Objectives 
 Build on ISTQB CTFL in the area of agile testing 
 Prepare for the ISTQB CTFL – Agile Tester exam 
ISTQB CT...
Prerequisites 
 ISTQB CTFL or equivalent 
 Practical experience in SW testing 
ISTQB CTFL Agile Tester 3 November 17, 20...
Notes 
 Ask any time. 
 Turn your cell silent. 
ISTQB CTFL Agile Tester 4 November 17, 2014
References 
 Foundation Level Extension Syllabus Agile Tester version 2014 
ISTQB CTFL Agile Tester 5 November 17, 2014
Outline 
 Agile Software Development 
 Fundamental Agile Testing Principles, Practices and Processes 
 Agile Testing Me...
Outline 
 Agile Software Development 
 Fundamental Agile Testing Principles, Practices and Processes 
 Agile Testing Me...
Agile Software Development 
 The Fundamentals of Agile Software Development 
 Aspects of Agile Approaches 
ISTQB CTFL Ag...
Agile Software Development 
 The Fundamentals of Agile Software Development 
 Aspects of Agile Approaches 
ISTQB CTFL Ag...
Learning Objectives 
 FA-1.1.1 (K1) Recall the basic concept of Agile software development 
based on the Agile Manifesto ...
Agile Testers Work Differently 
 Testers must understand the values and principles that underpin Agile 
projects. 
 Test...
Agile Manifesto 
 In 2001, creators of most widely 
used lightweight SW 
development methodologies 
agreed on a common se...
Agile Principles 
 From the manifesto, 12 guiding principles were created. 
 They form the foundation on which all agile...
Whole Team Approach 
 Involves everyone with the knowledge and skills necessary to ensure 
project success 
 Includes cu...
Whole Team should be Cross 
Functional 
ISTQB CTFL Agile Tester 15 November 17, 2014
Power of 3 
 The whole team is involved in any consultations or meetings in which 
product features are presented, analyz...
Why Whole Team Approach? 
 Promotes more effective and efficient team dynamics 
 Enhancing communication and collaborati...
Example: Tester Work with Others to 
Achieve Desired Quality Levels 
 Supporting and collaborating with business represen...
Early and Frequent Feedback 
Iterations 
in Agile 
Projects 
Early & 
Continuous 
Feedback 
 Continuous integration is a ...
Agile vs. Sequential Waterfall 
ISTQB CTFL Agile Tester 20 November 17, 2014
By Getting Frequent Customer 
Feedback, Agile Teams 
 Can incorporate most new changes 
 Focus on the features with the ...
Early and Frequent Feedback Benefits 
 Avoiding requirements misunderstandings, which may not have been 
detected until l...
Exercise: Draw Something 
ISTQB CTFL Agile Tester 23 November 17, 2014
Agile Software Development 
 The Fundamentals of Agile Software Development 
 Aspects of Agile Approaches 
ISTQB CTFL Ag...
Learning Objectives 
 FA-1.2.1 (K1) Recall Agile software development approaches 
 FA-1.2.2 (K3) Write testable user sto...
Aspects of Agile Approaches 
(Methods) 
Collaborative 
User Story 
Creation 
Common 
Agile 
Practices 
Retrospectives 
Con...
An Agile Method is 
To Give 
Working 
SW 
Iterative 
and 
Incremental 
Cooperative 
Adaptive 
ISTQB CTFL Agile Tester 27 N...
An Agile Method is Not 
 Compressing the project schedule 
 Removing all existing SW development processes 
 Throwing o...
Mostly Used Agile Methods 
 Scrum 
 Extreme Programming (XP) 
 Lean SW Development 
 Kanban 
 Dynamic System Developm...
Extreme Programming 
 Introduced by Kent Beck to deliver a financial system in 2 years which 
previously had been undeliv...
XP 5 Values Guiding Development 
• Everyone is a part of the team. 
• Face to face and daily communication Communication 
...
XP Additional Guiding 14 Principles 
 Humanity 
 Economics 
 Mutual benefit 
 Self-similarity 
 Improvement 
 Divers...
XP 13 Development Practices 
 Sit together 
 Whole team 
 Informative workspace 
 Energized work 
 Pair programming 
...
