ENPI CBC MEDITERRANEAN SEA BASIN PROGRAMME 2007-2013

SIDIG-MED
Project Kick Off Meeting
Inge Keymeulen
Project officer
Joint Technical Secretariat
Ph. +39 07 06 06 20 79
ikeymeulen@regione.sardegna.it

Amman, February 5-6, 2014
Presentation overview
• Contractual Obligations
• Modifications of the Project

• Monitoring Reports

2
Contractual obligations

3
4

Legal framework of the Project
Financial Regulation (1605/2002) and
Implementing Rules (2342/2002)

ENPI Regulation (1638/2006)
and Implementing Rules (951/2007)
CBC Strategy Paper 2007-2013
Indicative programme 2007-2010
Financing Agreements
EC Decision

Practical Guide for External Actions (PraG)
Joint Operational Programme
Call for Proposals

Projects Implementation
Manual

Grant contract JMA - Beneficiary

Directive 2004/18/EC on
Public Procurement

Partnership Agreement
About the Grant
How can I ensure the achievement of the
project objectives and therefore its success?
By complying with the contractual commitments described in your approved project proposal and
respecting all legal requirements:
What is the PraG?


It is a working tool describing procedures and related standard documents
and contract templates for the programmes and projects of the external
actions of EC
 It is to be used for ENPI CBC, as indicated in the Implementing Rules
 The specificities of the Programme have to be taken into account (e.g. Special Conditions to the
contract, specific rules defined in the JOP)
http://ec.europa.eu/europeaid/work/procedures/implementation/practical_guide/previous_versions/2
011/index_en.htm

PraG version to be used for
SIDIG-MED:
PraG 2010 update March 2011
The Grant Contract
The Grant Contract, signed between the Beneficiary and
the Joint Managing Authority, is the main legal tool
to be used during the project lifetime.
It defines:
•
The project description, its duration, the amount of the grant, …
•
The applicable rules for the project implementation
•
The reporting templates and the terms of reference for expenditure verification

The provisions of the Special Conditions take precedence over all the annexes
Annex I: Part 5 of the Full Application Form – Description of the Project
Annex II: General Conditions applicable to European Union financed grant contracts for external
Actions
Annex III: Budget of the Project
Annex IV: Contract-award procedures
Annex V: Standard request for payment and financial identification form
Annex VI: Model narrative and financial report
Annex VII: Terms of reference for an expenditure verification of an EU financed grant contract for external
actions and model report of factual findings
Annex VIII: Pre-financing guarantee form
Annex IX: Standard template for Transfer of Assets Ownership
Annex X: Partnership Agreement
Special conditions
–
–
–
–

Article 1 – Purpose
Article 2 - Implementation period of the Project
Article 3 - Financing of the Project
Article 4 - Narrative and financial reporting and payment
arrangements
– Article 5 - Contact addresses
– Article 6 – Annexes
– Article 7 - Other specific conditions applying to the
Action
Some basics:
Know the rules!
– You award a grant on behalf of an ENPI CBC Programme
– Read carefully the Grant Contract and the Partnership Agreement

Focus on objectives and results
– Review and confirm the exact roles and responsibilities of each partner as
outlined in the grant contract and in the Partnership Agreement
– Review and agree the work plan and agree the next immediate steps
– Ensure a shared understanding of the budget, financial obligations and
financial flows
Set up a smooth communication flow
– Appoint an overall coordinator and the other team members
– Agree about reporting obligations (narrative and financial reporting)
– Agree about internal and external communication

Monitoring & reporting
– Six-month monitoring
– Interim and Final Reports
9
10

What comes first?

• The provisions of the Special Conditions take
precedence over ALL the Annexes
• Annex II (General Conditions applicable to European
Union financed grant contracts for external Actions) takes
precedence over the other annexes
Read those 2 documents carefully
before getting started!
Start of implementation
• Distinguish between:
– When the contract takes effect = date of last signature
(SIDIG-MED: November 15th 2013)
– When the Project starts = as specified in art. 2.2 of the
special conditions:
The day following that on which the last of the two Parties
signs (SIDIG-MED: project started on November 16th 2013)
• Costs are eligible only after Project start date
Procedures to award sub-contracts for goods, services or
works may be initiated before that date but sub-contracts
may NOT be concluded by the Beneficiary or its partners
before the Project start date
11
SIDIG-MED time line
Date of signature of the contract: November 15th 2013
Duration: 24 months

PROJECT
AWARD

END OF
PROJECT
ACTIVITIES

CONTRACT
SIGNED/
START OF
PROJECT
ACTIVITIES

Before
the end of
March
2016

FINAL
SUBMISSION PAYMENT
OF FINAL
REPORT

Costs
not eligible

Costs eligible

Contracting period

Implementation
period

All accounting and project documents
should remain archived and accessible

3
months

Final
report
ing
period

Balance
payment
period

Inspection period
(for 7 years after final payment received)

6 months

.
Reporting
period

Time
..Contractual

obligations...

