Performance measurement system – a conceptual model
Neide Cristine Ossovski
Pontifical Catholic University of Parana (PUCPR), Brazil
ncristine@gmail.com
Edson Pinheiro de Lima
Pontifical Catholic University of Parana (PUCPR), Brazil
Federal University of Technology - Parana (UTFPR), Brazil
Sergio E. Gouvea da Costa
Pontifical Catholic University of Parana (PUCPR), Brazil
Federal University of Technology - Parana (UTFPR), Brazil
Abstract
In globalized world performance measurement became crucial for enterprises to build best in class
operations. Paper goal is to revise the main PMS aspects. A literature review was conducted, followed by
a proposed conceptual model. As result both theoretical review and conceptual model guide enterprises
on PMS implementation and improvement.
Keywords: Performance Measurement System, PMS Conceptual Model, Improvement.
INTRODUCTION
With the advent of globalization performance measurement interest highly evolved among
organizations which are increasingly seeking for tools that leads to process optimization,
efficiency and competitiveness. The top management became more involved as well operating
levels. Organization strategies are now designed to promote its deployment in measures that will
lead to actions for targets achievement.
There are several academic literatures on the topic of performance measurement. Some
authors give more emphasis to the development of performance measurement system along the
century, others focus in the difference between the financial and non-financial attributes and
others focus on a specific stage of the performance measurement system. There are articles
which focus specifically on structural models emerged during the measurement system evolution
as the famous Balanced Scorecard (Kaplan 1987).
The purpose of this paper is to promote an integrated review of the academic literature and
describe the stages of a performance measurement system. The results are the consolidation
literature review and a proposed conceptual model to be used by any organization. It serves the
objective of facilitating and guiding actions, both for the development or maintenance of a
performance measurement system which requires continuous review.
STRATEGIC MANAGEMENT
2
The Measurement System Strategic Performance - MSSP stimulates the development of a
more comprehensive strategic agenda within the organization. It consists not only in the
formulation of the strategy - a process in which a company defines its general guidelines for
long-term, how it will set up its operations and its resources in the market in order to achieve
competitive advantage. It also defines how this strategy will be deployed and implemented
bringing 'action', 'monitoring' and 'evaluation' of results to the processes.
It’s therefore concluded that the adoption of a measurement system strategic performance
brings a very important alignment between the long-term strategy of the organization and other
aspects and stages imbued in a performance measurement system - the deployment in targets,
measurements, assessments, actions, reviews and learning. It also promotes the involvement of
the top management - a factor that is crucial to achieve success while developing or maintaining
a performance measurement system in an organization acting as a motivating factor for the entire
chain such as managers, experts, operational staff, customers and suppliers.
PERFORMANCE MANAGEMENT
The effects of strategic analysis aligned to performance measurement system guideline
managers to focus on the future, encourage a more accurate communication flow and optimize
the coordination process as a whole. It also stimulates the dialog between the team by
rationalizing instead of emotionalizing strategic decisions, supporting the acceptance of the set
goals, the predisposition of managers to coordinate the teams in the pursuit of goals achievement
as well as of the teams for their execution (Gimbert et al. 2010).
The same as the support of top management, the support of managers is fundamental in the
performance management process. But the priorities of an organization are often affected by
other internal and external events, and therefore may change over time making the resources and
managers available time to be limited - this can turn into a natural resistance scenario in the
process (Bourne 2005).
Bourne (2005) clarify that also other factors might affect the perception and lead to support
or imply natural resistance to the process by the managers or the organization staff:
 the effort required;
 easy access to IT for development of a specific system for performance measurement;
 the results of measurements which imply in reviews about efficiencies or inefficiencies,
leading to actions that often generate discomfort and insecurity;
 the belief that the process has always been done that way and does not require any
changes, or that the type of application will never succeed in the organization.
As conclusion, creating a list of factors that encourage or block the process can be helpful to
managers in dealing with it. Also helps conducting an assessment of in progress and future
projects, its expected benefits and priorities and level of support obtained. In the absence of these
factors, a negotiation with top management about demands priorities is crucial (Bourne 2005).
PERFORMANCE MEASUREMENT SYSTEMS
Performance measurement systems are characterized as strategic expert systems by which
organizations observe and measure their intangible performance elements in the form of
qualitative and quantitative assessment as stated in the article of Fried (2010).
3
According to Gimbert et al. (2010) performance measurement system is a brief and precise
set of measures (financial or non-financial) that supports the decision-making process of an
organization by collecting, processing and analyzing quantified data of performance information.
Traditional and Non-Traditional Performance Measurement
According to academic literature performance measurement had until the 80's a more
traditional approach with financial focus. From that point on, the globalization introduced a non-
traditional approach changing the strategic focus of low production costs into quality, flexibility
and delivery focus, showing that traditional concepts were very limited and opening to new
models (Ghalayini and Noble, 1996).
Based on non-traditional performance measures features - which is the current recommended
model – organizations may be guided by aspects that make the process more productive and
effective: directed to all employees; simple and easy to use; accurate; always revised; supporting
continuous improvement; etc
It is important to analyze the organization approach and its objectives to build a PMS.
Table 1 – A comparison between traditional and non-traditional performance measures (Ghalayini and
Noble, 1996)
Traditional performance measures Non-traditional performance measures
Based on outdated traditional accounting system Based on company strategy
Mainly financial measures Mainly non-financial measures
Intended for top and senior managers Intended for all employees
Late metrics (weekly or monthly) On-time metrics (hourly, or daily)
Difficult, confusing and misleading Simple, accurate and easy to use
Lead to employee frustration Lead to employee satisfaction
Neglected at the shop floor Frequently used at the shop floor
Have a fixed format Have no fixed format (depends on needs)
Do not vary between locations Vary between locations
Do not change over time Change over time as the need changes
Intended mainly for monitoring performance Intended to improve performance
Not applicable for JIT, TQM, RPR, OPT, etc. Applicable
Hinders continuous improvement Support continuous improvement
Stages of a Performance Measurement System
The development of a performance measurement system can be divided into three main
stages: design, implementation and use of performance measures (Bourne et al. 2000). A fourth
and fifth stages might also be considered: the review and learning.
This is the sequence a performance measurement system should evolve, however, stages may
overlap and some stages be implemented before others (Bourne et al. 2000).
Design
4
The design stage usually starts with an overview of the business in order to identify the
demands of stakeholders and clients as well validate the alignment with the organization's
strategy before listing a new set of objectives for the business (Bourne et al. 2000).
Thus, the design stage can be further sub-divided into: identification of key design objectives
and measures design (Bourne et al. 2000).
Several articles have discussed the performance measures design establishing different
approaches and recommendations. Through a literature review of 10 books and articles these
approaches and recommendations were summarized and listed in a table by Neely et al. (1997).
The recommendations say that performance measures must: derivate from the strategy; provide
