SlideShare a Scribd company logo
1 of 46
Download to read offline
Welcome !
CROWNSWEAR PRODUCT
SERIES…
Wire Coil
PVC Coated
Synthetic
Polyester
Fibers1st layer
Filter Fabric 2nd layer
( 0.1mm~0.38mm)
Synthetic PolyesterFibers 3rd layer
Hose Structure
PVC Strips
Hose Structure





Sub-Soil Drainage Technology At Its Best
Advantages




Sub-Soil Drainage Technology At Its Best
Area of Usage
適用範圍
 for Field Drainage, Golf Course, Landscape to prevent ponding
 for Tunnel, Concealed Perimeter Drain
 for Roadside, Railside, Airport
 for Hillside Drainage and Slope Protection
 for Garbage Treatment Site
 for Coal Storage Areas
 for Retaining Walls in water logged areas
 for Soil Stabilization and Land Reclamation
Sub-Soil Drainage Technology At Its Best
Sub-Soil Drainage Technology At Its Best
試 驗 項 目
Testing Item
試 驗 方 法
Testing Method
標 準
Result(at least)
單 位
Unit
備 註
Remarks
1
抗拉強度
Tensile
Strength
CNS 5610
L 3080
120以上 經 線
Warp
Kg/5cm 夾具:5cm
拉速:300
mm/min
Width of
Specimen:5cm
Speed:300mm/min
90以上 緯 線
weft
Kg/5cm
2
伸 長 率
Elongation at
break
CNS 5610
L 3080
20以上 經 線
warp
%
20以上 緯 線
Weft
%
3
撕裂強度
Tearing
Strength
CNS 5610
L 3080
35以上 經 線
Warp
Kg
32以上 緯 線
Weft
Kg
4 密 度
Density
目視計數
By eye
3.4以上 經線
Warp
條/cm
50以上 (200丹以上)
(at least 200D/1)
緯線
weft
5
透水係數
Coefficient of
Pereating
CNS10460
L 3201
0.02以上 Cm/sec
定水頭10cm
Constant head of
water:10cm
Sub-Soil Drainage Technology At Its Best
Permeable Area of Crownswear Flexible Permeable Hose 軟管透水面積
口徑
Diameter of
hose
(mm)
面積
Tatal Area
(mm2)
不透水面積
Non-peraeable Ares(mm2)
透水面積
Total Permeable Area
(mm2)
Yarn(a) Spring Wire(b) Total(a+b)
50 157,080 60,000 17,278.80 77,278.80 79,801.20(50.80%)
80 251,328 90,000 25,132.80 115,132.80 136,195.20(54.19%)
100 314,160 120,000 32,044.32 152,044.32 162,115.68(51.60%)
150 471,240 180,000 47,124.00 227,124.00 244,116.00(51.80%)
200 628,320 240,000 59,690.40 299,690.40 328,629.60(52.20%)
Specifications 規格
規格
Specification
Item Nos.
口徑
Inner Diameter
mm(inch)+2
鋼線密度
Steel Coil
Density( Coil/M)+3
鋼線直徑
Steel Diameter
(mm)+0.1
標準長度
Standard
Length (m)
50 50(2) 內徑 55 1.4 150
80 80(3) 內徑 40 2.0 80
100 100(4) 內徑 34 2.6 60
150 150(6) 內徑 25 3.5 50
200 200(8) 內徑 19 4.5 35
250 250(10) 內徑 15 5.0 25
300 300(12) 內徑 12 5.5 25
軟式透水管有管壁及鋼線做支撐體而硬管只有管壁做支撐體
Crushing Strength
Crownswear Flexible Permeable Hose Vs Concrete Porous Pipe
口徑
Nominal
Diameter
(mm)
軟式透水管
Crownswear Flexible
Permeable Hose
硬管(網管)
Concrete Porous
Pipe
測試結果
Comparison
Result
75/80 20920 N/m 20200 N/m Ok
100 21400 N/m 20200 N/m Ok
150/200 23160 N/m 20200 N/m Ok
Sub-Soil Drainage Technology At Its Best
Flattening Pressure Endurance Ratio
Flexible Permeable Hose with the screw like reinforcement structure is constructed by using the strong
carbon steel wire which is to let external pressure to spread evenly around the body of the hose when press.
1.The list of pressure added with tolerence of +5%.
2.The test results is based on 25cm hose length,if testing length is 1 meter, then the pressure added will be 4 times of
this listed test results.
The test results is 1 meter.
Sub-Soil Drainage Technology At Its Best
(外徑)
Recommended Trenching
規格
Product Code
口徑
Inner Diameter
(mm)
寬度
W=Width Of Trench
(mm)
埋管基本深度
H=Initial Depth Of Trench
(mm)
SH-50 50 (內徑) 300 400~600
SH-80 80 (內徑) 300 430~630
SH-100 100 (內徑) 400 450~650
SH-150 150 (內徑) 450 500~700
SH-200 200 (內徑) 450 550~750
Sub-Soil Drainage Technology At Its Best
Methods of Installation
 Flexibility, lightweight and easy to install cost effective.
。
 Geotextiles is not required, for wrap-around the pipes.
