CONSTRUCTION MANAGEMENT
Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 1
Learning Outcomes
By the end of this unit the learner will be able to:
īƒŧ Explain the various features of Vendor Management
īƒŧ Describe the importance of Learning Cycle and Training in VendorManagement
UNIT-7 Specialised Buying &
Vendor Management
CONSTRUCTION MANAGEMENT
Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 2
Unit 7
Specialised Buying & Vendor Management
Introduction
Specialised buying involves the purchasing division of a company making provision for buying or importing
items such as raw materials, plant, or equipment due to the non-availability of these items in the country
where the company is located or due to the low cost of importing the items.
Companies may resort to importing since no single country in the world has all the resources available in
the right form, in the right quantity and at the right time.
Vendor Management
Vendor management seeks to identify the right sources, undertake selection of sources of supply, and
develop the sources selected.
Choosing the Right Source
The choice of a particular source can have a negative or positive effect on the organisation seeking to make
purchases from the source. It is the duty of the purchase manager to identify the right source and manage
the company’s relationship with that source to ensure that items purchased are delivered on time, at the
right price and to the highest possible standard.
An ideal vendor source must meet the following criteria:
i. The vendor must be capable of fulfilling purchase orders at the right price. Items should be of
high quality. The vendor should also be in a position to deal with emergency situations such as
providing credit facilities and should make constant improvements to services and items being
purchased.
ii. There must be sufficient competition in the market to encourage the provision of high-quality
products and fair pricing.
Identifying the Right Source of Supply
Points to consider when identifying the right source at the macro level:
(a) Identify which items are being procured nationally and internationally using singlesources.
(b) Identify alternative suppliers or vendors to consider.
(c) What strategies need to be adopted to develop sources to provide high-qualityproducts?
(d) Identify strategies to reduce risks associated with supply monopolies.
CONSTRUCTION MANAGEMENT
Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 3
(e) Determine whether all sources of supply have been identified.
(f) What are the main elements that make up the cost of items?
(g) Can the supply cost of components be forecasted for the nextyear?
(h) What events are likely to affect potential vendors in the years ahead?
(i) What will be the effect of the entry or exit of major suppliers to these vendors with regard to
pricing in the market?
(j) Will changing prices influence manufacturing costs?
Micro points to address in finding the right source include the following:
(a) Obtaining and studying past records of thesupplier
(b) Obtaining information on the financial standing of the supplier from their balancesheet
(c) Determining suppliers’ capacity and flexibility to expand in thefuture
(d) Records on delivery lead time and delays
(e) Willingness of the supplier to work on the buyer’s terms, conditions, quality specifications and
other pertinent issues such as offering warranties for itemspurchased
(f) The supplier’s capacity to deal with emergency requests for the supply ofitems
(g) The level of expertise of supplier’s production staff
(h) Information on the break-even points of manufacturingunits
(i) Overall efficiency and reliability of supplier’s company
(j) How innovative are the suppliers and their staff?
Selecting a Source
Considerations for embarking on a vendor development programme:
Further considerations when embarking on a vendor development programme:
i. For the buyer to remain important to vendors, only a small number of potential sources of
suppliers should be used. This will also ensure healthy competition in producing quality
products at competitive, low prices.
ii. The recommended number of vendors is two or three for large projects requiring a large
number of personnel. Good relationships must be maintained between suppliers and the
(a) The company's own past records of the vendor under consideration or other vendors who have
supplied them in the past
(b) Catalogues
(c) Trade directories
(d) The Internet
(e) Advertisements to register vendors
(f) Trade conferences
CONSTRUCTION MANAGEMENT
Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 4
buyer.
iii. It is advisable to source for three or more vendors for fast-movingitems.
iv. If competition between the vendors is quite even, the best vendor is likely to be the one
closest to the storage depot of the buyer (contractor).
v. Computerisation and management intent are key ingredients to the success of vendor
development programmes.
vi. Since the development of a vendor programme may take quite a while (two-five years), it
