SlideShare a Scribd company logo
1 of 16
Download to read offline
Aerospace Tooling
Portable Proof Load Kit Instruction Manual
sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0)
GLOBAL MASTER DISTRIBUTOR:
Carter Manufacturing Limited
TEL: +44 (0)1865 821 720
EMAIL: sales@carterbearings.co.uk
GLOBAL MASTER DISTRIBUTOR:
Carter Manufacturing Limited
TEL: +44 (0)1865 821 720
EMAIL: sales@carterbearings.co.uk
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
2
Unasis Breakaway Torque Tool
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
Table of Contents
Table of Figures.................................................................. 	 4
Part List ..............................................................................	 5
Precautions Prior to Use .................................................... 	 6
Instructions ......................................................................... 	 7
	 Step 1............................................................................ 	 7
		 Connect load cell to the electronic display ............... 	 7
	 Step 2............................................................................ 	 8
		 Turn on the electronic load display........................... 	 8
	 Step 3............................................................................ 	 8
		 Tare the display to zero load .................................... 	 8
	 Step 4............................................................................	 8
		 Mount DTI assembly onto bearing and housing ......	 8
	 Step 5 ...........................................................................	 10
		 Turn on and prepare indicator .................................	 10
	 Step 6 ...........................................................................	 10
		 Apply load and begin proof load test .......................	 10
	 Step 7 ...........................................................................	 10
		 Disassemble the proof load cell assembly ..............	 10
	 Step 8 ...........................................................................	 10
		 Rotate device and mount from the opposite side ....	 10
Battery Maintenance ..........................................................	 11
3
Unasis Portable Tri-Roller Swaging Tool
Unasis Portable Cutting Tool
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
Table of Figures
Figure 1 - Electronic Load Display .........................................................................................................................................	 5
Figure 2 - DTI Assembly .......................................................................................................................................................	 5
Figure 3 - Load Cell ............................................................................................................................................................... 	 5
Figure 4 - Battery Charging Cable ......................................................................................................................................... 	 5
Figure 5 - Charger Adaptors .................................................................................................................................................. 	 5
Figure 6 - Spanner ................................................................................................................................................................. 	 5
Figure 7 - Correct load cell orientation assembled ............................................................................................................... 	 6
Figure 8 - Correct load cell orientation exploded view .......................................................................................................... 	 6
Figure 9 - Load cell correctly connected to electronic load display........................................................................................ 	 7
Figure 10 - Electronic load display port descriptions ............................................................................................................. 	 7
Figure 11 - Port of electronic load display .............................................................................................................................	 7
Figure 12 - 12 pin connector ..................................................................................................................................................	 7
Figure 13 - Load cell connected to electronic load display .................................................................................................... 	 7
Figure 14 - Power button on electronic load display .............................................................................................................. 	 8
Figure 15 - Tare button on electronic load display ................................................................................................................. 	 8
Figure 16 - DTI assembly draw rod inserted into bearing bore .............................................................................................. 	 9
Figure 17 - Gap present between housing and cylinder to be eliminated .............................................................................. 	 9
Figure 18 - Pusher side of load cell ....................................................................................................................................... 	 9
Figure 19 - Receiver side of load cell .................................................................................................................................... 	 9
Figure 20 - Gap eliminated prior to tightening of nut ............................................................................................................. 	 9
Figure 21 - Gap eliminated and nut finger tightened ............................................................................................................. 	 9
Figure 22 - DTI gauge turned on .......................................................................................................................................... 	10
Figure 23 - Torque applied to the nut to begin proof load test ............................................................................................... 10
Figure 24 - Portable proof load kit showing result of axial displacement and applied load ................................................... 10
Figure 25 - DTI assembly mounted on the opposite side of the bearing ...............................................................................	10
Figure 26 - Battery port on electronic load display and battery charger ................................................................................	11
Figure 27 - Charger adapter box as supplied ........................................................................................................................	11
Figure 28 - All charger adapters supplied ..............................................................................................................................	11
4
Part List
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