updated feedback; be quantifiable; reflect the business; be specific, relevant, simple, objective;
have visual impact; focus on improvement; etc.
Furthermore, authors proposed a framework – the Performance Measure Record Sheet,
which seeks to specify what a good performance measure constitutes. The proposed framework,
besides previous recommendations, emphasizes that the measures must be clearly defined as well
based on clearly formula and data source (Neely et al. 1997).
Table 2 – The performance measure record sheet (Neely et al. 1997)
Details
Title
Purpose
Relates to
Target
Formula
Frequency
Who measures?
Source of data
Who acts on the data?
What do they do?
Notes and comments
According to the academic literature there is not a framework or complete tool to use in a
performance measurement system. Each one has specific features and specific focus, addressed
more to a certain purpose than another, with advantages and disadvantages, resulting in positive
and negative points.
While SMART is strong in integrating corporate with operating objectives it does not
provide a mechanism to identify key indicators nor integrates the concept of continuous
improvement. Neither PMQ provides a mechanism to identify areas for improvement in the
company. As the Balanced Scorecard, it integrates important perspectives of performance and is
easy to use but is more directed to support the top management level not being adherent to the
operational level (Ghalayini and Noble, 1996).
Thus, it is up to the head or group responsible for the development of PMS a deep business
analysis and identification among available frameworks or tools, and the task of selecting and
applying those most pertinent to the business and organization’s objectives.
5
Table 3 – Key proposals of PMS models (Attadia and Martins, 2003)
PM MODELS KEY ATTRIBUTES
Performance Measurement Matrix
(KEEGAN et al., 1989)
- performance measures internal and external, financial and non-
financial
- performance measures linked to strategy
SMART - Performance Pyramid (CROSS
& LINCH, 1990)
- performance measures of internal efficiency and external
effectiveness
- performance measures deployed from organization's strategy
Balanced Scorecard (KAPLAN &
NORTON, 1992, 1996)
- performance measures grouped into four perspectives
- cause and effect relation between perspectives reflecting the
strategy
Integrated Performance Measurement
System (BITITCI et al, 1997)
- strategic development for business, business unit, processes
and activities generates measures considering requirements of
stakeholders, external monitoring, objectives and performance
measures
Performance Prism (NEELY & ADAMS,
2000)
- performance measurement of stakeholders satisfaction
- strategy communication
- approach for the management of business processes
Implementation
The implementation is defined as the stage in which systems and procedures are put in place
in order to collect and process the data that will generate the measurements (Bourne et al. 2000).
It might be a new process that involves new procedures, or a computer programming for data
extraction.
Each organization will set up its own system or procedures, depending on the available
resources and according to the strategy defined.
Use
The use of performance measures can be splitted in two sub-divisions: evaluate the success
or failure of the implementation and challenge the strategic assumptions (Bourne et al. 2000).
Evaluating the success of the implementation means that the PMS fits in the operation and
provides the scores that allows the top management, managers and employees to visualize if the
goals were achieved or not. In case of failure, the review stage must take place.
By challenging the strategic assumptions we can understand that through the results of the
implemented PMS and extracted measures the organization can guideline the actions towards
improvements or changes to be made.
Review
In a review process the organization have a better understanding of performance
measurement system in several aspects, increasing its expertise on measures applicability.
There are two aspects to be considered towards the review stage: the preparation for the
process review in order it to be effective and a system for understanding the flaws or weaknesses
in the performance measurement system that need to be corrected or optimized.
6
According to Farris et al. (2011) the research of Meekings (2005) offers some guidelines to
set up an effective review process based on three case studies:
 structure the process review by defining: "what, when, why, where and how";
 ensure review meetings to be productive;
 pilot the review at a unit that is more susceptible to accept the process.
Farris et al. (2011) research involving a number of organizations, listed questions that
initially support a systematic process review to understand the failures and necessary
improvements in the PMS review stage:
 has the organization an effective way of communicating the measurement framework, the
process, the measures and the resulting actions required?
 has the organization a robust performance achievement process established and driven by
measures that identify the appropriate actions and recognize best practices?
 has the organization successfully integrated PM approach in its culture and business?
Farris et al. (2011) article proposes a systematic process review consistent of:
 a list of evaluation criteria’s divided into 04 dimensions: 1) approach (scheduled
meetings involving the operational team and stakeholders); 2) deployment (critical results
communication to internal and external stakeholders); 3) study (analysis results and
action plans); 4) refinement (actions for improvement and deviations adjustments), where
these evaluation criteria’s are used as support for PMS analysis;
 a list of improvement opportunities extracted from the evaluation criteria’s analysis;
 a final list with the key strengths which will guide the actions to optimize the PMS;
 the identification of root causes and action plans for process optimization;
Learning
From the organizational behavior standpoint view the individual learning happens when
people assimilate new knowledge through experience in their daily lives and from other sources -
this process increases the intelligence and the ability of the individual. When the learning process
is absorbed between the members of the organization, a new culture is established and an
organizational learning occurs (Yeung Lai and Yee, 2007).
According to Fried (2010) strategic learning does not result automatically from the
implementation of a performance measurement system - but their development and use can lead
to a strategic learning process. Similarly, the review of a PMS conducts to learning – by
increasing knowledge about the current measures, the improvement opportunities identified that
lead to change and innovation, and finally to better understand the PMS as a whole.
PMS CONCEPTUAL MODEL
Other authors also have been concerned to define criteria for the development of an efficient
and effective performance measurement system from the perspective of strategic management.
The proposed conceptual model seeks to consolidate the stages described in this paper, in a
sequential order, synthesizing the main important practices. The objective is to allow the
conceptual model to be used as a guide by any organization while developing or reviewing a
PMS process. It lists key actions preventing crucial points in the process to be ignored or
forgotten. For each listed stage, respective key actions and specific actions are recommended.
7
While using the conceptual model if any question raises the theoretical part can always be
reviewed for additional details. Moreover, academic bibliographies available referring to the
subject might be used as support as well.
Table 5 – Performance measurement system - a conceptual model (authors)
Stages Key Actions Specific Actions
 Long Term
Strategy – Top
Management
 Align Organization Strategy with
Top Management / Managers for
PMS support
 List factors that block PMS in case
of resistance at management level
 Long Term
Strategy – Senior
Managers
 Deploy Business Strategy,
Corporate / Process / Employees
Goals, to support PMS
development and maintenance
 List factors that block PMS in case
of resistance at operational level
 Traditional and
Non-Traditional
Measures
 Analyze Organization’s Approach
and Objectives (where they want
to go) to set the measures
 Select between:
Traditional measures and
Non-Traditional Measures (Tab1)
 Performance
Measures
 Ensure compliance with the 08
attributes at measures definition
 Emphasize specific attributes
according to the business scenario
and the Organization strategies
 Design  Use the Recommendations for the
Performance Measures Design
 Use the Record Sheet for the
Performance Measures (Tab2)
 Analyze available PM models and
apply best option (Tab3)
 Ensure the establishment of
objective, simple and only
necessary measures