 No fittings is required for jointings (i.e.T-joints, Y-joints or elbows)
。
(We fabricate bends, tees, elbows reducer by using the parent hose.)
 The hose can be installed horizontally, vertically, diagonally or in
herringbone design or 90
。
or any other way the client wishes to
install.
Sub-Soil Drainage Technology At Its Best
TABLE OF FLOW QUANTITY AND VELOCITY DATA
Sub-Soil Drainage Technology At Its Best
Static Pressure of Ground
Sub-Soil Drainage Technology At Its Best
Static Pressure of Ground
The static pressure of ground above the buried
pipe can be counted pre following formula:
P: Static pressure of ground (kg/m2)
h: the burying depth
B: the width of ditch
W: the weight of 1 m3 soil (2000kg/m3,soil and
rock)
Ө: 40゚ (the angle of ____ ) (May adjust)
e: the base of _____ (May adjust)
B: Pipe diameter (D)X2
Joint Recommendation
Joint Recommendation
Joint Recommendation
Typical Trench Details
Recommendation I :
- Road Base
Drainage
- Railside Drainage
Recommendation II :
- Concealed Perimeter
Drain
Recommendation III :
- Field Drainage
NOTE:THE BACKFILLING MATERIALS WILL DEPENDS ON.
1.COST BETWEEN AGGREGATE AND SAND.
2.THE RATE OF INFILTRATION, USING AGGREGATE WILL CREATE A BETTER POROUSITY AND WILL
ENHANCE THE PERMEABILITY RATES.
** 回填土溝之材料選擇,將隨著下列因素變更
1.骨材與粗砂的成本。
2.用粗砂會獲得較好的孔隙率,且會增進其滲透率及排水量。
Typical Football Field Design
Sample I Sample II
Sample III Sample IV
Typical Tunnel & Road Base
Drainage Design
Vertical & Horizontal Tunnel
Drainage
Road Base Drainage System
Permeable Hose
Tunnel Drainage Conceal Perimeter Drain
Tunnel Project in Nanjing, China
Bungalow at Jalan Tun Ismail, Ipoh
Perak.
Road Drainage Railside Drain
Sim Yang - Shan Hai Kuan Highway
Project in China
Electrified Double Tracking Project
between Rawang and Ipoh
Typical Retaining Wall Design
Vertical Drainage on Back of
Retaining Wall System
Horizontal Drainage on Back
of Retaining Wall System
Retaining Wall Protection Drainage
Farlim area 9D, Bandar Baru Ayer
Item, Pulau Pinang.
Retaining Wall Project in Taiwan.
Typical Slope Drainage Design
Blind Ditch and Branches of
Intercepting Water on Ladder
Slope
Slope Protection Drainage
System
Slope Protection
MTD - Pos Slim - Lojing Highway
(Second East - West Highway)
Horizontal Drainage Project in
Taiwan.
Vertical Drainage & Conceal Perimeter
Drainage Design
Vertical Drainage System Comparison between Open &
Conceal Drainage System
Vertical Drainage
Sub-Soil Drainage Technology At Its Best
Sub-Soil Drainage Technology At Its Best
Vertical Drainage
Land Reclamation Soil Consolidation
Formosa, Yulin County, Taiwan Keelung River, Taipei City, Taiwan
Soil Consolidation Formosa, Yulin County, Taiwan NOVEMBER,1996
Soil Consolidation Formosa, Yulin County, Taiwan APRIL,2012
麥寮區5道A大排 F2a段 海豐區7道D大排 中排匯入(A6a段旁)
海豐區7道D大排 透水孔(A2a段旁) 海豐區7道D大排 透水孔(A2a段基礎施工)
Taiwan Taoyuan International Airport Access
MRT System Construction Project
Field Drainage
Wing On Golf Country Club
Field Drainage
Tucheng Maintenance Depot
Field Drainage
Clearwater Sanctuary Golf Resort Ipoh, Perak.
Golf Course : Sport Field:
S.R.J.K. (C) Yuk Choy
Landscape
Dewan Undangan Negeri Perak.
Method of Installation
Step 1: To measure the dimension &
level.
Step 2: To construct a sump.
Field Drainage (Sport Field)
Method of Installation
Step 3: To drill the holes for the hose
outlet.
Step 4: To excavate the
trench for main hose.
Field Drainage (Sport Field)
Method of Installation
Step 6: To backfill the hose
with sand.
Step 5: To lay the main hose.
Field Drainage (Sport Field)
Method of Installation
