Engine Crankcase Housing
   25-Jun-07



                                                   Using Machine Cost per Hour                             Using Lost Revenue per Hour
                                                                                                     Current with            Proposed with Lost
                                     Current with Cost/Hour        Proposed with Cost/Hr            Revenue/Hour                  Revenue
Supplies
   Coolant Changes
   System Size                              900                          900                          900                          900
   Coolant Cost                      $    15.00                           15                   $    15.00                           15
   Coolant Concentration                     7%                          7%                            7%                          7%
   System Cost                              945                          945                          945                          945
   Changes per year                            6                           1                             6                           1
   Total Cost                                      $   5,670.00                 $    945.00                  $   5,670.00                 $    945.00

   Coolant Disposal
   System Size                              900                          900                          900                          900
   Changes/year                                6                            1                            6                            1
   Gallons Disposed                        5400                          900                         5400                          900
   Cost per gallon                   $     0.20                   $     0.20                   $     0.20                   $     0.20
                                                   $   1,080.00                 $    180.00                  $   1,080.00                 $    180.00
   Trip Charge for disposal          $   250.00                   $   250.00                   $   250.00                   $   250.00
   Number of Disposals                         3                            1                            3                            1
                                                   $    750.00                  $    250.00                  $    750.00                  $    250.00
   Additives (biocide/defoam, etc)
   Current vs. proposed costs                      $   1,200.00                 $       -                    $   1,200.00                 $       -

   Filters
   Number of machines                          2                            2                            2                            2
   Number of bags/machine                      4                            4                            4                            4
   Cost per bag                      $     5.00                   $     5.00                   $     5.00                   $     5.00
   Bag changes/year                           36                            3                           36                            3
                                                   $   1,440.00                 $    120.00                  $   1,440.00                 $    120.00

   Roll Media Cost                                 $       -                    $   2,400.00                 $       -                    $   2,400.00

   Pump Failures
   Number of Failures/year                     3                            1                            3                            1
   Pump Cost                         $ 2,000.00                   $ 2,000.00                   $ 2,000.00                   $ 2,000.00
                                                   $   6,000.00                 $   2,000.00                 $   6,000.00                 $   2,000.00
   Tooling
   Tooling Cost                      $    10.00                   $    10.00                   $    10.00                   $    10.00
   Tooling changes/year                       10                           10                           10                           10
                                                   $    100.00                  $    100.00                  $    100.00                  $    100.00

Supplies Subtotal                                  $ 16,240.00                  $   5,995.00                 $ 16,240.00                  $   5,995.00

More Related Content

What's hot (9)

Supporting Spreadsheet How to replace your datacenter with Amazon Web Services
Supporting Spreadsheet How to replace your datacenter with Amazon Web ServicesSupporting Spreadsheet How to replace your datacenter with Amazon Web Services
Supporting Spreadsheet How to replace your datacenter with Amazon Web Services
 
13. project report for 10000 layers
13. project report for 10000 layers13. project report for 10000 layers
13. project report for 10000 layers
 
High Tunnel Economics, 2015
High Tunnel Economics, 2015High Tunnel Economics, 2015
High Tunnel Economics, 2015
 
Ameri Veri Cr Projected Savings Chart V101612
Ameri Veri Cr Projected Savings Chart V101612Ameri Veri Cr Projected Savings Chart V101612
Ameri Veri Cr Projected Savings Chart V101612
 
Pdq arroz caldo
Pdq arroz caldoPdq arroz caldo
Pdq arroz caldo
 
A10 key abc landscaping
A10 key abc landscapingA10 key abc landscaping
A10 key abc landscaping
 
Secamanos Mitsubishi Jet-Towel
Secamanos Mitsubishi Jet-TowelSecamanos Mitsubishi Jet-Towel
Secamanos Mitsubishi Jet-Towel
 
Pre Budget Meeting December 5, 2012
Pre Budget Meeting December 5, 2012 Pre Budget Meeting December 5, 2012
Pre Budget Meeting December 5, 2012
 
Conference Budget Template
Conference Budget TemplateConference Budget Template
Conference Budget Template
 

Viewers also liked

Gost 11422 75
 Gost 11422 75 Gost 11422 75
Gost 11422 75cosy_mousy
 
ใบความรู้ พุทธศาสนิกชนตัวอย่าง+502+dltvsocp6+54soc p06 f37-1page
ใบความรู้  พุทธศาสนิกชนตัวอย่าง+502+dltvsocp6+54soc p06 f37-1pageใบความรู้  พุทธศาสนิกชนตัวอย่าง+502+dltvsocp6+54soc p06 f37-1page
ใบความรู้ พุทธศาสนิกชนตัวอย่าง+502+dltvsocp6+54soc p06 f37-1pagePrachoom Rangkasikorn
 