Figure 3 - Load Cell Figure 6 - Spanner
Figure 1 - Electronic Load Display Figure 4 - Battery Charging Cable
Figure 2 – DTI Assembly Figure 5 - Charger Adaptors
5
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
Precautions Prior to Use
 	 Please charge electronic load display for 24 hours prior 	
	 to initial use.
 	 Check battery life on digital display to ensure adequate life.
 	 Make sure all contact surfaces are clean and lube dry.
 	 Ensure the housing has suitable clearance for test to be 	
	performed.
 	 Perform an initial test by hand to ensure there is no 			
	 notable free play with respect to the housing.
NOTE: IF NOTABLE FREE PLAY IS PRESENT THEN
BEARING HAS ALREADY FAILED. THE ASSEMBLY
SHOULD BE REJECTED AND THE BEARING
REINSTALLED.
6
WARNING: IF YOUR KIT HAS MULTIPLE ADAPTER PUSHER CUPS, PLEASE ENSURE THE LOAD CELL IS
REPLACED ENSURING THE RAISED BORE SIDE OF THE LOAD CELL IS IN CONTACT WITH THE NUT
(EXAMPLE ORIENTATION SHOWN IN FIGURE 7 & FIGURE 8).
Figure 7 - Correct load cell orientation assembled
Figure 8 - Correct load cell orientation exploded view
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
Instructions
Step 1 – Connect load cell to the electronic display
NOTE: LOAD CELL MUST BE CONNECTED BEFORE
UNIT IS POWERED ON
 	 Unscrew port cap for Sensor/Load cell connector.
 	 Connect the load cell to the electronic load display
	 ensuring to match the keyway with the slot.
 	 Secure the connector by turning the collar clockwise.
Figure 9 - Load cell correctly
connected to electronic load display
Figure 10 - Electronic load display port descriptions
Figure 11 (Left) - Port of electronic load display
Figure 12 (Right) - 12-pin connector Figure 13 - Load cell connected to electronic load display
Sensor/Load
Cell
Output
Connector
USB
Connector
Power
Connector
7
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
Step 2 – Turn on the electronic load display
 	 Turn on the display by holding the power button.
 	 The display will recognise the load cell serial number and 	
	 will calibrate automatically.
 	 The initial load may show positive or negative figures at 	
	 this point.
Step 3 – Tare the display to zero load
 	 Once powered on, use the Tare/Gross button to zero 		
	 out the unit before connecting the load cell to the 	DTI 		
	assembly.
NOTE: LOAD CELL WILL NOT REMAIN AT ZERO DUE TO
HIGH SENSITIVITY
Step 4 – Mount DTI assembly onto bearing
		 and housing
 	 Mount the DTI assembly so that the draw rod goes 			
	 through the bearing bore.
 	 Please note the load cell assembly features two sides:
	 a) Pusher side (See Figure 18)
	  This will contact the v-groove of the bearing.
	 b) Receiver side (See Figure 19)
	  This will contact the nut.
Figure 14 - Power button on
electronic load display
Figure 15 - Tare button on electronic load display
8
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
 	 Install the load cell assembly with the pusher side facing 	
	 towards the bearing.
 	 Hold the cylinder assembly from the opposite side.
 	 Ensure the ridge of the pusher side is completely seated 	
	 within the v-groove of the bearing.
 	 If there is an adaptor sleeve, this should sit between the 	
	 draw rod and the load cell bore.
 	 Mount the nut onto the draw rod while holding the load 		
	 cell in place
 	 Push the cylinder flush with the housing as you tighten 		
	 the nut up to the load cell.
 	 Finger tighten the nut. Allow all of the components to 		
	 self-align, loosen the nut and then finger tighten the nut 	
	again.
NOTE: OVER-TIGHTENING THE NUT AT THIS POINT
WOULD APPLY PREMATURE PRESSURE ONTO THE
LOAD CELL.
Figure 19 - Receiver side of load cell
Figure 17 (Right) - Gap present between housing
and cylinder to be eliminated
Figure 18 - Pusher side of load cell
Figure 21 (Right) - Gap eliminated
and nut finger tightened
Figure 20 (Left) - Gap eliminated
prior to tightening of nut
Figure 16 (Left) - DTI assembly draw
rod inserted into bearing bore
9
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
Step 5 – Turn on and prepare indicator
 	 Turn on indicator with the button on the bottom right.
 	 Ensure the units of measurement are set as desired.
NOTE: CONSULT DTI MANNUAL FOR INSTRUCTIONS
ON CHANGING THE UNITS AND NAVIGATING THE DTI
GAUGE.
Step 6 – Apply load and begin proof load test
NOTE: TARE ELECTRONIC LOAD DISPLAY BEFORE
APPLYING TORQUE ON THE NUT.
 	 Apply initial load by turning the nut clockwise using the 		
	wrench.
 	 Monitor the electronic load display to ensure 	only the 		
	 desired load is applied to the system.
 	 Once the desired load is achieved, take note of the linear 	
	 displacement presented on the DTI gauge.
NOTE: THE LINEAR DISPLACEMENT OF THE BEARING
UNDER THE REQUIRED LOAD DETERMINES
WHETHER THE BEARING INSTALLATION WAS
COMPLETED SUCESSFULLY OR NOT.
Step 7 – Disassemble the proof load cell
		 assembly
 	 Disassemble the proof load assembly by removing the 		
	 nut, load cell and cylinder assembly.
Step 8 – Rotate device and mount from the
		 opposite side.
 	 To test the bearing from the opposite side, reassemble the 	
	 system on the reverse side and follow from Step 3.
NOTE: THE LINEAR DISPLACEMENT OF THE BEARING
ON THE SECOND SIDE IS THE CRITICAL INFORMATION.
THIS READING SHOWS THE FULL TRAVEL OF THE
BEARING WITHIN THE HOUSING. ONLY PROOF LOAD
TESTING IN ONE DIRECTION IS NOT SUFFICIENT.
Figure 24 - Portable proof load kit showing result
of axial displacement and applied load
Figure 25 - DTI assembly mounted on the
opposite side of the bearing
Figure 23 (Right) - Torque applied to
the nut to begin proof load test
Figure 22 (Left) - DTI gauge turned on
10
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
Battery Maintenance
NOTE: CHARGE ELECTRONIC LOAD DISPLAY FOR 24
HOURS PRIOR TO FIRST USE AND CHECK BATTERY
STRENGTH REGULARLY
 	 In order to check Battery Level, press the Battery/Enter 	
	Button
 	 The battery level will be displayed as bars on the 	screen
 	 In order to charge the battery, connect the charger 	power 	
	connector.
 	 The wall charger plug configuration can be easily 			
	 changed by switching to suitable adaptors.
Figure 26 - Battery port on electronic load
display and battery charger
Figure 27 - Charger adapter box as supplied
Figure 28 - All charger adapters supplied
11
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
Notes
12
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
Notes
13
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
Notes
14
sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com
This catalogue has been produced with a great
amount of care and attention; all data
has been checked for its accuracy.
However, no liability can be assumed for
any incorrect or incomplete data.
Due to the constant development and
expansion of the product range,
we reserve the right to make modifications
without prior notice.
All rights reserved. Reproduction in whole or in
part without authorisation is prohibited.
15
UNASIS INTERNATIONAL LIMITED
UNIT 7, ISIS COURT, WYNDYKE FURLONG
ABINGDON BUSINESS PARK
ABINGDON
OXFORDSHIRE
OX14 1DZ
UNITED KINGDOM
TEL: +44 (0)1235 527 770
EMAIL: sales@unasisbearings.com
WEBSITE: www.unasisbearings.com

