Building Information Modeling which is one of the best pioneers for BIM services. And we had achieved more than 12 Years in BIM Engineering. Our services which are also globally delivered and we have great exposure in service the different domains of the industry. Our project preference belongs to different areas such as residential, healthcare, commercial, educational, industrial, retail, and hospitality. As a client concentric organization, we keep on upgrading our work methodology by keeping a tab on the latest BIM technology.
2. Introduction
This is a universal fact that nobody can deny and it is that the construction
industries have gained a lot of demand in the market and because of which
its marketability has increased tremendously along with its existence. In the
earlier time, when there was no such facility and the latest tools and
technology, the team of contractors, engineers, and owners use to produce
the design and prepare the model drawings on the piece of paper with the
pencil to have a look as to how their building would be looking like.
Later it was in the year 1960, that the designers and the drafters started
preparing the drawings in a 2D model and that was possible with the help
of AutoCAD software, wherein the design of the models were easily been
showcased as per the details shared by the architectural, structural, and
MEP engineers. However, it took a lot of time to understand the model and
visualize the accuracy of the design and that how the building material
would be materialized post the construction of the building.
3. There are many do's and don't of making drawings on the
2D CAD models. One of them is that it will require rework
or redo of the work during construction and this is due to
the installation process along with the design of the
elements that would not be adequately shown in the 2D
drawings. It is like the drawings that are drawn in 2D
seems to be OK, but when building them the way it is
shown in 2D is not at all practical.
Later in the 1980s, the construction industries started
growing and this was leading towards modernization and
with that, they started growing and look forward to
adopting the latest BIM services and transforming the
drawings and technology in digital form and that is all
related to the construction industry. BIM was the service
that was not very much is known by major companies, but
since the government has made it compulsory for the use
of the latest BIM drafting services in public and private
projects, it indeed gained a lot of momentum.
4. Building information modeling services actually helps the
team of architect and the engineers to check and have a look
into the model very closely and also to check if at all there are
any potential clashes occurring that needs to be resolved at the
initial stage of the design itself. It actually enhances the
collaboration and demands to follow all the three disciplines
and that also in a detailed model. Having said this let us
understand and have a look at how BIM Coordination and
Clash detection services actually work in the construction
project:
5. Difference Between BIM Coordination
and Clash Detection
In the construction industries, it is not at all saying in wrong, that
these two services are very much necessary and this are
interchangeable terms and are considered to be essential for any
of the design to come into existence. This is the service that gives
an accurate result and that is what is been expected and this also
without any clashes in 3D BIM models.
The process of BIM Coordination services is an important part of
the design criterion that processes all use in the construction
projects. It provides a better as well as precise collaboration
within the design model and with this process it gives a digital
representation amongst three disciplines of the construction
projects.
It is one of the processes that is required in building information
modeling that is a link and considered to be coordination between
architectural, structural, and MEP engineering based on the design
and along with the elemental outcome. BIM coordination and BIM
clash detection services give an outline for the installation process
by following all the three disciplines.
6. Clash detection services are the first stage in the process of BIM coordination. This is the
process that identifies the clashes and shares the accurate interferences to check the
reports that are very much important for the BIM model trades.
Clashes can be identified in different ways to extract the report in a specific format. The
different types of clashes available are hard, soft, workflow clashes. This data report
gives and helps to check the level of interference between the architects, structural, and
MEP engineer's disciplines which help in sharing and differentiating the date between the
severe and routine clashes.
Soft clashes resolve the process of re-modeling a BIM model, whereas some of the hard
clashes need to be clarified and understood clearly so that the work with the expert
engineers are done with convenience.
The three disciplines that assist in this process gives an expert view of inspection,
identification, and reporting of the clashes across. This also gives a benefitting approach
to ensuring the efficient execution of a new and existing project.
7. BIM Coordination and Clash
Detection Process
BIM coordination services are one of the biggest backbones for most of the
implementation in the BIM related projects. The BIM coordination process includes
clash detection reports, that gives constructability reviews for virtual as well as
personal coordinated meetings with the team of construction professionals, that
enhances the operability and BIM software thus ensure this project so as to there is
no delay and with this incurs unnecessary costs for the team and the clients.
It further ensures the coordination and with the prior to get the installation to reduce
the design changes. It identifies the issues in the process of pre-design stages and
also to avoid errors in design, and also reduces the clashes and improves the
coordination with the process of disciplines. This helps in reducing a lot of amount of
wastages, conflicts, and installation issues.
The design drawings that are getting converted into the virtual 3D models for
geometry presentation, all the models are then created with the help of the
software Revit or Navisworks to detect this error, collisions, and interferences, etc.
8. Thanks You
Contact us:
Name: Building Information Modeling
URL: http://www.buildinginformationmodelling.net/
Email ID: info@buildinginformationmodelling.net
Contact no:
USA : + 1 - 763 - 270 - 8285
UK : + 44 - 208 - 819 - 5832
Aus : + 61 - 871- 303 - 063
India : + 91 - 79 - 40031887