Visita a la fabrica de zapatos
Visita a la fabrica de zapatosVisita a la fabrica de zapatos
Visita a la fabrica de zapatosjhormansvargas
 
Bitacoras de tecno
Bitacoras de tecnoBitacoras de tecno
Bitacoras de tecnoOmar Casti
 
The New Rules On Dressing For Success
The New Rules On Dressing For SuccessThe New Rules On Dressing For Success
The New Rules On Dressing For Successleongsgp
 
Revista bravo 01-05-2012
Revista bravo   01-05-2012Revista bravo   01-05-2012
Revista bravo 01-05-2012Rachel Caiano
 
Boletín n° 006 alcaldes de occidente esperan 30 mil millones para la región a...
Boletín n° 006 alcaldes de occidente esperan 30 mil millones para la región a...Boletín n° 006 alcaldes de occidente esperan 30 mil millones para la región a...
Boletín n° 006 alcaldes de occidente esperan 30 mil millones para la región a...leidy376
 
Diploma in Software Programming
Diploma in Software ProgrammingDiploma in Software Programming
Diploma in Software ProgrammingVipin Raj
 
Critical Report Alice Shone
Critical Report Alice ShoneCritical Report Alice Shone
Critical Report Alice ShoneAlice Shone
 

Viewers also liked (14)

Gost 11422 75
 Gost 11422 75 Gost 11422 75
Gost 11422 75
 
Proyecto de vida
Proyecto de vidaProyecto de vida
Proyecto de vida
 
ใบความรู้ พุทธศาสนิกชนตัวอย่าง+502+dltvsocp6+54soc p06 f37-1page
ใบความรู้  พุทธศาสนิกชนตัวอย่าง+502+dltvsocp6+54soc p06 f37-1pageใบความรู้  พุทธศาสนิกชนตัวอย่าง+502+dltvsocp6+54soc p06 f37-1page
ใบความรู้ พุทธศาสนิกชนตัวอย่าง+502+dltvsocp6+54soc p06 f37-1page
 
Visita a la fabrica de zapatos
Visita a la fabrica de zapatosVisita a la fabrica de zapatos
Visita a la fabrica de zapatos
 
Bitacoras de tecno
Bitacoras de tecnoBitacoras de tecno
Bitacoras de tecno
 
Resume
Resume Resume
Resume
 
Notitas
Notitas Notitas
Notitas
 
The New Rules On Dressing For Success
The New Rules On Dressing For SuccessThe New Rules On Dressing For Success
The New Rules On Dressing For Success
 
Revista bravo 01-05-2012
Revista bravo   01-05-2012Revista bravo   01-05-2012
Revista bravo 01-05-2012
 
Aρκάδι
Aρκάδι Aρκάδι
Aρκάδι
 
Boletín n° 006 alcaldes de occidente esperan 30 mil millones para la región a...
Boletín n° 006 alcaldes de occidente esperan 30 mil millones para la región a...Boletín n° 006 alcaldes de occidente esperan 30 mil millones para la región a...
Boletín n° 006 alcaldes de occidente esperan 30 mil millones para la región a...
 
Diploma in Software Programming
Diploma in Software ProgrammingDiploma in Software Programming
Diploma in Software Programming
 
Rac
RacRac
Rac
 
Critical Report Alice Shone
Critical Report Alice ShoneCritical Report Alice Shone
Critical Report Alice Shone
 

Similar to Engine Crankcase Housing Payback

"INTRODUCCION DE NUEVAS ESPECIES PARA LA PRODUCCION DE FLORES A CAMPO ABIERTO"
"INTRODUCCION DE NUEVAS ESPECIES PARA LA PRODUCCION DE FLORES A CAMPO ABIERTO""INTRODUCCION DE NUEVAS ESPECIES PARA LA PRODUCCION DE FLORES A CAMPO ABIERTO"
"INTRODUCCION DE NUEVAS ESPECIES PARA LA PRODUCCION DE FLORES A CAMPO ABIERTO"presslima
 
Titan Farms Presentation
Titan Farms PresentationTitan Farms Presentation
Titan Farms Presentationscagcouncil
 
Ace 10 high efficiency plumbing fixtures are flush with savings
Ace 10 high efficiency plumbing fixtures are flush with savingsAce 10 high efficiency plumbing fixtures are flush with savings
Ace 10 high efficiency plumbing fixtures are flush with savingsTroy Aichele
 
Assessing carbon value
Assessing carbon valueAssessing carbon value
Assessing carbon valuePeter Weisberg
 