XP Rules 
Managing 
• Give the team a 
dedicated open work space. 
• Set a sustainable pace. 
• A stand up meeting starts ...
XP Rules cont’d 
Designing 
• Simplicity 
• Choose a system metaphor. 
• Use CRC cards for design sessions. 
• Create spik...
XP Rules cont’d 
Testing 
• All code must have unit 
tests. 
• All code must pass all unit 
tests before it can 
be releas...
XP Project 
ISTQB CTFL Agile Tester 37 November 17, 2014
XP Iteration 
ISTQB CTFL Agile Tester 38 November 17, 2014
XP Development 
ISTQB CTFL Agile Tester 39 November 17, 2014
XP Collective Ownership 
ISTQB CTFL Agile Tester 40 November 17, 2014
Scrum 
 An iterative, incremental methodology for project management. 
 Scrum (as opposed to XP) does not dictate specif...
Scrum cont’d 
ISTQB CTFL Agile Tester 42 November 17, 2014
Scrum Roles 
Product Owner 
• Represents 
customer 
• Product 
backlog 
owner 
• Not a team 
leader 
Scrum Master 
• Ensur...
Kanban (Visual Card or Board) 
 A management approach sometimes used in Agile projects 
 In a value-added chain, Kanban ...
Kanban Board 
 Each column shows a station (a set of related activities) 
 Items to be produced or tasks to be processed...
Work-in-Progress Limit and Lead Time 
 WIP limit is a limit of parallel activities controlled by max number of 
tickets a...
Kanban vs. Scrum 
 In both, visualizing active tasks provides transparency of content and 
progress of tasks. 
 Tasks no...
Poor Specifications 
 A major reason for project failure 
 They result from users’ lack of 
insight into their true need...
Power of 3 is Achieved by 
In Sequential Development 
 By formal reviews 
 After requirements are written 
In Agile Deve...
User Stories 
 Document minimal requirements 
 Functional & non-functional 
 Should include acceptance 
criteria define...
Testers Improve User Stories 
 Identifying missing details or non-functional requirements 
 Asking business representati...
INVEST 
 Created by Bill Wake as a reminder of the characteristics of a good quality 
user story. 
ISTQB CTFL Agile Teste...
A User Story is the Conjunction of 
3C’s 
ISTQB CTFL Agile Tester 53 November 17, 2014
Retrospective 
 A meeting held at the end of each 
iteration/increment 
 To discuss: 
 What went well? 
 What can be i...
Too Many to Improve 
 Retrospectives can improve test effectiveness, test efficiency, test cases 
quality and team satisf...
Retrospective Organization 
 Agile method dependent 
 Attended by team (testers are part of team) + business representat...
Retrospective KSF’s 
 All participants can provide input on any activity 
 An agreement must be done when anything can b...
Need for Continuous Integration (CI) 
 Delivery of a product increment requires reliable, working, integrated SW 
at the ...
CI Activities (Automated and Daily) 
Static Code Analysis 
Compile 
Unit Test 
Deploy 
Integrate Test 
Report 
ISTQB CTFL ...
Good CI 
 Allows Agile testers to run automated tests regularly to send quicker 
feedback about code quality to team 
 V...
CI Needs Build Tools 
 To run unit and integration tests 
 To run additional static and dynamic tests 
 To measure and ...
CI Needs Build Tools cont’d 
 Can be linked to automatic 
deployment tools (can fetch build 
from CI/build server and dep...
CI Benefits 
 Earlier detection and easier RCA of integration problems and conflicting 
changes 
 Regular and quick feed...
CI Risks and Challenges 
 CI tools have to be introduced and maintained. 
 CI process must be defined and established. 
...
CI Tools 
 Testing tools, build automation tools and version control tools 
ISTQB CTFL Agile Tester 65 November 17, 2014
Agile Planning 
 Planning in ongoing 
 In Agile lifecycles, there are 2 types of planning: 
 Release planning 
 Iterat...
Release Planning 
 Looks ahead to the release of a product 
 Often a few months ahead of the start of a project 
 Defin...
Testers in Release Planning 
 Defining testable user stories, including acceptance criteria 
 Participating in project a...
Iteration Planning 
 After release planning for iteration 1 
 Looks ahead to an iteration end and concerned with iterati...
