SlideShare a Scribd company logo
1 of 5
Download to read offline
INNOVATIVE DESIGN
LOW CARBON TRANSPORT – 16.67 % Co2e g/km
Transport, Automotive, Rail, Ship, Missile

LOW CARBON, P P
33 % FUEL, 33 % CO2e / MW
COAL, NG, ALL FUELS,
No Boiler. No Turbine. Andy Engine only

NO CARBON PP
CSP, CPV Solar. NUKE, Geothermal PP
No Boiler. No Turbine. Andy Engine only

INVESTMENT RETURN, REPAYMENT Mn$
INVEST Mn$     RETURN Mn$/Yr      REPAY Mn$       SECTOR
    100             400            200 in 2 yrs    AUTO
    200            1500           400 in 2 yrs     RAIL
    400            5000           800 in 2 yrs     SHIP
    100             300           200 in 2 yrs    MISSILE
   1000             300           200 - 10 yrs      PP

V C FUND 2 Mn$ 2 Yrs
Truck 15 T, 30 kmpl; Ship 100 T, 330 knots, 15 kmpl

Muthukal Andy Appan, M.E, 48 yrs Expert, India

Phone +6073616460 . e mail niraima1@gmail.com
INNOVATIVE DESIGN
LOW CARBON TRANSPORT – 16.67 % Co2e g/km
Transport, Automotive, Rail, Ship, Missile
Technology:
Double Speed, 1/3 Fuel for same Ton-HP-Vehicle.
6 x kmpl; 16.67 % Co2e g/km; g/t-km.
Achieved by
Andy Engine, Andy Bearing, Jet
Andy Engine – develops same power in 1/3 volume,
Consuming 1/3 fuel at normal by 7 bar slider crank
mechanism.
Andy Bearing, Jet–attached to bottom of vehicle to move at
ease. This reduces rolling friction at wheels, drag, doze at
nose in Transport, to run at Double Speed for the same Ton-
HP-Vehicle.     Kmpl= 2/[1/3]= 6 kmpl Co2e = 1/6
Hence 6 x kmpl, 16.67 % Co2e g/km; g/t-km.
AUTOMOTIVE 60 kmpl 2 T CAR; 30 kmpl TRUCK 15 T
BULLET RAIL 600, 1200 kmph single track two-way run
SHIPPING 330, 660 knots ;          5 Mach MISSILES
LOW CARBON, NO CARBON P P
33 % FUEL, 33 % CO2e / MW
COAL, NG, ALL FUELS, CSP, CPV Solar. NUKE, Geothermal PP
No Boiler. No Turbine. Andy Engine only
Phone +6073616460 . e mail niraima1@gmail.com
V C FUND 2 Mn$ 2 Yrs
Truck 15 T, 30 kmpl; Ship 100 T, 330 knots, 15 kmpl
Muthukal Andy Appan, M.E, 48 yrs Expert, India
ANDY TECHNOLOGY
LOW CARBON TRANSPORT
AUTOMOTIVE, RAIL, SHIP, MISSILE.
 Double Speed, 1/3 Fuel for same Ton-HP-Vehicle by
 Andy Engine, Andy Bearing, Jet.
6 x kmpl; 16.67 % Co2e g/km; g/t-km.
Royalty Mn$ / year / plant
Vehicle   Ton    Speed Kmpl Co2e      Net$   Cost$ Roi% Royalty

Bike      0.3     120    360   6.5    2500    1k      250    100

Car        2      200    60    39     60k    15k      400    100

Truck      15     200    30    77.5   300k   50k      600    100

Rail *    1000    600     1    2.32   120m   12mn 1000
                                                             200
Rail *    1000   1200     1    2.32   240m   24mn 1000

