This document contains a transcript for Jaspreet Singh from Humber College Institute of Technology and Advanced Learning. It lists the courses he took between Fall 2008 and Winter 2009 for the Project Management Ontario College Graduate Certificate program. It shows his grades for each course and term GPAs. His final GPA for the program was 55.8. The transcript indicates he graduated from the program in Winter 2009. A second document is a degree certificate from Punjab Technical University conferring Jaspreet Singh with a Bachelor of Technology degree in Mechanical Engineering in May 2008.
Biological control systems - System Concepts-Mathankumar.S, VMKVECMathankumar S
Biological control systems - System Concepts- Basic structure of control system - Types of systems - Open loop systems, closed loop systems, Effects of feedback, Block diagram & Signal flow graph, conversion of block diagram to signal flow graph, reduction of block diagram and signal flow graph.
Chứng nhận CO, CQ về chất lượng sản phẩm tấm, phụ kiện vách ngăn vệ sinh của TOKY. Nhà phân phối và thi công vách ngăn vệ sinh TOKY chất lượng cao, giá rẻ với độ bền lớn nhất thị trường. Xem chi tiết tại http://toky.vn
Data bank Vijayapuram village part - Data bank vijayapuram Grama Panchayth - Paddy & wetland Act - Solve your land problems James Joseph Adhikarathil your land consultant call 9447464502.
Vijayapuram muttamabalam data bank.
Data bank is the list of paddy lands and wetlands prepared as per paddy and wet land act 2008 in each village and website of LSG in order to protect paddy and wet land . If land is included in the list by mistake it has to be rectified and land has to be regularised. .
The register containing details of all types of land ( Basic Tax Register or BTR ) in a village is maintained in a village office. The Kerala Conservation of Paddy Land and Wetland Act was enacted on August 12, 2008, to protect fields and wetlands . Accordingly the list of all types of Wetland and Paddy land known as Data Bank has been published. How ever, the law permits restricted conversion or “tharam mattom” of Nilam land to purayidom and subsequent changes in the BTR.
Is my land eligible for tharam mattom?
1. If the land is mentioned as Nilam in the BTR and not included in the Data Bank but physically converted as purayidom before 12/08/2008 there is provision to regularize the land by remitting prescribed fee. After regularization by the Revenue Divisional officer, the category of land mentioned in the BTR will be changed to Purayidom.
2. If the land is mentioned as Nilam in the BTR , included in the Data Bank and physically appeared as Nilam/wetland tharam mattom is not allowed but there is provision to permit the land for conversion of 10 cents in Panchayath area and 5 cents in municipal area for construction of house if the applicant has no other house sites. This facility is not available for those who purchased land before 12/08/2008.
3. If the land is mentioned as Nilam in the BTR and not included in the Data Bank but physically converted as Purayidom before 04/07/1967 there is provision to regularize the land by remitting fee at concessional rate . Also there is possibility for free conversion as per KLU order.
How can I apply for Land conversion?
Normally there are two processes. If your land is wrongly notified in the data bank it has to be de notified. So check the status of your land in the data bank and apply for de notification of the land if it is included. After de notification, you can apply for regularization. If your land is not included in the data bank, you can directly apply for regularization ( Tharam mattom ). You can apply online and there are several performa for each type of application as follows.
Form 1 : For conversion of
Biological control systems - System Concepts-Mathankumar.S, VMKVECMathankumar S
Biological control systems - System Concepts- Basic structure of control system - Types of systems - Open loop systems, closed loop systems, Effects of feedback, Block diagram & Signal flow graph, conversion of block diagram to signal flow graph, reduction of block diagram and signal flow graph.
Chứng nhận CO, CQ về chất lượng sản phẩm tấm, phụ kiện vách ngăn vệ sinh của TOKY. Nhà phân phối và thi công vách ngăn vệ sinh TOKY chất lượng cao, giá rẻ với độ bền lớn nhất thị trường. Xem chi tiết tại http://toky.vn
Data bank Vijayapuram village part - Data bank vijayapuram Grama Panchayth - Paddy & wetland Act - Solve your land problems James Joseph Adhikarathil your land consultant call 9447464502.
Vijayapuram muttamabalam data bank.
Data bank is the list of paddy lands and wetlands prepared as per paddy and wet land act 2008 in each village and website of LSG in order to protect paddy and wet land . If land is included in the list by mistake it has to be rectified and land has to be regularised. .
The register containing details of all types of land ( Basic Tax Register or BTR ) in a village is maintained in a village office. The Kerala Conservation of Paddy Land and Wetland Act was enacted on August 12, 2008, to protect fields and wetlands . Accordingly the list of all types of Wetland and Paddy land known as Data Bank has been published. How ever, the law permits restricted conversion or “tharam mattom” of Nilam land to purayidom and subsequent changes in the BTR.
Is my land eligible for tharam mattom?
1. If the land is mentioned as Nilam in the BTR and not included in the Data Bank but physically converted as purayidom before 12/08/2008 there is provision to regularize the land by remitting prescribed fee. After regularization by the Revenue Divisional officer, the category of land mentioned in the BTR will be changed to Purayidom.