More Related Content

What's hot

Fort Henry - Energy Audit Report
Fort Henry - Energy Audit ReportFort Henry - Energy Audit Report
Fort Henry - Energy Audit Report
Michael Clarke
 
Video Jet 10 Manual
Video Jet 10 ManualVideo Jet 10 Manual
Video Jet 10 Manual
guest0ea020
 
User Manual Joomla2006
User Manual Joomla2006User Manual Joomla2006
User Manual Joomla2006
defg gf
 
Bts3900 Site Maintenance Guide(V200 01)
Bts3900 Site Maintenance Guide(V200 01)Bts3900 Site Maintenance Guide(V200 01)
Bts3900 Site Maintenance Guide(V200 01)
Atif Mahmood
 
RouteScout_v1.1_UserGuide_v1
RouteScout_v1.1_UserGuide_v1RouteScout_v1.1_UserGuide_v1
RouteScout_v1.1_UserGuide_v1
Martha Roden
 
Dcp 2000 field-instmanual_000344_v1_5
Dcp 2000 field-instmanual_000344_v1_5Dcp 2000 field-instmanual_000344_v1_5
Dcp 2000 field-instmanual_000344_v1_5
xacho1
 

What's hot (18)

E2027 a8v e-se
E2027 a8v e-seE2027 a8v e-se
E2027 a8v e-se
 
ANSI_EVSP_Roadmap_May_2013.pdf
ANSI_EVSP_Roadmap_May_2013.pdfANSI_EVSP_Roadmap_May_2013.pdf
ANSI_EVSP_Roadmap_May_2013.pdf
 
EVS-06-33e.pdf
EVS-06-33e.pdfEVS-06-33e.pdf
EVS-06-33e.pdf
 
Development of Digital Power and Machines Labs
Development of Digital Power and Machines LabsDevelopment of Digital Power and Machines Labs
Development of Digital Power and Machines Labs
 
Plum AXE Plus 2 Manual / User Guide
Plum AXE Plus 2 Manual / User GuidePlum AXE Plus 2 Manual / User Guide
Plum AXE Plus 2 Manual / User Guide
 
Fort Henry - Energy Audit Report
Fort Henry - Energy Audit ReportFort Henry - Energy Audit Report
Fort Henry - Energy Audit Report
 
Win plc engine-en
Win plc engine-enWin plc engine-en
Win plc engine-en
 
Central Authentication Service (CAS) SSO for EMC Documentum Rest Services
Central Authentication Service (CAS) SSO for EMC Documentum Rest ServicesCentral Authentication Service (CAS) SSO for EMC Documentum Rest Services
Central Authentication Service (CAS) SSO for EMC Documentum Rest Services
 
Video Jet 10 Manual
Video Jet 10 ManualVideo Jet 10 Manual
Video Jet 10 Manual
 
User Manual Joomla2006
User Manual Joomla2006User Manual Joomla2006
User Manual Joomla2006
 
Plum Optimax 8.0 Manual / User Guide
Plum Optimax 8.0 Manual / User Guide Plum Optimax 8.0 Manual / User Guide
Plum Optimax 8.0 Manual / User Guide
 
Plum Optimax 7.0 Manual / User Guide
Plum Optimax 7.0 Manual / User GuidePlum Optimax 7.0 Manual / User Guide
Plum Optimax 7.0 Manual / User Guide
 
AltiGen Alti Report Manual
AltiGen Alti Report ManualAltiGen Alti Report Manual
AltiGen Alti Report Manual
 
Bts3900 Site Maintenance Guide(V200 01)
Bts3900 Site Maintenance Guide(V200 01)Bts3900 Site Maintenance Guide(V200 01)
Bts3900 Site Maintenance Guide(V200 01)
 
impress
impressimpress
impress
 
RouteScout_v1.1_UserGuide_v1
RouteScout_v1.1_UserGuide_v1RouteScout_v1.1_UserGuide_v1
RouteScout_v1.1_UserGuide_v1
 