Step 7: To excavate and level the
branch hose.
Step 8: To lay and tie the
joints.
Field Drainage (Sport Field)
Method of Installation
Step 9: The T-joint.
Step 10: To measure the finish
level.
Field Drainage (Sport Field)
Method of Installation
Step 11: To mark the expected finish
level.
Step 12: To flatten and chamfer
the surface layers.
Field Drainage (Sport Field)
Method of Installation
Completion.
Performance.
Field Drainage (Sport Field)
NO. 工 程 名 稱
1 大台北華城整地工程及擋土牆工程 77-83年
2 新店溪右岸堤外低水擴岸工程 81年
3 松山信義計畫一號廣場地下停車場 81年
4 台北市市政中心新建工程 81年
5 永漢高爾夫球場 82年
6 彰濱工業區鹿港西區排水幹線及閘門工程 82,83,86年
7 台北市信義區安全島增設排水管工程 83年
8 秀崗山莊 83-86年
9 捷運木柵線、新店線、淡水線 83年
10 基隆河截彎取直整治工程,金泰段,舊宗段及綠化工程 83,84年
11 西濱快速道路 84年
12 圓山飯店 84,85年
13 木柵文山區兆如安養中心 84年
14 北二高基汐段 84年
15 新竹科學園區 84年
16 金山安樂園 84年
17 台塑麥寮六輕工程 84-87年
18 台北市市府1號廣場 85年
19 嘉義棒球場 85年
20 中油桃園煤油場 85年
21
第二高速公路後續計畫雲林,嘉義段C34PZ標、C366~368標
86年
22 北宜高速公路2-M-127,2-M-128 87年
23 台中酒廠 87年
24 二高後續計畫雲嘉段第C349Z標 87年
25 南二高關廟休息站及關廟龜洞段基樁與大地工程 87年
26 國立海洋生物博館地一期增建工程 88年
NO 工 程 名 稱
27 二高後續計畫雲林嘉義段第C3451標、西湖段C313、307標 88-89年
28 砂崙子崩塌地植生工程 89年
29 捷運土城線CD550標 89年
30 二高後續計畫竹南至西湖段第C305標即304A標工程 89年
31 台北市立動物園遊客運輸系統前期工程還原道路 90年
32 第二高速公路後續林嘉義段第C345標古坑大林段及梅山交流道工程 90年
33 台北捷運土城線CD550標子標施工標CD267標工程 90年
34 台北市仰德大道三段102號邊坡穩定處理工程 91年
35 台糖公司新營廠水庫大壩及邊坡災害復救工程 91年
36 國道一號汐止至五股段工程22K+800~24K+700圓山交流道景觀工程 91年
37 南科滯洪池D、A及防洪抽水站工程 91年
38 陸軍湖口基地燒炭窩溪訓練場一O五裝甲車靶場遷建工程 91年
39 基隆河整治計畫(前期計畫)-保長坑溪(支流)改善工程(第二標) 93-94年
40 澎湖縣馬公市山水東段綠化工程及湖西鄉北寮段綠化工程 95年
41 營造光榮碼頭景觀廊道白色沙灘景觀遊憩工程 96年
42 屏東隘口溪吉民橋下游護岸復建工程 96年
43 臺灣桃園國際機場聯外捷運系統建設統包工程-機廠土建及其他機電設備
44 台南縣大新營工業區開發工程高架水塔及配水池新建工程
45 烏來區第32林班崩塌地下水土保持維護工程
46 龍門核四計畫九十七年度綠化植栽養護工程
47 美濃溪福安中壇護岸防災減災工程
48 國定古蹟蔣宋士林官邸建築物修繕工程
49 雲林縣北港鎮台糖舊鐵道既有市區道路景觀與人行環境改善計畫工程
50 「臺鐵高雄-屏東潮州捷運化建設計畫」潮州車輛基地整地暨東港溪橋工程
NO. 工 程 名 稱
51 台電中平變電所
52 龍崎鄉牛埔村烏山腳村道災害復建工程
53 東眼山國家森林遊樂區餐廳基地穩定處理工程
54 台北捷運新莊線CK570C區段標景觀工程
55 土城市公兒一公園開闢工程
56 屏東六堆忠義祠舊碑保存及廟前廣利用工程
57 嘉義東興村3鄰野溪復建工程
58 台南阿姆坪生態園區第二期整建工程
59 台塑嘉義雲林長庚綜合醫學大樓環境工程
60 高雄縣第二十三期育才市地重劃後續工程
61
97年卡玫基及鳳凰災後復建-信義鄉自強村投59線8k+700道路災
修復建工程
62 98年度蘭潭風景區整頓觀光遊憩環境品質工程
63 高雄市第45期小港區孔宅段1062地號自辦市地重劃工程
64
台北捷運新莊線CK570G區段標大橋國小復舊設施及游泳地新建工
程
65 台北市立美術館南西向第二出入口與台北故事館介面整修工程
66 國防部-常山專案工程
67 國防部-順安專案工程
68 中部科學工業園后里園區(七星園區)基地聯絡道工程
69 臺北縣歷史建築「公司田溪程氏古厝」修復及再利用工程
70 雲林縣大美國小運動場及周邊整修工程
71 99年度大坑地區治山防洪工程
72 總統府正大門車道兩側景觀改善工程
73 國醫中心職務官舍新建工程(第二階段)統包工程
74 國防部-「SA專案」TP營區新建工程
75
台灣世界展望會-八八水災重建工程部落安置住宅案屏東瑪家基
地永久屋興建工程
76 98年度三芝石門自行車道(古庄至白沙灣)興建工程
NO 工 程 名 稱
77
八八水災重建-屏東瑪家鄉風景巷原住民活動中心新建工程
78
協和電廠345KV開關廠更新土建統包工程
79
空軍司令部「忠勇分案」新建工程
80
臺灣桃園國際機場聯外捷運系統建設計畫機電系統統包工程-機廠土建及其他
機電設備(蘆竹機廠)
81
澎湖縣馬公市20-3計畫道路改善工程
82 臺北機廠遷建建設計畫-富岡基地(CL221標及CL221-1標)
83
新北市萬里區中幅子土資場
84
新北市石碇鄉小格頭土方資源堆置場
85
大鵬灣國家風景區BOT案-大鵬灣國際賽車場北側看台土堤工程
86
慶豐社區1鄰產業道路及周邊環境改善工程
87
臺北機廠遷建建設計畫-富岡基地(CL321-2標機務段第一期工程)暨臺鐵捷運後
續計畫(CL321-1標電聯車檢修基地廠房及周邊配合工程)
88
101年度6月泰利颱風H3-176鹿谷鄉和雅村樟空路0K+350道路災修復建工程
89
藝之森-九九峰生態藝術園區-園區美化工程
90
台塑越南河靜鋼全廠區南北側邊界主排擋牆工程
91
台塑河靜鋼鐵廠FGHJ主管宿舍新建-運動場工程
92
新北市國定古蹟新莊廣福宮修復工程
93
新北市立深坑國民中學足球場修繕工程
94 台南白河段轄區邊坡排水維護工程(103)
95 食水坑支流野溪整治工程
96 屏東縣屏東市中正市地重劃區重劃工程
97 女一舍擋土牆及排水設施修復工程
98 新北市立新埔國民中學-102年度透水鋪面改善工程
99 彰化縣國中技藝教育中心擋土牆設施新建工程
100
臺東市海濱休憩帶周邊環境改善工程
廣水企業股份有限公司 Crownswear Head Office:
台北市士林區文林路726號2樓
2FL. NO.726. WEN LIN ROAD.TAIPEI,
TAIWAN, R.O.C
TEL:886-2-2832-1916 FAX:886-2-2832-1917
E-mail:crownmp@ms29.hinet.net
http://www.crownswear.com
南京廣水管業有限公司 Manufacturing Plant:
南京市馬群科學園區天馬路8號廠房
NO.8 TIANMA ROAD, MAQUN SCIENCE
PARK, 210049 NANJING. CHINA. PROC.
TEL:86-25-84358698 FAX:86-25-84365586
越南廣水責任有限公司 Crownswear Vietnam:
越南胡志明市新平郡第十二坊黃花探街
214 號5樓
5 Floor, No.214 Hoang Hoa Tham, Ward 12, Tan
Binh District, HCM City, Vietnam
TEL:84-8-866855110 FAX:84-8--62937939