Costs not
eligible except
costs relating to
final reports,
expenditure
verification and
project evaluation

12
13

Implementation period
•

Distinguish between:
– when the implementation period ends: 24 months after Action start
date (art. 2.3 Special conditions)
and
– when the execution period of the contract ends:
 when final payment is paid by JMA
OR
 in any case at the latest 18 months after the end of implementation period

Costs are eligible only during the implementation period except for costs
related to final reports, expenditure verification and project evaluation
SIDIG-MED: the date of the last signature is November 15th 2013, the
implementation period starts on 16/11/2013 and ends on 15/11/2015
Obligations of the partnership:
key elements
General conditions article 1.3:
Partners take part in the implementation of the Action, and the costs they incur
are eligible in the same way as those incurred by the Beneficiary.
General conditions article 1.3 (as modified by Article 7.4.1):
“The Beneficiary (...) shall undertake that the conditions applicable to it
under Articles 1, 3, 4, 5, 6, 7, 8, 9.2, 10, 11.2, 12.2, 14, 15.5, 15.6, 16, 17
and 18.4 shall also apply to its partners, and those applicable under Articles
1, 3, 4, 5, 6, 7, 8, 10 and 16 to all subcontractors.
In particular, the Beneficiary should undertake that the conditions
applicable to it under Article 18.6 (according to the text introduced by
paragraph 7.4.6 of these Special Conditions) on the recovery procedure
by the EU Member States and the Commission shall also apply to its
partners.”
It shall include provisions to that effect as appropriate in its contracts with them.
The provisions mentioned in article 7.4.1 of the
Special Conditions concern:
Article 1 – General obligations
Article 3 – Liability
Article 4 – Conflict of interests

Article 5 – Confidentiality
Article 6 – Visibility
Article 7 – Ownership/use of results and equipment
Article 8 – Evaluation/monitoring of the Action
Article 9 – Amendment of the Contract

They apply to the
Beneficiary (all), to the
partners (all) and to the
subcontractors (only the
underlined ones)

Article 10 – Assignment
Article 11 – Implementation period of the Action, extension, suspension, force majeure
and end date
Article 14 – Eligible costs
Article 15 – Payment and interest on late payment

Article 16 – Accounts and technical and financial checks
Article 17 – Final amount of financing by the Contracting Authority
Article 18 – Recovery
15
Modifications to the Project and
amendment of the Contract
Reasons for Modifications
• time constraints;
• some activities cannot be carried out;

• withdrawal of a partner;
• budget needs: some partners are overspending, some underspending
in different Activities/BLs (see Partnership Agreement: The PPs shall
inform the Beneficiary immediately when any need for an amendment
of the project budget occurs).
• ….

17
Modifications to the Project and
amendment of the Contract
Legal framework:
Article 7.4.3 of Special conditions to the Grant Contract modifying
article 9 of Annex II (General conditions) :
“Any amendment to the contract, including the annexes thereto,
must be set out in writing in an addendum. This contract can be
modified only during its execution period. …..”

18
Types of Amendments (1)
Major amendments requiring always an
addendum to be approved by the JMC
Anything requiring an update of the grant contract (and of its
annexes) is considered as a major change.
Examples of major amendments:
•
•

Transfer among budget headings and/or partners above 15%;

•

Modification to Expected Results/Outputs;

•

Change of the Project duration;

•
19

Partnership change or replacement;

…..
Types of Amendments (2)
Limited amendments usually NOT requiring
the approval of an addendum
Examples of limited amendments (in some circumstances they
could require an addendum)
• budget changes below 15% among budget headings;
• budget changes below 15% among partners;
• budget changes within the same budget heading (sub-headings);
• modification of the associates;
• modifications of the activities not involving a modification of project
objectives and results.
ATTENTION: Budget changes (%) are always calculated on the basis of the
approved budget (Annex III of the Grant Contract)
REFER ALWAYS TO YOUR JTS OFFICERS

IF YOU INTEND TO AMEND YOUR PROJECT
20
Types of Amendments (3)
Minor changes certainly NOT requiring an
addendum
Examples of minor changes:
• VAT status;
• contact details of the Applicant or partners;
• changes of bank account and changes of auditor (this does not stop
the JMA from opposing the Beneficiary's choice of bank account or
auditor)
• change in the acronym

Minor changes have always to be notified !
21
Procedure (1)
Minor changes not requiring an amendment:
• a simple notification to the JTS and JMA must be sent within 30
calendar days.

