SlideShare a Scribd company logo
1 of 10
Download to read offline
AQUAPRO INDUSTRIAL CO.,LTD 
Reverse Osmosis Parts Introduction
AQUAPRO INDUSTRIAL CO.,LTD 
Reverse Osmosis Flow Chart 
2 
FEED 
WATER 
TDS 
PERMEATE WATER 
FLOW METER 
35KG 
15KG 
CONCENTRATE 
WATER 
FLOW METER 
PUMP 
FLUSHING 
OUTLET 
FLUSHING 
SOLENOID 
VALVE 
MEMBRANE 
HOUSING 
INLET 
SOLENOID 
VALVE 
WATER IMPROVER
AQUAPRO INDUSTRIAL CO.,LTD 
Reverse Osmosis Electrical Diagram 
RO Pump internal wiring 
3
Reverse Osmosis Specification 
Filter Housing with Cartridges 
20" Filter Housing 
20" Cartridge: Sediment 5, 1micron 
Carbon Block 
Carbon Block 
Booster Pump & Motor 
1. Pump : PROCON 1533 
2. Flow Rate : 125GPH 
3. Motor : 1/2 HP 
4. Voltage: 110/8.6A/220V/ 
4 
4.3A/60Hz/50Hz 
5. R.P.M. : 1725 
AQUAPRO INDUSTRIAL CO.,LTD 
Booster Pump & Motor 
1. Pump : PROCON 2507 
2. Flow Rate : 240GPH 
3. Motor : 1 HP 
4. Voltage: 110V/14A/ 220V/7A/60Hz/50Hz 
5. R.P.M. : 1725 
Solenoid Valve 
Shutting down while Low pressure switch sends out signal. 
Flushing while control box sends out flushing signal. 
Inlet Flush 
500-600GPD: 1/2" 3/8" 
800-1000GPD: 1/2" 3/8" 
1500-2000GPD: 1/2" 1/2"
RO Membrane & RO Housing 
(A) RO Membrane Housing 
(B) RO Membrane: 
1.Specification of Membrane 
(1) Max. Operation Pressure: 300PSI 
O (2) Max. Operation Temperature: 45 C 
(3) Turbidity (NTU): <1 
(4) Chlorine: 0.1PPM 
(5) PH Range: 2~11 
(6) Flow Rate: 10GPM 
(7) Max. S.D.I. Index: 5 
(8) Salt Rejection Rate: 96% 
2.Application Data For System Design: 
(1) Max. Operation Pressure: 190~220PSI 
O (2) Max. Operation Temperature: 45 C 
(3) Turbidity (N.T.U.): <1 
(4) Chlorine: <0.1PPM 
(5) PH Range: 4~11 
(6) System Inlet Water pressure: 3.5KG+/- 15% 
(7) Max. S.D.I. Index: 4 
(8) Salt Rejection Rate: 96% 
(9) Product Water Generate: 25% 
O (C) Testing Environment: 25 C/pH=8 
(1) NaCl: 2000 PPM 
(2) Operating Pressure: 225PSI 
(3) Recovery Rate: 15% 
600PSI` 
Water Inlet pressure Gauge 
2 0~15 KG/CM Oil-Filled Pressure Gauge 
2 *Not allow to operate under 1.5KG/CM * 
RO Inlet Water Pressure Gauge 
2 0~35KG/CM (30bar)Oil-Filled Pressure Gauge, set the pressure between 
150~180PSI to get the maximum performance. 
Pressure Regulator 
Adjust Clockwise to boost RO operating pressure, Counterclockwise to 
Lower operating pressure. 
5 
AQUAPRO INDUSTRIAL CO.,LTD 
Reverse Osmosis Specification 
Gate Valve 
Only for vertical pump using.
Flow Meter 
1.0~10GPM 
Electromagnetic Switch 
1HP FOR 1/2 HORSE POWER MOTOR (Single Phase) 
3HP FOR 1 HORSE POWER MOTOR (Single Phase) 
5HP FOR 3 HORSE POWER MOTOR (Single Phase) 
7.5HP FOR 4 OR 5 HORSE POWER MOTOR (Three Phase) 
Water-generating 
Water-input Full-water 
Flush Sorce Full 
6 
AQUAPRO INDUSTRIAL CO.,LTD 
Reverse Osmosis Specification 
0.2~2GPM 0.5~5GPM 2.0~20GPM 
Microprocessor Controller 
Model: MC-2---Six lights microprocessorized automatic flush controller. 
Power: 230VAC, 50/60Hz, or 24VDC 
Function: Controller processing steps: 
(1) Automatically flush for 1 minute and 30 seconds when the machine starts its first time. 
(2) Water-generating detection: Automatically flush for 1 minute and 30 seconds after the 
accumulated time reaches 12 hours. 
(3) Input water detection: It will not start control system (stop pump/solenoid valve) if the 
low pressure switch delays for 5 seconds (out of source water). 
(4) Output water detection: When production water is full, Full water lamp is on and stop 
pump/solenoid valve. 
Configurations: 
Pump 
INDICATION OF EACH LAMP: 
Power 
Manual 
PUMP: Water-generating, will be on when pump is generating. 
FLUSH: Auto flush function, will be on when it is flushing automatically. 
SOURCE: Water-input, will be on when it is short of water. 
FULL: Full-water, will be on when water tank if full. 
POWER: Will be always on. 
MANUAL: Manual flush function, will be on when flushing by manual. 
WRING INSTRUCTION: 
1. Low Pressure Switch- YELLOW with AMP connector 
2. Floating/Pressure Switch-BLUE with AMP male connector 
3. Flushing Valve-RED with AMP connector 
4. Booster Pump-GREEN/BLACK With AMP connector 
5. Inlet Valve-GREEN/BLACK With AMP connector
Reverse Osmosis Installation Reminder 