More Related Content

Similar to Permeable pipe

4塑料排水板 軟基處理及真空預壓-中英文說明
4塑料排水板 軟基處理及真空預壓-中英文說明4塑料排水板 軟基處理及真空預壓-中英文說明
4塑料排水板 軟基處理及真空預壓-中英文說明
crownswear
 
37至59号墩特殊地段承台支护方案
37至59号墩特殊地段承台支护方案37至59号墩特殊地段承台支护方案
37至59号墩特殊地段承台支护方案
kombergke
 
井巷工程 第六章 煤巷施工
井巷工程 第六章 煤巷施工井巷工程 第六章 煤巷施工
井巷工程 第六章 煤巷施工
zhao heh
 

Similar to Permeable pipe (7)

4塑料排水板 軟基處理及真空預壓-中英文說明
4塑料排水板 軟基處理及真空預壓-中英文說明4塑料排水板 軟基處理及真空預壓-中英文說明
4塑料排水板 軟基處理及真空預壓-中英文說明
 
4塑料排水板 軟基處理及真空預壓-中英文說明
4塑料排水板 軟基處理及真空預壓-中英文說明4塑料排水板 軟基處理及真空預壓-中英文說明
4塑料排水板 軟基處理及真空預壓-中英文說明
 
Est group harbin urea conference 2014 pap paper v1 chinese
Est group harbin urea conference 2014 pap paper v1 chineseEst group harbin urea conference 2014 pap paper v1 chinese
Est group harbin urea conference 2014 pap paper v1 chinese
 
Research on Key Construction Technologies of Hangzhou Bay Bridge
Research on Key Construction Technologies of Hangzhou Bay BridgeResearch on Key Construction Technologies of Hangzhou Bay Bridge
Research on Key Construction Technologies of Hangzhou Bay Bridge
 
