1. BABAR SATTAR KHAN
H# 184, street #4,sector F-5,
phase 6 Hayatabad, Peshawar
Phone (Res.)# 091-5599208
Cell#(+92)-334-9251550
E-mail:hallianbabar@gmail.com
Educational Profile
Degree
Passing
Year/Result
University/Board
M.S (Electrical Power
Engineering )
B.S (Electrical Power
Engineering )
Course
Work
Completed /
CGPA 3.2
2011/CGPA
3.14
K.P.K University Of Engineering And
Technology Peshawar
COMSATS Institute of Information
technology Abbottabad
HSSC (Pre-Engineering) 2007
Army Burn Hall College For Boys
Abbottabad/FBISE Islamabad
SSC
2005
Army Burn Hall College For Boys
Abbottabad/FBISE Islamabad
Computer Skills
MS Office Word, power point
Programs
C++, FORTRAN 90, Keil,World power
simulator,Electronics work bench,Matlab
PLC and SCADA
OMICRON A universal test software used for relay testing
Final Year Project
Protection of 500 kv grid
station Sheikh
Mohammadi
Analyzing the protective scheme ,testing of over
current and distance relays with the help of load box
and omicron test set
Semester Projects
Study of iterative methods
Dc power supply
Traffic signal system
Future Interests
Power system protection
2. Electric machines and Control system
Work Experience
1).MIA Corporation (Pvt) Ltd.(3/2/2014 to 3/6/2014)
Worked as Application Engineering in one of the leading HVAC (Heating Ventillation And Air
Conditioning) company of Pakistan.
2). Rehman Medical Institute (RMI): (01/11/2012 to 31/12/2013)
Worked as Electrical Project Engineer in Rehman Medical Institute Peshawar. Got sufficient skill
and practical experience of electrical installation and commissioning in different project phases.
a) HT and LT Power Panels.
b) Diesel Generator Sets.
c) Installation and termination of MDB’s ,SMDB’s and DB’s.
d) MCC’s (motor control center).
e) HVAC System(Heating Ventillation And Air Conditioning) .
f) BMS (Building Management System) .
g) Low Current Systems (Fire Alarm, Smoke, Heat, Gas Detectors).
h) Nursing Call System.
i) Medical Equipment, IT Data center and switch rooms.
Developed corrective and preventive maintenance programs for the improvement of
electrical system.
3) Worked as Electrical Engineer in Malakand hydro electric power station from
01/11/2011 to 30/9/2012.
Worked with O&M staff and has been given familiarization of
a) Power plant layout.
b) Its equipments and subsystems.
c) Operation methodology and electrical maintenance techniques.
3. 4) Workshop attended on plc and scada on university level.
5) Worked in a 500kv grid station as internee for the period of four months.
During this period got sufficient skill in the following P&I, Maintenance and
Operations jobs.
a) Power Auto Transformers i.e. 500KV/220KV/132KV/11KV voltage level.
b) Automatic Circuit Breakers Operation and its Control.
c) Bus Isolators with Full Load Operation.
d) Various kiosks marshalling box wiring termination system.
e) Various type of Automatic Relays Operation.
f) Various Kind of Maintenance jobs during Shut Downs in Grid Station.
Extra-curricular Activities
Playing and watching cricket.
Reading books and newspapers.
Personal Profile
Father’s Name: Engr: Fazle Sattar
NIC No : 13101-0462545-7
Date of Birth : January 28, 1989
Domicile : K.P.K
Religion: Islam
Marital Status: Single
Languages Spoken: English, Urdu, Pashto, Hindko
Present Address: H# 141,street #4,sector F-5,phase 6
Hayatabad Peshawar
PEC reg# Elect/32346