2. If the land is mentioned as Nilam in the BTR , included in the Data Bank and physically appeared as Nilam/wetland tharam mattom is not allowed but there is provision to permit the land for conversion of 10 cents in Panchayath area and 5 cents in municipal area for construction of house if the applicant has no other house sites. This facility is not available for those who purchased land before 12/08/2008.
3. If the land is mentioned as Nilam in the BTR and not included in the Data Bank but physically converted as Purayidom before 04/07/1967 there is provision to regularize the land by remitting fee at concessional rate . Also there is possibility for free conversion as per KLU order.
How can I apply for Land conversion?
Normally there are two processes. If your land is wrongly notified in the data bank it has to be de notified. So check the status of your land in the data bank and apply for de notification of the land if it is included. After de notification, you can apply for regularization. If your land is not included in the data bank, you can directly apply for regularization ( Tharam mattom ). You can apply online and there are several performa for each type of application as follows.
Form 1 : For conversion of
3. t: I : :
ffli"'1ni' M'*uil
JASPREET::SINGH :.:.:: :: ::
59 UPPER HUMEER DRIVE ETOBICOKE
TORONTO ,:
rOEONTO ON MPW 7B3 / ,,.i1r.',.i.' '.,.',
TRANSCRIPT OF AEADEMIG;.REGORD
::.::l:: - /- t.:.
:tlunher colSe lnBtitute df Teclnlologtrl
:and Arlvand leaming .',,
205 Humber Coll€e Boulevard '
Toronto, Ontario, Canada MgW 517
Page: L
Student
Date of
Nombez"':
Is:sU
0:3,-
06
sUrar
Grade Status' Course.Code Course Name
FALL 2OO8
ATEC 350
- FM+G 11-1
PMPG 1]-2
PMPG ].2].
PMPG
.]-22
IPMPG 213
PMPG 231-
i
WINTER 2OO9
PMPG 21-4
PMPG 215
PMPG 2]-5 |
PMPG 3].7
PMPG 318
PMPG 334
Graduated in
WINTER 2OO9
CAREER MANAGEMENT ,,,,,,::: :
PR r N€ 3++.ES-€E - -PR+Jser . $:4*FiAGryT
BUSINESS REQUIREMENT QUAL MGMT
iPROJECT F]NANCE AND ACCOUNT]NG
PRO.JECT RESOURCE PLANN]NG SCHD
ORGAN]ZAT]ONAL SKILLS & COMP 1
RTSK" MANAGEMENT
PROCUREMENT AND CONTRACT MGMT
PRO,J PLAN INTGRTN MN]TR CNTRL
PMO AND PORTFOLTO MANAGEMENT
MGMT ETH]CS & CASE STUDIES
MAJOR PRO.TECT PRACTICE
'' " , t'i'
i 80 PASS.
82 PASS
70 PASS : ::
60PASS,,:
60 PASS :. :
63PASS::.
** Term GPA: 67.8
',,:,,,,,; ;.
;;:1,:,
:',;,, 2i,;:,,O
.:.:,-.:-3-1;.0
3.0
3.0
3.0
3.0
3.0
3,,,''0
3.0
3 .0.
3 .0.:
3 .0'
3.0
70 PASS yT,,;..;,:. '.,:,.',
64 PASS
6l ' ,,: PASS
t,6i7::', ,,tr,,l::,;:P,ASS : .,
66 ,,Pess
.60 i PASS
** Term GPA: 63.6
* Final GPA: :: 55.8
PRO,]ECT MANAGEMENT ONTARIO COLLEGE GRADUATE CERTTF]CATE
**r**r.******END OF TRANSCRIPT******.*****
.,:.a;=+'-a:::.::_--
THIS DOCUMENT rS PRTNTED ON EECURTTY PAPER WITH VTSIBLE AND tNVtStBtE F|BRES,
A WATERMARK, TONER ADHESION AND CHEMICAL SENSITIVITY WITH A VOID PANTOGRAPH.
A BLACK AND WHITE COPY IS NOT OFFICIAL.
4. +2677026
Regn. cum Roll No,
.t7rZrfu
PUNJAB TEGHNIGAL UNIVERSITY
BACHELOR OF
M r./M s. f a,*Preef S ir14*v
TECHNOLOGY
son/daughrt, of Sfu ?'ituS@
student rf D' A' V' IM' ?fEW' e f '' lfu having completed the course of
studies upproved by the (.lniversity and huving pussed the prescribed examination held;n M*y'2OO8 ,
has been conferued the degree of Bachelor of Technology of this (Iniversity in the discipline of
M echan knL f ng:t n"?R r LrW in FirttDiNid.{ow
Given under the seal of the University
ft
4{,'*-HY
__ -/
?. r'r-fl-?/'
ere?E-aiqqd
Vice-Chuncellor
Resistrur
Jat-andhar, 76/O3/O9 Chuncellor