Replacement of Filter Cartridges 
7 
AQUAPRO INDUSTRIAL CO.,LTD 
1. Make sure the voltage and phase of the system you order, never use wrong 
setting. 
2. Check the pure/concentration water are piping right. 
3. The power line core should large enough (not less than 3.5 mm) 
4. Be ware do not let brine flow through the system while water softener is 
backwashing. 
5. Make sure the water softener's In/Out are connected correct. 
6. Measure feed water pressure with a water pressure gauge. Feed water 
pressure is preferably to be 35 psi and the minimum is 26 psi. If lower than 26 
psi, it should install a booster pump at the feed water location. 
7. Check prefilters every week to make sure the water supply. 
8. If the equipment comes with Ultraviolet Device, make sure you have a steady 
Power supply in protection of the U.V. Lamp. 
The replacement of filter cartridges depends greatly on the quality and condition 
of the water in local area where the reverse osmosis system is placed. Please 
follow the instructions below to ensure good performance of the system. 
1. It is most recommended to replace the filter cartridges every three months. 
2. After a while's usage, check regularly Reverse Osmosis Panel's Inlet Water 
Water Pressure Gauge. If its water pressure is 15% lower than the feed water 
Pressure, it is recommended to replace the filter cartridges. 
E.g. If the feed water pressure is 2bar (35psi), and the Inlet Water Gauge's 
Index is 1.7bar (29psi), it is recommended to replace the filter cartridges.
Reverse Osmosis Setup Suggestion 
1. If possible, install the active carbon filter and water softener to ensure the incoming water 
quality. 
2. Water softener should regenerate the resin by adding salt to its salt tank. Do it regularly. 
3. If not install the water softener, lower the pure/concentration water ratio by adjusting the 
pressure adjust needle valve(RO Needle Valve). 
4. Change pure/concentration water ratio, you should always notice the motor operating 
pressure, adjust it from the PROCON bypass to ensure the motor is running at the best 
condition. 
5. If your water incoming pressure lower than 1 kg/CM2, remember to add a pump in front of 
the system. 
6. The lines left on side of autoflushing timer are used for level control or high pressure 
switch (If you are using a pressurize storage device). 
7. Please use Hardness Tester (5B) to know your water hardness. Make sure the water 
softener is working fine. 
8. Please use the Chlorine Tester to detect the active carbon's working condition, change 
active carbon when necessary. 
9. Cleaning R.O. membrane when the product rate declined 10% or pressure drop up 15%, 
the following figure tell you how: 
a. Take pure water pipe (O) out and put it into drain. 
b. Put concentration water pipe (P) into cleaning solution (Q). 
c. Start pump (Notice: Make sure to release the air gather in pipes). 
d. Close (M) valve, open (N) valve, let cleaning solution suck into R.O. system. 
e. Adjust needle valve (Pressure adjusting valve) to the maximum level. And let it run for 30 
minutes. After 30 minutes, adjust pressure to 60 psi, run for another 30 minutes. 
f. Put concentration water pipe back to the drain, adjust pressure to maximum level, flush for 
1 minute and it's done. 
Note: Using the right cleaning solution to clean different types of scale, the cleaning solution 
PH should range from 3 to 10 at temperature of 35OC. 
8 
AQUAPRO INDUSTRIAL CO.,LTD
ROUTE FOR ACTUATOR 
INPUT 
OPEN 
CLOSED 
T 
O 
C 
F 
AQUAPRO INDUSTRIAL CO.,LTD 
9 
M
Reminder 
10 
AQUAPRO INDUSTRIAL CO.,LTD 
1. INLET PIPING SIZE 
(1) 1500~2000GPD, 1Membrane 
Inlet Piping: 3/4" ~ 1" 
(2) 3000~4000GPD, 2 Membranes, 1HP Motor, Procon Pump 
Inlet Piping: 3/4" ~ 1" 
(3) 3000~4000GPD, 2 Membranes, 3HP, Grundfos Pump 
Inlet Piping: 1" 
(4) 6000~14000GPD, 4 ~ 8 Membranes 
Inlet Piping: 1" ~ 1-1/4" 
2. INSTALLATION OF AN ADDITIONAL PUMP 
The inlet water pressure must be at least 1.5kg / cm2. 
When inlet water pressure is under 1.5kg/cm2, equip the system 
with an additional pump to increase the inlet water pressure. The 
selection of the additional pump must be based on actual 
Situations.