Limited amendments:
• a notification must be sent to the JTS and JMA. The change must
be notified within 30 calendar days from the moment it has occurred
(prior authorization of the JMA is not needed but it is always
recommended to submit the notification before it has already occurred).

22
Procedure (2)
Major amendments requiring the approval of an addendum:
1. Official letter must be sent with the description of the amendment
and the reasons for change (upon request a template is provided
by the JMA).
2. The JTS and the JMA will assess the proposed modifications;
3. If acceptable the JMA will send the request to the JMC in order to
approve the addendum;

4. The Addendum must be signed by both the JMA and the
Beneficiary with the prior submission of a signed addendum to the
Partnership Agreement among PPs.
23
24

Modification of the project duration: an
addendum to the Grant contract is required
The Beneficiary may request an extension of the Action
implementation period (Special Conditions art. 7.2.11
derogating from General Conditions art. 11.1)
– In exceptional and justified cases
– No later than 30 calendar days before the initially foreseen
end of the project
– Request must be accompanied by all the supporting
evidence needed for its appraisal and must be approved
by the Joint Monitoring Committee
To date all projects must end by December 31st 2015
Monitoring reports

25
Type of reports required during
project life cycle:

Impact
Efficiency &
Effectiveness
State of play

26
Article 4 Special Conditions:
• Article 4 – Narrative and financial reporting and payment
arrangements
4.1 Narrative and financial reports shall be produced in support of
payment requests, in compliance with Articles 2 and 15.1 of Annex II
(General conditions).

4
Article 2 General Conditions (1):
• Obligation to provide the JMA with all required information on the
implementation of the project : The Beneficiary must draw up interim
reports and a final report and send them to the Joint Managing
Authority within the foreseen deadlines
• Both Interim and Final reports should be drafted in the language of
the project
• Interim reports should accompany every request for payment
• The final report should be sent no later than 3 MONTHS after the
end of the project implementation period

5
Article 2 General Conditions (2):
If the Beneficiary fails to supply the Joint Managing
Authority with a final report by the set deadline without
sufficient written explanation, the Joint Managing
Authority may terminate the Contract in accordance with
Article 12.2 a) and recover the amounts already paid
and not substantiated.

6
Article 2 General Conditions (3):
•

where the Beneficiary fails to present an interim report and a
request for payment by the end of each twelve-month period
following the date of the start of the implementation, the
Beneficiary must:


and


•

30

inform the Joint Managing Authority about the reasons why

provide a summary of progress in the Project implementation
(six month report)

if the Beneficiary fails to comply with this obligation, the Joint
Managing Authority may terminate the Contract in accordance with
Article 12.2 a) and recover the amounts already paid and not
substantiated.
Reporting
 Prepare a narrative report of activities: build it up progressively and update it
regularly so that it can be produced rapidly when the threshold for further prefinancing is reached
 Give a concise description of the activities carried out (dates, places,
attendees, target groups) and mention the Work Package the activity refers to
 For every event/meeting prepare an agenda (respecting visibility guidelines)
and write minutes or a short report with key points/agreed outcomes of the
meeting/event and an attendance list of participants (signed by all)
 Take pictures of the meetings and events if possible (showing visibility
requirements have been respected)
Make reporting part of your administrative routine!
Make sure your report is easy to read and to understand.
The narrative report must support and demonstrate the eligibility
of costs included in the financial report!
31
Structure of the six month monitoring report

32
33
34
35
Thank you for your attention
Inge Keymeulen
Project Officer
Joint Technical Secretariat
Ph. +39 07 06 06 20 79
ikeymeulen@regione.sardegna.it
Follow us…
www.enpicbcmed.eu
Facebook: ENPI CBC Med Programme
Twitter: @ENPICBCMed
Indoona: @ENPICBCMed

36

More Related Content

What's hot

Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
tdartnell
 

What's hot (20)

Cl report final
Cl report finalCl report final
Cl report final
 
Chapter 1- Procurement management
Chapter 1- Procurement managementChapter 1- Procurement management
Chapter 1- Procurement management
 
Procurement of works
Procurement of worksProcurement of works
Procurement of works
 
Chapter 2- Contract Management
Chapter 2- Contract ManagementChapter 2- Contract Management
Chapter 2- Contract Management
 
Sales Of Pre Construction Condominiums
Sales Of Pre Construction CondominiumsSales Of Pre Construction Condominiums
Sales Of Pre Construction Condominiums
 
Let's pick a TE&A news!
Let's pick a TE&A news! Let's pick a TE&A news!
Let's pick a TE&A news!
 