would be wise to break the process into smaller parts for more effective execution using the
value chain system or a similar method of quantifying benefits.
Benefits of choosing a Source of Supply
Vendor Registration and Development
The selected vendor(s) must be registered by the buyer organisation. During the process of registration, a
comprehensive questionnaire is sent to the vendors for them to provide details on all aspects of their
business. It is important to discuss the intention of this questionnaire with the suppliers to make them
aware of what is expected of them. Details collected are kept on secure databases and should be well
guarded to ensure confidentiality.
Details to request in the questionnaire include:
(a) Name of the supplier
(b) Location of supplier's communications office
(c) Location of supplier's warehouse
(d) Location of supplier's factory
(e) Past record of the supplier with the company
(f) Willingness of the supplier to work on buyer’s terms, conditions, quality specifications and other
ī‚ˇ Conservation of working capital by operating on lowinventories
ī‚ˇ Cost saving resulting from buying instead of manufacturing items, which involves largecapital
ī‚ˇ Ability to obtain large-quantity requirements from manyvendors
ī‚ˇ Ability to deal with seasonal variations in supply with the help ofvendors
ī‚ˇ Lead time for purchase order is reduced since items originate from a singlesource
ī‚ˇ Costs associated with dual inspection can be reduced
ī‚ˇ Quicker payments to suppliers may actually mean reduced prices
ī‚ˇ Availability of extra credit lines from vendors
ī‚ˇ More productive time for material managers through proper
ī‚ˇ Computerisation of processes frees up more time for managers to undertake more productive
tasks and solve more problems
ī‚ˇ Problems associated with late deliveries and rejection of items arereduced
CONSTRUCTION MANAGEMENT
Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 5
pertinent issues such as offering warranties for items purchased
(g) The supplier’s capacity to deal with emergency requests for the supply ofitems
(h) The level of expertise of supplier’s production staff
(i) Information on the break-even points of manufacturingunits
(j) Overall efficiency and reliability of supplier’s company
(k) How innovative are the suppliers and their staff?
(l) Effectiveness of the supplier's organisation and management including the ownership status and
operational reliability of their machinery
(m)The firm’s industrial relations with its unions, its past strikes or other work stoppages or slowdown
problems and the ability of the firm to cope with them in the past
(n) Innovativeness of the company and morale of staff
(o) Availability of testing and inspection facilities
Vendor Rating
Vendors are rated based on certain criteria after they have been registered: Points to consider when
rating vendors:
Aims of Vendor Rating
Vendor rating is carried out to determine who is providing quality products, at the right price, and with
the capacity to deliver at the right time. Vendors may also develop their own rating system for each
buyer.
i. It saves time and money for the buyer and provides value for money due to the high-quality suppliers
of high-quality products.
(a) How far has the vendor accepted the specifications and inspection procedures in theirentirety?
(b) Is quality control well developed, robust anddocumented?
(c) How effective is the delivery system of the vendor?
(d) How does the rejection level of the vendor under consideration compare with others?
(e) Can you see a particular trend in rejection of thevendor?
(f) Does the vendor’s price compare favourably with market prices?
(g) Is the vendor’s system up to date?
(h) How effective is the production planning system of thevendor?
(i) Is there an effective Research and Development programme in place?
(j) Does the vendor have good labour relations prevailing at theworkplace?
(k) Does the vendor supply reputable global brands?
(l) Has the vendor a good reputation in themarketplace?
(m)Does the vendor have ISO 9000 certification?
CONSTRUCTION MANAGEMENT
Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 6
ii. It promotes good business practices by ensuring transparency and objectivity while eliminating
negative practices such as nepotism, favouritism and corruption.
iii. Vendor rating puts the company on a good standing with vendors and otherbusinesses.
iv. It provides the opportunity to find the best available vendor using a wide range of assessment tools.
v. It provides the right platform to appreciate vendors who supply quality items and improves the
relationship between the buyer and the supplier.
vi. Competition is ignited between suppliers to promote qualityimprovements.
vii. It is the best method of fairly distributing businesses orcontracts.
viii.Vendor rating provides a fairer platform to discriminate between classes of vendors when making
decisions.
ix. Vendors can learn about the effectiveness of their business models by comparing their performances
with their competitors in terms of lead times, technical assistance, pricing, etc.