 Ensure clarity and registration of
the established measures
 Implementation  Apply the Design stage
definitions, the system model
chosen and the data allocation
 Follow up Design stage planning
 Check need for adjustments
 Use  Stratify the results
 Apply the analysis and process
improvement for low
performances
 Ensure data accuracy, results
analysis and regular meetings
 Ensure team motivation focusing
on improvements not on guilty
 Review -
Preparation
 Ensure the preparation for the
process review according to the
proposed guidelines
 Set 'what, when, why, where, how'
 Ensure productive meetings
 Identify Business Unit to review
 Review -
Systematic
 Apply the Systematic Process
Review
 Apply Evaluation Criteria’s list
 Extract a list of Strengths and
Opportunities for Improvement
 Select the main opportunities
 Identify Root Cause and apply
Action Plans for improvement
 Learning  Identify opportunities for
improvement and innovation
based on PMS Review
 Ensure improvement projects and
progress of measures
 Apply PMS adjusts as expertise
increases and deviations raises
8
RESULTS
Through the compilation of several articles and renowned publications of the academic
community this paper brings as first result the consolidation of the stages and its aspects, in a
sequential order, to be considered in a PMS process. It serves as support towards the theoretical
aspect without complexity of terms and classifications so that it can be easily internalized by the
readers, with the objective to support the knowledge.
As second contribution it proposes a PMS conceptual model as a facilitator tool in a practical
aspect, emphasizing and listing the main stages and aspects to be considered in a PMS process
with the objective to support the actions.
The proposed model can also be applied to support a PMS process review for those who have
already developed its PMS and are willing to add adjustments or improvements.
CONCLUSIONS
The purpose of this paper is to support organizations with a literature consolidation for
knowledge support and a PMS conceptual model for practical support on a PMS process.
It is expected that with the brief review of academic literature provided by the theoretical part
of this paper the organization can have a better understanding of a PMS process and increase the
chances of success in its development or review stages.
It is also expected that the conceptual model can serve as a guide for an organization during
the PMS process so that it can be the most effective and efficient as possible considering its
scenario, objectives and strategies.
Despite covering certain aspects and stages of a PMS process this paper does not cover all
variables of the substantial academic literature available, so there is still considerable room for
additional researches.
Bibliography
Neely, A.D. (1999). The performance measurement revolution: why now and what next? International Journal of
Operations and Production Management 19(2): 205-228.
Neely, A.D. (2005). The evolution of performance measurement research: developments in the last decade and a
research agenda for the next. International Journal of Operations and Production Management 25(12):
1264-1277.
Gomes, C.F., Yasin, M.M. and Lisboa, J.V. (2004). A literature review of manufacturing performance measures and
measurement in an organizational context: a framework and direction for future research. Journal of
Manufacturing Technology Management 15(6): 511-530.
Folan, P. and Browne, J. (2005). A review of performance measurement: towards performance management.
Computers in Industry 56(7): 663–680.
Folan, P., Browne, J. and Jagdev, H. (2007). Performance: its meaning and content for today’s business research.
Computers in Industry 58(7): 605-620.
Nudurupati, S.S., Bititci, U.S., Kumar, V. and Chan, F.T.S. (2011). State of the art literature review on performance
measurement. Computers and Industrial Engineering 60(2): 279-290.
Ghalayini, A.M. and Noble, J.S. (1996). The changing basis of performance measurement. International Journal of
Operations & Production Management 16(8): 63-80.
9
Tangen, S. (2004). Performance measurement: from philosophy to practice. International Journal of Productivity
and Performance Management 53(8): 726-737.
Henry, J.F. (2006). Management control systems and strategy: a resource-based perspective. Accounting,
Organizations and Society. 31(6): 529–558.
Suwignjo, P., Bititci, U.S., Carrie, A.S. (2000). Quantitative models for performance measurement system.
International Journal of Production Economics 64(1/3): 231-241.
De Toni, A. and Tonchia, S. (2001). Performance measurement systems: models, characteristics and measures.
International Journal of Operations & Production Management 21(1/2): 46-70.
Franco-Santos, M., Kennerley, M., Micheli, P., Martinez, V., Mason, S., Marr, B., Gray, D. and Neely, A.D. (2007).
Towards a definition of a business performance measurement system. International Journal of Operations
& Production Management 27(8): 784-801.
Bititci, U.S., Turner, T. and Begemann, C. (2000). Dynamics of performance measurement systems. International
Journal of Operations & Production Management 20(6): 692-704.
Tan, K.H., Platts, K. and Noble, J. (2004). Building performance through in-process measurement: toward an
“indicative” scorecard for business excellence. International Journal of Productivity and Performance
Management 53(3): 233-244.
Malina, M.A. and Selto, F.H. (2004). Choice and change of measures in performance measurement models.
Management Accounting Research 15(4): 441-469.
Neely, A.D., Richards, H., Mills, J.F., Platts, K.W. and Bourne, M.C.S. (1997). Designing performance measures: a
structured approach. International Journal of Operations & Production Management 17(11): 1131-1152.
Bourne, M.C.S., Mills, J.F., Wilcox, M., Neely, A.D. and Platts, K.W. (2000). Designing, implementing and
updating performance measurement systems. International Journal of Operations & Production
Management 20(7): 754- 771.
Chenhall, R.H. (2003). Management control systems design within its organizational context: findings from
contingency-based research and directions for the future. Accounting, Organizations and Society 28(2/3):
127-168.
Kennerley, M.P. and Neely, A.D. (2003). Measuring performance in a changing business environment. International
Journal of Operations and Production Management 23(2): 213–229.
Bourne, M.C.S. (2005). Researching performance measurement system implementation : the dynamics of success
and failure. Production Planning & Control 16(2): 101-113.
Artz, M., Homburg, C., Rajab T. (2012). Performance-measurement system design and functional strategic decision
influence: the role of performance-measure properties. Accounting, Organizations and Society 37(7): 445-
460.
Bourne, M.C.S., Kennerley, M. and Franco-Santos, M. (2005). Managing through measures: a study of impact on
performance. Journal of Manufacturing Technology Management 16(4): 373-395.
Ferreira, A. and Otley, D. (2009). The design and use of performance management systems: An extended framework
for analysis. Management Accounting Research 20(4): 263-282.
Farris, J.A., van Aken, E.M., Letens, G., Chearksul, P., Coleman, G. (2011). Improving the performance review
process: A structured approach and case application. International Journal of Operations & Production
Management 31(4): 376-404.
Attadia, L.C.L. and Martins, R.A. (2003). Medição de desempenho como base para evolução da melhoria contínua.
Produção 13(2): 33-41.
Mergulhão, R.C. and Martins, R.A. (2008). Relação entre sistemas de medição de desempenho e projetos Seis
Sigma: estudo de caso múltiplo. Produção 18(2): 342-358.
10
Chenhall, R.H. (2005). Integrative strategic performance measurement systems, strategic alignment of
manufacturing, learning and strategic outcomes: an exploratory study. Accounting, Organizations and Society
30(5): 395-422.
Neely, A.D. and Al Najjar, M. (2006). Management learning not management control: the true role of performance
measurement. California Management Review 48(3): 100-114.
Yeung, A.C.L., Lai, K.H. and Yee, R.W.Y. (2007). Organizational learning, innovativeness, and organizational
performance: a qualitative investigation. International Journal of Production Research 45(11): 2459–2477.
Fried, A. (2010). Performance measurement systems and their relation to strategic learning: a case study in a
software-developing organization. Critical Perspectives on Accounting 21(2): 118-133.
Tahir, A.C., Darton, R.C. (2010). The Process Analysis Method of selecting indicators to quantify the sustainability
performance of a business operation. Journal of Cleaner Production 18(16–17): 1598-1607.
Gimbert, X., Bisbe, J. and Mendoza, X. (2010). The role of performance measurement systems in strategy
formulation processes. Long Range Planning 43(4): 477-497.
Bititci, U., Garengo, P., Dörfler, V. and Nudurupati, S. (2012). Performance Measurement: challenges for tomorrow.
International Journal of Management Reviews 14(3): 305-327.