Ferry     1000 660kn     1.5   1.55   96mn   6mn      1600   200

Cargo     5000 330kn     0.3   1.55   180m   15mn 1200       200

Cont’r    200    330kn   0.3   1.55   180m   15mn 1200       200

VLCC      50 k 330kn 0.03      1.55 1800m 150m 1200          200

Missile   100    3300    15    1.55   72mn   6mn      1200   200
                                     Total 1500 mn$/yr
Rail * No electro-magnetic drive. Mechanical bearing.
Ship No Axial-Screw but 12- 24 leaved Radial Propeller.
Muthukal Andy Appan, M.E, 48 yrs Expert, India
ANDY TECHNOLOGY
LOW CARBON POWER PLANT
COAL, NG, Bio, CRUDE,
No Boiler. No Turbine. Andy Engine only.
 1/3 Fuel for same MWh.
 33 % Co2e T/MWh.
NO CARBON POWER PLANT
CSP sun, Nuke, Geothermal
No Boiler. No Turbine. Andy Engine only.
Royalty Mn$ / year / plant
PLANT      MW Fuel.t/h Co2e       Net$ Cost$ Roi%       Royalty

Coal       1000   100t/h   1.7mt 300m      1bn   30      100

NG         1000   100t/h   1.7mt 300m      1bn   30      100

Bio        1000   100t/h   1.7mt 300m      1bn   30      100

CSP        1000     nil     nil   600m     2bn   30      100

NUKE       1000     nil     nil   600m     8bn   7.5     100

Geotherm 1000       nil     nil   600m     2bn   30      100

Hybrid
                   100     1.67
CSP+CPV+ 1000                    500m      3bn   16      200
                   t/h     mt/yr
Fuel
                                Total      800 mn$/yr
Muthukal Andy Appan, M.E, 48 yrs Expert, India
Phone +6073616460 . e mail niraima1@gmail.com
Special Data:
Land Fare $1/100 km; Freight $1/25 km/T
Sea Fare $1/50 km; Freight $1/25 km/T
• No more technical details until royalty is paid
• Sector : Automotive, Rail, Ship, Missile, Power Plant.
• Ship- Flat bottomed, cross-country drive- 50 m Track.
• Ship 50,000 GRT/330 knt=1.5mnT/11 knt[11.5mn Brl Oil]
• Ship Revenue = 50,000*600/50*20h*300d= 3600 mn$/yr
• Rail on special Flat, smooth track- 2.5 m – 10 m wide.
• Missile Land, Sea, Sky- liquid, powder fuel- air breathing
• Phone +6073616460 . e mail niraima1@gmail.com

More Related Content

Viewers also liked

Royalty on profit by transport 1.5 bn$
Royalty  on  profit  by transport 1.5 bn$Royalty  on  profit  by transport 1.5 bn$
Royalty on profit by transport 1.5 bn$google
 
Automotive
AutomotiveAutomotive
Automotivegoogle
 
Land sea shipping
Land  sea  shippingLand  sea  shipping
Land sea shippinggoogle
 
Csp solar thermal power plant
Csp  solar  thermal  power  plantCsp  solar  thermal  power  plant
Csp solar thermal power plantgoogle
 
Fta agreements
Fta agreementsFta agreements
Fta agreementsgoogle
 
Power Plant
Power PlantPower Plant
Power Plantgoogle
 
Energy efficiency
Energy  efficiencyEnergy  efficiency
Energy efficiencygoogle
 
Andy motors inc
Andy  motors  incAndy  motors  inc
Andy motors incgoogle
 

Viewers also liked (9)

Royalty on profit by transport 1.5 bn$
Royalty  on  profit  by transport 1.5 bn$Royalty  on  profit  by transport 1.5 bn$
Royalty on profit by transport 1.5 bn$
 
Automotive
AutomotiveAutomotive
Automotive
 
Land sea shipping
Land  sea  shippingLand  sea  shipping
Land sea shipping
 
Rail
RailRail
Rail
 
Csp solar thermal power plant
Csp  solar  thermal  power  plantCsp  solar  thermal  power  plant
Csp solar thermal power plant
 
Fta agreements
Fta agreementsFta agreements
Fta agreements
 
Power Plant
Power PlantPower Plant
Power Plant
 
Energy efficiency
Energy  efficiencyEnergy  efficiency
Energy efficiency
 
Andy motors inc
Andy  motors  incAndy  motors  inc
Andy motors inc
 

More from google

Andy technology renewable energy. no ghge. 120 ppm
Andy  technology renewable energy. no ghge. 120 ppmAndy  technology renewable energy. no ghge. 120 ppm
Andy technology renewable energy. no ghge. 120 ppmgoogle
 