Cotizacion Redes Cole
Cotizacion Redes ColeCotizacion Redes Cole
Cotizacion Redes ColePaola Pedroza
 
From Small to Big - how we doubled our events business at Armidale City Bowli...
From Small to Big - how we doubled our events business at Armidale City Bowli...From Small to Big - how we doubled our events business at Armidale City Bowli...
From Small to Big - how we doubled our events business at Armidale City Bowli...Profitable Hospitality
 
Executive Summary Rough Draft #3
Executive Summary Rough Draft #3Executive Summary Rough Draft #3
Executive Summary Rough Draft #3AVINRAM
 
Jpg Comptoir 1 Year One
Jpg Comptoir 1 Year OneJpg Comptoir 1 Year One
Jpg Comptoir 1 Year Oneguestf8a979
 
Llc Business Model 2011 Sr20 B Cv1
Llc Business Model   2011 Sr20 B Cv1Llc Business Model   2011 Sr20 B Cv1
Llc Business Model 2011 Sr20 B Cv1Bill Cattley
 
Outsourcing Bottling Operations - Silver Peak Brewery
Outsourcing Bottling Operations - Silver Peak BreweryOutsourcing Bottling Operations - Silver Peak Brewery
Outsourcing Bottling Operations - Silver Peak BreweryDaniel Herr
 
The power of solar residential_11.28
The power of solar residential_11.28The power of solar residential_11.28
The power of solar residential_11.28Antonio Ciampa LLC.
 
Analysis Coversheet Final
Analysis Coversheet FinalAnalysis Coversheet Final
Analysis Coversheet FinalJohn_Nuckel1
 
Coffee dispenser projection 50 cups eng
Coffee dispenser projection 50 cups   engCoffee dispenser projection 50 cups   eng
Coffee dispenser projection 50 cups engmbarlow939
 

Similar to Engine Crankcase Housing Payback (20)

"INTRODUCCION DE NUEVAS ESPECIES PARA LA PRODUCCION DE FLORES A CAMPO ABIERTO"
"INTRODUCCION DE NUEVAS ESPECIES PARA LA PRODUCCION DE FLORES A CAMPO ABIERTO""INTRODUCCION DE NUEVAS ESPECIES PARA LA PRODUCCION DE FLORES A CAMPO ABIERTO"
"INTRODUCCION DE NUEVAS ESPECIES PARA LA PRODUCCION DE FLORES A CAMPO ABIERTO"
 
Titan Farms Presentation
Titan Farms PresentationTitan Farms Presentation
Titan Farms Presentation
 
Elasticity
ElasticityElasticity
Elasticity
 
Elasticity
ElasticityElasticity
Elasticity
 
Ace 10 high efficiency plumbing fixtures are flush with savings
Ace 10 high efficiency plumbing fixtures are flush with savingsAce 10 high efficiency plumbing fixtures are flush with savings
Ace 10 high efficiency plumbing fixtures are flush with savings
 
Assessing carbon value
Assessing carbon valueAssessing carbon value
Assessing carbon value
 
Cost Managment
Cost ManagmentCost Managment
Cost Managment
 
Cotizacion Redes Cole
Cotizacion Redes ColeCotizacion Redes Cole
Cotizacion Redes Cole
 
Budget Report
Budget ReportBudget Report
Budget Report
 
From Small to Big - how we doubled our events business at Armidale City Bowli...
From Small to Big - how we doubled our events business at Armidale City Bowli...From Small to Big - how we doubled our events business at Armidale City Bowli...
From Small to Big - how we doubled our events business at Armidale City Bowli...
 
Executive Summary Rough Draft #3
Executive Summary Rough Draft #3Executive Summary Rough Draft #3
Executive Summary Rough Draft #3
 
Jpg Comptoir 1 Year One
Jpg Comptoir 1 Year OneJpg Comptoir 1 Year One
Jpg Comptoir 1 Year One
 
Llc Business Model 2011 Sr20 B Cv1
Llc Business Model   2011 Sr20 B Cv1Llc Business Model   2011 Sr20 B Cv1
Llc Business Model 2011 Sr20 B Cv1
 
Outsourcing Bottling Operations - Silver Peak Brewery
Outsourcing Bottling Operations - Silver Peak BreweryOutsourcing Bottling Operations - Silver Peak Brewery
Outsourcing Bottling Operations - Silver Peak Brewery
 
The power of solar residential_11.28
The power of solar residential_11.28The power of solar residential_11.28
The power of solar residential_11.28
 
Analysis Coversheet Final
Analysis Coversheet FinalAnalysis Coversheet Final
Analysis Coversheet Final
 
