LIFE CYCLE COSTING FOR BREEAM 2011 REQUIREMENTS
Man 05 Life Cycle Costing and Service Life Planning




                                                      Copyright 2011 ADW Developments Ltd
About ‘BREEAM New Construction’




                                                                                                                                                        LIFE CYCLE COSTING FOR BREEAM 2011 REQUIREMENTS
BREEAM 2011 is called ‘BREEAM New Construction’ and the scheme is designed to assess all new build projects with this assessment criteria, regardless
of the building function and building type.

The scope of the ‘BREEAM New Construction’ scheme now includes building types previously assessed under the bespoke scheme, for example:

    Hotels
    Leisure complexes
    Community buildings




General Information                                                             The BREEAM Rating Benchmarks

Under the BREEAM New Construction scheme, there are 10 criteria by              The BREEAM rating benchmarks for new construction projects assessed
which a building is assessed:                                                   using the 2011 version of BREEAM are as follows:

      Management                                                               OUTSTANDING           ≥85
      Health and Wellbeing
      Energy
                                                                                EXCELLENT             ≥70
      Transport
      Water
      Materials                                                                VERY GOOD             ≥55
      Waste
      Land Use and Ecology                                                     GOOD                  ≥45
      Pollution
      Innovation                                                               PASS                  ≥30

BREEAM New Construction consists of forty-nine assessment issues.               UNCLASSIFIED          <30
Each issue addresses a specific building-related environmental impact or
issue, and has a number of ‘credits’ assigned to it. These credits are
awarded where a building demonstrates that it meets the best practice
performance levels defined for that issue.




                                                                Copyright 2011 ADW Developments Ltd
About ‘BREEAM New Construction’ Man 05 Credits




                                                                                                                                                                              LIFE CYCLE COSTING FOR BREEAM 2011 REQUIREMENTS
To recognise and encourage Life Cycle Costing and Service Life Planning, 3 credits are available under the BREEAM New Construction 2011 scheme. These credits are
intended to improve design, specification through-life maintenance and operation of a built asset.

The assessor should note that BREEAM places fixed criteria on the time at which the Life Cycle Cost study should be carried out in order that maximum benefit from
undertaking this is achieved.

The strategic level analysis (looking at issues such as location and external environment, maintainability and internal environment etc) and system level analysis (looking
at issues such as foundations, solid or framed wall and floors, types of energy, ventilation, water capacity and communications etc), should be carried out early in the
design process. This is to ensure the process can be used to influence the fundamental decisions taken regarding the building without having an adverse affect on either
the cost or design programme.

It is important that this is revisited as the design develops, to ensure that an optimal solution is retained throughout the procurement process.

Achieving Credit 1

A Life Cycle Cost (LCC) analysis must be carried out based on the                         The design team should carry out a critical appraisal at the feasibility
proposals developed during RIBA Work Stages C/D (concept                                  stage of the construction project, reporting service life estimations and
design/design development) or equivalent.                                                 maintenance implications for various design and specification options.

 This analysis is carried out in accordance with the process outlined in                  The appraisal is carried out in accordance with the ISO 15686
PD156865:200819 (a supplement to BS ISO 15686-5:2008)                                     Buildings and Constructed Assets - Service Life Planning Part 1
                                                                                          Methodology, with Reference Service Lives informed by a service life
 Completed for the following categories and uses a study period of 60                    database and third party datasets where appropriate
years, shown in real and discounted cash flow terms:
    Construction
                                                                                           The Estimated Service Lives are derived using the ISO 15686 Buildings
    Operation - includes as a minimum, utilities, cleaning,                              and Constructed Assets - Service Life Planning Part 1 Methodology
        management costs
    Maintenance - includes as a minimum, planned maintenance,
        replacements and repairs costs                                                     The appropriate consultant should prepare the initial cost model that
                                                                                          forecasts the LCC based on the proposals developed during RIBA Work
 At the feasibility stage of building procurement, a critical appraisal                  Stages C/D (concept design/design development) or equivalent
must be completed covering the service life estimations and
maintenance implications for different design options                                      A report should be prepared detailing the on the relative merits of
                                                                                          alternative designs and specifications, and identify which design
 The overall appraisal must comply with service life planning in                         development proposals will provide benefits to the client both in terms
accordance with ISO 15686 Buildings and Constructed Assets - Service                      of LCC and improved building performance
Life Planning Part 1