37至59号墩特殊地段承台支护方案
37至59号墩特殊地段承台支护方案37至59号墩特殊地段承台支护方案
37至59号墩特殊地段承台支护方案
 
China pap presentation 2014 1-6
China pap presentation 2014 1-6China pap presentation 2014 1-6
China pap presentation 2014 1-6
 
井巷工程 第六章 煤巷施工
井巷工程 第六章 煤巷施工井巷工程 第六章 煤巷施工
井巷工程 第六章 煤巷施工
 

More from crownswear (20)

Permeable paving.pptx
Permeable paving.pptxPermeable paving.pptx
Permeable paving.pptx
 
Permeable paving.pptx
Permeable paving.pptxPermeable paving.pptx
Permeable paving.pptx
 
Penetration side ditch.pptx
Penetration side ditch.pptxPenetration side ditch.pptx
Penetration side ditch.pptx
 
Permeable paving.pptx
Permeable paving.pptxPermeable paving.pptx
Permeable paving.pptx
 
Soft permeable pipe.pptx
Soft permeable pipe.pptxSoft permeable pipe.pptx
Soft permeable pipe.pptx
 
permeable paving
permeable pavingpermeable paving
permeable paving
 
soft permeable pipe
soft permeable pipesoft permeable pipe
soft permeable pipe
 
slideshare
slideshareslideshare
slideshare
 
soft permeable pipe
soft permeable pipesoft permeable pipe
soft permeable pipe
 
Sc 01
Sc 01Sc 01
Sc 01
 
Permeable materials
Permeable materialsPermeable materials
Permeable materials
 
Pavement
PavementPavement
Pavement
 
pavement
pavementpavement
pavement
 
pavement
pavementpavement
pavement
 
Pavement
PavementPavement
Pavement
 
Pavement
PavementPavement
Pavement
 
Pavement
PavementPavement
Pavement
 
Pavement
PavementPavement
Pavement
 
Pavement
PavementPavement
Pavement
 
Pavement
PavementPavement
Pavement
 

Permeable pipe

  • 2.
  • 3. Wire Coil PVC Coated Synthetic Polyester Fibers1st layer Filter Fabric 2nd layer ( 0.1mm~0.38mm) Synthetic PolyesterFibers 3rd layer Hose Structure PVC Strips
  • 6. Area of Usage 適用範圍  for Field Drainage, Golf Course, Landscape to prevent ponding  for Tunnel, Concealed Perimeter Drain  for Roadside, Railside, Airport  for Hillside Drainage and Slope Protection  for Garbage Treatment Site  for Coal Storage Areas  for Retaining Walls in water logged areas  for Soil Stabilization and Land Reclamation Sub-Soil Drainage Technology At Its Best
  • 7. Sub-Soil Drainage Technology At Its Best 試 驗 項 目 Testing Item 試 驗 方 法 Testing Method 標 準 Result(at least) 單 位 Unit 備 註 Remarks 1 抗拉強度 Tensile Strength CNS 5610 L 3080 120以上 經 線 Warp Kg/5cm 夾具:5cm 拉速:300 mm/min Width of Specimen:5cm Speed:300mm/min 90以上 緯 線 weft Kg/5cm 2 伸 長 率 Elongation at break CNS 5610 L 3080 20以上 經 線 warp % 20以上 緯 線 Weft % 3 撕裂強度 Tearing Strength CNS 5610 L 3080 35以上 經 線 Warp Kg 32以上 緯 線 Weft Kg 4 密 度 Density 目視計數 By eye 3.4以上 經線 Warp 條/cm 50以上 (200丹以上) (at least 200D/1) 緯線 weft 5 透水係數 Coefficient of Pereating CNS10460 L 3201 0.02以上 Cm/sec 定水頭10cm Constant head of water:10cm