More Related Content

What's hot

Greenbuilding with examples
Greenbuilding with examplesGreenbuilding with examples
Greenbuilding with examplesVikrant Sanke
 
Surface treatments
Surface treatmentsSurface treatments
Surface treatmentssree aero
 
Machining process in mechanical engineering
Machining process in mechanical engineeringMachining process in mechanical engineering
Machining process in mechanical engineeringakshay ghanwat
 
Sustainable Architecture PPT
Sustainable Architecture PPTSustainable Architecture PPT
Sustainable Architecture PPTA S
 
Innovation is Sustainable Housing
Innovation is Sustainable HousingInnovation is Sustainable Housing
Innovation is Sustainable HousingGayle Deneen
 
Introduction to mechanical engineering
Introduction to mechanical engineeringIntroduction to mechanical engineering
Introduction to mechanical engineeringFlt Lt Dinesh Gupta
 
Abrasive jet machining
Abrasive jet machiningAbrasive jet machining
Abrasive jet machiningmohit99033
 
Description of design process new
Description of design process newDescription of design process new
Description of design process newSiddharth Sharma
 
Protection of metals from corrosion
Protection of metals from corrosionProtection of metals from corrosion
Protection of metals from corrosionAwais Chaudhary
 
PPT on green buildings
PPT on green buildingsPPT on green buildings
PPT on green buildingsAkshat Jain
 
Electrical discharge machining
Electrical discharge machining Electrical discharge machining
Electrical discharge machining Gopinath Guru
 
First Review for B.Tech Mechanical VIII Sem
First Review for B.Tech Mechanical VIII SemFirst Review for B.Tech Mechanical VIII Sem
First Review for B.Tech Mechanical VIII SemVIT University
 
Smart materials (actuator)
Smart materials (actuator)Smart materials (actuator)
Smart materials (actuator)Abderazak Alewi
 
Surface treatment an overview
Surface treatment   an overviewSurface treatment   an overview
Surface treatment an overviewMuhammad Ahmad
 
DUCT FORMULA Design-2006.pptx
DUCT FORMULA Design-2006.pptxDUCT FORMULA Design-2006.pptx
DUCT FORMULA Design-2006.pptxPraveenMGowdru
 
Green inhibitors for prevention of metal and alloys corrosion, an overview
Green inhibitors for prevention of metal and alloys corrosion, an overviewGreen inhibitors for prevention of metal and alloys corrosion, an overview
Green inhibitors for prevention of metal and alloys corrosion, an overviewAlexander Decker
 

What's hot (20)

Green Building
Green BuildingGreen Building
Green Building
 
Greenbuilding with examples
Greenbuilding with examplesGreenbuilding with examples
Greenbuilding with examples
 
Surface treatments
Surface treatmentsSurface treatments
Surface treatments
 
Machining process in mechanical engineering
Machining process in mechanical engineeringMachining process in mechanical engineering
Machining process in mechanical engineering
 
Basic Sensors Technology
Basic Sensors TechnologyBasic Sensors Technology
Basic Sensors Technology
 
Sustainable Architecture PPT
Sustainable Architecture PPTSustainable Architecture PPT
Sustainable Architecture PPT
 