                                                                         Copyright 2011 ADW Developments Ltd
Achieving Credit 2




                                                                                                                                                                LIFE CYCLE COSTING FOR BREEAM 2011 REQUIREMENTS
A second credit can be awarded if an analysis is carried out that                   For the second credit, the design team should carry out a component
demonstrates building components have been analysed at a strategic                  level LCC analysis on at least two of the following areas:
and system level, comparing alternative options which meet the
performance criteria for the building (i.e. realistic options are used for             Envelope: e.g. cladding, windows and/or roofing
the comparison) .                                                                      Services: e.g. heat source, cooling source and/or controls
The lowest discounted LCC over the period is preferred, assuming that                  Finishes: e.g. walls, floors and/or ceilings
their selection results in at least one of the following:                              External spaces

 Lower building energy consumption over the operational life span of               To do so, we recommend the consultant initially identifies the
the building (compared to other options/alternatives analysed)                      components that are of critical value within the project, by ranking each
 A reduction in maintenance requirement/frequency                                  building element in the project in order of their LCC significance. We
 Extended service lives of services infrastructure/systems and/or                  then suggest at least four significant components are appraised and
building fabric, resulting in fewer replacement intervals                           alternatives that have the lowest discounted LCC over the period of
                                                                                    analysis ,are put forward for specification.
 Dismantling and recycling or re-use of building components

Achieving Credit 3

Providing the above criteria are achieved, a third credit can be awarded if          For the third credit, the model developed under the first LCC credit
                                                                                     should be updated.
the model outlined in the first LCC credit is updated during RIBA Work
Stages D/E (design development/technical design) or equivalent.
                                                                                     The LCC recommendations, identified for the second credit, should be
                                                                                     implemented in the specification, design and final construction of the
The results of the study must be implemented in the specification, design            assessed building.
and final construction of the assessed building.
                                                                                     In addition, a maintenance strategy report should be prepared which is
                                                                                     informed by the LCC analysis.
A maintenance strategy must be developed, informed by the LCC
analysis and includes:                                                               Such report should consider :

 the extent to which maintenance has been designed out and how                      Where and how the need for maintenance has been reduced
systems have been included in the specification to facilitate safe,                  Plans for commissioning and maintenance
efficient and cost-effective operation and maintenance                               Safety considerations during operation and maintenance
 How the removal and replacement of major plant and equipment,                      Plans for the landscaping and grounds maintenance
within the design life of the building, has been facilitated by the building         Other key FM requirements as appropriate
design and specification (lay-out/access etc)
 A management plan for the landscaping (for example, as defined in
BREEAM issue LE 05 Long Term Impact on Biodiversity) if appropriate


                                                                     Copyright 2011 ADW Developments Ltd
Schedule of Evidence




                                                                                                                                                                 LIFE CYCLE COSTING FOR BREEAM 2011 REQUIREMENTS
For the First Credit
 Relevant sections of the feasibility stage life cycle cost analysis report/documentation
 Relevant sections of the feasibility stage appraisal documentation

For the Second Credit
 Details of alternative options considered including benefits of selected options (in terms of criteria 6) and evidence that the element is of critical value
 Evidence that preferred options selected at the design stage (based on the latest LCC analysis) have been implemented

For the Third Credit
 As above updated for the detail design
 Design drawings or relevant section/clauses of the building specification or contract demonstrating implementation of the preferred option(s) from
the latest LCC analysis
 A copy of the maintenance strategy and/or a letter of commitment from the client/developer to provide one
 Evidence of how the maintenance strategy was/will be informed by the LCC analysis above
 Post construction drawings or BREEAM Assessor’s site inspection report and photographic evidence