More Related Content

What's hot

Four Steps of Controlling Process
Four Steps of Controlling ProcessFour Steps of Controlling Process
Four Steps of Controlling ProcessPhilip Telen
 
Controlling mangament and its process
Controlling mangament and its processControlling mangament and its process
Controlling mangament and its processAnant Agarwal
 
Business process monitoring system in supporting information technology gover...
Business process monitoring system in supporting information technology gover...Business process monitoring system in supporting information technology gover...
Business process monitoring system in supporting information technology gover...journalBEEI
 
Principles of Management
Principles of ManagementPrinciples of Management
Principles of ManagementMuhammad Akram
 
Controlling
ControllingControlling
ControllingOnline
 
Strategic management process
Strategic management processStrategic management process
Strategic management processNarain Watson
 
Chapter 11 controlling function of management
Chapter 11 controlling function of managementChapter 11 controlling function of management
Chapter 11 controlling function of managementPatel Jay
 
Performance management ppt
Performance management pptPerformance management ppt
Performance management pptZohaib Ali
 
Controlling-Management Functions-Organisation Structure & Process
Controlling-Management Functions-Organisation Structure & ProcessControlling-Management Functions-Organisation Structure & Process
Controlling-Management Functions-Organisation Structure & ProcessZeba Rukhsar
 

What's hot (20)

Four Steps of Controlling Process
Four Steps of Controlling ProcessFour Steps of Controlling Process
Four Steps of Controlling Process
 
Controlling ppt
Controlling  pptControlling  ppt
Controlling ppt
 
Controlling ppt
Controlling pptControlling ppt
Controlling ppt
 
new controling process
 new controling process new controling process
new controling process
 
Control process
Control processControl process
Control process
 
Controlling mangament and its process
Controlling mangament and its processControlling mangament and its process
Controlling mangament and its process
 
Principles of Management – Chpt 17 : Controlling
Principles of Management – Chpt 17 : ControllingPrinciples of Management – Chpt 17 : Controlling
Principles of Management – Chpt 17 : Controlling
 
Business process monitoring system in supporting information technology gover...
Business process monitoring system in supporting information technology gover...Business process monitoring system in supporting information technology gover...
Business process monitoring system in supporting information technology gover...
 
Principles of Management
Principles of ManagementPrinciples of Management
Principles of Management
 
Controlling
ControllingControlling
Controlling
 
Unit 5 controlling
Unit 5 controllingUnit 5 controlling
Unit 5 controlling
 
Benchmarking Article
Benchmarking ArticleBenchmarking Article
Benchmarking Article
 
Controlling
ControllingControlling
Controlling
 
Strategic management process
Strategic management processStrategic management process
Strategic management process
 
Unit 2--- Planning
Unit 2--- PlanningUnit 2--- Planning
Unit 2--- Planning
 
Chapter 11 controlling function of management
Chapter 11 controlling function of managementChapter 11 controlling function of management
Chapter 11 controlling function of management
 
Performance management ppt
Performance management pptPerformance management ppt
Performance management ppt
 
Controlling-Management Functions-Organisation Structure & Process
Controlling-Management Functions-Organisation Structure & ProcessControlling-Management Functions-Organisation Structure & Process
Controlling-Management Functions-Organisation Structure & Process
 
Bpm course
Bpm courseBpm course
Bpm course
 
Chap 17 controlling
Chap 17 controllingChap 17 controlling
Chap 17 controlling
 

Similar to 065 0791

Paper on-balance-scorecard1
Paper on-balance-scorecard1Paper on-balance-scorecard1
Paper on-balance-scorecard1Ijcem Journal
 
Measures of corporate performance
Measures of corporate performanceMeasures of corporate performance
Measures of corporate performanceSamahAdra
 
Measuring organizational performance
Measuring organizational performanceMeasuring organizational performance
Measuring organizational performanceGerald Ogoko
 
Enterprise performance-management
Enterprise performance-managementEnterprise performance-management
Enterprise performance-managementOmair Mustafa
 
job fit ;;performance management and measurement report
job fit ;;performance management and measurement reportjob fit ;;performance management and measurement report
job fit ;;performance management and measurement reportbasitktr
 
Planning and cybernetic control paper
Planning and cybernetic control paperPlanning and cybernetic control paper
Planning and cybernetic control paperEka Darmadi
 
Lecture 4 quality performance measurement tools and techniques
Lecture 4 quality performance measurement tools and techniquesLecture 4 quality performance measurement tools and techniques
Lecture 4 quality performance measurement tools and techniquesTantish QS, UTM
 
Summary of this courseHealth care business analysesHealth Care.docx
Summary of this courseHealth care business analysesHealth Care.docxSummary of this courseHealth care business analysesHealth Care.docx
Summary of this courseHealth care business analysesHealth Care.docxmattinsonjanel
 
Common Objectives Performance Management System for Not-for-profit and Public...
Common Objectives Performance Management System for Not-for-profit and Public...Common Objectives Performance Management System for Not-for-profit and Public...
Common Objectives Performance Management System for Not-for-profit and Public...Browne & Mohan
 
The hr audit process
The hr audit processThe hr audit process
The hr audit processprachinishu
 
Assessing Quality Outcome And Performance Management
Assessing Quality Outcome And Performance ManagementAssessing Quality Outcome And Performance Management
Assessing Quality Outcome And Performance ManagementKelly Taylor
 
Effects of balanced scorecard on performance of firms in the service sector
Effects of balanced scorecard on performance of firms in the service sectorEffects of balanced scorecard on performance of firms in the service sector
Effects of balanced scorecard on performance of firms in the service sectorAlexander Decker
 
Improve business practice
Improve business practiceImprove business practice
Improve business practiceJaleto Sunkemo
 