Determination of enginer sbd2
Determination of enginer sbd2Determination of enginer sbd2
Determination of enginer sbd2
 
Werksmans Construction & Engineering Seminar - Deon Griessel presentation
Werksmans Construction & Engineering Seminar - Deon Griessel presentationWerksmans Construction & Engineering Seminar - Deon Griessel presentation
Werksmans Construction & Engineering Seminar - Deon Griessel presentation
 
Fidic yellow vs silver
Fidic yellow vs silverFidic yellow vs silver
Fidic yellow vs silver
 
ACH 231 Lecture 07 (Contract Documents) Part 1
ACH 231 Lecture 07 (Contract Documents) Part 1ACH 231 Lecture 07 (Contract Documents) Part 1
ACH 231 Lecture 07 (Contract Documents) Part 1
 
Professional Practice II (Group Assignment)
Professional Practice II (Group Assignment)Professional Practice II (Group Assignment)
Professional Practice II (Group Assignment)
 
Construction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityConstruction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's University
 
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
 
Condominium property law part 2 - Creation of a condominium property
Condominium property law   part 2 - Creation of a condominium propertyCondominium property law   part 2 - Creation of a condominium property
Condominium property law part 2 - Creation of a condominium property
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIA
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
Variations in works contracts
Variations in works contractsVariations in works contracts
Variations in works contracts
 
ACH 231 Lecture 07 (Contract Documents) Part 2
ACH 231 Lecture 07 (Contract Documents) Part 2ACH 231 Lecture 07 (Contract Documents) Part 2
ACH 231 Lecture 07 (Contract Documents) Part 2
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignment
 
ACH 231 Lecture 07 (Contract Documents) Part 3
ACH 231 Lecture 07 (Contract Documents) Part 3ACH 231 Lecture 07 (Contract Documents) Part 3
ACH 231 Lecture 07 (Contract Documents) Part 3
 

Viewers also liked (8)

Robin kear contemporary approaches to effective library instruction
Robin kear   contemporary approaches to effective library instructionRobin kear   contemporary approaches to effective library instruction
Robin kear contemporary approaches to effective library instruction
 
Robin kear introduction to library instruction
Robin kear   introduction to library instructionRobin kear   introduction to library instruction
Robin kear introduction to library instruction
 
Robin kear information literacy
Robin kear   information literacyRobin kear   information literacy
Robin kear information literacy
 
Robin kear western trends in academic librarianship - instruction
Robin kear   western trends in academic librarianship - instructionRobin kear   western trends in academic librarianship - instruction
Robin kear western trends in academic librarianship - instruction
 
SidigMed Communication Plan and Strategy. ESMO
SidigMed Communication Plan and Strategy. ESMOSidigMed Communication Plan and Strategy. ESMO
SidigMed Communication Plan and Strategy. ESMO
 
Sidig med presentation AMB
Sidig med presentation AMBSidig med presentation AMB
Sidig med presentation AMB
 
Laoracion
LaoracionLaoracion
Laoracion
 
Con Amor Eterno Te Amado
Con Amor Eterno Te AmadoCon Amor Eterno Te Amado
Con Amor Eterno Te Amado
 

Similar to Presentation sidig med-jts

CSCM Sla cscm
CSCM Sla cscmCSCM Sla cscm
CSCM Sla cscm
Est
 
11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov
Assen Antov
 
Go through two actual contracts of your choice, highlighting key el.pdf
Go through two actual contracts of your choice, highlighting key el.pdfGo through two actual contracts of your choice, highlighting key el.pdf
Go through two actual contracts of your choice, highlighting key el.pdf
arrowvisionoptics
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
Arvind Solanki
 
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
Slope wp9  - task 9.2, overview on the finacial guidelines by GraphitechSlope wp9  - task 9.2, overview on the finacial guidelines by Graphitech
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
SLOPE Project
 
Activity agreement r2_pf
Activity agreement r2_pfActivity agreement r2_pf
Activity agreement r2_pf
Sebi Radulescu
 
Kickoff Adore-it - Intelligent Energy Europe
Kickoff Adore-it - Intelligent Energy EuropeKickoff Adore-it - Intelligent Energy Europe
Kickoff Adore-it - Intelligent Energy Europe
adoreit
 

Similar to Presentation sidig med-jts (20)

Presentation “Auditing PPP- Lessons learned from the French experience”. Anka...
Presentation “Auditing PPP- Lessons learned from the French experience”. Anka...Presentation “Auditing PPP- Lessons learned from the French experience”. Anka...
Presentation “Auditing PPP- Lessons learned from the French experience”. Anka...
 