  • 8. Sub-Soil Drainage Technology At Its Best Permeable Area of Crownswear Flexible Permeable Hose 軟管透水面積 口徑 Diameter of hose (mm) 面積 Tatal Area (mm2) 不透水面積 Non-peraeable Ares(mm2) 透水面積 Total Permeable Area (mm2) Yarn(a) Spring Wire(b) Total(a+b) 50 157,080 60,000 17,278.80 77,278.80 79,801.20(50.80%) 80 251,328 90,000 25,132.80 115,132.80 136,195.20(54.19%) 100 314,160 120,000 32,044.32 152,044.32 162,115.68(51.60%) 150 471,240 180,000 47,124.00 227,124.00 244,116.00(51.80%) 200 628,320 240,000 59,690.40 299,690.40 328,629.60(52.20%) Specifications 規格 規格 Specification Item Nos. 口徑 Inner Diameter mm(inch)+2 鋼線密度 Steel Coil Density( Coil/M)+3 鋼線直徑 Steel Diameter (mm)+0.1 標準長度 Standard Length (m) 50 50(2) 內徑 55 1.4 150 80 80(3) 內徑 40 2.0 80 100 100(4) 內徑 34 2.6 60 150 150(6) 內徑 25 3.5 50 200 200(8) 內徑 19 4.5 35 250 250(10) 內徑 15 5.0 25 300 300(12) 內徑 12 5.5 25
  • 9. 軟式透水管有管壁及鋼線做支撐體而硬管只有管壁做支撐體 Crushing Strength Crownswear Flexible Permeable Hose Vs Concrete Porous Pipe 口徑 Nominal Diameter (mm) 軟式透水管 Crownswear Flexible Permeable Hose 硬管(網管) Concrete Porous Pipe 測試結果 Comparison Result 75/80 20920 N/m 20200 N/m Ok 100 21400 N/m 20200 N/m Ok 150/200 23160 N/m 20200 N/m Ok Sub-Soil Drainage Technology At Its Best
  • 10. Flattening Pressure Endurance Ratio Flexible Permeable Hose with the screw like reinforcement structure is constructed by using the strong carbon steel wire which is to let external pressure to spread evenly around the body of the hose when press. 1.The list of pressure added with tolerence of +5%. 2.The test results is based on 25cm hose length,if testing length is 1 meter, then the pressure added will be 4 times of this listed test results. The test results is 1 meter. Sub-Soil Drainage Technology At Its Best (外徑)
  • 11. Recommended Trenching 規格 Product Code 口徑 Inner Diameter (mm) 寬度 W=Width Of Trench (mm) 埋管基本深度 H=Initial Depth Of Trench (mm) SH-50 50 (內徑) 300 400~600 SH-80 80 (內徑) 300 430~630 SH-100 100 (內徑) 400 450~650 SH-150 150 (內徑) 450 500~700 SH-200 200 (內徑) 450 550~750 Sub-Soil Drainage Technology At Its Best
  • 12. Methods of Installation  Flexibility, lightweight and easy to install cost effective. 。  Geotextiles is not required, for wrap-around the pipes.  No fittings is required for jointings (i.e.T-joints, Y-joints or elbows) 。 (We fabricate bends, tees, elbows reducer by using the parent hose.)  The hose can be installed horizontally, vertically, diagonally or in herringbone design or 90 。 or any other way the client wishes to install. Sub-Soil Drainage Technology At Its Best
  • 13. TABLE OF FLOW QUANTITY AND VELOCITY DATA Sub-Soil Drainage Technology At Its Best
  • 14. Static Pressure of Ground Sub-Soil Drainage Technology At Its Best Static Pressure of Ground The static pressure of ground above the buried pipe can be counted pre following formula: P: Static pressure of ground (kg/m2) h: the burying depth B: the width of ditch W: the weight of 1 m3 soil (2000kg/m3,soil and rock) Ө: 40゚ (the angle of ____ ) (May adjust) e: the base of _____ (May adjust) B: Pipe diameter (D)X2
  • 18. Typical Trench Details Recommendation I : - Road Base Drainage - Railside Drainage Recommendation II : - Concealed Perimeter Drain Recommendation III : - Field Drainage NOTE:THE BACKFILLING MATERIALS WILL DEPENDS ON. 1.COST BETWEEN AGGREGATE AND SAND. 2.THE RATE OF INFILTRATION, USING AGGREGATE WILL CREATE A BETTER POROUSITY AND WILL ENHANCE THE PERMEABILITY RATES. ** 回填土溝之材料選擇,將隨著下列因素變更 1.骨材與粗砂的成本。 2.用粗砂會獲得較好的孔隙率,且會增進其滲透率及排水量。