Compliance                                                                          Contact

BREEAM places fixed criteria on the time at which the Life Cycle Cost                ADW Developments Ltd has developed an LCC Model and procedure
study should be carried out in order to ensure the maximum benefit is               which meets the requirements for the BREEAM appraisal
achieved.
                                                                                     We can demonstrate that the selection of the most appropriate
It is necessary that the strategic level and system level analysis are              strategy has been made in order to improve design, specification,
carried out early in the design process and revisited as the design                 through-life maintenance and operation
develops.
                                                                                     The analysis carried out meets the requirements detailed in the
To comply with the requirements, and to achieve these three BREEAM                  BREEAM Technical Manual to achieve three BREEAM credits under the
credits under the BREEAM 2011 scheme for New Construction, we                       Man 05, Life Cycle Cost and Service Life Planning Credits
recommend these points are targeted as early on in the design process
as possible.
                                                                                    Please contact Anthony Waterman
                                                                                    anthony.waterman@adwdevelopments.com
                                                                                    Mobile: +44 (0)7825 782 999




                                                                    Copyright 2011 ADW Developments Ltd

More Related Content

Viewers also liked

стратегийн удирдлага нэгдсэн сургууль
стратегийн удирдлага   нэгдсэн сургуульстратегийн удирдлага   нэгдсэн сургууль
стратегийн удирдлага нэгдсэн сургуульBuka King
 
IT Operation Risk-Issue Management
IT Operation Risk-Issue ManagementIT Operation Risk-Issue Management
IT Operation Risk-Issue ManagementRod Delwar
 
Innovation&tech.
Innovation&tech.Innovation&tech.
Innovation&tech.noonii
 
Operation zarb e-azb, us troops withdrawal &; kunduz operation
Operation zarb e-azb, us troops withdrawal &; kunduz operationOperation zarb e-azb, us troops withdrawal &; kunduz operation
Operation zarb e-azb, us troops withdrawal &; kunduz operationMaj (R) Imtiaz Ahmad
 
Tero technology and Tribology - Maintenance Management
Tero technology and Tribology - Maintenance ManagementTero technology and Tribology - Maintenance Management
Tero technology and Tribology - Maintenance ManagementPulkit Sharma
 
SOUTHWEST AIRLINES Strategic Evaluation
SOUTHWEST AIRLINES Strategic EvaluationSOUTHWEST AIRLINES Strategic Evaluation
SOUTHWEST AIRLINES Strategic EvaluationSINGHZEE
 
Broadband world forum service delivery framework KPN presentation
Broadband world forum service delivery framework KPN presentationBroadband world forum service delivery framework KPN presentation
Broadband world forum service delivery framework KPN presentationAlan Quayle
 
Performing A Life Cycle Cost Analysis
Performing A Life Cycle Cost AnalysisPerforming A Life Cycle Cost Analysis
Performing A Life Cycle Cost Analysischrishvaceng
 
Life cycle cost example
Life cycle cost exampleLife cycle cost example
Life cycle cost exampleHuzaifa Sajid
 
Og for sdh ason network management (v100 r002c01-02)
Og for sdh ason network management (v100 r002c01-02)Og for sdh ason network management (v100 r002c01-02)
Og for sdh ason network management (v100 r002c01-02)Nicat Mikayilov
 
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)DC Department of General Services
 
Internal Environmental Analysis
Internal Environmental AnalysisInternal Environmental Analysis
Internal Environmental AnalysisFaiz Alwi
 
Co-Operation and Competition: Antitrust Pitfalls in R&D Alliances and Other S...
Co-Operation and Competition: Antitrust Pitfalls in R&D Alliances and Other S...Co-Operation and Competition: Antitrust Pitfalls in R&D Alliances and Other S...
Co-Operation and Competition: Antitrust Pitfalls in R&D Alliances and Other S...iohann Le Frapper
 
New-Product Development and Life-Cycle Strategies
New-Product Development and Life-Cycle StrategiesNew-Product Development and Life-Cycle Strategies
New-Product Development and Life-Cycle StrategiesMehmet Cihangir
 