Improve business practice by jaleto sunkemo
Improve business practice by jaleto sunkemoImprove business practice by jaleto sunkemo
Improve business practice by jaleto sunkemoJaleto Sunkemo
 
Utilizing the BSC and EFQM as a Combination Framework; Scrutinizing the Possi...
Utilizing the BSC and EFQM as a Combination Framework; Scrutinizing the Possi...Utilizing the BSC and EFQM as a Combination Framework; Scrutinizing the Possi...
Utilizing the BSC and EFQM as a Combination Framework; Scrutinizing the Possi...Waqas Tariq
 
Strategy Evaluation
Strategy Evaluation Strategy Evaluation
Strategy Evaluation Taher Ahmed
 
Data1. From the Table below prepare the following Financial Statem.docx
Data1. From the Table below prepare the following Financial Statem.docxData1. From the Table below prepare the following Financial Statem.docx
Data1. From the Table below prepare the following Financial Statem.docxwhittemorelucilla
 
pnadw107.pdf
pnadw107.pdfpnadw107.pdf
pnadw107.pdfHinSeene
 
Business process literature_review
Business process literature_reviewBusiness process literature_review
Business process literature_reviewRadhika Jadhav
 
The discussion assignment for this week will be a review of the Ke.docx
The discussion assignment for this week will be a review of the Ke.docxThe discussion assignment for this week will be a review of the Ke.docx
The discussion assignment for this week will be a review of the Ke.docxmehek4
 

Similar to 065 0791 (20)

Paper on-balance-scorecard1
Paper on-balance-scorecard1Paper on-balance-scorecard1
Paper on-balance-scorecard1
 
Measures of corporate performance
Measures of corporate performanceMeasures of corporate performance
Measures of corporate performance
 
Measuring organizational performance
Measuring organizational performanceMeasuring organizational performance
Measuring organizational performance
 
Enterprise performance-management
Enterprise performance-managementEnterprise performance-management
Enterprise performance-management
 
job fit ;;performance management and measurement report
job fit ;;performance management and measurement reportjob fit ;;performance management and measurement report
job fit ;;performance management and measurement report
 
Planning and cybernetic control paper
Planning and cybernetic control paperPlanning and cybernetic control paper
Planning and cybernetic control paper
 
Lecture 4 quality performance measurement tools and techniques
Lecture 4 quality performance measurement tools and techniquesLecture 4 quality performance measurement tools and techniques
Lecture 4 quality performance measurement tools and techniques
 
Summary of this courseHealth care business analysesHealth Care.docx
Summary of this courseHealth care business analysesHealth Care.docxSummary of this courseHealth care business analysesHealth Care.docx
Summary of this courseHealth care business analysesHealth Care.docx
 
Common Objectives Performance Management System for Not-for-profit and Public...
Common Objectives Performance Management System for Not-for-profit and Public...Common Objectives Performance Management System for Not-for-profit and Public...
Common Objectives Performance Management System for Not-for-profit and Public...
 
The hr audit process
The hr audit processThe hr audit process
The hr audit process
 
Assessing Quality Outcome And Performance Management
Assessing Quality Outcome And Performance ManagementAssessing Quality Outcome And Performance Management
Assessing Quality Outcome And Performance Management
 
Effects of balanced scorecard on performance of firms in the service sector
Effects of balanced scorecard on performance of firms in the service sectorEffects of balanced scorecard on performance of firms in the service sector
Effects of balanced scorecard on performance of firms in the service sector
 
Improve business practice
Improve business practiceImprove business practice
Improve business practice
 
Improve business practice by jaleto sunkemo
Improve business practice by jaleto sunkemoImprove business practice by jaleto sunkemo
Improve business practice by jaleto sunkemo
 
Utilizing the BSC and EFQM as a Combination Framework; Scrutinizing the Possi...
Utilizing the BSC and EFQM as a Combination Framework; Scrutinizing the Possi...Utilizing the BSC and EFQM as a Combination Framework; Scrutinizing the Possi...
Utilizing the BSC and EFQM as a Combination Framework; Scrutinizing the Possi...
 
Strategy Evaluation
Strategy Evaluation Strategy Evaluation
Strategy Evaluation
 
Data1. From the Table below prepare the following Financial Statem.docx
Data1. From the Table below prepare the following Financial Statem.docxData1. From the Table below prepare the following Financial Statem.docx
Data1. From the Table below prepare the following Financial Statem.docx
 
pnadw107.pdf
pnadw107.pdfpnadw107.pdf
pnadw107.pdf
 
Business process literature_review
Business process literature_reviewBusiness process literature_review
Business process literature_review
 
The discussion assignment for this week will be a review of the Ke.docx
The discussion assignment for this week will be a review of the Ke.docxThe discussion assignment for this week will be a review of the Ke.docx
The discussion assignment for this week will be a review of the Ke.docx
 

Recently uploaded

UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERUNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERunosafeads
 
(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...
(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...
(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...Hot Call Girls In Sector 58 (Noida)
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubaikojalkojal131
 
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHot Call Girls In Sector 58 (Noida)
 
Crash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.pptCrash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.pptVlademirGebDubouzet1
 
Not Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These SymptomsNot Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These SymptomsFifth Gear Automotive
 
GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024AHOhOops1
 
The 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journeyThe 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journeyHyundai Motor Group
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...shivangimorya083
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxDineshKumar4165
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂Hot Call Girls In Sector 58 (Noida)
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agencyHyundai Motor Group
 
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...shivangimorya083
 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERDineshKumar4165
 
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 personDelhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 personshivangimorya083
 
Digamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and QualificationsDigamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and QualificationsMihajloManjak
 
BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024AHOhOops1
 
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryCall me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryPooja Nehwal
 

Recently uploaded (20)

Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...
Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...
Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...
 
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERUNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
 
Call Girls in Shri Niwas Puri Delhi 💯Call Us 🔝9953056974🔝
Call Girls in  Shri Niwas Puri  Delhi 💯Call Us 🔝9953056974🔝Call Girls in  Shri Niwas Puri  Delhi 💯Call Us 🔝9953056974🔝
Call Girls in Shri Niwas Puri Delhi 💯Call Us 🔝9953056974🔝
 
(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...
(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...
(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
 
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
 
Crash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.pptCrash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.ppt
 
Not Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These SymptomsNot Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These Symptoms
 
GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024
 
The 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journeyThe 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journey
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency
 
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
 
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 personDelhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
 
Digamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and QualificationsDigamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and Qualifications
 
BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024
 
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryCall me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
 