Air motor
Air  motorAir  motor
Air motorgoogle
 
Andy low c , low fare transport
Andy   low c , low  fare  transportAndy   low c , low  fare  transport
Andy low c , low fare transportgoogle
 
Usa trade potential
Usa    trade   potentialUsa    trade   potential
Usa trade potentialgoogle
 
Andy technology automotive cost paid back in days
Andy technology  automotive  cost  paid back in daysAndy technology  automotive  cost  paid back in days
Andy technology automotive cost paid back in daysgoogle
 
Andy technology automotive
Andy   technology  automotiveAndy   technology  automotive
Andy technology automotivegoogle
 
Usa trade potential
Usa    trade   potentialUsa    trade   potential
Usa trade potentialgoogle
 
Sea car data1
Sea  car    data1Sea  car    data1
Sea car data1google
 
Fpso. 10 tips for econo fpso1
Fpso. 10  tips for econo fpso1Fpso. 10  tips for econo fpso1
Fpso. 10 tips for econo fpso1google
 
Mechanical engineering services offered
Mechanical  engineering  services  offeredMechanical  engineering  services  offered
Mechanical engineering services offeredgoogle
 
Mechanical engineering services offered
Mechanical  engineering  services  offeredMechanical  engineering  services  offered
Mechanical engineering services offeredgoogle
 
Civil engineering services offerd for business
Civil engineering services offerd for businessCivil engineering services offerd for business
Civil engineering services offerd for businessgoogle
 
New multi vista transport roi, royalty1
New multi  vista transport  roi, royalty1New multi  vista transport  roi, royalty1
New multi vista transport roi, royalty1google
 
Low carbon technology flower ship, missile, g train
Low carbon technology flower  ship, missile, g trainLow carbon technology flower  ship, missile, g train
Low carbon technology flower ship, missile, g traingoogle
 
Andy rail mono, bullet, land-sea craft1
Andy  rail  mono, bullet, land-sea  craft1Andy  rail  mono, bullet, land-sea  craft1
Andy rail mono, bullet, land-sea craft1google
 
Andy ship, feryy, vlcc, container
Andy  ship, feryy, vlcc, containerAndy  ship, feryy, vlcc, container
Andy ship, feryy, vlcc, containergoogle
 
Andy rail mono, bullet, land-sea craft1
Andy  rail  mono, bullet, land-sea  craft1Andy  rail  mono, bullet, land-sea  craft1
Andy rail mono, bullet, land-sea craft1google
 
Royalty on profit by transport
Royalty on profit by transportRoyalty on profit by transport
Royalty on profit by transportgoogle
 
Royalty on profit by transport
Royalty on profit by transportRoyalty on profit by transport
Royalty on profit by transportgoogle
 
Facebook dmk proprty
Facebook  dmk  proprtyFacebook  dmk  proprty
Facebook dmk proprtygoogle
 

More from google (20)

Andy technology renewable energy. no ghge. 120 ppm
Andy  technology renewable energy. no ghge. 120 ppmAndy  technology renewable energy. no ghge. 120 ppm
Andy technology renewable energy. no ghge. 120 ppm
 
Air motor
Air  motorAir  motor
Air motor
 
Andy low c , low fare transport
Andy   low c , low  fare  transportAndy   low c , low  fare  transport
Andy low c , low fare transport
 
Usa trade potential
Usa    trade   potentialUsa    trade   potential
Usa trade potential
 
Andy technology automotive cost paid back in days
Andy technology  automotive  cost  paid back in daysAndy technology  automotive  cost  paid back in days
Andy technology automotive cost paid back in days
 
Andy technology automotive
Andy   technology  automotiveAndy   technology  automotive
Andy technology automotive
 
Usa trade potential
Usa    trade   potentialUsa    trade   potential
Usa trade potential
 