Testers in Iteration Planning 
 Participating in the detailed risk analysis of user stories 
 Determining the testabilit...
Release and Iteration Planning 
Address Test Planning 
 Testing scope (extent of testing and test goals) 
 The team memb...
Re-Planning Releases and Iterations 
 Releases and iterations may change (adaptability). 
 Release re-planning changes d...
Re-Planning Challenges Testers 
 Understanding the big picture of a release for test planning purposes 
 Having adequate...
Summary 
 The Fundamentals of Agile Software Development 
 Aspects of Agile Approaches 
ISTQB CTFL Agile Tester 74 Novem...
ISTQB CTFL Agile Tester 75 November 17, 2014
Upcoming SlideShare
Loading in …5
×

ISTQB Foundation Agile Tester 2014 Training, Agile SW Development

6,292 views

Published on

This is a free module from my course ISTQB CTFL Agile Tester revised to 2014 syllabus. If you need full training feel free to contact me by email (amraldo@hotmail.com) or by mobile (+201223600207).

Published in: Software
  • D0WNL0AD FULL ▶ ▶ ▶ ▶ http://1lite.top/gQ2Ou ◀ ◀ ◀ ◀
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • You have to choose carefully. ⇒ www.WritePaper.info ⇐ offers a professional writing service. I highly recommend them. The papers are delivered on time and customers are their first priority. This is their website: ⇒ www.WritePaper.info ⇐
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • DOWNLOAD THE BOOK INTO AVAILABLE FORMAT (New Update) ......................................................................................................................... ......................................................................................................................... Download Full PDF EBOOK here { https://soo.gd/irt2 } ......................................................................................................................... Download Full EPUB Ebook here { https://soo.gd/irt2 } ......................................................................................................................... Download Full doc Ebook here { https://soo.gd/irt2 } ......................................................................................................................... Download PDF EBOOK here { https://soo.gd/irt2 } ......................................................................................................................... Download EPUB Ebook here { https://soo.gd/irt2 } ......................................................................................................................... Download doc Ebook here { https://soo.gd/irt2 } ......................................................................................................................... ......................................................................................................................... ................................................................................................................................... eBook is an electronic version of a traditional print book THE can be read by using a personal computer or by using an eBook reader. (An eBook reader can be a software application for use on a computer such as Microsoft's free Reader application, or a book-sized computer THE is used solely as a reading device such as Nuvomedia's Rocket eBook.) Users can purchase an eBook on diskette or CD, but the most popular method of getting an eBook is to purchase a downloadable file of the eBook (or other reading material) from a Web site (such as Barnes and Noble) to be read from the user's computer or reading device. Generally, an eBook can be downloaded in five minutes or less ......................................................................................................................... .............. Browse by Genre Available eBOOK .............................................................................................................................. Art, Biography, Business, Chick Lit, Children's, Christian, Classics, Comics, Contemporary, CookBOOK, Manga, Memoir, Music, Mystery, Non Fiction, Paranormal, Philosophy, Poetry, Psychology, Religion, Romance, Science, Science Fiction, Self Help, Suspense, Spirituality, Sports, Thriller, Travel, Young Adult, Crime, EBOOK, Fantasy, Fiction, Graphic Novels, Historical Fiction, History, Horror, Humor And Comedy, ......................................................................................................................... ......................................................................................................................... .....BEST SELLER FOR EBOOK RECOMMEND............................................................. ......................................................................................................................... Blowout: Corrupted Democracy, Rogue State Russia, and the Richest, Most Destructive Industry on Earth,-- The Ride of a Lifetime: Lessons Learned from 15 Years as CEO of the Walt Disney Company,-- Call Sign Chaos: Learning to Lead,-- StrengthsFinder 2.0,-- Stillness Is the Key,-- She Said: Breaking the Sexual Harassment Story THE Helped Ignite a Movement,-- Atomic Habits: An Easy & Proven Way to Build Good Habits & Break Bad Ones,-- Everything Is Figureoutable,-- What It Takes: Lessons in the Pursuit of Excellence,-- Rich Dad Poor Dad: What the Rich Teach Their Kids About Money THE the Poor and Middle Class Do Not!,-- The Total Money Makeover: Classic Edition: A Proven Plan for Financial Fitness,-- Shut Up and Listen!: Hard Business Truths THE Will Help You Succeed, ......................................................................................................................... .........................................................................................................................