065 0791

  • 1. 1 Performance measurement system – a conceptual model Neide Cristine Ossovski Pontifical Catholic University of Parana (PUCPR), Brazil ncristine@gmail.com Edson Pinheiro de Lima Pontifical Catholic University of Parana (PUCPR), Brazil Federal University of Technology - Parana (UTFPR), Brazil Sergio E. Gouvea da Costa Pontifical Catholic University of Parana (PUCPR), Brazil Federal University of Technology - Parana (UTFPR), Brazil Abstract In globalized world performance measurement became crucial for enterprises to build best in class operations. Paper goal is to revise the main PMS aspects. A literature review was conducted, followed by a proposed conceptual model. As result both theoretical review and conceptual model guide enterprises on PMS implementation and improvement. Keywords: Performance Measurement System, PMS Conceptual Model, Improvement. INTRODUCTION With the advent of globalization performance measurement interest highly evolved among organizations which are increasingly seeking for tools that leads to process optimization, efficiency and competitiveness. The top management became more involved as well operating levels. Organization strategies are now designed to promote its deployment in measures that will lead to actions for targets achievement. There are several academic literatures on the topic of performance measurement. Some authors give more emphasis to the development of performance measurement system along the century, others focus in the difference between the financial and non-financial attributes and others focus on a specific stage of the performance measurement system. There are articles which focus specifically on structural models emerged during the measurement system evolution as the famous Balanced Scorecard (Kaplan 1987). The purpose of this paper is to promote an integrated review of the academic literature and describe the stages of a performance measurement system. The results are the consolidation literature review and a proposed conceptual model to be used by any organization. It serves the objective of facilitating and guiding actions, both for the development or maintenance of a performance measurement system which requires continuous review. STRATEGIC MANAGEMENT
  • 2. 2 The Measurement System Strategic Performance - MSSP stimulates the development of a more comprehensive strategic agenda within the organization. It consists not only in the formulation of the strategy - a process in which a company defines its general guidelines for long-term, how it will set up its operations and its resources in the market in order to achieve competitive advantage. It also defines how this strategy will be deployed and implemented bringing 'action', 'monitoring' and 'evaluation' of results to the processes. It’s therefore concluded that the adoption of a measurement system strategic performance brings a very important alignment between the long-term strategy of the organization and other aspects and stages imbued in a performance measurement system - the deployment in targets, measurements, assessments, actions, reviews and learning. It also promotes the involvement of the top management - a factor that is crucial to achieve success while developing or maintaining a performance measurement system in an organization acting as a motivating factor for the entire chain such as managers, experts, operational staff, customers and suppliers. PERFORMANCE MANAGEMENT The effects of strategic analysis aligned to performance measurement system guideline managers to focus on the future, encourage a more accurate communication flow and optimize the coordination process as a whole. It also stimulates the dialog between the team by rationalizing instead of emotionalizing strategic decisions, supporting the acceptance of the set goals, the predisposition of managers to coordinate the teams in the pursuit of goals achievement as well as of the teams for their execution (Gimbert et al. 2010). The same as the support of top management, the support of managers is fundamental in the performance management process. But the priorities of an organization are often affected by other internal and external events, and therefore may change over time making the resources and managers available time to be limited - this can turn into a natural resistance scenario in the process (Bourne 2005). Bourne (2005) clarify that also other factors might affect the perception and lead to support or imply natural resistance to the process by the managers or the organization staff:  the effort required;  easy access to IT for development of a specific system for performance measurement;  the results of measurements which imply in reviews about efficiencies or inefficiencies, leading to actions that often generate discomfort and insecurity;  the belief that the process has always been done that way and does not require any changes, or that the type of application will never succeed in the organization. As conclusion, creating a list of factors that encourage or block the process can be helpful to managers in dealing with it. Also helps conducting an assessment of in progress and future projects, its expected benefits and priorities and level of support obtained. In the absence of these factors, a negotiation with top management about demands priorities is crucial (Bourne 2005). PERFORMANCE MEASUREMENT SYSTEMS Performance measurement systems are characterized as strategic expert systems by which organizations observe and measure their intangible performance elements in the form of qualitative and quantitative assessment as stated in the article of Fried (2010).
  • 3. 3 According to Gimbert et al. (2010) performance measurement system is a brief and precise set of measures (financial or non-financial) that supports the decision-making process of an organization by collecting, processing and analyzing quantified data of performance information. Traditional and Non-Traditional Performance Measurement According to academic literature performance measurement had until the 80's a more traditional approach with financial focus. From that point on, the globalization introduced a non- traditional approach changing the strategic focus of low production costs into quality, flexibility and delivery focus, showing that traditional concepts were very limited and opening to new models (Ghalayini and Noble, 1996). Based on non-traditional performance measures features - which is the current recommended model – organizations may be guided by aspects that make the process more productive and effective: directed to all employees; simple and easy to use; accurate; always revised; supporting continuous improvement; etc It is important to analyze the organization approach and its objectives to build a PMS. Table 1 – A comparison between traditional and non-traditional performance measures (Ghalayini and Noble, 1996) Traditional performance measures Non-traditional performance measures Based on outdated traditional accounting system Based on company strategy Mainly financial measures Mainly non-financial measures Intended for top and senior managers Intended for all employees Late metrics (weekly or monthly) On-time metrics (hourly, or daily) Difficult, confusing and misleading Simple, accurate and easy to use Lead to employee frustration Lead to employee satisfaction Neglected at the shop floor Frequently used at the shop floor Have a fixed format Have no fixed format (depends on needs) Do not vary between locations Vary between locations Do not change over time Change over time as the need changes Intended mainly for monitoring performance Intended to improve performance Not applicable for JIT, TQM, RPR, OPT, etc. Applicable Hinders continuous improvement Support continuous improvement Stages of a Performance Measurement System The development of a performance measurement system can be divided into three main stages: design, implementation and use of performance measures (Bourne et al. 2000). A fourth and fifth stages might also be considered: the review and learning. This is the sequence a performance measurement system should evolve, however, stages may overlap and some stages be implemented before others (Bourne et al. 2000). Design