Regular updating of the vendor rating system is required and vendors should be notified of any changes to
the system. Vendor information should be kept confidential.
Vendor Rating Methods
Several methods exist but, generally, a vendor will be assigned a plus, neutral or negative rating,
depending on the performance. The one with the most plus ratings is chosen as the best vendor to supply
the items. Due to the large amount of data involved, computers are used to store rating data securely.
Rating Methods include:
(a) Weighted Pointed Plan (based on quality, price and delivery schedule)
(b) Cost Ratio Method (based on identifiable purchasing and receiving costs to the value of shipments
received from supplier)
(c) Eavston’s Vendor Selection Method (selecting the ideal standards and diluting them till one or two
vendors qualify)
(d) Forced DecLion Matrix Method (using relative weights attributable to factors such as price, quality,
lead time, service etc.)
(e) Dowst's Key Questions Method (asking key questions about the vendor such as why, who, how
etc., helps to build a vendor profile)
(f) Spear Supplier Evaluation Method (macro level factors used for analysis include management,
engineering, finance, material, manufacturing, quality and reliabilityetc.)
(g) IBM Quality Rating (uses factors such as desired inspection costs to actual inspection costs)
(h) Bell Quality Rating System (uses factors such as acceptable to rejectedmaterial)
CONSTRUCTION MANAGEMENT
Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 7
Parameters of Vendor Rating
Table 10.1 shows factors used for assessing vendors. The factors have been classified into four different
categories:
Table 7.1: Parameters of vendor rating
Learning Cycle and Training
Aspects of tasks whose importance and relevance change with time include the following:
(a) Defining the task
(b) Finding solutions to tasks
(c) Determination of the most suitable tool to carry outsolutions
(d) Learning how to use tools to carry out solutions
(e) Actual work on the job
CONSTRUCTION MANAGEMENT
Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 8
(f) Realising proficiency in the use of the tools
(g) Discovering innovative ways of problem-solving
(h) Performing smooth steady-state operations
The learning cycle shows that, when tackling a task for the first time, it takes longer to find solutions or
accomplish the task. After some time has elapsed, the person performing the task becomes more
proficient at executing the task and the time taken reduces considerably. Figure 10.2 shows a graph of the
time spent on tasks versus the number of times the tasks have been performed.
Figure: 7.2 The Learning Curve
Learning about material management follows a similar pattern to the curve. The beginning is usually slow
but with experience all aspects begin to function more efficiently and shorter times are required to
accomplish objectives. The curve is applicable to individual working at the department and can also be
applied to the entire management department by summing up individual curves.
Pitfalls of the Learning Curve
A learning curve is expected to be applied not to items and actions but to ‘situations, attitudes, problems
or negotiations’.
A material manager’s duties include consideration of the following:
(a) In what ways can the learning process reduce material costs?
(b) In what ways can the learning process be used to negotiate prices withvendors?
(c) At what point might a new recruit be allowed to perform tasks withoutsupervision?
(d) How can one shorten the learning curve?
(e) What is the time taken by new systems to attain steadystate?
CONSTRUCTION MANAGEMENT
Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 9
The learning curve shows that no system or person starts functioning at the optimum level from the
beginning of employment. There is a natural learning process that follows the learning curve. The
nature of the curve (steeper or shallower) depends on the nature of training policies deployed by an
organisation.
A steeper learning curve indicates a fast learning process. Conversely, a shallow curve means that a
slow leaning process is occurring. Factors that affect the learning process include:
i. Personality Traits: it is desirable to have individuals who are keen to learn new things and have
a thirst for knowledge
ii. The Atmosphere Prevailing in the Company or Department: the influence of the manager on
the workers to motivate them for growth, the availability of a well-stocked library, general
opportunities to grow with the company
iii. Training Programmes: the availability of relevant training programmes shorten the learning
curve of the three points mentioned above, training has been found to have more influence on
the learning process of employees. The prevailing atmosphere also has a certain effect but not
as much as the training aspect. This means that the company has the leeway in promoting
these two avenues of learning because they fall under the company’s control, unlike the
personality trait which is beyond its control. Training facilitates the shortening of the learning