Dcp 2000 field-instmanual_000344_v1_5
Dcp 2000 field-instmanual_000344_v1_5Dcp 2000 field-instmanual_000344_v1_5
Dcp 2000 field-instmanual_000344_v1_5
 
Mod mag m7600 manual badger meter electromagnetic flow meter_m-series
 Mod mag m7600 manual badger meter electromagnetic flow meter_m-series Mod mag m7600 manual badger meter electromagnetic flow meter_m-series
Mod mag m7600 manual badger meter electromagnetic flow meter_m-series
 

Similar to UNASIS Portable Proof Load Kit Instruction Manual

Komatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and upKomatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and up
jfjskekdhnejd
 
Komatsu d65 wx 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 wx 16 dozer bulldozer service repair manual sn 80001 and upKomatsu d65 wx 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 wx 16 dozer bulldozer service repair manual sn 80001 and up
jfjskekdhnejd
 

Similar to UNASIS Portable Proof Load Kit Instruction Manual (20)

LED Driver "BCR420U / BCR421U" | Infineon Technologies
LED Driver "BCR420U / BCR421U" | Infineon TechnologiesLED Driver "BCR420U / BCR421U" | Infineon Technologies
LED Driver "BCR420U / BCR421U" | Infineon Technologies
 
UNASIS Portable Install Remove Tool Instruction Manual
UNASIS Portable Install Remove Tool Instruction ManualUNASIS Portable Install Remove Tool Instruction Manual
UNASIS Portable Install Remove Tool Instruction Manual
 
LED Driver "BCR401W" | Infineon Technologies
 LED Driver "BCR401W" | Infineon Technologies LED Driver "BCR401W" | Infineon Technologies
LED Driver "BCR401W" | Infineon Technologies
 
LED Driver "BCR401U"| Infineon Technologies
LED Driver "BCR401U"| Infineon TechnologiesLED Driver "BCR401U"| Infineon Technologies
LED Driver "BCR401U"| Infineon Technologies
 
Datasheet
DatasheetDatasheet
Datasheet
 
Q45D-60-2-Wire-Dissolved-Oxygen-Transmitter.pdf
Q45D-60-2-Wire-Dissolved-Oxygen-Transmitter.pdfQ45D-60-2-Wire-Dissolved-Oxygen-Transmitter.pdf
Q45D-60-2-Wire-Dissolved-Oxygen-Transmitter.pdf
 
LED Driver "BCR402W" | Infineon Technologies
LED Driver "BCR402W" | Infineon TechnologiesLED Driver "BCR402W" | Infineon Technologies
LED Driver "BCR402W" | Infineon Technologies
 
LED Driver "BCR402U" - Datasheet | Infineon Technologies
LED Driver "BCR402U" - Datasheet | Infineon TechnologiesLED Driver "BCR402U" - Datasheet | Infineon Technologies
LED Driver "BCR402U" - Datasheet | Infineon Technologies
 
Manual de instalacion Satloc bantam
Manual de instalacion Satloc bantamManual de instalacion Satloc bantam
Manual de instalacion Satloc bantam
 
E426content
E426contentE426content
E426content
 
Q46R-ORP-Monitor O&M Manual.pdf
Q46R-ORP-Monitor O&M Manual.pdfQ46R-ORP-Monitor O&M Manual.pdf
Q46R-ORP-Monitor O&M Manual.pdf
 
Q46R-ORP-Monitor.pdf
Q46R-ORP-Monitor.pdfQ46R-ORP-Monitor.pdf
Q46R-ORP-Monitor.pdf
 
Q45C4-2-Wire-4-electrode-Conductivity-Transmitter.pdf
Q45C4-2-Wire-4-electrode-Conductivity-Transmitter.pdfQ45C4-2-Wire-4-electrode-Conductivity-Transmitter.pdf
Q45C4-2-Wire-4-electrode-Conductivity-Transmitter.pdf
 
Original audio amplifier ic tda7292 7292 new st microelectronics
Original audio amplifier ic tda7292 7292 new st microelectronicsOriginal audio amplifier ic tda7292 7292 new st microelectronics
Original audio amplifier ic tda7292 7292 new st microelectronics
 
Manual 3
Manual 3Manual 3
Manual 3
 
Komatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and upKomatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and up
 
Komatsu d65 ex 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 ex 16 dozer bulldozer service repair manual sn 80001 and upKomatsu d65 ex 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 ex 16 dozer bulldozer service repair manual sn 80001 and up
 
Komatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and upKomatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and up
 
Komatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and upKomatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 px 16 dozer bulldozer service repair manual sn 80001 and up
 
Komatsu d65 wx 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 wx 16 dozer bulldozer service repair manual sn 80001 and upKomatsu d65 wx 16 dozer bulldozer service repair manual sn 80001 and up
Komatsu d65 wx 16 dozer bulldozer service repair manual sn 80001 and up
 

More from Carter Manufacturing Limited

More from Carter Manufacturing Limited (16)

Split thin section bearings
Split thin section bearingsSplit thin section bearings
Split thin section bearings
 
Thin section bearings
Thin section bearingsThin section bearings
Thin section bearings
 