dokumen.tips_fidic-power-point-presentation.pdf
dokumen.tips_fidic-power-point-presentation.pdfdokumen.tips_fidic-power-point-presentation.pdf
dokumen.tips_fidic-power-point-presentation.pdf
 
FIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdfFIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdf
 
CSCM Sla cscm
CSCM Sla cscmCSCM Sla cscm
CSCM Sla cscm
 
KA3 start up seminar 2015
KA3 start up seminar 2015KA3 start up seminar 2015
KA3 start up seminar 2015
 
11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov
 
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
 
Fidic law1
Fidic law1Fidic law1
Fidic law1
 
Go through two actual contracts of your choice, highlighting key el.pdf
Go through two actual contracts of your choice, highlighting key el.pdfGo through two actual contracts of your choice, highlighting key el.pdf
Go through two actual contracts of your choice, highlighting key el.pdf
 
Horizon 2020 ga
Horizon 2020 gaHorizon 2020 ga
Horizon 2020 ga
 
Blockchers. Experts Contract template
Blockchers. Experts Contract templateBlockchers. Experts Contract template
Blockchers. Experts Contract template
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
 
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
Slope wp9  - task 9.2, overview on the finacial guidelines by GraphitechSlope wp9  - task 9.2, overview on the finacial guidelines by Graphitech
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
 
Activity agreement r2_pf
Activity agreement r2_pfActivity agreement r2_pf
Activity agreement r2_pf
 
Activity agreement r2_pf
Activity agreement r2_pfActivity agreement r2_pf
Activity agreement r2_pf
 
Europeana Cloud - Progress and Financial Reporting
Europeana Cloud - Progress and Financial ReportingEuropeana Cloud - Progress and Financial Reporting
Europeana Cloud - Progress and Financial Reporting
 
Kickoff Adore-it - Intelligent Energy Europe
Kickoff Adore-it - Intelligent Energy EuropeKickoff Adore-it - Intelligent Energy Europe
Kickoff Adore-it - Intelligent Energy Europe
 
Final standard tender doc
Final standard tender docFinal standard tender doc
Final standard tender doc
 
6_Link LFA to Full application
6_Link LFA to Full application6_Link LFA to Full application
6_Link LFA to Full application
 
Key Action 2 Start up seminar VET, Adult Education & Youth (2014 Call) 29.1.15
Key Action 2 Start up seminar VET, Adult Education & Youth (2014 Call) 29.1.15Key Action 2 Start up seminar VET, Adult Education & Youth (2014 Call) 29.1.15
Key Action 2 Start up seminar VET, Adult Education & Youth (2014 Call) 29.1.15
 

Recently uploaded

VIP Call Girl in Thane 💧 9920725232 ( Call Me ) Get A New Crush Everyday With...
VIP Call Girl in Thane 💧 9920725232 ( Call Me ) Get A New Crush Everyday With...VIP Call Girl in Thane 💧 9920725232 ( Call Me ) Get A New Crush Everyday With...
VIP Call Girl in Thane 💧 9920725232 ( Call Me ) Get A New Crush Everyday With...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Call Girl in Mumbai Central 💧 9920725232 ( Call Me ) Get A New Crush Ever...
VIP Call Girl in Mumbai Central 💧 9920725232 ( Call Me ) Get A New Crush Ever...VIP Call Girl in Mumbai Central 💧 9920725232 ( Call Me ) Get A New Crush Ever...
VIP Call Girl in Mumbai Central 💧 9920725232 ( Call Me ) Get A New Crush Ever...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
amitlee9823
 
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
dipikadinghjn ( Why You Choose Us? ) Escorts
 

Recently uploaded (20)

Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...
 
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
 
Top Rated Pune Call Girls Dighi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated  Pune Call Girls Dighi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...Top Rated  Pune Call Girls Dighi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated Pune Call Girls Dighi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
 
VIP Call Girl in Thane 💧 9920725232 ( Call Me ) Get A New Crush Everyday With...
VIP Call Girl in Thane 💧 9920725232 ( Call Me ) Get A New Crush Everyday With...VIP Call Girl in Thane 💧 9920725232 ( Call Me ) Get A New Crush Everyday With...
VIP Call Girl in Thane 💧 9920725232 ( Call Me ) Get A New Crush Everyday With...
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
 
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
 
Enjoy Night⚡Call Girls Patel Nagar Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Patel Nagar Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Patel Nagar Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Patel Nagar Delhi >༒8448380779 Escort Service
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
Indore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdfIndore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdf
 