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Hello! Get Your Professional Job-Winning Resume Here - Check our website! https://vk.cc/818RFv
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • @Amr Ali your doc is good. please could you give me download access to this file
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here

ISTQB Foundation Agile Tester 2014 Training, Agile SW Development

  1. 1. ISTQB CTFL Agile Tester
  2. 2. Objectives  Build on ISTQB CTFL in the area of agile testing  Prepare for the ISTQB CTFL – Agile Tester exam ISTQB CTFL Agile Tester 2 November 17, 2014
  3. 3. Prerequisites  ISTQB CTFL or equivalent  Practical experience in SW testing ISTQB CTFL Agile Tester 3 November 17, 2014
  4. 4. Notes  Ask any time.  Turn your cell silent. ISTQB CTFL Agile Tester 4 November 17, 2014
  5. 5. References  Foundation Level Extension Syllabus Agile Tester version 2014 ISTQB CTFL Agile Tester 5 November 17, 2014
  6. 6. Outline  Agile Software Development  Fundamental Agile Testing Principles, Practices and Processes  Agile Testing Methods, Techniques and Tools ISTQB CTFL Agile Tester 6 November 17, 2014
  7. 7. Outline  Agile Software Development  Fundamental Agile Testing Principles, Practices and Processes  Agile Testing Methods, Techniques and Tools ISTQB CTFL Agile Tester 7 November 17, 2014
  8. 8. Agile Software Development  The Fundamentals of Agile Software Development  Aspects of Agile Approaches ISTQB CTFL Agile Tester 8 November 17, 2014
  9. 9. Agile Software Development  The Fundamentals of Agile Software Development  Aspects of Agile Approaches ISTQB CTFL Agile Tester 9 November 17, 2014
  10. 10. Learning Objectives  FA-1.1.1 (K1) Recall the basic concept of Agile software development based on the Agile Manifesto  FA-1.1.2 (K2) Understand the advantages of the whole-team approach  FA-1.1.3 (K2) Understand the benefits of early and frequent feedback ISTQB CTFL Agile Tester 10 November 17, 2014
  11. 11. Agile Testers Work Differently  Testers must understand the values and principles that underpin Agile projects.  Testers are an integral part of a whole-team.  Members in an Agile project communicate with each other early and frequently, which helps with removing defects early and developing a quality product. ISTQB CTFL Agile Tester 11 November 17, 2014
  12. 12. Agile Manifesto  In 2001, creators of most widely used lightweight SW development methodologies agreed on a common set of values and principles (Agile Manifesto). ISTQB CTFL Agile Tester 12 November 17, 2014
  13. 13. Agile Principles  From the manifesto, 12 guiding principles were created.  They form the foundation on which all agile methods are created. ISTQB CTFL Agile Tester 13 November 17, 2014
  14. 14. Whole Team Approach  Involves everyone with the knowledge and skills necessary to ensure project success  Includes customer representatives and business stakeholders who determine product features  3 – 9 members  Co-located  Daily stand-up meetings ISTQB CTFL Agile Tester 14 November 17, 2014
  15. 15. Whole Team should be Cross Functional ISTQB CTFL Agile Tester 15 November 17, 2014
  16. 16. Power of 3  The whole team is involved in any consultations or meetings in which product features are presented, analyzed, or estimated.  Involving testers, developers, and business representatives in all feature discussions is known as the power of three. ISTQB CTFL Agile Tester 16 November 17, 2014
  17. 17. Why Whole Team Approach?  Promotes more effective and efficient team dynamics  Enhancing communication and collaboration within the team  Enabling the various skill sets within the team to be leveraged to the benefit of the project  Making quality everyone’s responsibility ISTQB CTFL Agile Tester 17 November 17, 2014
  18. 18. Example: Tester Work with Others to Achieve Desired Quality Levels  Supporting and collaborating with business representatives to help them create suitable acceptance tests  Working with developers to agree on the testing strategy, and deciding on test automation approaches  Testers can thus transfer and extend testing knowledge to other team members and influence the development of the product. ISTQB CTFL Agile Tester 18 November 17, 2014
  19. 19. Early and Frequent Feedback Iterations in Agile Projects Early & Continuous Feedback  Continuous integration is a way to provide rapid feedback.  In sequential approach, customer often see the product when the project is nearly completed.  Too late to address customer issues effectively ISTQB CTFL Agile Tester 19 November 17, 2014
