Sample content
Kudler Fine Foods Network: Final
Network Deployment/Timeline
Kudler Fine Foods’ new network roll out is not an easy job as easy as someone may think. Careful implementation is very important and is carried out in three phases for a reason that Kudler’s operation must be kept in constant activity. One of the most important factors in each of the phases is the documentation. This documentation will be useful for the client in terms of providing them with the network information and install accreditation. The following are the phases that will take place:
First Phase: Installation of the network
Second Phase: Testing and Security Checks
Third Phase: Observation of the network (includes the information when the
network goes up; elimination of the old network; and distribution of documentation to the owners and network teams)
First Phase: Del Mar site is the first store to be upgraded since it will be treated as the backbone or the mainline support of the
NTC 362 Week 5 Learning Team Assignment ImplementationTimeline 2015 version
1. NTC 362 Week 5 Learning Team Assignment ImplementationTimeline
Link : http://uopexam.com/product/ntc-362-week-5-learning-team-assignment-
implementationtimeline/
Sample content
Kudler Fine Foods Network: Final
Network Deployment/Timeline
2. Kudler Fine Foods’ new network roll out is not an easy job as easy as someone
may think. Careful implementation is very important and is carried out in three
phases for a reason that Kudler’s operation must be kept in constant activity. One
of the most important factors in each of the phases is the documentation. This
documentation will be useful for the client in terms of providing them with the
network information and install accreditation. The following are the phases that will
take place:
First Phase: Installation of the network
Second Phase: Testing and Security Checks
Third Phase: Observation of the network (includes the information when the
network goes up; elimination of the old network; and distribution of documentation
to the owners and network teams)
First Phase: Del Mar site is the first store to be upgraded since it will be treated as
the backbone or the mainline support of the entire network operation. Del Mar site
will contain the POS (Point of Sale) server, Inventory Database, File Integrity
Checker, Security Console for monitoring and the T1 line(s). This Del Mar store
upgrade will take five weeks to be completed. After completion, it is La Jolla’s site
turn to be upgraded next. With all the possible irregularities that may come in while
doing the upgrade and integration of this site, though it is expected to operate
smoothly, completion time is expected to be five weeks also. Taking everything that
has been learned from this experience, it shall be of great help in the installation at
the Encinitas site and shall therefore make it even smoother and should be finished
faster in three weeks.
Second Phase: This phase will only begin once all the sites have been finished
with installation. In this phase, the network will undergo testing that will last for
three weeks to be completed. The first week will be allotted in conducting he
network’s load and speed testing. The test will basically help speed up the
performance of the network and will also help in detecting and solving network-
related problems such as lag, latency, and jitter. The second week will be allotted
in conducting pen testing and security hardening of the newly-installed network.
The procedure will make sure that there are no security holes left open. Should
there be any irregularities or occurrence of deviation, corresponding fix should be
devised at the end of the second week. The third week will be allotted for retesti