(INDIRA) Call Girl Srinagar Call Now 8617697112 Srinagar Escorts 24x7
(INDIRA) Call Girl Srinagar Call Now 8617697112 Srinagar Escorts 24x7(INDIRA) Call Girl Srinagar Call Now 8617697112 Srinagar Escorts 24x7
(INDIRA) Call Girl Srinagar Call Now 8617697112 Srinagar Escorts 24x7
 
VIP Call Girl in Mumbai Central 💧 9920725232 ( Call Me ) Get A New Crush Ever...
VIP Call Girl in Mumbai Central 💧 9920725232 ( Call Me ) Get A New Crush Ever...VIP Call Girl in Mumbai Central 💧 9920725232 ( Call Me ) Get A New Crush Ever...
VIP Call Girl in Mumbai Central 💧 9920725232 ( Call Me ) Get A New Crush Ever...
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdf
 
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
 
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
 
Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Banaswadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
 
Business Principles, Tools, and Techniques in Participating in Various Types...
Business Principles, Tools, and Techniques  in Participating in Various Types...Business Principles, Tools, and Techniques  in Participating in Various Types...
Business Principles, Tools, and Techniques in Participating in Various Types...
 
Top Rated Pune Call Girls Lohegaon ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Lohegaon ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Lohegaon ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Lohegaon ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
 