Cam followers
Cam followersCam followers
Cam followers
 
UNASIS Portable Tri-Roller Swaging Tool Instruction Manual
UNASIS Portable Tri-Roller Swaging Tool Instruction ManualUNASIS Portable Tri-Roller Swaging Tool Instruction Manual
UNASIS Portable Tri-Roller Swaging Tool Instruction Manual
 
Unitec special bearings for industrial applications
Unitec special bearings for industrial applicationsUnitec special bearings for industrial applications
Unitec special bearings for industrial applications
 
Unitec precision bearings for machine tools
Unitec precision bearings for machine toolsUnitec precision bearings for machine tools
Unitec precision bearings for machine tools
 
Ibc ball screw support bearings
Ibc ball screw support bearingsIbc ball screw support bearings
Ibc ball screw support bearings
 
Unasis portable swaging tool instructions
Unasis portable swaging tool instructionsUnasis portable swaging tool instructions
Unasis portable swaging tool instructions
 
Drill press swaging tool operating instructions
Drill press swaging tool operating instructionsDrill press swaging tool operating instructions
Drill press swaging tool operating instructions
 
Drill press cutting tool operating instructions
Drill press cutting tool operating instructionsDrill press cutting tool operating instructions
Drill press cutting tool operating instructions
 
UNASIS Cam Followers & Yoke Rollers
UNASIS Cam Followers & Yoke RollersUNASIS Cam Followers & Yoke Rollers
UNASIS Cam Followers & Yoke Rollers
 
Thin section bearings range
Thin section bearings rangeThin section bearings range
Thin section bearings range
 
Stainless steel cam followers and cam yoke rollers
Stainless steel cam followers and cam yoke rollersStainless steel cam followers and cam yoke rollers
Stainless steel cam followers and cam yoke rollers
 
Ibc precision bearings
Ibc precision bearingsIbc precision bearings
Ibc precision bearings
 
Unasis high temperature bearings
Unasis high temperature bearingsUnasis high temperature bearings
Unasis high temperature bearings
 
Special environment, hybrid and ceramic bearings
Special environment, hybrid and ceramic bearingsSpecial environment, hybrid and ceramic bearings
Special environment, hybrid and ceramic bearings
 

Recently uploaded

Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...
Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...
Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...
Laiba Pari
 
Call Girls in New delhi railway station 8447389422 Escorts service ❤️
Call Girls in New delhi railway station 8447389422 Escorts service ❤️Call Girls in New delhi railway station 8447389422 Escorts service ❤️
Call Girls in New delhi railway station 8447389422 Escorts service ❤️
ankitagirls22
 
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Ifra Zohaib
 
Goa Escorts Service 9540619990 Call Girls in Goa
Goa Escorts Service 9540619990 Call Girls in GoaGoa Escorts Service 9540619990 Call Girls in Goa
Goa Escorts Service 9540619990 Call Girls in Goa
Goa escorts Service 😋 Goa escort agency
 
Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...
Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...
Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...
Apsara Of India
 
Call Girls In Karachi-->>03274048030<<--Meet Call Girls In Karachi for Unforg...
Call Girls In Karachi-->>03274048030<<--Meet Call Girls In Karachi for Unforg...Call Girls In Karachi-->>03274048030<<--Meet Call Girls In Karachi for Unforg...
Call Girls In Karachi-->>03274048030<<--Meet Call Girls In Karachi for Unforg...
Sana Rajpoot
 

Recently uploaded (20)

Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...
Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...
Call Girls In Karachi-->>03224951619<<--100+ Hot Girls WhatsApp Numbers Book ...
 
Call Girls in New delhi railway station 8447389422 Escorts service ❤️
Call Girls in New delhi railway station 8447389422 Escorts service ❤️Call Girls in New delhi railway station 8447389422 Escorts service ❤️
Call Girls in New delhi railway station 8447389422 Escorts service ❤️
 
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
Call Girls In Lahore-->>03274100048<<--Independent Call Girls & Escorts In La...
 
Budaun Call Girl WhatsApp Chat: 📞 8617370543 | Girls Number for Friendship
Budaun Call Girl WhatsApp Chat: 📞 8617370543 | Girls Number for FriendshipBudaun Call Girl WhatsApp Chat: 📞 8617370543 | Girls Number for Friendship
Budaun Call Girl WhatsApp Chat: 📞 8617370543 | Girls Number for Friendship
 
Motihari ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In motihari ❤ Low ...
Motihari ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In motihari ❤ Low ...Motihari ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In motihari ❤ Low ...
Motihari ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In motihari ❤ Low ...
 
Mysore❤CALL GIRL 9647466585 ❤CALL GIRLS IN Mysore ESCORT SERVICE
Mysore❤CALL GIRL 9647466585 ❤CALL GIRLS IN Mysore ESCORT SERVICEMysore❤CALL GIRL 9647466585 ❤CALL GIRLS IN Mysore ESCORT SERVICE
Mysore❤CALL GIRL 9647466585 ❤CALL GIRLS IN Mysore ESCORT SERVICE
 
Vip Call Girls Hyderabad Just Call 7091864438 Top Class Call Girl Service Ava...
Vip Call Girls Hyderabad Just Call 7091864438 Top Class Call Girl Service Ava...Vip Call Girls Hyderabad Just Call 7091864438 Top Class Call Girl Service Ava...
Vip Call Girls Hyderabad Just Call 7091864438 Top Class Call Girl Service Ava...
 
