration - Fernando Negron
Personal Brand Exploration - Fernando NegronPersonal Brand Exploration - Fernando Negron
Personal Brand Exploration - Fernando Negronnegronf24
 
CFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceCFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceSanjay Bokadia
 
Dombivli Call Girls, 9892124323, Kharghar Call Girls, chembur Call Girls, Vas...
Dombivli Call Girls, 9892124323, Kharghar Call Girls, chembur Call Girls, Vas...Dombivli Call Girls, 9892124323, Kharghar Call Girls, chembur Call Girls, Vas...
Dombivli Call Girls, 9892124323, Kharghar Call Girls, chembur Call Girls, Vas...Pooja Nehwal
 
TEST BANK For Evidence-Based Practice for Nurses Appraisal and Application of...
TEST BANK For Evidence-Based Practice for Nurses Appraisal and Application of...TEST BANK For Evidence-Based Practice for Nurses Appraisal and Application of...
TEST BANK For Evidence-Based Practice for Nurses Appraisal and Application of...robinsonayot
 
Call Girls Bidadi ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bidadi ☎ 7737669865☎ Book Your One night Stand (Bangalore)Call Girls Bidadi ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bidadi ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Joshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptxJoshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptxsportsworldproductio
 
Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...amitlee9823
 
Dubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big Boody
Dubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big BoodyDubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big Boody
Dubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big Boodykojalkojal131
 
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...amitlee9823
 
Personal Brand Exploration ppt.- Ronnie Jones
Personal Brand  Exploration ppt.- Ronnie JonesPersonal Brand  Exploration ppt.- Ronnie Jones
Personal Brand Exploration ppt.- Ronnie Jonesjonesyde302
 
Résumé (2 pager - 12 ft standard syntax)
Résumé (2 pager -  12 ft standard syntax)Résumé (2 pager -  12 ft standard syntax)
Résumé (2 pager - 12 ft standard syntax)Soham Mondal
 
Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...
Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...
Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...sonalitrivedi431
 
Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.GabrielaMiletti
 
Call Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Guide to a Winning Interview May 2024 for MCWN
Guide to a Winning Interview May 2024 for MCWNGuide to a Winning Interview May 2024 for MCWN
Guide to a Winning Interview May 2024 for MCWNBruce Bennett
 

Recently uploaded (20)

➥🔝 7737669865 🔝▻ Tirupati Call-girls in Women Seeking Men 🔝Tirupati🔝 Escor...
➥🔝 7737669865 🔝▻ Tirupati Call-girls in Women Seeking Men  🔝Tirupati🔝   Escor...➥🔝 7737669865 🔝▻ Tirupati Call-girls in Women Seeking Men  🔝Tirupati🔝   Escor...
➥🔝 7737669865 🔝▻ Tirupati Call-girls in Women Seeking Men 🔝Tirupati🔝 Escor...
 
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
Call Girls Hosur Road Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Hosur Road Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...Call Girls Hosur Road Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Hosur Road Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
 
Gabriel_Carter_EXPOLRATIONpp.pptx........
Gabriel_Carter_EXPOLRATIONpp.pptx........Gabriel_Carter_EXPOLRATIONpp.pptx........
Gabriel_Carter_EXPOLRATIONpp.pptx........
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying Online
 
Personal Brand Exploration - Fernando Negron
Personal Brand Exploration - Fernando NegronPersonal Brand Exploration - Fernando Negron
Personal Brand Exploration - Fernando Negron
 
CFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceCFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector Experience
 
Dombivli Call Girls, 9892124323, Kharghar Call Girls, chembur Call Girls, Vas...
Dombivli Call Girls, 9892124323, Kharghar Call Girls, chembur Call Girls, Vas...Dombivli Call Girls, 9892124323, Kharghar Call Girls, chembur Call Girls, Vas...
Dombivli Call Girls, 9892124323, Kharghar Call Girls, chembur Call Girls, Vas...
 
TEST BANK For Evidence-Based Practice for Nurses Appraisal and Application of...
TEST BANK For Evidence-Based Practice for Nurses Appraisal and Application of...TEST BANK For Evidence-Based Practice for Nurses Appraisal and Application of...
TEST BANK For Evidence-Based Practice for Nurses Appraisal and Application of...
 
Call Girls Bidadi ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bidadi ☎ 7737669865☎ Book Your One night Stand (Bangalore)Call Girls Bidadi ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bidadi ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Joshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptxJoshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptx
 
Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
 
Dubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big Boody
Dubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big BoodyDubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big Boody
Dubai Call Girls Demons O525547819 Call Girls IN DUbai Natural Big Boody
 
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
Personal Brand Exploration ppt.- Ronnie Jones
Personal Brand  Exploration ppt.- Ronnie JonesPersonal Brand  Exploration ppt.- Ronnie Jones
Personal Brand Exploration ppt.- Ronnie Jones
 
Résumé (2 pager - 12 ft standard syntax)
Résumé (2 pager -  12 ft standard syntax)Résumé (2 pager -  12 ft standard syntax)
Résumé (2 pager - 12 ft standard syntax)
 
Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...
Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...
Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...
 
Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.
 
Call Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Guide to a Winning Interview May 2024 for MCWN
Guide to a Winning Interview May 2024 for MCWNGuide to a Winning Interview May 2024 for MCWN
Guide to a Winning Interview May 2024 for MCWN
 

Project integration management quiz

  • 1. Knowledge Area Quiz—Project Integration Management 1. What is a recommended method for controlling change within a project? a. Have only the project manager able to initiate change b. Have each change approved or rejected by a board c. Allow each project member ultimate control of changes within their realm of the project without a review process d. Freeze scope and allow absolutely no changes 2. The project manager of a project calls you in as a consultant to provide inputs on developing the Project Charter. Your contribution to the project could be best termed as: a. Professional Consultant b. Expert Judgment c. Charter Consultant d. Expert Consultancy 3. Which process is concerned with providing forecasts to update current cost information? a. Monitor and Control Project Work b. Project Management Information System c. Close Project or Phase d. Direct and Manage Project Execution 4. Which of the following would not be considered as an Enterprise Environmental Factor during the Develop Project Charter process? a. Scope Statement b. Organizational infrastructure c. Governmental standards d. Marketplace conditions 5. Which of these activities would the Close Project or Phase process be applicable to? a. Cancelled projects b. Completed projects c. Completed phases in a multi- phase project d. All of the above 6. Which of these tools and techniques are common to all six Project Integration Management processes? a. Project management Information System b. Earned value technique c. Project management methodology d. Expert Judgment 7. You are beginning a new project. When should you use the Perform Integrated Change Control process? a. Throughout the entire project b. Only when closing out the project c. Only after the project is completely funded d. Only after the project scope is clearly defined 8. The project management team has determined that there some changes to the Scope of the project. Who would be responsible for reviewing, evaluating and approving documented changes to the project? a. Change Control Board (CCB) b. Change Configuration Board (CCB) c. Scope Control Board (SCB) d. Configuration Control Board (CCB) 9. What is the difference between the Monitor and Control Project Work process and the Direct and Manage Project Execution process? a. The Monitor and Control Project Work process and the Direct and Manage Project Execution process are the same. b. The Monitor and Control Project Work process monitors the project performance while the Direct and Manage Project Execution process is concerned with performing the activities to accomplish project requirements. c. The Monitor and Control Project Work process is a sub-process of the Direct and Manage Project Execution process. d. There is no such thing as the Monitor and Control Project Work process. 10. Which of these Direct and Manage Project Execution items is not an output of the process?
  • 2. a. Deliverables b. Work Performance Information c. Project management plan d. Change requests Answer Key and Explanations 1. B - It often works best for all project changes to be reviewed by a consistent group of people so that the changes are integrated and the project deliverables can be appropriately updated. [PMBOK Page 94] [Project Integration Management] 2. B - Expert judgment is the judgment provided, based upon the expertise in an application area, knowledge area, discipline, industry etc. This is available from many sources including consultants. [Project Integration Management] 3. A - The Monitor and Control Project Work process is responsible for keeping track of the project's measures, including cost. [PMBOK Page 89] [Project Integration Management] 4. A - The Scope statement is clearly not an enterprise environmental factor whereas the other three choices -Governmental standards, Organizational infrastructure, and Marketplace conditions are enterprise environmental factors. [Project Integration Management] 5. D - The Close Project or Phase process allows the project manager to close or finish a specific portion of the project. [PMBOK Page 99] [Project Integration Management] 6. D - All six processes of Project Integration Management use Expert judgment as a tool and technique. [PMBOK Page 73] [Project Integration Management] 7. A - Changes can occur in the project at any time, therefore the Perform Integrated Change Control process is valuable for managing and tracking those changes. [PMBOK Page 93] [Project Integration Management] 8. A - The Change Control Board is a group of formally constituted stakeholders responsible for reviewing, evaluating, approving, delaying or rejecting changes to the project. [Project Integration Management] 9. B - The Monitor and Control Project Work process monitors the other project processes, including the Direct and Manage Project Execution process, while the Direct and Manage Project Execution process completes the project scope. [PMBOK Page 83, 89] [Project Integration Management] 10. C - The Direct and Manage Project Execution has several outputs, including deliverables, work performance information, change requests, project management plan updates, and project document updates. The project management plan is an input to the process. [PMBOK Page 84] [Project Integration Management]