Presentation sidig med-jts

  • 1. ENPI CBC MEDITERRANEAN SEA BASIN PROGRAMME 2007-2013 SIDIG-MED Project Kick Off Meeting Inge Keymeulen Project officer Joint Technical Secretariat Ph. +39 07 06 06 20 79 ikeymeulen@regione.sardegna.it Amman, February 5-6, 2014
  • 2. Presentation overview • Contractual Obligations • Modifications of the Project • Monitoring Reports 2
  • 4. 4 Legal framework of the Project Financial Regulation (1605/2002) and Implementing Rules (2342/2002) ENPI Regulation (1638/2006) and Implementing Rules (951/2007) CBC Strategy Paper 2007-2013 Indicative programme 2007-2010 Financing Agreements EC Decision Practical Guide for External Actions (PraG) Joint Operational Programme Call for Proposals Projects Implementation Manual Grant contract JMA - Beneficiary Directive 2004/18/EC on Public Procurement Partnership Agreement
  • 5. About the Grant How can I ensure the achievement of the project objectives and therefore its success? By complying with the contractual commitments described in your approved project proposal and respecting all legal requirements:
  • 6. What is the PraG?  It is a working tool describing procedures and related standard documents and contract templates for the programmes and projects of the external actions of EC  It is to be used for ENPI CBC, as indicated in the Implementing Rules  The specificities of the Programme have to be taken into account (e.g. Special Conditions to the contract, specific rules defined in the JOP) http://ec.europa.eu/europeaid/work/procedures/implementation/practical_guide/previous_versions/2 011/index_en.htm PraG version to be used for SIDIG-MED: PraG 2010 update March 2011
  • 7. The Grant Contract The Grant Contract, signed between the Beneficiary and the Joint Managing Authority, is the main legal tool to be used during the project lifetime. It defines: • The project description, its duration, the amount of the grant, … • The applicable rules for the project implementation • The reporting templates and the terms of reference for expenditure verification The provisions of the Special Conditions take precedence over all the annexes Annex I: Part 5 of the Full Application Form – Description of the Project Annex II: General Conditions applicable to European Union financed grant contracts for external Actions Annex III: Budget of the Project Annex IV: Contract-award procedures Annex V: Standard request for payment and financial identification form Annex VI: Model narrative and financial report Annex VII: Terms of reference for an expenditure verification of an EU financed grant contract for external actions and model report of factual findings Annex VIII: Pre-financing guarantee form Annex IX: Standard template for Transfer of Assets Ownership Annex X: Partnership Agreement
  • 8. Special conditions – – – – Article 1 – Purpose Article 2 - Implementation period of the Project Article 3 - Financing of the Project Article 4 - Narrative and financial reporting and payment arrangements – Article 5 - Contact addresses – Article 6 – Annexes – Article 7 - Other specific conditions applying to the Action
  • 9. Some basics: Know the rules! – You award a grant on behalf of an ENPI CBC Programme – Read carefully the Grant Contract and the Partnership Agreement Focus on objectives and results – Review and confirm the exact roles and responsibilities of each partner as outlined in the grant contract and in the Partnership Agreement – Review and agree the work plan and agree the next immediate steps – Ensure a shared understanding of the budget, financial obligations and financial flows Set up a smooth communication flow – Appoint an overall coordinator and the other team members – Agree about reporting obligations (narrative and financial reporting) – Agree about internal and external communication Monitoring & reporting – Six-month monitoring – Interim and Final Reports 9
  • 10. 10 What comes first? • The provisions of the Special Conditions take precedence over ALL the Annexes • Annex II (General Conditions applicable to European Union financed grant contracts for external Actions) takes precedence over the other annexes Read those 2 documents carefully before getting started!
  • 11. Start of implementation • Distinguish between: – When the contract takes effect = date of last signature (SIDIG-MED: November 15th 2013) – When the Project starts = as specified in art. 2.2 of the special conditions: The day following that on which the last of the two Parties signs (SIDIG-MED: project started on November 16th 2013) • Costs are eligible only after Project start date Procedures to award sub-contracts for goods, services or works may be initiated before that date but sub-contracts may NOT be concluded by the Beneficiary or its partners before the Project start date 11
  • 12. SIDIG-MED time line Date of signature of the contract: November 15th 2013 Duration: 24 months PROJECT AWARD END OF PROJECT ACTIVITIES CONTRACT SIGNED/ START OF PROJECT ACTIVITIES Before the end of March 2016 FINAL SUBMISSION PAYMENT OF FINAL REPORT Costs not eligible Costs eligible Contracting period Implementation period All accounting and project documents should remain archived and accessible 3 months Final report ing period Balance payment period Inspection period (for 7 years after final payment received) 6 months . Reporting period Time ..Contractual obligations... Costs not eligible except costs relating to final reports, expenditure verification and project evaluation 12
  • 13. 13 Implementation period • Distinguish between: – when the implementation period ends: 24 months after Action start date (art. 2.3 Special conditions) and – when the execution period of the contract ends:  when final payment is paid by JMA OR  in any case at the latest 18 months after the end of implementation period Costs are eligible only during the implementation period except for costs related to final reports, expenditure verification and project evaluation SIDIG-MED: the date of the last signature is November 15th 2013, the implementation period starts on 16/11/2013 and ends on 15/11/2015
  • 14. Obligations of the partnership: key elements General conditions article 1.3: Partners take part in the implementation of the Action, and the costs they incur are eligible in the same way as those incurred by the Beneficiary. General conditions article 1.3 (as modified by Article 7.4.1): “The Beneficiary (...) shall undertake that the conditions applicable to it under Articles 1, 3, 4, 5, 6, 7, 8, 9.2, 10, 11.2, 12.2, 14, 15.5, 15.6, 16, 17 and 18.4 shall also apply to its partners, and those applicable under Articles 1, 3, 4, 5, 6, 7, 8, 10 and 16 to all subcontractors. In particular, the Beneficiary should undertake that the conditions applicable to it under Article 18.6 (according to the text introduced by paragraph 7.4.6 of these Special Conditions) on the recovery procedure by the EU Member States and the Commission shall also apply to its partners.” It shall include provisions to that effect as appropriate in its contracts with them.