curve more than the other two factors, and managers should focus on providing the best
available methods of training staff in order to improve productivity.
Systematic Training Needs Analysis
The materials manager is expected to:
(a) Provide induction training to explain the company’s philosophy on objectives it wants to achieve
(b) Provide explanations of all departmental rules and procedures
(c) Provide regular and relevant training to all personnel
(d) Frequently update training manuals to reflect new and emerging concepts or skillsets
(e) Provide an up-to-date library stocked with journals and relevant magazines to enhance the
learning experience
Improving the materials manager’s ability involves:
(a) Development of analytical and problem-solving ability,
(b) Providing training on how to use new tools andtechniques
(c) Learning from the experience of senior managementpersonnel
(d) Focusing on his/her life philosophy
(e) Importance of ethics for him/herself, the organisation and the nation’sdevelopment
(f) Attending induction programmes to learn more about the organisation’s philosophy, objectives,
motives, structure, procedures etc.
CONSTRUCTION MANAGEMENT
Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 10
Documenting the Processes, Codification and ISO 9000
Questions for Material Management Department
(a) How should vendors be rated?
(b) Have the purchase orders been typed without any mistakes?
(c) Who should approve items to be purchased?
(d) What are my accommodation and other entitlements during inspectiontrips?
(e) Which location is most suitable for a specific item?
(f) Where can I find this particular item?
(g) Where can a vendor’s file be found?
(h) Which items are fast-moving and which ones areslow-moving?
(i) How can items be properly disposed of?
(j) What are the procedures for coding new items?
Companies need to document their processes and make copies available to all concerned parties to
ensure everyone is on the same wavelength. The ISO 9000 standards help to ensure consistency in the
products and services that companies produce.
To assist in preparing a good document, items must be coded. Coding:
The meaning of each code should be self-explanatory and made available to all relevant parties.
Materials Management Computerisation
Ways in which computerised systems can help the materials manager
(a) Efficiency - The processes that save time when you are away from the management, end user,
your own staff or the vendor, thus giving you more time to see vendors, end users, your own staff
or management efficiently
(b) Effectiveness - The processes that make the time with an end user, vendor, your own staff or
management more productive
(c) Communications - The processes that facilitate the easy transfer of information (usable
ī‚ˇ Makes it easy to identify an item
ī‚ˇ Avoids long and ambiguous names which are difficult toremember
ī‚ˇ Promotes orderly arrangement of similar items
ī‚ˇ Eliminates duplication
ī‚ˇ Enables bulk ordering of items
ī‚ˇ Reduces lead time
ī‚ˇ Assists in simplifying and standardising items
ī‚ˇ Makes it easy to computerise and transfer stocks betweencompanies
CONSTRUCTION MANAGEMENT
Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 11
information and not just data) between people throughout the entire organisationalstructure.
Today's situation means that the organisation, vendor or customers will want and expect:
ī‚ˇ Quick and accurate information about the status of variousactivities
ī‚ˇ Quick and dependable answers to questions
ī‚ˇ The honouring of commitments within the promisedtimeframe
ī‚ˇ Frequent communication through follow-ups
Benefits gained by Construction Manager by using computerised system
ī‚ˇ Reduces the amount of paperwork
ī‚ˇ Gains more face-to-face meeting time
ī‚ˇ Promotes effective services
ī‚ˇ Reduces time for procurement and delivery
ī‚ˇ Provides current status of vendor and user requirements
ī‚ˇ Provides instant and professionally prepared proposals andreports
ī‚ˇ Provides instant review of all proceedings between the buyer andvendor
ī‚ˇ Ensures information is intact even when a staff member in charge of certain aspects of
management leaves the organisation
ī‚ˇ Automatic generation of reports
ī‚ˇ Provides the ability to detect fast-changing inventorytrends
ī‚ˇ Can be used to perform inventory controlfunctions
ī‚ˇ Enables easier exchange of information between buyers andvendors
ī‚ˇ Integrates materials management data into corporate information systems
ī‚ˇ Ability to provide forecasting functionality
ī‚ˇ Can assist in re-designing layout and location of the store orsite
ī‚ˇ Computerised systems are flexible and scalable to match changingtrends
ī‚ˇ Can be used to assess the organisation’s strengths and weaknesses in terms of the performance
of various departments
CONSTRUCTION MANAGEMENT
Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 12
Further Reading:
īƒŧ P Gopalakrishnan, M Sundaresan (2018), Materials Management: An Integrated
Approach
īƒŧ Thomas V. Bonoma, Gerald Zaltman (2019), Organizational Buying Behavior