Renault Nissan Merger Case Study
Renault Nissan Merger Case StudyRenault Nissan Merger Case Study
Renault Nissan Merger Case Studybgascoyne
 
life cycle costing
life cycle costing life cycle costing
life cycle costing Mohd Hisyam
 

Viewers also liked (20)

стратегийн удирдлага нэгдсэн сургууль
стратегийн удирдлага   нэгдсэн сургуульстратегийн удирдлага   нэгдсэн сургууль
стратегийн удирдлага нэгдсэн сургууль
 
IT Operation Risk-Issue Management
IT Operation Risk-Issue ManagementIT Operation Risk-Issue Management
IT Operation Risk-Issue Management
 
Innovation&tech.
Innovation&tech.Innovation&tech.
Innovation&tech.
 
Operation zarb e-azb, us troops withdrawal &; kunduz operation
Operation zarb e-azb, us troops withdrawal &; kunduz operationOperation zarb e-azb, us troops withdrawal &; kunduz operation
Operation zarb e-azb, us troops withdrawal &; kunduz operation
 
Tero technology and Tribology - Maintenance Management
Tero technology and Tribology - Maintenance ManagementTero technology and Tribology - Maintenance Management
Tero technology and Tribology - Maintenance Management
 
Life Cycle Costings
Life Cycle CostingsLife Cycle Costings
Life Cycle Costings
 
SOUTHWEST AIRLINES Strategic Evaluation
SOUTHWEST AIRLINES Strategic EvaluationSOUTHWEST AIRLINES Strategic Evaluation
SOUTHWEST AIRLINES Strategic Evaluation
 
Cultural impacts on international strategic alliances ,analysis of renault ni...
Cultural impacts on international strategic alliances ,analysis of renault ni...Cultural impacts on international strategic alliances ,analysis of renault ni...
Cultural impacts on international strategic alliances ,analysis of renault ni...
 
Broadband world forum service delivery framework KPN presentation
Broadband world forum service delivery framework KPN presentationBroadband world forum service delivery framework KPN presentation
Broadband world forum service delivery framework KPN presentation
 
Performing A Life Cycle Cost Analysis
Performing A Life Cycle Cost AnalysisPerforming A Life Cycle Cost Analysis
Performing A Life Cycle Cost Analysis
 
Life cycle cost example
Life cycle cost exampleLife cycle cost example
Life cycle cost example
 
Og for sdh ason network management (v100 r002c01-02)
Og for sdh ason network management (v100 r002c01-02)Og for sdh ason network management (v100 r002c01-02)
Og for sdh ason network management (v100 r002c01-02)
 
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
 
Frp materials
Frp materialsFrp materials
Frp materials
 
Internal Environmental Analysis
Internal Environmental AnalysisInternal Environmental Analysis
Internal Environmental Analysis
 
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)
 
Co-Operation and Competition: Antitrust Pitfalls in R&D Alliances and Other S...
Co-Operation and Competition: Antitrust Pitfalls in R&D Alliances and Other S...Co-Operation and Competition: Antitrust Pitfalls in R&D Alliances and Other S...
Co-Operation and Competition: Antitrust Pitfalls in R&D Alliances and Other S...
 
New-Product Development and Life-Cycle Strategies
New-Product Development and Life-Cycle StrategiesNew-Product Development and Life-Cycle Strategies
New-Product Development and Life-Cycle Strategies
 
Renault Nissan Merger Case Study
Renault Nissan Merger Case StudyRenault Nissan Merger Case Study
Renault Nissan Merger Case Study
 
life cycle costing
life cycle costing life cycle costing
life cycle costing
 

Recently uploaded

MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...katerynaivanenko1
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...mrchrns005
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改yuu sss
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 

Recently uploaded (20)

MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 

Life Cycle Cost for BREEEAM New Construction ADW Developments

  • 1. LIFE CYCLE COSTING FOR BREEAM 2011 REQUIREMENTS Man 05 Life Cycle Costing and Service Life Planning Copyright 2011 ADW Developments Ltd
  • 2. About ‘BREEAM New Construction’ LIFE CYCLE COSTING FOR BREEAM 2011 REQUIREMENTS BREEAM 2011 is called ‘BREEAM New Construction’ and the scheme is designed to assess all new build projects with this assessment criteria, regardless of the building function and building type. The scope of the ‘BREEAM New Construction’ scheme now includes building types previously assessed under the bespoke scheme, for example:  Hotels  Leisure complexes  Community buildings General Information The BREEAM Rating Benchmarks Under the BREEAM New Construction scheme, there are 10 criteria by The BREEAM rating benchmarks for new construction projects assessed which a building is assessed: using the 2011 version of BREEAM are as follows:  Management OUTSTANDING ≥85  Health and Wellbeing  Energy EXCELLENT ≥70  Transport  Water  Materials VERY GOOD ≥55  Waste  Land Use and Ecology GOOD ≥45  Pollution  Innovation PASS ≥30 BREEAM New Construction consists of forty-nine assessment issues. UNCLASSIFIED <30 Each issue addresses a specific building-related environmental impact or issue, and has a number of ‘credits’ assigned to it. These credits are awarded where a building demonstrates that it meets the best practice performance levels defined for that issue. Copyright 2011 ADW Developments Ltd
  • 3. About ‘BREEAM New Construction’ Man 05 Credits LIFE CYCLE COSTING FOR BREEAM 2011 REQUIREMENTS To recognise and encourage Life Cycle Costing and Service Life Planning, 3 credits are available under the BREEAM New Construction 2011 scheme. These credits are intended to improve design, specification through-life maintenance and operation of a built asset. The assessor should note that BREEAM places fixed criteria on the time at which the Life Cycle Cost study should be carried out in order that maximum benefit from undertaking this is achieved. The strategic level analysis (looking at issues such as location and external environment, maintainability and internal environment etc) and system level analysis (looking at issues such as foundations, solid or framed wall and floors, types of energy, ventilation, water capacity and communications etc), should be carried out early in the design process. This is to ensure the process can be used to influence the fundamental decisions taken regarding the building without having an adverse affect on either the cost or design programme. It is important that this is revisited as the design develops, to ensure that an optimal solution is retained throughout the procurement process. Achieving Credit 1 A Life Cycle Cost (LCC) analysis must be carried out based on the The design team should carry out a critical appraisal at the feasibility proposals developed during RIBA Work Stages C/D (concept stage of the construction project, reporting service life estimations and design/design development) or equivalent. maintenance implications for various design and specification options.  This analysis is carried out in accordance with the process outlined in  The appraisal is carried out in accordance with the ISO 15686 PD156865:200819 (a supplement to BS ISO 15686-5:2008) Buildings and Constructed Assets - Service Life Planning Part 1 Methodology, with Reference Service Lives informed by a service life  Completed for the following categories and uses a study period of 60 database and third party datasets where appropriate years, shown in real and discounted cash flow terms:  Construction  The Estimated Service Lives are derived using the ISO 15686 Buildings  Operation - includes as a minimum, utilities, cleaning, and Constructed Assets - Service Life Planning Part 1 Methodology management costs  Maintenance - includes as a minimum, planned maintenance, replacements and repairs costs  The appropriate consultant should prepare the initial cost model that forecasts the LCC based on the proposals developed during RIBA Work  At the feasibility stage of building procurement, a critical appraisal Stages C/D (concept design/design development) or equivalent must be completed covering the service life estimations and maintenance implications for different design options  A report should be prepared detailing the on the relative merits of alternative designs and specifications, and identify which design  The overall appraisal must comply with service life planning in development proposals will provide benefits to the client both in terms accordance with ISO 15686 Buildings and Constructed Assets - Service of LCC and improved building performance Life Planning Part 1 Copyright 2011 ADW Developments Ltd