Innovation is Sustainable Housing
Innovation is Sustainable HousingInnovation is Sustainable Housing
Innovation is Sustainable Housing
 
Introduction to mechanical engineering
Introduction to mechanical engineeringIntroduction to mechanical engineering
Introduction to mechanical engineering
 
Abrasive jet machining
Abrasive jet machiningAbrasive jet machining
Abrasive jet machining
 
Description of design process new
Description of design process newDescription of design process new
Description of design process new
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Protection of metals from corrosion
Protection of metals from corrosionProtection of metals from corrosion
Protection of metals from corrosion
 
Corrosion protection
Corrosion protectionCorrosion protection
Corrosion protection
 
PPT on green buildings
PPT on green buildingsPPT on green buildings
PPT on green buildings
 
Electrical discharge machining
Electrical discharge machining Electrical discharge machining
Electrical discharge machining
 
First Review for B.Tech Mechanical VIII Sem
First Review for B.Tech Mechanical VIII SemFirst Review for B.Tech Mechanical VIII Sem
First Review for B.Tech Mechanical VIII Sem
 
Smart materials (actuator)
Smart materials (actuator)Smart materials (actuator)
Smart materials (actuator)
 
Surface treatment an overview
Surface treatment   an overviewSurface treatment   an overview
Surface treatment an overview
 
DUCT FORMULA Design-2006.pptx
DUCT FORMULA Design-2006.pptxDUCT FORMULA Design-2006.pptx
DUCT FORMULA Design-2006.pptx
 
Green inhibitors for prevention of metal and alloys corrosion, an overview
Green inhibitors for prevention of metal and alloys corrosion, an overviewGreen inhibitors for prevention of metal and alloys corrosion, an overview
Green inhibitors for prevention of metal and alloys corrosion, an overview
 

Similar to RO DRINKING WATER FILTRATION SYSTEM IN UAE ( www.aquaprouae.com )

Coconut water extraction mass production machine
Coconut water extraction mass production machineCoconut water extraction mass production machine
Coconut water extraction mass production machineLuis Cabrera
 
Pro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up Guide
Pro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up GuidePro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up Guide
Pro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up GuideClean Water Systems
 
Greyhound Chromatography HPLC Pumps 2019
Greyhound Chromatography HPLC Pumps 2019Greyhound Chromatography HPLC Pumps 2019
Greyhound Chromatography HPLC Pumps 2019AlexWood93
 
Rotameters and Bubble Tube Purge for Level Measurement
Rotameters and Bubble Tube Purge for Level MeasurementRotameters and Bubble Tube Purge for Level Measurement
Rotameters and Bubble Tube Purge for Level MeasurementPower Specialties, Inc.
 
Bubbler Method Liquid Level Measurement
Bubbler Method Liquid Level MeasurementBubbler Method Liquid Level Measurement
Bubbler Method Liquid Level MeasurementClassic Controls, Inc.
 
Liquid Level Measurement Using the Bubbler Method
Liquid Level Measurement Using the Bubbler MethodLiquid Level Measurement Using the Bubbler Method
Liquid Level Measurement Using the Bubbler MethodMiller Energy, Inc.
 
Inspection, Testing and Maintenance of fire pump
Inspection, Testing and Maintenance of fire pumpInspection, Testing and Maintenance of fire pump
Inspection, Testing and Maintenance of fire pumpklsmani
 
Anastasia machine reparing
Anastasia machine reparingAnastasia machine reparing
Anastasia machine reparingRABAH ABUABKER
 
Pentair #320 chlorinator manual
Pentair #320 chlorinator manualPentair #320 chlorinator manual
Pentair #320 chlorinator manualDavid Hackney
 
Coluna de Calibração _ Milton Roy
Coluna de Calibração _ Milton RoyColuna de Calibração _ Milton Roy
Coluna de Calibração _ Milton RoyVibropac
 
Minimum flow system
Minimum flow systemMinimum flow system
Minimum flow systemtaylorpo
 
Dealer and Distributor of Booster | High Pressure Pump | Sewage cutter Pump |...
Dealer and Distributor of Booster | High Pressure Pump | Sewage cutter Pump |...Dealer and Distributor of Booster | High Pressure Pump | Sewage cutter Pump |...
Dealer and Distributor of Booster | High Pressure Pump | Sewage cutter Pump |...bdsblairs
 
Steam water analysis system
Steam water analysis systemSteam water analysis system
Steam water analysis systempriyank.modi
 