Sea car data1
Sea  car    data1Sea  car    data1
Sea car data1
 
Fpso. 10 tips for econo fpso1
Fpso. 10  tips for econo fpso1Fpso. 10  tips for econo fpso1
Fpso. 10 tips for econo fpso1
 
Mechanical engineering services offered
Mechanical  engineering  services  offeredMechanical  engineering  services  offered
Mechanical engineering services offered
 
Mechanical engineering services offered
Mechanical  engineering  services  offeredMechanical  engineering  services  offered
Mechanical engineering services offered
 
Civil engineering services offerd for business
Civil engineering services offerd for businessCivil engineering services offerd for business
Civil engineering services offerd for business
 
New multi vista transport roi, royalty1
New multi  vista transport  roi, royalty1New multi  vista transport  roi, royalty1
New multi vista transport roi, royalty1
 
Low carbon technology flower ship, missile, g train
Low carbon technology flower  ship, missile, g trainLow carbon technology flower  ship, missile, g train
Low carbon technology flower ship, missile, g train
 
Andy rail mono, bullet, land-sea craft1
Andy  rail  mono, bullet, land-sea  craft1Andy  rail  mono, bullet, land-sea  craft1
Andy rail mono, bullet, land-sea craft1
 
Andy ship, feryy, vlcc, container
Andy  ship, feryy, vlcc, containerAndy  ship, feryy, vlcc, container
Andy ship, feryy, vlcc, container
 
Andy rail mono, bullet, land-sea craft1
Andy  rail  mono, bullet, land-sea  craft1Andy  rail  mono, bullet, land-sea  craft1
Andy rail mono, bullet, land-sea craft1
 
Royalty on profit by transport
Royalty on profit by transportRoyalty on profit by transport
Royalty on profit by transport
 
Royalty on profit by transport
Royalty on profit by transportRoyalty on profit by transport
Royalty on profit by transport
 
Facebook dmk proprty
Facebook  dmk  proprtyFacebook  dmk  proprty
Facebook dmk proprty
 

Recently uploaded

New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 

Recently uploaded (20)

