Post-Project Evaluation
Purpose

The purpose of this tool is to facilitate the evaluation of completed or failed projects with
the intention of building on strengths and learning from mistakes.


The goal is to develop a disciplined process for evaluating project success, and to create
standard, formalized, Best Practices that can be applied for future initiatives.


Scope

This tool will provide a framework for completing a Post-Project Evaluation.


There are 6 key areas that need to be assessed:


      1. Overall Project Assessment
      2.   Scope Management
      3.   Quality of Deliverables
      4.   Key Accomplishments
      5.   Lessons Learned
      6. Opportunities for Improvement
      7. Future Considerations
      8. Best Practices
Project Information

Project Name:                                  Date:


Project Manager:                               Project Sponsor:


Anticipated End Date:                          Actual End Date:


Anticipated Budget:                            Actual Budget:


Overall Project Assessment

      Did this project meet all the goals and objectives from the Project Charter?
      Was the feedback from stakeholders regarding project deliverables positive?
      Was the project completed on time and on budget?


Scope Management

      Did this project deliver all items that were agreed upon in the original scope?
      Were all Project Change Requests documented and approved?
      If the scope was extended, were budgets and timelines adjusted properly?


Quality of Deliverables

      Overall, were stakeholders satisfied with the quality of project deliverables?
      Were there any exceptional deliverables that really added business value?
      Were there any deliverables that were met, but not completed very well?


Key Accomplishments

       Discuss particular project strengths such as teamwork, effective use of tools, or any
       other items that stood out as positive accomplishments.
Lessons Learned

      Discuss any areas that were problematic and could be done better next time.
      Identify any areas that were successful and should be shared with the PMO.
      Be honest in this section; credibility results from accountability.
      Determine what actions could be implemented to prevent future problems.
      Add information from the table below into the Lessons Learned Knowledge Base.



      Category    Issue Name     Problem/Success             Impact         Recommendations



                                                         Impact was         Always consider
                                 A risk was identified
                                                         minimal because    external impacts on the
                                 that there may be
                 Risk                                    the PM included    project cost and
  Risk                           delays in shipping
                 Management                              shipping delays    schedule. This must be
                                 due to weather
                                                         into the project   continuous throughout
                                 conditions.
                                                         schedule.          the project lifecycle.



                                                         The PM did not
                                 Company XYZ             have a plan for
                                                                            The PM must create
                                 product development     addressing
                                                                            standardized templates
                                 department added to     changes to the
  Scope          Project Scope                                              and an approval
                                 the project scope       project scope so
                                                                            process for any scope
                                 throughout the          the project was
                                                                            changes.
                                 project lifecycle.      delayed 2
                                                         months.



                                                         Resources were
                                                         divided across
                                 Company XYZ was                            PM must hire
                                                         many different
                 Project         engaged in too many                        additional project
  Resources                                              projects causing
                 Resources       projects at the same                       resources and allocate
                                                         long wait times
                                 time.                                      them accordingly
                                                         and a delay of 3
                                                         months.
Future Considerations

        Discuss what work could/will be done in future regarding this project.
        Include any project maintenance procedures that need to be managed.


Best Practices

         Identify any processes or best practices that were established during this project and
         describe how these practices will be formalized.


Required Signatures

By signing below, you agree that an effective post-project evaluation has been completed
and action items for improvement have been assigned.


Project Manager:                                Project Sponsor:

Date:                                           Date:


Name:                                           Name:


Title:                                          Title:


Signature:                                      Signature:

More Related Content

Viewers also liked

Post Implementation Review Template
Post Implementation Review TemplatePost Implementation Review Template
Post Implementation Review TemplateEdmond Cheng
 
Erp post implementation audit
Erp post implementation auditErp post implementation audit
Erp post implementation auditvelcomerp
 
Project post-mortem analysis
Project post-mortem analysisProject post-mortem analysis
Project post-mortem analysisJaiveer Singh
 
Post ERP Implementation - A Little Goes a Long Way
Post ERP Implementation - A Little Goes a Long WayPost ERP Implementation - A Little Goes a Long Way
Post ERP Implementation - A Little Goes a Long WayWinnie Chen
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklistRam Srivastava
 
Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]skzarif
 
Rapid assessment and recovery of troubled projects
Rapid assessment and recovery of troubled projectsRapid assessment and recovery of troubled projects
Rapid assessment and recovery of troubled projectsMohammed Al_busailiy
 
Research Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryResearch Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryPM Solutions
 