Dry Pellet Chlorinator In-Line Chlorinator Model 400 Installation Guide
 Dry Pellet Chlorinator In-Line Chlorinator Model 400 Installation Guide Dry Pellet Chlorinator In-Line Chlorinator Model 400 Installation Guide
Dry Pellet Chlorinator In-Line Chlorinator Model 400 Installation GuideClean Water Systems
 

Similar to RO DRINKING WATER FILTRATION SYSTEM IN UAE ( www.aquaprouae.com ) (20)

Application guide
Application guideApplication guide
Application guide
 
Coconut water extraction mass production machine
Coconut water extraction mass production machineCoconut water extraction mass production machine
Coconut water extraction mass production machine
 
Plant Com
Plant  ComPlant  Com
Plant Com
 
Pro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up Guide
Pro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up GuidePro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up Guide
Pro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up Guide
 
Greyhound Chromatography HPLC Pumps 2019
Greyhound Chromatography HPLC Pumps 2019Greyhound Chromatography HPLC Pumps 2019
Greyhound Chromatography HPLC Pumps 2019
 
Greyhound Chromatography HPLC Pumps 2019
Greyhound Chromatography HPLC Pumps 2019Greyhound Chromatography HPLC Pumps 2019
Greyhound Chromatography HPLC Pumps 2019
 
Rotameters and Bubble Tube Purge for Level Measurement
Rotameters and Bubble Tube Purge for Level MeasurementRotameters and Bubble Tube Purge for Level Measurement
Rotameters and Bubble Tube Purge for Level Measurement
 
Bubbler Method Liquid Level Measurement
Bubbler Method Liquid Level MeasurementBubbler Method Liquid Level Measurement
Bubbler Method Liquid Level Measurement
 
Liquid Level Measurement Using the Bubbler Method
Liquid Level Measurement Using the Bubbler MethodLiquid Level Measurement Using the Bubbler Method
Liquid Level Measurement Using the Bubbler Method
 
Inspection, Testing and Maintenance of fire pump
Inspection, Testing and Maintenance of fire pumpInspection, Testing and Maintenance of fire pump
Inspection, Testing and Maintenance of fire pump
 
Anastasia machine reparing
Anastasia machine reparingAnastasia machine reparing
Anastasia machine reparing
 
Pentair #320 chlorinator manual
Pentair #320 chlorinator manualPentair #320 chlorinator manual
Pentair #320 chlorinator manual
 
Coluna de Calibração _ Milton Roy
Coluna de Calibração _ Milton RoyColuna de Calibração _ Milton Roy
Coluna de Calibração _ Milton Roy
 
Minimum flow system
Minimum flow systemMinimum flow system
Minimum flow system
 
Dealer and Distributor of Booster | High Pressure Pump | Sewage cutter Pump |...
Dealer and Distributor of Booster | High Pressure Pump | Sewage cutter Pump |...Dealer and Distributor of Booster | High Pressure Pump | Sewage cutter Pump |...
Dealer and Distributor of Booster | High Pressure Pump | Sewage cutter Pump |...
 
Greyhound Chromatography HPLC Pumps
Greyhound Chromatography HPLC Pumps Greyhound Chromatography HPLC Pumps
Greyhound Chromatography HPLC Pumps
 
MixRite Catalgue
MixRite Catalgue   MixRite Catalgue
MixRite Catalgue
 
Hydraulic flushing rig ppt
Hydraulic flushing rig pptHydraulic flushing rig ppt
Hydraulic flushing rig ppt
 
Steam water analysis system
Steam water analysis systemSteam water analysis system
Steam water analysis system
 
Dry Pellet Chlorinator In-Line Chlorinator Model 400 Installation Guide
 Dry Pellet Chlorinator In-Line Chlorinator Model 400 Installation Guide Dry Pellet Chlorinator In-Line Chlorinator Model 400 Installation Guide
Dry Pellet Chlorinator In-Line Chlorinator Model 400 Installation Guide
 

Recently uploaded

原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证
原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证
原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证jdkhjh
 
Call Girls In Hauz Khas Delhi 9654467111 Independent Escorts Service
Call Girls In Hauz Khas Delhi 9654467111 Independent Escorts ServiceCall Girls In Hauz Khas Delhi 9654467111 Independent Escorts Service
Call Girls In Hauz Khas Delhi 9654467111 Independent Escorts ServiceSapana Sha
 
BEST ✨ Call Girls In Park Plaza Faridabad ✔️ 9871031762 ✔️ Escorts Service In...
BEST ✨ Call Girls In Park Plaza Faridabad ✔️ 9871031762 ✔️ Escorts Service In...BEST ✨ Call Girls In Park Plaza Faridabad ✔️ 9871031762 ✔️ Escorts Service In...
BEST ✨ Call Girls In Park Plaza Faridabad ✔️ 9871031762 ✔️ Escorts Service In...noida100girls
 
BEST ✨Call Girls In Park Plaza Gurugram ✔️9773824855✔️ Escorts Service In Del...
BEST ✨Call Girls In Park Plaza Gurugram ✔️9773824855✔️ Escorts Service In Del...BEST ✨Call Girls In Park Plaza Gurugram ✔️9773824855✔️ Escorts Service In Del...
BEST ✨Call Girls In Park Plaza Gurugram ✔️9773824855✔️ Escorts Service In Del...noida100girls
 
BEST ✨ Call Girls In MG Road Gurgaon ✔️ 9871031762 ✔️ Escorts Service In De...
BEST ✨ Call Girls In  MG Road Gurgaon  ✔️ 9871031762 ✔️ Escorts Service In De...BEST ✨ Call Girls In  MG Road Gurgaon  ✔️ 9871031762 ✔️ Escorts Service In De...
BEST ✨ Call Girls In MG Road Gurgaon ✔️ 9871031762 ✔️ Escorts Service In De...noida100girls
 
HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607
HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607
HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607dollysharma2066
 
办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样
办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样
办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样7pn7zv3i
 
NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756
NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756
NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756dollysharma2066
 

Recently uploaded (10)

Cheap Rate ➥8448380779 ▻Call Girls In Sector 57 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 57 GurgaonCheap Rate ➥8448380779 ▻Call Girls In Sector 57 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 57 Gurgaon
 
9953056974 Low Rate Call Girls In Ashok Nagar Delhi NCR
9953056974 Low Rate Call Girls In Ashok Nagar Delhi NCR9953056974 Low Rate Call Girls In Ashok Nagar Delhi NCR
9953056974 Low Rate Call Girls In Ashok Nagar Delhi NCR
 
原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证
原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证
原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证
 
Call Girls In Hauz Khas Delhi 9654467111 Independent Escorts Service
Call Girls In Hauz Khas Delhi 9654467111 Independent Escorts ServiceCall Girls In Hauz Khas Delhi 9654467111 Independent Escorts Service
Call Girls In Hauz Khas Delhi 9654467111 Independent Escorts Service
 
BEST ✨ Call Girls In Park Plaza Faridabad ✔️ 9871031762 ✔️ Escorts Service In...
BEST ✨ Call Girls In Park Plaza Faridabad ✔️ 9871031762 ✔️ Escorts Service In...BEST ✨ Call Girls In Park Plaza Faridabad ✔️ 9871031762 ✔️ Escorts Service In...
BEST ✨ Call Girls In Park Plaza Faridabad ✔️ 9871031762 ✔️ Escorts Service In...
 
BEST ✨Call Girls In Park Plaza Gurugram ✔️9773824855✔️ Escorts Service In Del...
BEST ✨Call Girls In Park Plaza Gurugram ✔️9773824855✔️ Escorts Service In Del...BEST ✨Call Girls In Park Plaza Gurugram ✔️9773824855✔️ Escorts Service In Del...
BEST ✨Call Girls In Park Plaza Gurugram ✔️9773824855✔️ Escorts Service In Del...
 
BEST ✨ Call Girls In MG Road Gurgaon ✔️ 9871031762 ✔️ Escorts Service In De...
BEST ✨ Call Girls In  MG Road Gurgaon  ✔️ 9871031762 ✔️ Escorts Service In De...BEST ✨ Call Girls In  MG Road Gurgaon  ✔️ 9871031762 ✔️ Escorts Service In De...
BEST ✨ Call Girls In MG Road Gurgaon ✔️ 9871031762 ✔️ Escorts Service In De...
 
HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607
HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607
HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607
 
办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样
办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样
办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样
 
NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756
NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756
NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756
 

RO DRINKING WATER FILTRATION SYSTEM IN UAE ( www.aquaprouae.com )

  • 1. AQUAPRO INDUSTRIAL CO.,LTD Reverse Osmosis Parts Introduction
  • 2. AQUAPRO INDUSTRIAL CO.,LTD Reverse Osmosis Flow Chart 2 FEED WATER TDS PERMEATE WATER FLOW METER 35KG 15KG CONCENTRATE WATER FLOW METER PUMP FLUSHING OUTLET FLUSHING SOLENOID VALVE MEMBRANE HOUSING INLET SOLENOID VALVE WATER IMPROVER
  • 3. AQUAPRO INDUSTRIAL CO.,LTD Reverse Osmosis Electrical Diagram RO Pump internal wiring 3
  • 4. Reverse Osmosis Specification Filter Housing with Cartridges 20" Filter Housing 20" Cartridge: Sediment 5, 1micron Carbon Block Carbon Block Booster Pump & Motor 1. Pump : PROCON 1533 2. Flow Rate : 125GPH 3. Motor : 1/2 HP 4. Voltage: 110/8.6A/220V/ 4 4.3A/60Hz/50Hz 5. R.P.M. : 1725 AQUAPRO INDUSTRIAL CO.,LTD Booster Pump & Motor 1. Pump : PROCON 2507 2. Flow Rate : 240GPH 3. Motor : 1 HP 4. Voltage: 110V/14A/ 220V/7A/60Hz/50Hz 5. R.P.M. : 1725 Solenoid Valve Shutting down while Low pressure switch sends out signal. Flushing while control box sends out flushing signal. Inlet Flush 500-600GPD: 1/2" 3/8" 800-1000GPD: 1/2" 3/8" 1500-2000GPD: 1/2" 1/2"
  • 5. RO Membrane & RO Housing (A) RO Membrane Housing (B) RO Membrane: 1.Specification of Membrane (1) Max. Operation Pressure: 300PSI O (2) Max. Operation Temperature: 45 C (3) Turbidity (NTU): <1 (4) Chlorine: 0.1PPM (5) PH Range: 2~11 (6) Flow Rate: 10GPM (7) Max. S.D.I. Index: 5 (8) Salt Rejection Rate: 96% 2.Application Data For System Design: (1) Max. Operation Pressure: 190~220PSI O (2) Max. Operation Temperature: 45 C (3) Turbidity (N.T.U.): <1 (4) Chlorine: <0.1PPM (5) PH Range: 4~11 (6) System Inlet Water pressure: 3.5KG+/- 15% (7) Max. S.D.I. Index: 4 (8) Salt Rejection Rate: 96% (9) Product Water Generate: 25% O (C) Testing Environment: 25 C/pH=8 (1) NaCl: 2000 PPM (2) Operating Pressure: 225PSI (3) Recovery Rate: 15% 600PSI` Water Inlet pressure Gauge 2 0~15 KG/CM Oil-Filled Pressure Gauge 2 *Not allow to operate under 1.5KG/CM * RO Inlet Water Pressure Gauge 2 0~35KG/CM (30bar)Oil-Filled Pressure Gauge, set the pressure between 150~180PSI to get the maximum performance. Pressure Regulator Adjust Clockwise to boost RO operating pressure, Counterclockwise to Lower operating pressure. 5 AQUAPRO INDUSTRIAL CO.,LTD Reverse Osmosis Specification Gate Valve Only for vertical pump using.
  • 6. Flow Meter 1.0~10GPM Electromagnetic Switch 1HP FOR 1/2 HORSE POWER MOTOR (Single Phase) 3HP FOR 1 HORSE POWER MOTOR (Single Phase) 5HP FOR 3 HORSE POWER MOTOR (Single Phase) 7.5HP FOR 4 OR 5 HORSE POWER MOTOR (Three Phase) Water-generating Water-input Full-water Flush Sorce Full 6 AQUAPRO INDUSTRIAL CO.,LTD Reverse Osmosis Specification 0.2~2GPM 0.5~5GPM 2.0~20GPM Microprocessor Controller Model: MC-2---Six lights microprocessorized automatic flush controller. Power: 230VAC, 50/60Hz, or 24VDC Function: Controller processing steps: (1) Automatically flush for 1 minute and 30 seconds when the machine starts its first time. (2) Water-generating detection: Automatically flush for 1 minute and 30 seconds after the accumulated time reaches 12 hours. (3) Input water detection: It will not start control system (stop pump/solenoid valve) if the low pressure switch delays for 5 seconds (out of source water). (4) Output water detection: When production water is full, Full water lamp is on and stop pump/solenoid valve. Configurations: Pump INDICATION OF EACH LAMP: Power Manual PUMP: Water-generating, will be on when pump is generating. FLUSH: Auto flush function, will be on when it is flushing automatically. SOURCE: Water-input, will be on when it is short of water. FULL: Full-water, will be on when water tank if full. POWER: Will be always on. MANUAL: Manual flush function, will be on when flushing by manual. WRING INSTRUCTION: 1. Low Pressure Switch- YELLOW with AMP connector 2. Floating/Pressure Switch-BLUE with AMP male connector 3. Flushing Valve-RED with AMP connector 4. Booster Pump-GREEN/BLACK With AMP connector 5. Inlet Valve-GREEN/BLACK With AMP connector