  • 4. 4 The design stage usually starts with an overview of the business in order to identify the demands of stakeholders and clients as well validate the alignment with the organization's strategy before listing a new set of objectives for the business (Bourne et al. 2000). Thus, the design stage can be further sub-divided into: identification of key design objectives and measures design (Bourne et al. 2000). Several articles have discussed the performance measures design establishing different approaches and recommendations. Through a literature review of 10 books and articles these approaches and recommendations were summarized and listed in a table by Neely et al. (1997). The recommendations say that performance measures must: derivate from the strategy; provide updated feedback; be quantifiable; reflect the business; be specific, relevant, simple, objective; have visual impact; focus on improvement; etc. Furthermore, authors proposed a framework – the Performance Measure Record Sheet, which seeks to specify what a good performance measure constitutes. The proposed framework, besides previous recommendations, emphasizes that the measures must be clearly defined as well based on clearly formula and data source (Neely et al. 1997). Table 2 – The performance measure record sheet (Neely et al. 1997) Details Title Purpose Relates to Target Formula Frequency Who measures? Source of data Who acts on the data? What do they do? Notes and comments According to the academic literature there is not a framework or complete tool to use in a performance measurement system. Each one has specific features and specific focus, addressed more to a certain purpose than another, with advantages and disadvantages, resulting in positive and negative points. While SMART is strong in integrating corporate with operating objectives it does not provide a mechanism to identify key indicators nor integrates the concept of continuous improvement. Neither PMQ provides a mechanism to identify areas for improvement in the company. As the Balanced Scorecard, it integrates important perspectives of performance and is easy to use but is more directed to support the top management level not being adherent to the operational level (Ghalayini and Noble, 1996). Thus, it is up to the head or group responsible for the development of PMS a deep business analysis and identification among available frameworks or tools, and the task of selecting and applying those most pertinent to the business and organization’s objectives.
  • 5. 5 Table 3 – Key proposals of PMS models (Attadia and Martins, 2003) PM MODELS KEY ATTRIBUTES Performance Measurement Matrix (KEEGAN et al., 1989) - performance measures internal and external, financial and non- financial - performance measures linked to strategy SMART - Performance Pyramid (CROSS & LINCH, 1990) - performance measures of internal efficiency and external effectiveness - performance measures deployed from organization's strategy Balanced Scorecard (KAPLAN & NORTON, 1992, 1996) - performance measures grouped into four perspectives - cause and effect relation between perspectives reflecting the strategy Integrated Performance Measurement System (BITITCI et al, 1997) - strategic development for business, business unit, processes and activities generates measures considering requirements of stakeholders, external monitoring, objectives and performance measures Performance Prism (NEELY & ADAMS, 2000) - performance measurement of stakeholders satisfaction - strategy communication - approach for the management of business processes Implementation The implementation is defined as the stage in which systems and procedures are put in place in order to collect and process the data that will generate the measurements (Bourne et al. 2000). It might be a new process that involves new procedures, or a computer programming for data extraction. Each organization will set up its own system or procedures, depending on the available resources and according to the strategy defined. Use The use of performance measures can be splitted in two sub-divisions: evaluate the success or failure of the implementation and challenge the strategic assumptions (Bourne et al. 2000). Evaluating the success of the implementation means that the PMS fits in the operation and provides the scores that allows the top management, managers and employees to visualize if the goals were achieved or not. In case of failure, the review stage must take place. By challenging the strategic assumptions we can understand that through the results of the implemented PMS and extracted measures the organization can guideline the actions towards improvements or changes to be made. Review In a review process the organization have a better understanding of performance measurement system in several aspects, increasing its expertise on measures applicability. There are two aspects to be considered towards the review stage: the preparation for the process review in order it to be effective and a system for understanding the flaws or weaknesses in the performance measurement system that need to be corrected or optimized.
  • 6. 6 According to Farris et al. (2011) the research of Meekings (2005) offers some guidelines to set up an effective review process based on three case studies:  structure the process review by defining: "what, when, why, where and how";  ensure review meetings to be productive;  pilot the review at a unit that is more susceptible to accept the process. Farris et al. (2011) research involving a number of organizations, listed questions that initially support a systematic process review to understand the failures and necessary improvements in the PMS review stage:  has the organization an effective way of communicating the measurement framework, the process, the measures and the resulting actions required?  has the organization a robust performance achievement process established and driven by measures that identify the appropriate actions and recognize best practices?  has the organization successfully integrated PM approach in its culture and business? Farris et al. (2011) article proposes a systematic process review consistent of:  a list of evaluation criteria’s divided into 04 dimensions: 1) approach (scheduled meetings involving the operational team and stakeholders); 2) deployment (critical results communication to internal and external stakeholders); 3) study (analysis results and action plans); 4) refinement (actions for improvement and deviations adjustments), where these evaluation criteria’s are used as support for PMS analysis;  a list of improvement opportunities extracted from the evaluation criteria’s analysis;  a final list with the key strengths which will guide the actions to optimize the PMS;  the identification of root causes and action plans for process optimization; Learning From the organizational behavior standpoint view the individual learning happens when people assimilate new knowledge through experience in their daily lives and from other sources - this process increases the intelligence and the ability of the individual. When the learning process is absorbed between the members of the organization, a new culture is established and an organizational learning occurs (Yeung Lai and Yee, 2007). According to Fried (2010) strategic learning does not result automatically from the implementation of a performance measurement system - but their development and use can lead to a strategic learning process. Similarly, the review of a PMS conducts to learning – by increasing knowledge about the current measures, the improvement opportunities identified that lead to change and innovation, and finally to better understand the PMS as a whole. PMS CONCEPTUAL MODEL Other authors also have been concerned to define criteria for the development of an efficient and effective performance measurement system from the perspective of strategic management. The proposed conceptual model seeks to consolidate the stages described in this paper, in a sequential order, synthesizing the main important practices. The objective is to allow the conceptual model to be used as a guide by any organization while developing or reviewing a PMS process. It lists key actions preventing crucial points in the process to be ignored or forgotten. For each listed stage, respective key actions and specific actions are recommended.
  • 7. 7 While using the conceptual model if any question raises the theoretical part can always be reviewed for additional details. Moreover, academic bibliographies available referring to the subject might be used as support as well. Table 5 – Performance measurement system - a conceptual model (authors) Stages Key Actions Specific Actions  Long Term Strategy – Top Management  Align Organization Strategy with Top Management / Managers for PMS support  List factors that block PMS in case of resistance at management level  Long Term Strategy – Senior Managers  Deploy Business Strategy, Corporate / Process / Employees Goals, to support PMS development and maintenance  List factors that block PMS in case of resistance at operational level  Traditional and Non-Traditional Measures  Analyze Organization’s Approach and Objectives (where they want to go) to set the measures  Select between: Traditional measures and Non-Traditional Measures (Tab1)  Performance Measures  Ensure compliance with the 08 attributes at measures definition  Emphasize specific attributes according to the business scenario and the Organization strategies  Design  Use the Recommendations for the Performance Measures Design  Use the Record Sheet for the Performance Measures (Tab2)  Analyze available PM models and apply best option (Tab3)  Ensure the establishment of objective, simple and only necessary measures  Ensure clarity and registration of the established measures  Implementation  Apply the Design stage definitions, the system model chosen and the data allocation  Follow up Design stage planning  Check need for adjustments  Use  Stratify the results  Apply the analysis and process improvement for low performances  Ensure data accuracy, results analysis and regular meetings  Ensure team motivation focusing on improvements not on guilty  Review - Preparation  Ensure the preparation for the process review according to the proposed guidelines  Set 'what, when, why, where, how'  Ensure productive meetings  Identify Business Unit to review  Review - Systematic  Apply the Systematic Process Review  Apply Evaluation Criteria’s list  Extract a list of Strengths and Opportunities for Improvement  Select the main opportunities  Identify Root Cause and apply Action Plans for improvement  Learning  Identify opportunities for improvement and innovation based on PMS Review  Ensure improvement projects and progress of measures  Apply PMS adjusts as expertise increases and deviations raises