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & HeroSymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & HeroPMI Indonesia Chapter
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure ReportCheryl Burcham
 

Viewers also liked (17)

Post Implementation Review Template
Post Implementation Review TemplatePost Implementation Review Template
Post Implementation Review Template
 
Project Evaluation
Project EvaluationProject Evaluation
Project Evaluation
 
Erp post implementation audit
Erp post implementation auditErp post implementation audit
Erp post implementation audit
 
ERP Post Implementation Audit
ERP Post Implementation AuditERP Post Implementation Audit
ERP Post Implementation Audit
 
Project post-mortem analysis
Project post-mortem analysisProject post-mortem analysis
Project post-mortem analysis
 
Post ERP Implementation - A Little Goes a Long Way
Post ERP Implementation - A Little Goes a Long WayPost ERP Implementation - A Little Goes a Long Way
Post ERP Implementation - A Little Goes a Long Way
 
Approval Template
Approval TemplateApproval Template
Approval Template
 
Project Sign Off Tempalte
Project Sign Off TempalteProject Sign Off Tempalte
Project Sign Off Tempalte
 
Monitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMonitoring and Evaluation Framework
Monitoring and Evaluation Framework
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklist
 
Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]
 
Recovering a delayed project
Recovering a delayed projectRecovering a delayed project
Recovering a delayed project
 
Rapid assessment and recovery of troubled projects
Rapid assessment and recovery of troubled projectsRapid assessment and recovery of troubled projects
Rapid assessment and recovery of troubled projects
 
Research Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryResearch Report: Strategies for Project Recovery
Research Report: Strategies for Project Recovery
 
Project recovery
Project recoveryProject recovery
Project recovery
 
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & HeroSymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure Report
 

More from Demand Metric

The Impact of COVID-19 in B2B Marketing
The Impact of COVID-19 in B2B MarketingThe Impact of COVID-19 in B2B Marketing
The Impact of COVID-19 in B2B MarketingDemand Metric
 
Infographic Return Path Email Engagement
Infographic Return Path Email EngagementInfographic Return Path Email Engagement
Infographic Return Path Email EngagementDemand Metric
 
Infographic Vidyard Video Marketing 2018
Infographic Vidyard Video Marketing 2018Infographic Vidyard Video Marketing 2018
Infographic Vidyard Video Marketing 2018Demand Metric
 
Digital Marketing Best Practices Guide
Digital Marketing Best Practices GuideDigital Marketing Best Practices Guide
Digital Marketing Best Practices GuideDemand Metric
 
Content Marketing Solution Study
Content Marketing Solution StudyContent Marketing Solution Study
Content Marketing Solution StudyDemand Metric
 
SEO Technology Overview
SEO Technology OverviewSEO Technology Overview
SEO Technology OverviewDemand Metric
 
State of Video Marketing 2017
State of Video Marketing 2017State of Video Marketing 2017
State of Video Marketing 2017Demand Metric
 
Sales Enablement Maturity Model
Sales Enablement Maturity ModelSales Enablement Maturity Model
Sales Enablement Maturity ModelDemand Metric
 
Public Relations Maturity Model
Public Relations Maturity ModelPublic Relations Maturity Model
Public Relations Maturity ModelDemand Metric
 
Email Marketing Maturity Model
Email Marketing Maturity ModelEmail Marketing Maturity Model
Email Marketing Maturity ModelDemand Metric
 
Customer Engagement Maturity Model
Customer Engagement Maturity ModelCustomer Engagement Maturity Model
Customer Engagement Maturity ModelDemand Metric
 
Formalizing the Sales Support Function How-To Guide
Formalizing the Sales Support Function How-To GuideFormalizing the Sales Support Function How-To Guide
Formalizing the Sales Support Function How-To GuideDemand Metric
 
How to Launch a Mobile App Guide How-To Guide
How to Launch a Mobile App Guide How-To GuideHow to Launch a Mobile App Guide How-To Guide
How to Launch a Mobile App Guide How-To GuideDemand Metric
 
Getting Started with Agile Marketing How-To Guide
Getting Started with Agile Marketing How-To GuideGetting Started with Agile Marketing How-To Guide
Getting Started with Agile Marketing How-To GuideDemand Metric
 
Entering the European Market Successfully How-To Guide
Entering the European Market Successfully How-To GuideEntering the European Market Successfully How-To Guide
Entering the European Market Successfully How-To GuideDemand Metric
 