  • 7. Reverse Osmosis Installation Reminder Replacement of Filter Cartridges 7 AQUAPRO INDUSTRIAL CO.,LTD 1. Make sure the voltage and phase of the system you order, never use wrong setting. 2. Check the pure/concentration water are piping right. 3. The power line core should large enough (not less than 3.5 mm) 4. Be ware do not let brine flow through the system while water softener is backwashing. 5. Make sure the water softener's In/Out are connected correct. 6. Measure feed water pressure with a water pressure gauge. Feed water pressure is preferably to be 35 psi and the minimum is 26 psi. If lower than 26 psi, it should install a booster pump at the feed water location. 7. Check prefilters every week to make sure the water supply. 8. If the equipment comes with Ultraviolet Device, make sure you have a steady Power supply in protection of the U.V. Lamp. The replacement of filter cartridges depends greatly on the quality and condition of the water in local area where the reverse osmosis system is placed. Please follow the instructions below to ensure good performance of the system. 1. It is most recommended to replace the filter cartridges every three months. 2. After a while's usage, check regularly Reverse Osmosis Panel's Inlet Water Water Pressure Gauge. If its water pressure is 15% lower than the feed water Pressure, it is recommended to replace the filter cartridges. E.g. If the feed water pressure is 2bar (35psi), and the Inlet Water Gauge's Index is 1.7bar (29psi), it is recommended to replace the filter cartridges.
  • 8. Reverse Osmosis Setup Suggestion 1. If possible, install the active carbon filter and water softener to ensure the incoming water quality. 2. Water softener should regenerate the resin by adding salt to its salt tank. Do it regularly. 3. If not install the water softener, lower the pure/concentration water ratio by adjusting the pressure adjust needle valve(RO Needle Valve). 4. Change pure/concentration water ratio, you should always notice the motor operating pressure, adjust it from the PROCON bypass to ensure the motor is running at the best condition. 5. If your water incoming pressure lower than 1 kg/CM2, remember to add a pump in front of the system. 6. The lines left on side of autoflushing timer are used for level control or high pressure switch (If you are using a pressurize storage device). 7. Please use Hardness Tester (5B) to know your water hardness. Make sure the water softener is working fine. 8. Please use the Chlorine Tester to detect the active carbon's working condition, change active carbon when necessary. 9. Cleaning R.O. membrane when the product rate declined 10% or pressure drop up 15%, the following figure tell you how: a. Take pure water pipe (O) out and put it into drain. b. Put concentration water pipe (P) into cleaning solution (Q). c. Start pump (Notice: Make sure to release the air gather in pipes). d. Close (M) valve, open (N) valve, let cleaning solution suck into R.O. system. e. Adjust needle valve (Pressure adjusting valve) to the maximum level. And let it run for 30 minutes. After 30 minutes, adjust pressure to 60 psi, run for another 30 minutes. f. Put concentration water pipe back to the drain, adjust pressure to maximum level, flush for 1 minute and it's done. Note: Using the right cleaning solution to clean different types of scale, the cleaning solution PH should range from 3 to 10 at temperature of 35OC. 8 AQUAPRO INDUSTRIAL CO.,LTD
  • 9. ROUTE FOR ACTUATOR INPUT OPEN CLOSED T O C F AQUAPRO INDUSTRIAL CO.,LTD 9 M
  • 10. Reminder 10 AQUAPRO INDUSTRIAL CO.,LTD 1. INLET PIPING SIZE (1) 1500~2000GPD, 1Membrane Inlet Piping: 3/4" ~ 1" (2) 3000~4000GPD, 2 Membranes, 1HP Motor, Procon Pump Inlet Piping: 3/4" ~ 1" (3) 3000~4000GPD, 2 Membranes, 3HP, Grundfos Pump Inlet Piping: 1" (4) 6000~14000GPD, 4 ~ 8 Membranes Inlet Piping: 1" ~ 1-1/4" 2. INSTALLATION OF AN ADDITIONAL PUMP The inlet water pressure must be at least 1.5kg / cm2. When inlet water pressure is under 1.5kg/cm2, equip the system with an additional pump to increase the inlet water pressure. The selection of the additional pump must be based on actual Situations.