  • 15. The provisions mentioned in article 7.4.1 of the Special Conditions concern: Article 1 – General obligations Article 3 – Liability Article 4 – Conflict of interests Article 5 – Confidentiality Article 6 – Visibility Article 7 – Ownership/use of results and equipment Article 8 – Evaluation/monitoring of the Action Article 9 – Amendment of the Contract They apply to the Beneficiary (all), to the partners (all) and to the subcontractors (only the underlined ones) Article 10 – Assignment Article 11 – Implementation period of the Action, extension, suspension, force majeure and end date Article 14 – Eligible costs Article 15 – Payment and interest on late payment Article 16 – Accounts and technical and financial checks Article 17 – Final amount of financing by the Contracting Authority Article 18 – Recovery 15
  • 16. Modifications to the Project and amendment of the Contract
  • 17. Reasons for Modifications • time constraints; • some activities cannot be carried out; • withdrawal of a partner; • budget needs: some partners are overspending, some underspending in different Activities/BLs (see Partnership Agreement: The PPs shall inform the Beneficiary immediately when any need for an amendment of the project budget occurs). • …. 17
  • 18. Modifications to the Project and amendment of the Contract Legal framework: Article 7.4.3 of Special conditions to the Grant Contract modifying article 9 of Annex II (General conditions) : “Any amendment to the contract, including the annexes thereto, must be set out in writing in an addendum. This contract can be modified only during its execution period. …..” 18
  • 19. Types of Amendments (1) Major amendments requiring always an addendum to be approved by the JMC Anything requiring an update of the grant contract (and of its annexes) is considered as a major change. Examples of major amendments: • • Transfer among budget headings and/or partners above 15%; • Modification to Expected Results/Outputs; • Change of the Project duration; • 19 Partnership change or replacement; …..
  • 20. Types of Amendments (2) Limited amendments usually NOT requiring the approval of an addendum Examples of limited amendments (in some circumstances they could require an addendum) • budget changes below 15% among budget headings; • budget changes below 15% among partners; • budget changes within the same budget heading (sub-headings); • modification of the associates; • modifications of the activities not involving a modification of project objectives and results. ATTENTION: Budget changes (%) are always calculated on the basis of the approved budget (Annex III of the Grant Contract) REFER ALWAYS TO YOUR JTS OFFICERS IF YOU INTEND TO AMEND YOUR PROJECT 20
  • 21. Types of Amendments (3) Minor changes certainly NOT requiring an addendum Examples of minor changes: • VAT status; • contact details of the Applicant or partners; • changes of bank account and changes of auditor (this does not stop the JMA from opposing the Beneficiary's choice of bank account or auditor) • change in the acronym Minor changes have always to be notified ! 21
  • 22. Procedure (1) Minor changes not requiring an amendment: • a simple notification to the JTS and JMA must be sent within 30 calendar days. Limited amendments: • a notification must be sent to the JTS and JMA. The change must be notified within 30 calendar days from the moment it has occurred (prior authorization of the JMA is not needed but it is always recommended to submit the notification before it has already occurred). 22
  • 23. Procedure (2) Major amendments requiring the approval of an addendum: 1. Official letter must be sent with the description of the amendment and the reasons for change (upon request a template is provided by the JMA). 2. The JTS and the JMA will assess the proposed modifications; 3. If acceptable the JMA will send the request to the JMC in order to approve the addendum; 4. The Addendum must be signed by both the JMA and the Beneficiary with the prior submission of a signed addendum to the Partnership Agreement among PPs. 23
  • 24. 24 Modification of the project duration: an addendum to the Grant contract is required The Beneficiary may request an extension of the Action implementation period (Special Conditions art. 7.2.11 derogating from General Conditions art. 11.1) – In exceptional and justified cases – No later than 30 calendar days before the initially foreseen end of the project – Request must be accompanied by all the supporting evidence needed for its appraisal and must be approved by the Joint Monitoring Committee To date all projects must end by December 31st 2015
  • 26. Type of reports required during project life cycle: Impact Efficiency & Effectiveness State of play 26
  • 27. Article 4 Special Conditions: • Article 4 – Narrative and financial reporting and payment arrangements 4.1 Narrative and financial reports shall be produced in support of payment requests, in compliance with Articles 2 and 15.1 of Annex II (General conditions). 4
  • 28. Article 2 General Conditions (1): • Obligation to provide the JMA with all required information on the implementation of the project : The Beneficiary must draw up interim reports and a final report and send them to the Joint Managing Authority within the foreseen deadlines • Both Interim and Final reports should be drafted in the language of the project • Interim reports should accompany every request for payment • The final report should be sent no later than 3 MONTHS after the end of the project implementation period 5
  • 29. Article 2 General Conditions (2): If the Beneficiary fails to supply the Joint Managing Authority with a final report by the set deadline without sufficient written explanation, the Joint Managing Authority may terminate the Contract in accordance with Article 12.2 a) and recover the amounts already paid and not substantiated. 6
  • 30. Article 2 General Conditions (3): • where the Beneficiary fails to present an interim report and a request for payment by the end of each twelve-month period following the date of the start of the implementation, the Beneficiary must:  and  • 30 inform the Joint Managing Authority about the reasons why provide a summary of progress in the Project implementation (six month report) if the Beneficiary fails to comply with this obligation, the Joint Managing Authority may terminate the Contract in accordance with Article 12.2 a) and recover the amounts already paid and not substantiated.
  • 31. Reporting  Prepare a narrative report of activities: build it up progressively and update it regularly so that it can be produced rapidly when the threshold for further prefinancing is reached  Give a concise description of the activities carried out (dates, places, attendees, target groups) and mention the Work Package the activity refers to  For every event/meeting prepare an agenda (respecting visibility guidelines) and write minutes or a short report with key points/agreed outcomes of the meeting/event and an attendance list of participants (signed by all)  Take pictures of the meetings and events if possible (showing visibility requirements have been respected) Make reporting part of your administrative routine! Make sure your report is easy to read and to understand. The narrative report must support and demonstrate the eligibility of costs included in the financial report! 31
  • 32. Structure of the six month monitoring report 32
  • 33. 33
  • 34. 34
  • 35. 35
  • 36. Thank you for your attention Inge Keymeulen Project Officer Joint Technical Secretariat Ph. +39 07 06 06 20 79 ikeymeulen@regione.sardegna.it Follow us… www.enpicbcmed.eu Facebook: ENPI CBC Med Programme Twitter: @ENPICBCMed Indoona: @ENPICBCMed 36