More Related Content

Similar to 1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management (1).pdf

VENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTVENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTSWAPAN KUMAR ROY
 
bp case study
bp case study bp case study
bp case study etizaz
 
Description of design process
Description of design processDescription of design process
Description of design processMITS Gwalior
 
Tendering process CVC guidelines-converted.pptx
Tendering process CVC guidelines-converted.pptxTendering process CVC guidelines-converted.pptx
Tendering process CVC guidelines-converted.pptxAshishMishra416872
 
exam project logistic.dvgtgtgtgggtgrgrgrocx
exam project logistic.dvgtgtgtgggtgrgrgrocxexam project logistic.dvgtgtgtgggtgrgrgrocx
exam project logistic.dvgtgtgtgggtgrgrgrocxhabtamuteferi07
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations managementsmumbahelp
 
8. Strategic Plan Outline
8. Strategic Plan Outline8. Strategic Plan Outline
8. Strategic Plan OutlineEarl Stevens
 
Supplier Partnership.pdf
Supplier Partnership.pdfSupplier Partnership.pdf
Supplier Partnership.pdfKhariharan13
 
Design for Time to Market
Design for Time to MarketDesign for Time to Market
Design for Time to MarketNosayaba Evbuomwan
 
101754299 mcq-p-amp-mm
101754299 mcq-p-amp-mm101754299 mcq-p-amp-mm
101754299 mcq-p-amp-mmRakeshNimhan
 
Capital Budgeting.pptx
Capital Budgeting.pptxCapital Budgeting.pptx
Capital Budgeting.pptxVikash Barnwal
 
Management Supply Chain
Management Supply ChainManagement Supply Chain
Management Supply ChainAnkesh Gorkhali
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementGultayaz khan
 
Test Bank for Managing Operations Across the Supply Chain 2nd Edition by Swink
Test Bank for Managing Operations Across the Supply Chain 2nd Edition by SwinkTest Bank for Managing Operations Across the Supply Chain 2nd Edition by Swink
Test Bank for Managing Operations Across the Supply Chain 2nd Edition by Swinkriven012
 
KY Wong Resume-2014
KY Wong Resume-2014KY Wong Resume-2014
KY Wong Resume-2014Wong Kam Yuen
 
purchasing and contracting for projects
 purchasing and contracting for projects purchasing and contracting for projects
purchasing and contracting for projectsSomashekar S.M
 
Product definition starting point for medical device manufacturing
Product definition starting point for medical device manufacturingProduct definition starting point for medical device manufacturing
Product definition starting point for medical device manufacturingKatherine Dalton
 
OPERATIONS MANAGEMENT Chapter 1 5
OPERATIONS MANAGEMENT Chapter 1 5OPERATIONS MANAGEMENT Chapter 1 5
OPERATIONS MANAGEMENT Chapter 1 5yared ayele
 

Similar to 1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management (1).pdf (20)

VENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTVENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENT
 
bp case study
bp case study bp case study
bp case study
 
Cqe preparation | customer relations
Cqe preparation | customer relationsCqe preparation | customer relations
Cqe preparation | customer relations
 
Description of design process
Description of design processDescription of design process
Description of design process
 
Tendering process CVC guidelines-converted.pptx
Tendering process CVC guidelines-converted.pptxTendering process CVC guidelines-converted.pptx
Tendering process CVC guidelines-converted.pptx
 
Module-1.pptx
Module-1.pptxModule-1.pptx
Module-1.pptx
 
exam project logistic.dvgtgtgtgggtgrgrgrocx
exam project logistic.dvgtgtgtgggtgrgrgrocxexam project logistic.dvgtgtgtgggtgrgrgrocx
exam project logistic.dvgtgtgtgggtgrgrgrocx
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations management
 
8. Strategic Plan Outline
8. Strategic Plan Outline8. Strategic Plan Outline
8. Strategic Plan Outline
 
Supplier Partnership.pdf
Supplier Partnership.pdfSupplier Partnership.pdf
Supplier Partnership.pdf
 
Design for Time to Market
Design for Time to MarketDesign for Time to Market
Design for Time to Market
 