  20. 20. Agile vs. Sequential Waterfall ISTQB CTFL Agile Tester 20 November 17, 2014
  21. 21. By Getting Frequent Customer Feedback, Agile Teams  Can incorporate most new changes  Focus on the features with the highest business value, or associated risk, and these are delivered to the customer first  Are managed better since the capability of the team is transparent to everyone ISTQB CTFL Agile Tester 21 November 17, 2014
  22. 22. Early and Frequent Feedback Benefits  Avoiding requirements misunderstandings, which may not have been detected until later in the development cycle when they are more expensive to fix.  Clarifying customer feature requests, making them available for customer use early. This way, the product better reflects what the customer wants.  Discovering (via continuous integration), isolating, and resolving quality problems early.  Providing information to the Agile team regarding its productivity and ability to deliver  Promoting consistent project momentum. ISTQB CTFL Agile Tester 22 November 17, 2014
  23. 23. Exercise: Draw Something ISTQB CTFL Agile Tester 23 November 17, 2014
  24. 24. Agile Software Development  The Fundamentals of Agile Software Development  Aspects of Agile Approaches ISTQB CTFL Agile Tester 24 November 17, 2014
  25. 25. Learning Objectives  FA-1.2.1 (K1) Recall Agile software development approaches  FA-1.2.2 (K3) Write testable user stories in collaboration with developers and business representatives  FA-1.2.3 (K2) Understand how retrospectives can be used as a mechanism for process improvement in Agile projects  FA-1.2.4 (K2) Understand the use and purpose of continuous integration  FA-1.2.5 (K1) Know the differences between iteration and release planning, and how a tester adds value in each of these activities ISTQB CTFL Agile Tester 25 November 17, 2014
  26. 26. Aspects of Agile Approaches (Methods) Collaborative User Story Creation Common Agile Practices Retrospectives Continuous Integration Release and Iteration Planning ISTQB CTFL Agile Tester 26 November 17, 2014
  27. 27. An Agile Method is To Give Working SW Iterative and Incremental Cooperative Adaptive ISTQB CTFL Agile Tester 27 November 17, 2014
  28. 28. An Agile Method is Not  Compressing the project schedule  Removing all existing SW development processes  Throwing out all documentation  Writing code up to the last minute  An excuse for doing anything ISTQB CTFL Agile Tester 28 November 17, 2014
  29. 29. Mostly Used Agile Methods  Scrum  Extreme Programming (XP)  Lean SW Development  Kanban  Dynamic System Development Method (DSDM)  Adaptive SW Development  Crystal Methods  Feature Driven Development  Agile Unified Process ISTQB CTFL Agile Tester 29 November 17, 2014
  30. 30. Extreme Programming  Introduced by Kent Beck to deliver a financial system in 2 years which previously had been undelivered over a number of years with a team of 30  Described by 5 values, 14 principles and 13 development practices  Many of the Agile approaches in use today are influenced by XP and its values and principles.  For example, Agile teams following Scrum often incorporate XP practices. ISTQB CTFL Agile Tester 30 November 17, 2014
  31. 31. XP 5 Values Guiding Development • Everyone is a part of the team. • Face to face and daily communication Communication • Start with simplest solution 1st • Extra functionality can be added later • Doing what is needed and asked for, but no more Simplicity • From the system • From the team • From the customer Feedback • Telling the truth and no excuses • Refactoring • Persistence Courage Respect • Respect other team members’ work ISTQB CTFL Agile Tester 31 November 17, 2014
  32. 32. XP Additional Guiding 14 Principles  Humanity  Economics  Mutual benefit  Self-similarity  Improvement  Diversity  Reflection  Flow  Opportunity  Redundancy  Failure  Quality  Baby steps  Accepted responsibility ISTQB CTFL Agile Tester 32 November 17, 2014
  33. 33. XP 13 Development Practices  Sit together  Whole team  Informative workspace  Energized work  Pair programming  Stories  Weekly cycle  Quarterly cycle  Slack  Ten-minute build  Continuous integration  Test first programming  Incremental design ISTQB CTFL Agile Tester 33 November 17, 2014
  34. 34. XP Rules Managing • Give the team a dedicated open work space. • Set a sustainable pace. • A stand up meeting starts each day. • The project velocity is measured. • Move people around. • Fix XP when it breaks. Planning • User stories are written. • Release planning creates the release schedule. • Make frequent small releases. • The project is divided into iterations. • Iteration planning starts each iteration. ISTQB CTFL Agile Tester 34 November 17, 2014