Driving SEO with Press Releases How-To Guide
Driving SEO with Press Releases How-To GuideDriving SEO with Press Releases How-To Guide
Driving SEO with Press Releases How-To GuideDemand Metric
 
Calculating Customer Lifetime Value How-To Guide
Calculating Customer Lifetime Value How-To GuideCalculating Customer Lifetime Value How-To Guide
Calculating Customer Lifetime Value How-To GuideDemand Metric
 
Lead Scoring: Five Steps to Getting Started How-To Guide
Lead Scoring: Five Steps to Getting Started How-To GuideLead Scoring: Five Steps to Getting Started How-To Guide
Lead Scoring: Five Steps to Getting Started How-To GuideDemand Metric
 
Social CRM Best Practices How-To Guide
Social CRM Best Practices How-To GuideSocial CRM Best Practices How-To Guide
Social CRM Best Practices How-To GuideDemand Metric
 
Marketing Resource Management How-To Guide
Marketing Resource Management How-To GuideMarketing Resource Management How-To Guide
Marketing Resource Management How-To GuideDemand Metric
 

More from Demand Metric (20)

The Impact of COVID-19 in B2B Marketing
The Impact of COVID-19 in B2B MarketingThe Impact of COVID-19 in B2B Marketing
The Impact of COVID-19 in B2B Marketing
 
Infographic Return Path Email Engagement
Infographic Return Path Email EngagementInfographic Return Path Email Engagement
Infographic Return Path Email Engagement
 
Infographic Vidyard Video Marketing 2018
Infographic Vidyard Video Marketing 2018Infographic Vidyard Video Marketing 2018
Infographic Vidyard Video Marketing 2018
 
Digital Marketing Best Practices Guide
Digital Marketing Best Practices GuideDigital Marketing Best Practices Guide
Digital Marketing Best Practices Guide
 
Content Marketing Solution Study
Content Marketing Solution StudyContent Marketing Solution Study
Content Marketing Solution Study
 
SEO Technology Overview
SEO Technology OverviewSEO Technology Overview
SEO Technology Overview
 
State of Video Marketing 2017
State of Video Marketing 2017State of Video Marketing 2017
State of Video Marketing 2017
 
Sales Enablement Maturity Model
Sales Enablement Maturity ModelSales Enablement Maturity Model
Sales Enablement Maturity Model
 
Public Relations Maturity Model
Public Relations Maturity ModelPublic Relations Maturity Model
Public Relations Maturity Model
 
Email Marketing Maturity Model
Email Marketing Maturity ModelEmail Marketing Maturity Model
Email Marketing Maturity Model
 
Customer Engagement Maturity Model
Customer Engagement Maturity ModelCustomer Engagement Maturity Model
Customer Engagement Maturity Model
 
Formalizing the Sales Support Function How-To Guide
Formalizing the Sales Support Function How-To GuideFormalizing the Sales Support Function How-To Guide
Formalizing the Sales Support Function How-To Guide
 
How to Launch a Mobile App Guide How-To Guide
How to Launch a Mobile App Guide How-To GuideHow to Launch a Mobile App Guide How-To Guide
How to Launch a Mobile App Guide How-To Guide
 
Getting Started with Agile Marketing How-To Guide
Getting Started with Agile Marketing How-To GuideGetting Started with Agile Marketing How-To Guide
Getting Started with Agile Marketing How-To Guide
 
Entering the European Market Successfully How-To Guide
Entering the European Market Successfully How-To GuideEntering the European Market Successfully How-To Guide
Entering the European Market Successfully How-To Guide
 
Driving SEO with Press Releases How-To Guide
Driving SEO with Press Releases How-To GuideDriving SEO with Press Releases How-To Guide
Driving SEO with Press Releases How-To Guide
 
Calculating Customer Lifetime Value How-To Guide
Calculating Customer Lifetime Value How-To GuideCalculating Customer Lifetime Value How-To Guide
Calculating Customer Lifetime Value How-To Guide
 
Lead Scoring: Five Steps to Getting Started How-To Guide
Lead Scoring: Five Steps to Getting Started How-To GuideLead Scoring: Five Steps to Getting Started How-To Guide
Lead Scoring: Five Steps to Getting Started How-To Guide
 
Social CRM Best Practices How-To Guide
Social CRM Best Practices How-To GuideSocial CRM Best Practices How-To Guide
Social CRM Best Practices How-To Guide
 
Marketing Resource Management How-To Guide
Marketing Resource Management How-To GuideMarketing Resource Management How-To Guide
Marketing Resource Management How-To Guide
 