101754299 mcq-p-amp-mm
101754299 mcq-p-amp-mm101754299 mcq-p-amp-mm
101754299 mcq-p-amp-mm
 
Capital Budgeting.pptx
Capital Budgeting.pptxCapital Budgeting.pptx
Capital Budgeting.pptx
 
Management Supply Chain
Management Supply ChainManagement Supply Chain
Management Supply Chain
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Test Bank for Managing Operations Across the Supply Chain 2nd Edition by Swink
Test Bank for Managing Operations Across the Supply Chain 2nd Edition by SwinkTest Bank for Managing Operations Across the Supply Chain 2nd Edition by Swink
Test Bank for Managing Operations Across the Supply Chain 2nd Edition by Swink
 
KY Wong Resume-2014
KY Wong Resume-2014KY Wong Resume-2014
KY Wong Resume-2014
 
purchasing and contracting for projects
 purchasing and contracting for projects purchasing and contracting for projects
purchasing and contracting for projects
 
Product definition starting point for medical device manufacturing
Product definition starting point for medical device manufacturingProduct definition starting point for medical device manufacturing
Product definition starting point for medical device manufacturing
 
OPERATIONS MANAGEMENT Chapter 1 5
OPERATIONS MANAGEMENT Chapter 1 5OPERATIONS MANAGEMENT Chapter 1 5
OPERATIONS MANAGEMENT Chapter 1 5
 

More from ahsansaeed78

Dynamics of Structures - A K Chopra - Solutions Manual.pdf
Dynamics of Structures - A K Chopra - Solutions Manual.pdfDynamics of Structures - A K Chopra - Solutions Manual.pdf
Dynamics of Structures - A K Chopra - Solutions Manual.pdfahsansaeed78
 
1661351030Unit 4 1056-V1 Equipment Management.pdf
1661351030Unit 4 1056-V1 Equipment Management.pdf1661351030Unit 4 1056-V1 Equipment Management.pdf
1661351030Unit 4 1056-V1 Equipment Management.pdfahsansaeed78
 
1661351057Unit 5 1057-V1 Material Management.pdf
1661351057Unit 5 1057-V1 Material Management.pdf1661351057Unit 5 1057-V1 Material Management.pdf
1661351057Unit 5 1057-V1 Material Management.pdfahsansaeed78
 
1661351014Unit 2 1053-V1 Preliminary Investigations- Location and Site Select...
1661351014Unit 2 1053-V1 Preliminary Investigations- Location and Site Select...1661351014Unit 2 1053-V1 Preliminary Investigations- Location and Site Select...
1661351014Unit 2 1053-V1 Preliminary Investigations- Location and Site Select...ahsansaeed78
 
1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdfahsansaeed78
 
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdfahsansaeed78
 
1661351055Unit 6 1058-V1 Purchase and Stores Management.pdf
1661351055Unit 6 1058-V1 Purchase and Stores Management.pdf1661351055Unit 6 1058-V1 Purchase and Stores Management.pdf
1661351055Unit 6 1058-V1 Purchase and Stores Management.pdfahsansaeed78
 
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdfahsansaeed78
 
1661351047Unit 8 1060-V1 Quality Control during Construction.pdf
1661351047Unit 8 1060-V1 Quality Control during Construction.pdf1661351047Unit 8 1060-V1 Quality Control during Construction.pdf
1661351047Unit 8 1060-V1 Quality Control during Construction.pdfahsansaeed78
 

More from ahsansaeed78 (9)

Dynamics of Structures - A K Chopra - Solutions Manual.pdf
Dynamics of Structures - A K Chopra - Solutions Manual.pdfDynamics of Structures - A K Chopra - Solutions Manual.pdf
Dynamics of Structures - A K Chopra - Solutions Manual.pdf
 
1661351030Unit 4 1056-V1 Equipment Management.pdf
1661351030Unit 4 1056-V1 Equipment Management.pdf1661351030Unit 4 1056-V1 Equipment Management.pdf
1661351030Unit 4 1056-V1 Equipment Management.pdf
 
1661351057Unit 5 1057-V1 Material Management.pdf
1661351057Unit 5 1057-V1 Material Management.pdf1661351057Unit 5 1057-V1 Material Management.pdf
1661351057Unit 5 1057-V1 Material Management.pdf
 
1661351014Unit 2 1053-V1 Preliminary Investigations- Location and Site Select...
1661351014Unit 2 1053-V1 Preliminary Investigations- Location and Site Select...1661351014Unit 2 1053-V1 Preliminary Investigations- Location and Site Select...
1661351014Unit 2 1053-V1 Preliminary Investigations- Location and Site Select...
 