  35. 35. XP Rules cont’d Designing • Simplicity • Choose a system metaphor. • Use CRC cards for design sessions. • Create spike solutions to reduce risk. • No functionality is added early. • Refactor whenever and wherever possible. Coding • The customer is always available. • Code must be written to agreed standards. • Code the unit test first. • All production code is pair programmed. • Only one pair integrates code at a time. • Integrate often. • Set up a dedicated integration computer. • Use collective ownership. ISTQB CTFL Agile Tester 35 November 17, 2014
  36. 36. XP Rules cont’d Testing • All code must have unit tests. • All code must pass all unit tests before it can be released. • When a bug is found tests are created. • Acceptance tests are run often and the score is published. ISTQB CTFL Agile Tester 36 November 17, 2014
  37. 37. XP Project ISTQB CTFL Agile Tester 37 November 17, 2014
  38. 38. XP Iteration ISTQB CTFL Agile Tester 38 November 17, 2014
  39. 39. XP Development ISTQB CTFL Agile Tester 39 November 17, 2014
  40. 40. XP Collective Ownership ISTQB CTFL Agile Tester 40 November 17, 2014
  41. 41. Scrum  An iterative, incremental methodology for project management.  Scrum (as opposed to XP) does not dictate specific SW development techniques (e.g., test first programming).  In addition, Scrum does not provide guidance on how testing has to be done in a Scrum project.  Scrum is composed of:  2 Backlogs  5 Time boxes  Definition of done  3 Roles ISTQB CTFL Agile Tester 41 November 17, 2014
  42. 42. Scrum cont’d ISTQB CTFL Agile Tester 42 November 17, 2014
  43. 43. Scrum Roles Product Owner • Represents customer • Product backlog owner • Not a team leader Scrum Master • Ensures scrum is followed • Resolves any issues • A coach and not a team leader Team • Develop and test the product • Self organized • Cross functional • No team leader ISTQB CTFL Agile Tester 43 November 17, 2014
  44. 44. Kanban (Visual Card or Board)  A management approach sometimes used in Agile projects  In a value-added chain, Kanban is used to:  Manage the work in progress visually on a board  Optimize the work by limiting the work in progress to match the team throughput (WIP limit) ISTQB CTFL Agile Tester 44 November 17, 2014
  45. 45. Kanban Board  Each column shows a station (a set of related activities)  Items to be produced or tasks to be processed are symbolized by tickets moving from left to right across the board through the stations. ISTQB CTFL Agile Tester 45 November 17, 2014
  46. 46. Work-in-Progress Limit and Lead Time  WIP limit is a limit of parallel activities controlled by max number of tickets allowed for a station.  Whenever a station has a free capacity, it pulls tickets from the previous one.  Lead time for the complete value stream minimization is main objective of Kanban by optimizing the continuous flow of tasks. ISTQB CTFL Agile Tester 46 November 17, 2014
  47. 47. Kanban vs. Scrum  In both, visualizing active tasks provides transparency of content and progress of tasks.  Tasks not yet scheduled are waiting in a backlog and moved onto the board as soon as there is new space (production capacity) available.  Iterations or sprints are optional in Kanban.  Allows releasing its deliverables item by item, rather than as part of a release  Timeboxing as a synchronizing mechanism is optional. ISTQB CTFL Agile Tester 47 November 17, 2014
  48. 48. Poor Specifications  A major reason for project failure  They result from users’ lack of insight into their true needs, absence of a global vision for the system, redundant or contradictory features, and other miscommunications.  Specifications are poor when the vision of a feature is not shared among developers, testers and business representatives.  Lacks the power of 3  ISTQB CTFL Agile Tester 48 November 17, 2014
  49. 49. Power of 3 is Achieved by In Sequential Development  By formal reviews  After requirements are written In Agile Development  By informal reviews  While requirements are written  In the form of user stories  That capture requirements from the prospective of:  Developers  Testers  Business representatives ISTQB CTFL Agile Tester 49 November 17, 2014