  • 19. Typical Football Field Design Sample I Sample II Sample III Sample IV
  • 20. Typical Tunnel & Road Base Drainage Design Vertical & Horizontal Tunnel Drainage Road Base Drainage System Permeable Hose
  • 21. Tunnel Drainage Conceal Perimeter Drain Tunnel Project in Nanjing, China Bungalow at Jalan Tun Ismail, Ipoh Perak.
  • 22. Road Drainage Railside Drain Sim Yang - Shan Hai Kuan Highway Project in China Electrified Double Tracking Project between Rawang and Ipoh
  • 23. Typical Retaining Wall Design Vertical Drainage on Back of Retaining Wall System Horizontal Drainage on Back of Retaining Wall System
  • 24. Retaining Wall Protection Drainage Farlim area 9D, Bandar Baru Ayer Item, Pulau Pinang. Retaining Wall Project in Taiwan.
  • 25. Typical Slope Drainage Design Blind Ditch and Branches of Intercepting Water on Ladder Slope Slope Protection Drainage System
  • 26. Slope Protection MTD - Pos Slim - Lojing Highway (Second East - West Highway) Horizontal Drainage Project in Taiwan.
  • 27. Vertical Drainage & Conceal Perimeter Drainage Design Vertical Drainage System Comparison between Open & Conceal Drainage System
  • 28. Vertical Drainage Sub-Soil Drainage Technology At Its Best
  • 29. Sub-Soil Drainage Technology At Its Best Vertical Drainage
  • 30. Land Reclamation Soil Consolidation Formosa, Yulin County, Taiwan Keelung River, Taipei City, Taiwan
  • 31. Soil Consolidation Formosa, Yulin County, Taiwan NOVEMBER,1996
  • 32. Soil Consolidation Formosa, Yulin County, Taiwan APRIL,2012 麥寮區5道A大排 F2a段 海豐區7道D大排 中排匯入(A6a段旁) 海豐區7道D大排 透水孔(A2a段旁) 海豐區7道D大排 透水孔(A2a段基礎施工)
  • 33. Taiwan Taoyuan International Airport Access MRT System Construction Project Field Drainage
  • 34. Wing On Golf Country Club Field Drainage Tucheng Maintenance Depot
  • 35. Field Drainage Clearwater Sanctuary Golf Resort Ipoh, Perak. Golf Course : Sport Field: S.R.J.K. (C) Yuk Choy
  • 37. Method of Installation Step 1: To measure the dimension & level. Step 2: To construct a sump. Field Drainage (Sport Field)
  • 38. Method of Installation Step 3: To drill the holes for the hose outlet. Step 4: To excavate the trench for main hose. Field Drainage (Sport Field)
  • 39. Method of Installation Step 6: To backfill the hose with sand. Step 5: To lay the main hose. Field Drainage (Sport Field)
  • 40. Method of Installation Step 7: To excavate and level the branch hose. Step 8: To lay and tie the joints. Field Drainage (Sport Field)
  • 41. Method of Installation Step 9: The T-joint. Step 10: To measure the finish level. Field Drainage (Sport Field)
  • 42. Method of Installation Step 11: To mark the expected finish level. Step 12: To flatten and chamfer the surface layers. Field Drainage (Sport Field)