1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf
 
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf
1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management.pdf
 
1661351055Unit 6 1058-V1 Purchase and Stores Management.pdf
1661351055Unit 6 1058-V1 Purchase and Stores Management.pdf1661351055Unit 6 1058-V1 Purchase and Stores Management.pdf
1661351055Unit 6 1058-V1 Purchase and Stores Management.pdf
 
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
 
1661351047Unit 8 1060-V1 Quality Control during Construction.pdf
1661351047Unit 8 1060-V1 Quality Control during Construction.pdf1661351047Unit 8 1060-V1 Quality Control during Construction.pdf
1661351047Unit 8 1060-V1 Quality Control during Construction.pdf
 

Recently uploaded

VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 

Recently uploaded (13)

VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Call Girls Service Tilak Nagar @9999965857 Delhi đŸĢĻ No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi đŸĢĻ No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi đŸĢĻ No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi đŸĢĻ No Advance VVIP 🍎 SERVICE
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 

1661351055Unit 7 1059-V1 Specialised Buying & Vendor Management (1).pdf

  • 1. CONSTRUCTION MANAGEMENT Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 1 Learning Outcomes By the end of this unit the learner will be able to: īƒŧ Explain the various features of Vendor Management īƒŧ Describe the importance of Learning Cycle and Training in VendorManagement UNIT-7 Specialised Buying & Vendor Management
  • 2. CONSTRUCTION MANAGEMENT Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 2 Unit 7 Specialised Buying & Vendor Management Introduction Specialised buying involves the purchasing division of a company making provision for buying or importing items such as raw materials, plant, or equipment due to the non-availability of these items in the country where the company is located or due to the low cost of importing the items. Companies may resort to importing since no single country in the world has all the resources available in the right form, in the right quantity and at the right time. Vendor Management Vendor management seeks to identify the right sources, undertake selection of sources of supply, and develop the sources selected. Choosing the Right Source The choice of a particular source can have a negative or positive effect on the organisation seeking to make purchases from the source. It is the duty of the purchase manager to identify the right source and manage the company’s relationship with that source to ensure that items purchased are delivered on time, at the right price and to the highest possible standard. An ideal vendor source must meet the following criteria: i. The vendor must be capable of fulfilling purchase orders at the right price. Items should be of high quality. The vendor should also be in a position to deal with emergency situations such as providing credit facilities and should make constant improvements to services and items being purchased. ii. There must be sufficient competition in the market to encourage the provision of high-quality products and fair pricing. Identifying the Right Source of Supply Points to consider when identifying the right source at the macro level: (a) Identify which items are being procured nationally and internationally using singlesources. (b) Identify alternative suppliers or vendors to consider. (c) What strategies need to be adopted to develop sources to provide high-qualityproducts? (d) Identify strategies to reduce risks associated with supply monopolies.
  • 3. CONSTRUCTION MANAGEMENT Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 3 (e) Determine whether all sources of supply have been identified. (f) What are the main elements that make up the cost of items? (g) Can the supply cost of components be forecasted for the nextyear? (h) What events are likely to affect potential vendors in the years ahead? (i) What will be the effect of the entry or exit of major suppliers to these vendors with regard to pricing in the market? (j) Will changing prices influence manufacturing costs? Micro points to address in finding the right source include the following: (a) Obtaining and studying past records of thesupplier (b) Obtaining information on the financial standing of the supplier from their balancesheet (c) Determining suppliers’ capacity and flexibility to expand in thefuture (d) Records on delivery lead time and delays (e) Willingness of the supplier to work on the buyer’s terms, conditions, quality specifications and other pertinent issues such as offering warranties for itemspurchased (f) The supplier’s capacity to deal with emergency requests for the supply ofitems (g) The level of expertise of supplier’s production staff (h) Information on the break-even points of manufacturingunits (i) Overall efficiency and reliability of supplier’s company (j) How innovative are the suppliers and their staff? Selecting a Source Considerations for embarking on a vendor development programme: Further considerations when embarking on a vendor development programme: i. For the buyer to remain important to vendors, only a small number of potential sources of suppliers should be used. This will also ensure healthy competition in producing quality products at competitive, low prices. ii. The recommended number of vendors is two or three for large projects requiring a large number of personnel. Good relationships must be maintained between suppliers and the (a) The company's own past records of the vendor under consideration or other vendors who have supplied them in the past (b) Catalogues (c) Trade directories (d) The Internet (e) Advertisements to register vendors (f) Trade conferences