New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 

Innovative design print

  • 1. INNOVATIVE DESIGN LOW CARBON TRANSPORT – 16.67 % Co2e g/km Transport, Automotive, Rail, Ship, Missile LOW CARBON, P P 33 % FUEL, 33 % CO2e / MW COAL, NG, ALL FUELS, No Boiler. No Turbine. Andy Engine only NO CARBON PP CSP, CPV Solar. NUKE, Geothermal PP No Boiler. No Turbine. Andy Engine only INVESTMENT RETURN, REPAYMENT Mn$ INVEST Mn$ RETURN Mn$/Yr REPAY Mn$ SECTOR 100 400 200 in 2 yrs AUTO 200 1500 400 in 2 yrs RAIL 400 5000 800 in 2 yrs SHIP 100 300 200 in 2 yrs MISSILE 1000 300 200 - 10 yrs PP V C FUND 2 Mn$ 2 Yrs Truck 15 T, 30 kmpl; Ship 100 T, 330 knots, 15 kmpl Muthukal Andy Appan, M.E, 48 yrs Expert, India Phone +6073616460 . e mail niraima1@gmail.com
  • 2. INNOVATIVE DESIGN LOW CARBON TRANSPORT – 16.67 % Co2e g/km Transport, Automotive, Rail, Ship, Missile Technology: Double Speed, 1/3 Fuel for same Ton-HP-Vehicle. 6 x kmpl; 16.67 % Co2e g/km; g/t-km. Achieved by Andy Engine, Andy Bearing, Jet Andy Engine – develops same power in 1/3 volume, Consuming 1/3 fuel at normal by 7 bar slider crank mechanism. Andy Bearing, Jet–attached to bottom of vehicle to move at ease. This reduces rolling friction at wheels, drag, doze at nose in Transport, to run at Double Speed for the same Ton- HP-Vehicle. Kmpl= 2/[1/3]= 6 kmpl Co2e = 1/6 Hence 6 x kmpl, 16.67 % Co2e g/km; g/t-km. AUTOMOTIVE 60 kmpl 2 T CAR; 30 kmpl TRUCK 15 T BULLET RAIL 600, 1200 kmph single track two-way run SHIPPING 330, 660 knots ; 5 Mach MISSILES LOW CARBON, NO CARBON P P 33 % FUEL, 33 % CO2e / MW COAL, NG, ALL FUELS, CSP, CPV Solar. NUKE, Geothermal PP No Boiler. No Turbine. Andy Engine only Phone +6073616460 . e mail niraima1@gmail.com V C FUND 2 Mn$ 2 Yrs Truck 15 T, 30 kmpl; Ship 100 T, 330 knots, 15 kmpl Muthukal Andy Appan, M.E, 48 yrs Expert, India
  • 3. ANDY TECHNOLOGY LOW CARBON TRANSPORT AUTOMOTIVE, RAIL, SHIP, MISSILE.  Double Speed, 1/3 Fuel for same Ton-HP-Vehicle by  Andy Engine, Andy Bearing, Jet. 6 x kmpl; 16.67 % Co2e g/km; g/t-km. Royalty Mn$ / year / plant Vehicle Ton Speed Kmpl Co2e Net$ Cost$ Roi% Royalty Bike 0.3 120 360 6.5 2500 1k 250 100 Car 2 200 60 39 60k 15k 400 100 Truck 15 200 30 77.5 300k 50k 600 100 Rail * 1000 600 1 2.32 120m 12mn 1000 200 Rail * 1000 1200 1 2.32 240m 24mn 1000 Ferry 1000 660kn 1.5 1.55 96mn 6mn 1600 200 Cargo 5000 330kn 0.3 1.55 180m 15mn 1200 200 Cont’r 200 330kn 0.3 1.55 180m 15mn 1200 200 VLCC 50 k 330kn 0.03 1.55 1800m 150m 1200 200 Missile 100 3300 15 1.55 72mn 6mn 1200 200 Total 1500 mn$/yr Rail * No electro-magnetic drive. Mechanical bearing. Ship No Axial-Screw but 12- 24 leaved Radial Propeller. Muthukal Andy Appan, M.E, 48 yrs Expert, India
  • 4. ANDY TECHNOLOGY LOW CARBON POWER PLANT COAL, NG, Bio, CRUDE, No Boiler. No Turbine. Andy Engine only.  1/3 Fuel for same MWh.  33 % Co2e T/MWh. NO CARBON POWER PLANT CSP sun, Nuke, Geothermal No Boiler. No Turbine. Andy Engine only. Royalty Mn$ / year / plant PLANT MW Fuel.t/h Co2e Net$ Cost$ Roi% Royalty Coal 1000 100t/h 1.7mt 300m 1bn 30 100 NG 1000 100t/h 1.7mt 300m 1bn 30 100 Bio 1000 100t/h 1.7mt 300m 1bn 30 100 CSP 1000 nil nil 600m 2bn 30 100 NUKE 1000 nil nil 600m 8bn 7.5 100 Geotherm 1000 nil nil 600m 2bn 30 100 Hybrid 100 1.67 CSP+CPV+ 1000 500m 3bn 16 200 t/h mt/yr Fuel Total 800 mn$/yr Muthukal Andy Appan, M.E, 48 yrs Expert, India Phone +6073616460 . e mail niraima1@gmail.com
  • 5. Special Data: Land Fare $1/100 km; Freight $1/25 km/T Sea Fare $1/50 km; Freight $1/25 km/T • No more technical details until royalty is paid • Sector : Automotive, Rail, Ship, Missile, Power Plant. • Ship- Flat bottomed, cross-country drive- 50 m Track. • Ship 50,000 GRT/330 knt=1.5mnT/11 knt[11.5mn Brl Oil] • Ship Revenue = 50,000*600/50*20h*300d= 3600 mn$/yr • Rail on special Flat, smooth track- 2.5 m – 10 m wide. • Missile Land, Sea, Sky- liquid, powder fuel- air breathing • Phone +6073616460 . e mail niraima1@gmail.com