17. Case Study : Aim
17
Corrective Measures during Actual Incident
Support for Salvage Operation
Repair Feasibility Study
Operations
18. • Actual Incident
• Process –
• Estimate Survivability
• Pollution/ Oil Out Flow
• Ballast Exchange – Cargo Re Arrangement
• Double Banking
•
Case Study
18
19. Case Study : Salvage/ Recycle
19
Separate Hydrostatic Analysis
20. • To be re Towed and Restored
Case Study : Salvage/ Recycle – Cont..
20
21. • To be shifted and recycled
Case Study : Salvage/ Recycle – Cont..
21
22. Case Study : Salvage/ Recycle – Cont..
22
• Blanking of Pipe Lines
• Ballasting
• Establish a Condition for towing
23. • Challenges in Floating and Shifting
Case Study : Salvage/ Recycle – Cont..
23