  • 8. 8 RESULTS Through the compilation of several articles and renowned publications of the academic community this paper brings as first result the consolidation of the stages and its aspects, in a sequential order, to be considered in a PMS process. It serves as support towards the theoretical aspect without complexity of terms and classifications so that it can be easily internalized by the readers, with the objective to support the knowledge. As second contribution it proposes a PMS conceptual model as a facilitator tool in a practical aspect, emphasizing and listing the main stages and aspects to be considered in a PMS process with the objective to support the actions. The proposed model can also be applied to support a PMS process review for those who have already developed its PMS and are willing to add adjustments or improvements. CONCLUSIONS The purpose of this paper is to support organizations with a literature consolidation for knowledge support and a PMS conceptual model for practical support on a PMS process. It is expected that with the brief review of academic literature provided by the theoretical part of this paper the organization can have a better understanding of a PMS process and increase the chances of success in its development or review stages. It is also expected that the conceptual model can serve as a guide for an organization during the PMS process so that it can be the most effective and efficient as possible considering its scenario, objectives and strategies. Despite covering certain aspects and stages of a PMS process this paper does not cover all variables of the substantial academic literature available, so there is still considerable room for additional researches. Bibliography Neely, A.D. (1999). The performance measurement revolution: why now and what next? International Journal of Operations and Production Management 19(2): 205-228. Neely, A.D. (2005). The evolution of performance measurement research: developments in the last decade and a research agenda for the next. International Journal of Operations and Production Management 25(12): 1264-1277. Gomes, C.F., Yasin, M.M. and Lisboa, J.V. (2004). A literature review of manufacturing performance measures and measurement in an organizational context: a framework and direction for future research. Journal of Manufacturing Technology Management 15(6): 511-530. Folan, P. and Browne, J. (2005). A review of performance measurement: towards performance management. Computers in Industry 56(7): 663–680. Folan, P., Browne, J. and Jagdev, H. (2007). Performance: its meaning and content for today’s business research. Computers in Industry 58(7): 605-620. Nudurupati, S.S., Bititci, U.S., Kumar, V. and Chan, F.T.S. (2011). State of the art literature review on performance measurement. Computers and Industrial Engineering 60(2): 279-290. Ghalayini, A.M. and Noble, J.S. (1996). The changing basis of performance measurement. International Journal of Operations & Production Management 16(8): 63-80.
  • 9. 9 Tangen, S. (2004). Performance measurement: from philosophy to practice. International Journal of Productivity and Performance Management 53(8): 726-737. Henry, J.F. (2006). Management control systems and strategy: a resource-based perspective. Accounting, Organizations and Society. 31(6): 529–558. Suwignjo, P., Bititci, U.S., Carrie, A.S. (2000). Quantitative models for performance measurement system. International Journal of Production Economics 64(1/3): 231-241. De Toni, A. and Tonchia, S. (2001). Performance measurement systems: models, characteristics and measures. International Journal of Operations & Production Management 21(1/2): 46-70. Franco-Santos, M., Kennerley, M., Micheli, P., Martinez, V., Mason, S., Marr, B., Gray, D. and Neely, A.D. (2007). Towards a definition of a business performance measurement system. International Journal of Operations & Production Management 27(8): 784-801. Bititci, U.S., Turner, T. and Begemann, C. (2000). Dynamics of performance measurement systems. International Journal of Operations & Production Management 20(6): 692-704. Tan, K.H., Platts, K. and Noble, J. (2004). Building performance through in-process measurement: toward an “indicative” scorecard for business excellence. International Journal of Productivity and Performance Management 53(3): 233-244. Malina, M.A. and Selto, F.H. (2004). Choice and change of measures in performance measurement models. Management Accounting Research 15(4): 441-469. Neely, A.D., Richards, H., Mills, J.F., Platts, K.W. and Bourne, M.C.S. (1997). Designing performance measures: a structured approach. International Journal of Operations & Production Management 17(11): 1131-1152. Bourne, M.C.S., Mills, J.F., Wilcox, M., Neely, A.D. and Platts, K.W. (2000). Designing, implementing and updating performance measurement systems. International Journal of Operations & Production Management 20(7): 754- 771. Chenhall, R.H. (2003). Management control systems design within its organizational context: findings from contingency-based research and directions for the future. Accounting, Organizations and Society 28(2/3): 127-168. Kennerley, M.P. and Neely, A.D. (2003). Measuring performance in a changing business environment. International Journal of Operations and Production Management 23(2): 213–229. Bourne, M.C.S. (2005). Researching performance measurement system implementation : the dynamics of success and failure. Production Planning & Control 16(2): 101-113. Artz, M., Homburg, C., Rajab T. (2012). Performance-measurement system design and functional strategic decision influence: the role of performance-measure properties. Accounting, Organizations and Society 37(7): 445- 460. Bourne, M.C.S., Kennerley, M. and Franco-Santos, M. (2005). Managing through measures: a study of impact on performance. Journal of Manufacturing Technology Management 16(4): 373-395. Ferreira, A. and Otley, D. (2009). The design and use of performance management systems: An extended framework for analysis. Management Accounting Research 20(4): 263-282. Farris, J.A., van Aken, E.M., Letens, G., Chearksul, P., Coleman, G. (2011). Improving the performance review process: A structured approach and case application. International Journal of Operations & Production Management 31(4): 376-404. Attadia, L.C.L. and Martins, R.A. (2003). Medição de desempenho como base para evolução da melhoria contínua. Produção 13(2): 33-41. Mergulhão, R.C. and Martins, R.A. (2008). Relação entre sistemas de medição de desempenho e projetos Seis Sigma: estudo de caso múltiplo. Produção 18(2): 342-358.
  • 10. 10 Chenhall, R.H. (2005). Integrative strategic performance measurement systems, strategic alignment of manufacturing, learning and strategic outcomes: an exploratory study. Accounting, Organizations and Society 30(5): 395-422. Neely, A.D. and Al Najjar, M. (2006). Management learning not management control: the true role of performance measurement. California Management Review 48(3): 100-114. Yeung, A.C.L., Lai, K.H. and Yee, R.W.Y. (2007). Organizational learning, innovativeness, and organizational performance: a qualitative investigation. International Journal of Production Research 45(11): 2459–2477. Fried, A. (2010). Performance measurement systems and their relation to strategic learning: a case study in a software-developing organization. Critical Perspectives on Accounting 21(2): 118-133. Tahir, A.C., Darton, R.C. (2010). The Process Analysis Method of selecting indicators to quantify the sustainability performance of a business operation. Journal of Cleaner Production 18(16–17): 1598-1607. Gimbert, X., Bisbe, J. and Mendoza, X. (2010). The role of performance measurement systems in strategy formulation processes. Long Range Planning 43(4): 477-497. Bititci, U., Garengo, P., Dörfler, V. and Nudurupati, S. (2012). Performance Measurement: challenges for tomorrow. International Journal of Management Reviews 14(3): 305-327.