  • 4. Achieving Credit 2 LIFE CYCLE COSTING FOR BREEAM 2011 REQUIREMENTS A second credit can be awarded if an analysis is carried out that For the second credit, the design team should carry out a component demonstrates building components have been analysed at a strategic level LCC analysis on at least two of the following areas: and system level, comparing alternative options which meet the performance criteria for the building (i.e. realistic options are used for  Envelope: e.g. cladding, windows and/or roofing the comparison) .  Services: e.g. heat source, cooling source and/or controls The lowest discounted LCC over the period is preferred, assuming that  Finishes: e.g. walls, floors and/or ceilings their selection results in at least one of the following:  External spaces  Lower building energy consumption over the operational life span of To do so, we recommend the consultant initially identifies the the building (compared to other options/alternatives analysed) components that are of critical value within the project, by ranking each  A reduction in maintenance requirement/frequency building element in the project in order of their LCC significance. We  Extended service lives of services infrastructure/systems and/or then suggest at least four significant components are appraised and building fabric, resulting in fewer replacement intervals alternatives that have the lowest discounted LCC over the period of analysis ,are put forward for specification.  Dismantling and recycling or re-use of building components Achieving Credit 3 Providing the above criteria are achieved, a third credit can be awarded if For the third credit, the model developed under the first LCC credit should be updated. the model outlined in the first LCC credit is updated during RIBA Work Stages D/E (design development/technical design) or equivalent. The LCC recommendations, identified for the second credit, should be implemented in the specification, design and final construction of the The results of the study must be implemented in the specification, design assessed building. and final construction of the assessed building. In addition, a maintenance strategy report should be prepared which is informed by the LCC analysis. A maintenance strategy must be developed, informed by the LCC analysis and includes: Such report should consider :  the extent to which maintenance has been designed out and how Where and how the need for maintenance has been reduced systems have been included in the specification to facilitate safe, Plans for commissioning and maintenance efficient and cost-effective operation and maintenance Safety considerations during operation and maintenance  How the removal and replacement of major plant and equipment, Plans for the landscaping and grounds maintenance within the design life of the building, has been facilitated by the building Other key FM requirements as appropriate design and specification (lay-out/access etc)  A management plan for the landscaping (for example, as defined in BREEAM issue LE 05 Long Term Impact on Biodiversity) if appropriate Copyright 2011 ADW Developments Ltd
  • 5. Schedule of Evidence LIFE CYCLE COSTING FOR BREEAM 2011 REQUIREMENTS For the First Credit  Relevant sections of the feasibility stage life cycle cost analysis report/documentation  Relevant sections of the feasibility stage appraisal documentation For the Second Credit  Details of alternative options considered including benefits of selected options (in terms of criteria 6) and evidence that the element is of critical value  Evidence that preferred options selected at the design stage (based on the latest LCC analysis) have been implemented For the Third Credit  As above updated for the detail design  Design drawings or relevant section/clauses of the building specification or contract demonstrating implementation of the preferred option(s) from the latest LCC analysis  A copy of the maintenance strategy and/or a letter of commitment from the client/developer to provide one  Evidence of how the maintenance strategy was/will be informed by the LCC analysis above  Post construction drawings or BREEAM Assessor’s site inspection report and photographic evidence Compliance Contact BREEAM places fixed criteria on the time at which the Life Cycle Cost  ADW Developments Ltd has developed an LCC Model and procedure study should be carried out in order to ensure the maximum benefit is which meets the requirements for the BREEAM appraisal achieved.  We can demonstrate that the selection of the most appropriate It is necessary that the strategic level and system level analysis are strategy has been made in order to improve design, specification, carried out early in the design process and revisited as the design through-life maintenance and operation develops.  The analysis carried out meets the requirements detailed in the To comply with the requirements, and to achieve these three BREEAM BREEAM Technical Manual to achieve three BREEAM credits under the credits under the BREEAM 2011 scheme for New Construction, we Man 05, Life Cycle Cost and Service Life Planning Credits recommend these points are targeted as early on in the design process as possible. Please contact Anthony Waterman anthony.waterman@adwdevelopments.com Mobile: +44 (0)7825 782 999 Copyright 2011 ADW Developments Ltd