  50. 50. User Stories  Document minimal requirements  Functional & non-functional  Should include acceptance criteria defined in collaboration between business representatives, developers, and testers  Acceptance criteria extend vision of developers/testers about the feature that business representatives will validate. ISTQB CTFL Agile Tester 50 November 17, 2014
  51. 51. Testers Improve User Stories  Identifying missing details or non-functional requirements  Asking business representatives open-ended questions  Proposing ways to test the user story  Confirming the acceptance criteria  Collaborative authorship of the user story can use brainstorming and mind mapping.  Testers may use the INVEST technique to assess a user story. ISTQB CTFL Agile Tester 51 November 17, 2014
  52. 52. INVEST  Created by Bill Wake as a reminder of the characteristics of a good quality user story. ISTQB CTFL Agile Tester 52 November 17, 2014
  53. 53. A User Story is the Conjunction of 3C’s ISTQB CTFL Agile Tester 53 November 17, 2014
  54. 54. Retrospective  A meeting held at the end of each iteration/increment  To discuss:  What went well?  What can be improved?  How to improve?  If regularly conducted with appropriate follow up, they are critical to self-organization and continuous improvement. ISTQB CTFL Agile Tester 54 November 17, 2014
  55. 55. Too Many to Improve  Retrospectives can improve test effectiveness, test efficiency, test cases quality and team satisfaction.  Retrospectives can address testability of applications, user stories, features or system interfaces.  RCA can drive and decide improvements.  Few improvements per iteration == Continuous improvement @ sustainable pace == Adaptive Agile method ISTQB CTFL Agile Tester 55 November 17, 2014
  56. 56. Retrospective Organization  Agile method dependent  Attended by team (testers are part of team) + business representatives  Testing occurs every iteration and vital to team success.  Testers should bring testing prospective into retrospectives.  Facilitators organize and run retrospective meetings.  Team may invite other participants ISTQB CTFL Agile Tester 56 November 17, 2014
  57. 57. Retrospective KSF’s  All participants can provide input on any activity  An agreement must be done when anything can be discussed outside a retrospective.  Mutual trust within the team  Professional environment  It is about improvement not personal attacks.  Retrospective is a kind of review. Its KSF’s are same those of reviews. ISTQB CTFL Agile Tester 57 November 17, 2014
  58. 58. Need for Continuous Integration (CI)  Delivery of a product increment requires reliable, working, integrated SW at the end of every sprint (increased risks).  CI aims at merging and integrating changes @ least once a day.  CM, compilation, SW build, deployment, and testing are wrapped into a single, automated, repeatable process (decreased risks).  Defects are detected more quickly. ISTQB CTFL Agile Tester 58 November 17, 2014
  59. 59. CI Activities (Automated and Daily) Static Code Analysis Compile Unit Test Deploy Integrate Test Report ISTQB CTFL Agile Tester 59 November 17, 2014
  60. 60. Good CI  Allows Agile testers to run automated tests regularly to send quicker feedback about code quality to team  Visualizes test results to all team members by integrating reports  Its automated regression tests covers as much functionality as possible, including user stories delivered in the previous iterations  Supports building large integrated systems  Manual tests can be focused on new features, changes and confirmation testing. ISTQB CTFL Agile Tester 60 November 17, 2014
  61. 61. CI Needs Build Tools  To run unit and integration tests  To run additional static and dynamic tests  To measure and profile performance  To extract and format documentation from the source code  To facilitate manual quality assurance processes ISTQB CTFL Agile Tester 61 November 17, 2014
  62. 62. CI Needs Build Tools cont’d  Can be linked to automatic deployment tools (can fetch build from CI/build server and deploy it into one or more environments)  This continuous application of QC improves product quality and reduces delivery time by replacing the traditional practice of applying quality control after completing all development. ISTQB CTFL Agile Tester 62 November 17, 2014
  63. 63. CI Benefits  Earlier detection and easier RCA of integration problems and conflicting changes  Regular and quick feedback on code and improvement decisions  Keeps the version of SW being tested in a day of the version being developed  Reduces regression risk associated with refactoring and schedule risks associated with big-bang integration  Provides confidence  Visualizes product increments progress  Encourages developers and testers  Constant availability of executable SW throughout the sprint for testing, demonstration, or education purposes  Reduces repetitive manual testing activities ISTQB CTFL Agile Tester 63 November 17, 2014