  • 44. NO. 工 程 名 稱 1 大台北華城整地工程及擋土牆工程 77-83年 2 新店溪右岸堤外低水擴岸工程 81年 3 松山信義計畫一號廣場地下停車場 81年 4 台北市市政中心新建工程 81年 5 永漢高爾夫球場 82年 6 彰濱工業區鹿港西區排水幹線及閘門工程 82,83,86年 7 台北市信義區安全島增設排水管工程 83年 8 秀崗山莊 83-86年 9 捷運木柵線、新店線、淡水線 83年 10 基隆河截彎取直整治工程,金泰段,舊宗段及綠化工程 83,84年 11 西濱快速道路 84年 12 圓山飯店 84,85年 13 木柵文山區兆如安養中心 84年 14 北二高基汐段 84年 15 新竹科學園區 84年 16 金山安樂園 84年 17 台塑麥寮六輕工程 84-87年 18 台北市市府1號廣場 85年 19 嘉義棒球場 85年 20 中油桃園煤油場 85年 21 第二高速公路後續計畫雲林,嘉義段C34PZ標、C366~368標 86年 22 北宜高速公路2-M-127,2-M-128 87年 23 台中酒廠 87年 24 二高後續計畫雲嘉段第C349Z標 87年 25 南二高關廟休息站及關廟龜洞段基樁與大地工程 87年 26 國立海洋生物博館地一期增建工程 88年 NO 工 程 名 稱 27 二高後續計畫雲林嘉義段第C3451標、西湖段C313、307標 88-89年 28 砂崙子崩塌地植生工程 89年 29 捷運土城線CD550標 89年 30 二高後續計畫竹南至西湖段第C305標即304A標工程 89年 31 台北市立動物園遊客運輸系統前期工程還原道路 90年 32 第二高速公路後續林嘉義段第C345標古坑大林段及梅山交流道工程 90年 33 台北捷運土城線CD550標子標施工標CD267標工程 90年 34 台北市仰德大道三段102號邊坡穩定處理工程 91年 35 台糖公司新營廠水庫大壩及邊坡災害復救工程 91年 36 國道一號汐止至五股段工程22K+800~24K+700圓山交流道景觀工程 91年 37 南科滯洪池D、A及防洪抽水站工程 91年 38 陸軍湖口基地燒炭窩溪訓練場一O五裝甲車靶場遷建工程 91年 39 基隆河整治計畫(前期計畫)-保長坑溪(支流)改善工程(第二標) 93-94年 40 澎湖縣馬公市山水東段綠化工程及湖西鄉北寮段綠化工程 95年 41 營造光榮碼頭景觀廊道白色沙灘景觀遊憩工程 96年 42 屏東隘口溪吉民橋下游護岸復建工程 96年 43 臺灣桃園國際機場聯外捷運系統建設統包工程-機廠土建及其他機電設備 44 台南縣大新營工業區開發工程高架水塔及配水池新建工程 45 烏來區第32林班崩塌地下水土保持維護工程 46 龍門核四計畫九十七年度綠化植栽養護工程 47 美濃溪福安中壇護岸防災減災工程 48 國定古蹟蔣宋士林官邸建築物修繕工程 49 雲林縣北港鎮台糖舊鐵道既有市區道路景觀與人行環境改善計畫工程 50 「臺鐵高雄-屏東潮州捷運化建設計畫」潮州車輛基地整地暨東港溪橋工程
  • 45. NO. 工 程 名 稱 51 台電中平變電所 52 龍崎鄉牛埔村烏山腳村道災害復建工程 53 東眼山國家森林遊樂區餐廳基地穩定處理工程 54 台北捷運新莊線CK570C區段標景觀工程 55 土城市公兒一公園開闢工程 56 屏東六堆忠義祠舊碑保存及廟前廣利用工程 57 嘉義東興村3鄰野溪復建工程 58 台南阿姆坪生態園區第二期整建工程 59 台塑嘉義雲林長庚綜合醫學大樓環境工程 60 高雄縣第二十三期育才市地重劃後續工程 61 97年卡玫基及鳳凰災後復建-信義鄉自強村投59線8k+700道路災 修復建工程 62 98年度蘭潭風景區整頓觀光遊憩環境品質工程 63 高雄市第45期小港區孔宅段1062地號自辦市地重劃工程 64 台北捷運新莊線CK570G區段標大橋國小復舊設施及游泳地新建工 程 65 台北市立美術館南西向第二出入口與台北故事館介面整修工程 66 國防部-常山專案工程 67 國防部-順安專案工程 68 中部科學工業園后里園區(七星園區)基地聯絡道工程 69 臺北縣歷史建築「公司田溪程氏古厝」修復及再利用工程 70 雲林縣大美國小運動場及周邊整修工程 71 99年度大坑地區治山防洪工程 72 總統府正大門車道兩側景觀改善工程 73 國醫中心職務官舍新建工程(第二階段)統包工程 74 國防部-「SA專案」TP營區新建工程 75 台灣世界展望會-八八水災重建工程部落安置住宅案屏東瑪家基 地永久屋興建工程 76 98年度三芝石門自行車道(古庄至白沙灣)興建工程 NO 工 程 名 稱 77 八八水災重建-屏東瑪家鄉風景巷原住民活動中心新建工程 78 協和電廠345KV開關廠更新土建統包工程 79 空軍司令部「忠勇分案」新建工程 80 臺灣桃園國際機場聯外捷運系統建設計畫機電系統統包工程-機廠土建及其他 機電設備(蘆竹機廠) 81 澎湖縣馬公市20-3計畫道路改善工程 82 臺北機廠遷建建設計畫-富岡基地(CL221標及CL221-1標) 83 新北市萬里區中幅子土資場 84 新北市石碇鄉小格頭土方資源堆置場 85 大鵬灣國家風景區BOT案-大鵬灣國際賽車場北側看台土堤工程 86 慶豐社區1鄰產業道路及周邊環境改善工程 87 臺北機廠遷建建設計畫-富岡基地(CL321-2標機務段第一期工程)暨臺鐵捷運後 續計畫(CL321-1標電聯車檢修基地廠房及周邊配合工程) 88 101年度6月泰利颱風H3-176鹿谷鄉和雅村樟空路0K+350道路災修復建工程 89 藝之森-九九峰生態藝術園區-園區美化工程 90 台塑越南河靜鋼全廠區南北側邊界主排擋牆工程 91 台塑河靜鋼鐵廠FGHJ主管宿舍新建-運動場工程 92 新北市國定古蹟新莊廣福宮修復工程 93 新北市立深坑國民中學足球場修繕工程 94 台南白河段轄區邊坡排水維護工程(103) 95 食水坑支流野溪整治工程 96 屏東縣屏東市中正市地重劃區重劃工程 97 女一舍擋土牆及排水設施修復工程 98 新北市立新埔國民中學-102年度透水鋪面改善工程 99 彰化縣國中技藝教育中心擋土牆設施新建工程 100 臺東市海濱休憩帶周邊環境改善工程
  • 46. 廣水企業股份有限公司 Crownswear Head Office: 台北市士林區文林路726號2樓 2FL. NO.726. WEN LIN ROAD.TAIPEI, TAIWAN, R.O.C TEL:886-2-2832-1916 FAX:886-2-2832-1917 E-mail:crownmp@ms29.hinet.net http://www.crownswear.com 南京廣水管業有限公司 Manufacturing Plant: 南京市馬群科學園區天馬路8號廠房 NO.8 TIANMA ROAD, MAQUN SCIENCE PARK, 210049 NANJING. CHINA. PROC. TEL:86-25-84358698 FAX:86-25-84365586 越南廣水責任有限公司 Crownswear Vietnam: 越南胡志明市新平郡第十二坊黃花探街 214 號5樓 5 Floor, No.214 Hoang Hoa Tham, Ward 12, Tan Binh District, HCM City, Vietnam TEL:84-8-866855110 FAX:84-8--62937939