Davangere ❤CALL GIRL 9973520673 ❤CALL GIRLS IN Davangere ESCORT SERVICE❤CALL ...
Davangere ❤CALL GIRL 9973520673 ❤CALL GIRLS IN Davangere ESCORT SERVICE❤CALL ...Davangere ❤CALL GIRL 9973520673 ❤CALL GIRLS IN Davangere ESCORT SERVICE❤CALL ...
Davangere ❤CALL GIRL 9973520673 ❤CALL GIRLS IN Davangere ESCORT SERVICE❤CALL ...
 
Goa Escorts Service 9540619990 Call Girls in Goa
Goa Escorts Service 9540619990 Call Girls in GoaGoa Escorts Service 9540619990 Call Girls in Goa
Goa Escorts Service 9540619990 Call Girls in Goa
 
Hubli❤CALL GIRL 9647466585 ❤CALL GIRLS IN Hubli ESCORT SERVICE
Hubli❤CALL GIRL 9647466585 ❤CALL GIRLS IN Hubli ESCORT SERVICEHubli❤CALL GIRL 9647466585 ❤CALL GIRLS IN Hubli ESCORT SERVICE
Hubli❤CALL GIRL 9647466585 ❤CALL GIRLS IN Hubli ESCORT SERVICE
 
9999266834 Call Girls In Noida Sector 51 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 51 (Delhi) Call Girl Service9999266834 Call Girls In Noida Sector 51 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 51 (Delhi) Call Girl Service
 
ULHASNAGAR CALL GIRL 7857803690 LOW PRICE ESCORT SERVICE
ULHASNAGAR CALL GIRL 7857803690 LOW PRICE ESCORT SERVICEULHASNAGAR CALL GIRL 7857803690 LOW PRICE ESCORT SERVICE
ULHASNAGAR CALL GIRL 7857803690 LOW PRICE ESCORT SERVICE
 
Mainpuri Escorts 📞 8617370543 | Mainpuri Call Girls
Mainpuri Escorts 📞 8617370543 | Mainpuri Call GirlsMainpuri Escorts 📞 8617370543 | Mainpuri Call Girls
Mainpuri Escorts 📞 8617370543 | Mainpuri Call Girls
 
Guwahati CALL GIRL 9874883814 CALL GIRLS IN guwahati ESCORT SERVICE CALL GIRL...
Guwahati CALL GIRL 9874883814 CALL GIRLS IN guwahati ESCORT SERVICE CALL GIRL...Guwahati CALL GIRL 9874883814 CALL GIRLS IN guwahati ESCORT SERVICE CALL GIRL...
Guwahati CALL GIRL 9874883814 CALL GIRLS IN guwahati ESCORT SERVICE CALL GIRL...
 
Prince Armahs(Tinky) Brochure, for Funeral service
Prince Armahs(Tinky) Brochure, for Funeral servicePrince Armahs(Tinky) Brochure, for Funeral service
Prince Armahs(Tinky) Brochure, for Funeral service
 
Jamnagar 💋 Call Girl 9748763073 Call Girls in Jamnagar Escort service book now
Jamnagar 💋 Call Girl 9748763073 Call Girls in Jamnagar Escort service book nowJamnagar 💋 Call Girl 9748763073 Call Girls in Jamnagar Escort service book now
Jamnagar 💋 Call Girl 9748763073 Call Girls in Jamnagar Escort service book now
 
ROORKEE CALL GIRL 9661985112 IN CALL GIRLS ESCORT SERVICE
ROORKEE CALL GIRL 9661985112 IN CALL GIRLS ESCORT SERVICEROORKEE CALL GIRL 9661985112 IN CALL GIRLS ESCORT SERVICE
ROORKEE CALL GIRL 9661985112 IN CALL GIRLS ESCORT SERVICE
 
SAHARANPUR CALL GIRL 7857803690 LOW PRICE ESCORT SERVICE
SAHARANPUR CALL GIRL 7857803690 LOW PRICE ESCORT SERVICESAHARANPUR CALL GIRL 7857803690 LOW PRICE ESCORT SERVICE
SAHARANPUR CALL GIRL 7857803690 LOW PRICE ESCORT SERVICE
 
Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...
Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...
Udaipur Call Girls ☎ 9602870969✅ Just Genuine Call Girl in Udaipur Escort Ser...
 
Call Girls In Karachi-->>03274048030<<--Meet Call Girls In Karachi for Unforg...
Call Girls In Karachi-->>03274048030<<--Meet Call Girls In Karachi for Unforg...Call Girls In Karachi-->>03274048030<<--Meet Call Girls In Karachi for Unforg...
Call Girls In Karachi-->>03274048030<<--Meet Call Girls In Karachi for Unforg...
 