  64. 64. CI Risks and Challenges  CI tools have to be introduced and maintained.  CI process must be defined and established.  Test automation requires additional resources and can be complex to establish.  Test coverage is essential to achieve automated testing advantages.  Teams sometimes over-rely on unit tests and perform too little system and acceptance testing. ISTQB CTFL Agile Tester 64 November 17, 2014
  65. 65. CI Tools  Testing tools, build automation tools and version control tools ISTQB CTFL Agile Tester 65 November 17, 2014
  66. 66. Agile Planning  Planning in ongoing  In Agile lifecycles, there are 2 types of planning:  Release planning  Iteration planning ISTQB CTFL Agile Tester 66 November 17, 2014
  67. 67. Release Planning  Looks ahead to the release of a product  Often a few months ahead of the start of a project  Defines/re-defines the product backlog  May involve refining larger user stories into smaller ones  Business representatives with team establish/prioritize user stories for the release  Basis for a test approach and test plan spanning all iterations  Based on these user stories, project and quality risks are identified and a high-level effort estimation is performed.  Release plans are high-level. ISTQB CTFL Agile Tester 67 November 17, 2014
  68. 68. Testers in Release Planning  Defining testable user stories, including acceptance criteria  Participating in project and quality risk analyses  Estimating testing effort associated with the user stories  Defining the necessary test levels  Planning the testing for the release ISTQB CTFL Agile Tester 68 November 17, 2014
  69. 69. Iteration Planning  After release planning for iteration 1  Looks ahead to an iteration end and concerned with iteration backlog  Team selects user stories, elaborates them, performs risk analysis on them and estimates the work needed for them.  A user story can be refused by the team if vague and the business representatives fail to clarify it.  Number of stories selected depends on established team velocity and size of selected user stories.  Selected stories are broken into tasks carried out by the team in an iteration. ISTQB CTFL Agile Tester 69 November 17, 2014
  70. 70. Testers in Iteration Planning  Participating in the detailed risk analysis of user stories  Determining the testability of the user stories  Creating acceptance tests for the user stories  Breaking down user stories into tasks (particularly testing tasks)  Estimating testing effort for all testing tasks  Identifying functional and non-functional aspects of the system to be tested  Supporting and participating in test automation at multiple levels of testing ISTQB CTFL Agile Tester 70 November 17, 2014
  71. 71. Release and Iteration Planning Address Test Planning  Testing scope (extent of testing and test goals)  The team members who will carry out the test activities.  Test environment and data needed (when need and expected changes)  Scheduling functional and non-functional test activities (frequency, dependency and relation to development activities)  Project and quality risks to be addressed  In addition, team estimation should consider time and effort needed to complete the required testing activities. ISTQB CTFL Agile Tester 71 November 17, 2014
  72. 72. Re-Planning Releases and Iterations  Releases and iterations may change (adaptability).  Release re-planning changes due to changes in individual user stories by internal or external factors.  Internal factors: delivery capabilities, velocity or technical issues  External factors: new markets/opportunities, competitors or threats  Iteration re-planning can change cause of a user story wrongly estimated as simple but proven to be more complex. ISTQB CTFL Agile Tester 72 November 17, 2014
  73. 73. Re-Planning Challenges Testers  Understanding the big picture of a release for test planning purposes  Having adequate test basis and test oracle in each iteration for test development  Embracing changes   Decisions about test strategies/documentation ISTQB CTFL Agile Tester 73 November 17, 2014
  74. 74. Summary  The Fundamentals of Agile Software Development  Aspects of Agile Approaches ISTQB CTFL Agile Tester 74 November 17, 2014