Recently uploaded

8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,dollysharma2066
 
LC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdfLC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdfpastor83
 
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...PsychicRuben LoveSpells
 
The Selfspace Journal Preview by Mindbrush
The Selfspace Journal Preview by MindbrushThe Selfspace Journal Preview by Mindbrush
The Selfspace Journal Preview by MindbrushShivain97
 
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)Delhi Call girls
 
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
WOMEN EMPOWERMENT women empowerment.pptx
WOMEN EMPOWERMENT women empowerment.pptxWOMEN EMPOWERMENT women empowerment.pptx
WOMEN EMPOWERMENT women empowerment.pptxpadhand000
 
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)Delhi Call girls
 
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)Delhi Call girls
 
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girlsPooja Nehwal
 
Pokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy TheoryPokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy Theorydrae5
 
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)Delhi Call girls
 
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Morcall Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Morvikas rana
 

Recently uploaded (15)

(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...
(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...
(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...
 
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
 
LC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdfLC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdf
 
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
 
The Selfspace Journal Preview by Mindbrush
The Selfspace Journal Preview by MindbrushThe Selfspace Journal Preview by Mindbrush
The Selfspace Journal Preview by Mindbrush
 
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
 
(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7
(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7
(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7
 
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
WOMEN EMPOWERMENT women empowerment.pptx
WOMEN EMPOWERMENT women empowerment.pptxWOMEN EMPOWERMENT women empowerment.pptx
WOMEN EMPOWERMENT women empowerment.pptx
 
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
 
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
 
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
 
Pokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy TheoryPokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy Theory
 
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
 
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Morcall Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
 

Post project evaluation template

  • 1. Post-Project Evaluation Purpose The purpose of this tool is to facilitate the evaluation of completed or failed projects with the intention of building on strengths and learning from mistakes. The goal is to develop a disciplined process for evaluating project success, and to create standard, formalized, Best Practices that can be applied for future initiatives. Scope This tool will provide a framework for completing a Post-Project Evaluation. There are 6 key areas that need to be assessed: 1. Overall Project Assessment 2. Scope Management 3. Quality of Deliverables 4. Key Accomplishments 5. Lessons Learned 6. Opportunities for Improvement 7. Future Considerations 8. Best Practices
  • 2. Project Information Project Name: Date: Project Manager: Project Sponsor: Anticipated End Date: Actual End Date: Anticipated Budget: Actual Budget: Overall Project Assessment  Did this project meet all the goals and objectives from the Project Charter?  Was the feedback from stakeholders regarding project deliverables positive?  Was the project completed on time and on budget? Scope Management  Did this project deliver all items that were agreed upon in the original scope?  Were all Project Change Requests documented and approved?  If the scope was extended, were budgets and timelines adjusted properly? Quality of Deliverables  Overall, were stakeholders satisfied with the quality of project deliverables?  Were there any exceptional deliverables that really added business value?  Were there any deliverables that were met, but not completed very well? Key Accomplishments Discuss particular project strengths such as teamwork, effective use of tools, or any other items that stood out as positive accomplishments.
  • 3. Lessons Learned  Discuss any areas that were problematic and could be done better next time.  Identify any areas that were successful and should be shared with the PMO.  Be honest in this section; credibility results from accountability.  Determine what actions could be implemented to prevent future problems.  Add information from the table below into the Lessons Learned Knowledge Base. Category Issue Name Problem/Success Impact Recommendations Impact was Always consider A risk was identified minimal because external impacts on the that there may be Risk the PM included project cost and Risk delays in shipping Management shipping delays schedule. This must be due to weather into the project continuous throughout conditions. schedule. the project lifecycle. The PM did not Company XYZ have a plan for The PM must create product development addressing standardized templates department added to changes to the Scope Project Scope and an approval the project scope project scope so process for any scope throughout the the project was changes. project lifecycle. delayed 2 months. Resources were divided across Company XYZ was PM must hire many different Project engaged in too many additional project Resources projects causing Resources projects at the same resources and allocate long wait times time. them accordingly and a delay of 3 months.
  • 4. Future Considerations  Discuss what work could/will be done in future regarding this project.  Include any project maintenance procedures that need to be managed. Best Practices Identify any processes or best practices that were established during this project and describe how these practices will be formalized. Required Signatures By signing below, you agree that an effective post-project evaluation has been completed and action items for improvement have been assigned. Project Manager: Project Sponsor: Date: Date: Name: Name: Title: Title: Signature: Signature: