1. Production Schedule
Date Production Schedule What we need to do Completed?
Week beginning Conduct a photo-shoot in which all Propose a contract for permission
11th March images will be taken for the front of location and one for models. A risk
cover, contents and double page spread. assessment will also have to be done in the
chosen location before taking the image
Week beginning Start creating the front cover of the Make up the mast head, story
11th March magazine covers, editing to the images, make pugs
and other conventions of a front cover in
order to create a professional look.
Allow for extra days
Week beginning Produce contents page and double page Make up the typical conventions for a
18th March spread contents page and double page spread
including the written article.
Allow for extra days
Week beginning Final Check of finished products Make sure each piece of work is made to a
25th March high professional standard including most if
not all conventions of a magazine. Make
sure final product is original and creative
and check for spelling.
17th April Uploading Make sure all final pieces have been
uploaded to my Yolasite.