UNASIS Portable Proof Load Kit Instruction Manual

  • 1. Aerospace Tooling Portable Proof Load Kit Instruction Manual
  • 2. sales@unasisbearings.com www.unasisbearings.com Tel: +44 (0) GLOBAL MASTER DISTRIBUTOR: Carter Manufacturing Limited TEL: +44 (0)1865 821 720 EMAIL: sales@carterbearings.co.uk GLOBAL MASTER DISTRIBUTOR: Carter Manufacturing Limited TEL: +44 (0)1865 821 720 EMAIL: sales@carterbearings.co.uk sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com 2
  • 3. Unasis Breakaway Torque Tool sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com Table of Contents Table of Figures.................................................................. 4 Part List .............................................................................. 5 Precautions Prior to Use .................................................... 6 Instructions ......................................................................... 7 Step 1............................................................................ 7 Connect load cell to the electronic display ............... 7 Step 2............................................................................ 8 Turn on the electronic load display........................... 8 Step 3............................................................................ 8 Tare the display to zero load .................................... 8 Step 4............................................................................ 8 Mount DTI assembly onto bearing and housing ...... 8 Step 5 ........................................................................... 10 Turn on and prepare indicator ................................. 10 Step 6 ........................................................................... 10 Apply load and begin proof load test ....................... 10 Step 7 ........................................................................... 10 Disassemble the proof load cell assembly .............. 10 Step 8 ........................................................................... 10 Rotate device and mount from the opposite side .... 10 Battery Maintenance .......................................................... 11 3 Unasis Portable Tri-Roller Swaging Tool Unasis Portable Cutting Tool
  • 4. sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com Table of Figures Figure 1 - Electronic Load Display ......................................................................................................................................... 5 Figure 2 - DTI Assembly ....................................................................................................................................................... 5 Figure 3 - Load Cell ............................................................................................................................................................... 5 Figure 4 - Battery Charging Cable ......................................................................................................................................... 5 Figure 5 - Charger Adaptors .................................................................................................................................................. 5 Figure 6 - Spanner ................................................................................................................................................................. 5 Figure 7 - Correct load cell orientation assembled ............................................................................................................... 6 Figure 8 - Correct load cell orientation exploded view .......................................................................................................... 6 Figure 9 - Load cell correctly connected to electronic load display........................................................................................ 7 Figure 10 - Electronic load display port descriptions ............................................................................................................. 7 Figure 11 - Port of electronic load display ............................................................................................................................. 7 Figure 12 - 12 pin connector .................................................................................................................................................. 7 Figure 13 - Load cell connected to electronic load display .................................................................................................... 7 Figure 14 - Power button on electronic load display .............................................................................................................. 8 Figure 15 - Tare button on electronic load display ................................................................................................................. 8 Figure 16 - DTI assembly draw rod inserted into bearing bore .............................................................................................. 9 Figure 17 - Gap present between housing and cylinder to be eliminated .............................................................................. 9 Figure 18 - Pusher side of load cell ....................................................................................................................................... 9 Figure 19 - Receiver side of load cell .................................................................................................................................... 9 Figure 20 - Gap eliminated prior to tightening of nut ............................................................................................................. 9 Figure 21 - Gap eliminated and nut finger tightened ............................................................................................................. 9 Figure 22 - DTI gauge turned on .......................................................................................................................................... 10 Figure 23 - Torque applied to the nut to begin proof load test ............................................................................................... 10 Figure 24 - Portable proof load kit showing result of axial displacement and applied load ................................................... 10 Figure 25 - DTI assembly mounted on the opposite side of the bearing ............................................................................... 10 Figure 26 - Battery port on electronic load display and battery charger ................................................................................ 11 Figure 27 - Charger adapter box as supplied ........................................................................................................................ 11 Figure 28 - All charger adapters supplied .............................................................................................................................. 11 4