Making High Tunnels Pay
Making High Tunnels PayMaking High Tunnels Pay
Making High Tunnels Pay
 
Coffee dispenser projection 50 cups eng
Coffee dispenser projection 50 cups   engCoffee dispenser projection 50 cups   eng
Coffee dispenser projection 50 cups eng
 
Tree Project
Tree ProjectTree Project
Tree Project
 
Tree Project
Tree ProjectTree Project
Tree Project
 

More from bharrigan

Henry Filter Upgrade Benefit Analysis 4 22 10
Henry Filter Upgrade Benefit Analysis 4 22 10Henry Filter Upgrade Benefit Analysis 4 22 10
Henry Filter Upgrade Benefit Analysis 4 22 10bharrigan
 
Business Model 10 13 2010
Business Model 10 13 2010Business Model 10 13 2010
Business Model 10 13 2010bharrigan
 
Harrigan Process Engineering
Harrigan Process EngineeringHarrigan Process Engineering
Harrigan Process Engineeringbharrigan
 
Harrigan Equipment
Harrigan EquipmentHarrigan Equipment
Harrigan Equipmentbharrigan
 
Harrigan Plant Services
Harrigan Plant ServicesHarrigan Plant Services
Harrigan Plant Servicesbharrigan
 
Tractor Fish Bone
Tractor  Fish BoneTractor  Fish Bone
Tractor Fish Bonebharrigan
 

More from bharrigan (9)

Henry Filter Upgrade Benefit Analysis 4 22 10
Henry Filter Upgrade Benefit Analysis 4 22 10Henry Filter Upgrade Benefit Analysis 4 22 10
Henry Filter Upgrade Benefit Analysis 4 22 10
 
KMS 2005
KMS 2005KMS 2005
KMS 2005
 
Business Model 10 13 2010
Business Model 10 13 2010Business Model 10 13 2010
Business Model 10 13 2010
 
Harrigan Process Engineering
Harrigan Process EngineeringHarrigan Process Engineering
Harrigan Process Engineering
 
Harrigan Equipment
Harrigan EquipmentHarrigan Equipment
Harrigan Equipment
 
Harrigan Plant Services
Harrigan Plant ServicesHarrigan Plant Services
Harrigan Plant Services
 
KS 2005
KS 2005KS 2005
KS 2005
 
Tractor Fish Bone
Tractor  Fish BoneTractor  Fish Bone
Tractor Fish Bone
 
I Love Golf
I Love GolfI Love Golf
I Love Golf
 

Engine Crankcase Housing Payback

  • 1. Engine Crankcase Housing 25-Jun-07 Using Machine Cost per Hour Using Lost Revenue per Hour Current with Proposed with Lost Current with Cost/Hour Proposed with Cost/Hr Revenue/Hour Revenue Supplies Coolant Changes System Size 900 900 900 900 Coolant Cost $ 15.00 15 $ 15.00 15 Coolant Concentration 7% 7% 7% 7% System Cost 945 945 945 945 Changes per year 6 1 6 1 Total Cost $ 5,670.00 $ 945.00 $ 5,670.00 $ 945.00 Coolant Disposal System Size 900 900 900 900 Changes/year 6 1 6 1 Gallons Disposed 5400 900 5400 900 Cost per gallon $ 0.20 $ 0.20 $ 0.20 $ 0.20 $ 1,080.00 $ 180.00 $ 1,080.00 $ 180.00 Trip Charge for disposal $ 250.00 $ 250.00 $ 250.00 $ 250.00 Number of Disposals 3 1 3 1 $ 750.00 $ 250.00 $ 750.00 $ 250.00 Additives (biocide/defoam, etc) Current vs. proposed costs $ 1,200.00 $ - $ 1,200.00 $ - Filters Number of machines 2 2 2 2 Number of bags/machine 4 4 4 4 Cost per bag $ 5.00 $ 5.00 $ 5.00 $ 5.00 Bag changes/year 36 3 36 3 $ 1,440.00 $ 120.00 $ 1,440.00 $ 120.00 Roll Media Cost $ - $ 2,400.00 $ - $ 2,400.00 Pump Failures Number of Failures/year 3 1 3 1 Pump Cost $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 6,000.00 $ 2,000.00 $ 6,000.00 $ 2,000.00 Tooling Tooling Cost $ 10.00 $ 10.00 $ 10.00 $ 10.00 Tooling changes/year 10 10 10 10 $ 100.00 $ 100.00 $ 100.00 $ 100.00 Supplies Subtotal $ 16,240.00 $ 5,995.00 $ 16,240.00 $ 5,995.00