  • 5. Part List sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com Figure 3 - Load Cell Figure 6 - Spanner Figure 1 - Electronic Load Display Figure 4 - Battery Charging Cable Figure 2 – DTI Assembly Figure 5 - Charger Adaptors 5
  • 6. sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com Precautions Prior to Use  Please charge electronic load display for 24 hours prior to initial use.  Check battery life on digital display to ensure adequate life.  Make sure all contact surfaces are clean and lube dry.  Ensure the housing has suitable clearance for test to be performed.  Perform an initial test by hand to ensure there is no notable free play with respect to the housing. NOTE: IF NOTABLE FREE PLAY IS PRESENT THEN BEARING HAS ALREADY FAILED. THE ASSEMBLY SHOULD BE REJECTED AND THE BEARING REINSTALLED. 6 WARNING: IF YOUR KIT HAS MULTIPLE ADAPTER PUSHER CUPS, PLEASE ENSURE THE LOAD CELL IS REPLACED ENSURING THE RAISED BORE SIDE OF THE LOAD CELL IS IN CONTACT WITH THE NUT (EXAMPLE ORIENTATION SHOWN IN FIGURE 7 & FIGURE 8). Figure 7 - Correct load cell orientation assembled Figure 8 - Correct load cell orientation exploded view
  • 7. sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com Instructions Step 1 – Connect load cell to the electronic display NOTE: LOAD CELL MUST BE CONNECTED BEFORE UNIT IS POWERED ON  Unscrew port cap for Sensor/Load cell connector.  Connect the load cell to the electronic load display ensuring to match the keyway with the slot.  Secure the connector by turning the collar clockwise. Figure 9 - Load cell correctly connected to electronic load display Figure 10 - Electronic load display port descriptions Figure 11 (Left) - Port of electronic load display Figure 12 (Right) - 12-pin connector Figure 13 - Load cell connected to electronic load display Sensor/Load Cell Output Connector USB Connector Power Connector 7
  • 8. sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com Step 2 – Turn on the electronic load display  Turn on the display by holding the power button.  The display will recognise the load cell serial number and will calibrate automatically.  The initial load may show positive or negative figures at this point. Step 3 – Tare the display to zero load  Once powered on, use the Tare/Gross button to zero out the unit before connecting the load cell to the DTI assembly. NOTE: LOAD CELL WILL NOT REMAIN AT ZERO DUE TO HIGH SENSITIVITY Step 4 – Mount DTI assembly onto bearing and housing  Mount the DTI assembly so that the draw rod goes through the bearing bore.  Please note the load cell assembly features two sides: a) Pusher side (See Figure 18)  This will contact the v-groove of the bearing. b) Receiver side (See Figure 19)  This will contact the nut. Figure 14 - Power button on electronic load display Figure 15 - Tare button on electronic load display 8
  • 9. sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com  Install the load cell assembly with the pusher side facing towards the bearing.  Hold the cylinder assembly from the opposite side.  Ensure the ridge of the pusher side is completely seated within the v-groove of the bearing.  If there is an adaptor sleeve, this should sit between the draw rod and the load cell bore.  Mount the nut onto the draw rod while holding the load cell in place  Push the cylinder flush with the housing as you tighten the nut up to the load cell.  Finger tighten the nut. Allow all of the components to self-align, loosen the nut and then finger tighten the nut again. NOTE: OVER-TIGHTENING THE NUT AT THIS POINT WOULD APPLY PREMATURE PRESSURE ONTO THE LOAD CELL. Figure 19 - Receiver side of load cell Figure 17 (Right) - Gap present between housing and cylinder to be eliminated Figure 18 - Pusher side of load cell Figure 21 (Right) - Gap eliminated and nut finger tightened Figure 20 (Left) - Gap eliminated prior to tightening of nut Figure 16 (Left) - DTI assembly draw rod inserted into bearing bore 9
  • 10. sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com Step 5 – Turn on and prepare indicator  Turn on indicator with the button on the bottom right.  Ensure the units of measurement are set as desired. NOTE: CONSULT DTI MANNUAL FOR INSTRUCTIONS ON CHANGING THE UNITS AND NAVIGATING THE DTI GAUGE. Step 6 – Apply load and begin proof load test NOTE: TARE ELECTRONIC LOAD DISPLAY BEFORE APPLYING TORQUE ON THE NUT.  Apply initial load by turning the nut clockwise using the wrench.  Monitor the electronic load display to ensure only the desired load is applied to the system.  Once the desired load is achieved, take note of the linear displacement presented on the DTI gauge. NOTE: THE LINEAR DISPLACEMENT OF THE BEARING UNDER THE REQUIRED LOAD DETERMINES WHETHER THE BEARING INSTALLATION WAS COMPLETED SUCESSFULLY OR NOT. Step 7 – Disassemble the proof load cell assembly  Disassemble the proof load assembly by removing the nut, load cell and cylinder assembly. Step 8 – Rotate device and mount from the opposite side.  To test the bearing from the opposite side, reassemble the system on the reverse side and follow from Step 3. NOTE: THE LINEAR DISPLACEMENT OF THE BEARING ON THE SECOND SIDE IS THE CRITICAL INFORMATION. THIS READING SHOWS THE FULL TRAVEL OF THE BEARING WITHIN THE HOUSING. ONLY PROOF LOAD TESTING IN ONE DIRECTION IS NOT SUFFICIENT. Figure 24 - Portable proof load kit showing result of axial displacement and applied load Figure 25 - DTI assembly mounted on the opposite side of the bearing Figure 23 (Right) - Torque applied to the nut to begin proof load test Figure 22 (Left) - DTI gauge turned on 10
  • 11. sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com Battery Maintenance NOTE: CHARGE ELECTRONIC LOAD DISPLAY FOR 24 HOURS PRIOR TO FIRST USE AND CHECK BATTERY STRENGTH REGULARLY  In order to check Battery Level, press the Battery/Enter Button  The battery level will be displayed as bars on the screen  In order to charge the battery, connect the charger power connector.  The wall charger plug configuration can be easily changed by switching to suitable adaptors. Figure 26 - Battery port on electronic load display and battery charger Figure 27 - Charger adapter box as supplied Figure 28 - All charger adapters supplied 11
  • 12. sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com Notes 12
  • 13. sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com Notes 13
  • 14. sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com Notes 14
  • 15. sales@unasisbearings.com Tel: +44 (0) 1235 527 770www.unasisbearings.com This catalogue has been produced with a great amount of care and attention; all data has been checked for its accuracy. However, no liability can be assumed for any incorrect or incomplete data. Due to the constant development and expansion of the product range, we reserve the right to make modifications without prior notice. All rights reserved. Reproduction in whole or in part without authorisation is prohibited. 15
  • 16. UNASIS INTERNATIONAL LIMITED UNIT 7, ISIS COURT, WYNDYKE FURLONG ABINGDON BUSINESS PARK ABINGDON OXFORDSHIRE OX14 1DZ UNITED KINGDOM TEL: +44 (0)1235 527 770 EMAIL: sales@unasisbearings.com WEBSITE: www.unasisbearings.com