  • 4. CONSTRUCTION MANAGEMENT Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 4 buyer. iii. It is advisable to source for three or more vendors for fast-movingitems. iv. If competition between the vendors is quite even, the best vendor is likely to be the one closest to the storage depot of the buyer (contractor). v. Computerisation and management intent are key ingredients to the success of vendor development programmes. vi. Since the development of a vendor programme may take quite a while (two-five years), it would be wise to break the process into smaller parts for more effective execution using the value chain system or a similar method of quantifying benefits. Benefits of choosing a Source of Supply Vendor Registration and Development The selected vendor(s) must be registered by the buyer organisation. During the process of registration, a comprehensive questionnaire is sent to the vendors for them to provide details on all aspects of their business. It is important to discuss the intention of this questionnaire with the suppliers to make them aware of what is expected of them. Details collected are kept on secure databases and should be well guarded to ensure confidentiality. Details to request in the questionnaire include: (a) Name of the supplier (b) Location of supplier's communications office (c) Location of supplier's warehouse (d) Location of supplier's factory (e) Past record of the supplier with the company (f) Willingness of the supplier to work on buyer’s terms, conditions, quality specifications and other ī‚ˇ Conservation of working capital by operating on lowinventories ī‚ˇ Cost saving resulting from buying instead of manufacturing items, which involves largecapital ī‚ˇ Ability to obtain large-quantity requirements from manyvendors ī‚ˇ Ability to deal with seasonal variations in supply with the help ofvendors ī‚ˇ Lead time for purchase order is reduced since items originate from a singlesource ī‚ˇ Costs associated with dual inspection can be reduced ī‚ˇ Quicker payments to suppliers may actually mean reduced prices ī‚ˇ Availability of extra credit lines from vendors ī‚ˇ More productive time for material managers through proper ī‚ˇ Computerisation of processes frees up more time for managers to undertake more productive tasks and solve more problems ī‚ˇ Problems associated with late deliveries and rejection of items arereduced
  • 5. CONSTRUCTION MANAGEMENT Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 5 pertinent issues such as offering warranties for items purchased (g) The supplier’s capacity to deal with emergency requests for the supply ofitems (h) The level of expertise of supplier’s production staff (i) Information on the break-even points of manufacturingunits (j) Overall efficiency and reliability of supplier’s company (k) How innovative are the suppliers and their staff? (l) Effectiveness of the supplier's organisation and management including the ownership status and operational reliability of their machinery (m)The firm’s industrial relations with its unions, its past strikes or other work stoppages or slowdown problems and the ability of the firm to cope with them in the past (n) Innovativeness of the company and morale of staff (o) Availability of testing and inspection facilities Vendor Rating Vendors are rated based on certain criteria after they have been registered: Points to consider when rating vendors: Aims of Vendor Rating Vendor rating is carried out to determine who is providing quality products, at the right price, and with the capacity to deliver at the right time. Vendors may also develop their own rating system for each buyer. i. It saves time and money for the buyer and provides value for money due to the high-quality suppliers of high-quality products. (a) How far has the vendor accepted the specifications and inspection procedures in theirentirety? (b) Is quality control well developed, robust anddocumented? (c) How effective is the delivery system of the vendor? (d) How does the rejection level of the vendor under consideration compare with others? (e) Can you see a particular trend in rejection of thevendor? (f) Does the vendor’s price compare favourably with market prices? (g) Is the vendor’s system up to date? (h) How effective is the production planning system of thevendor? (i) Is there an effective Research and Development programme in place? (j) Does the vendor have good labour relations prevailing at theworkplace? (k) Does the vendor supply reputable global brands? (l) Has the vendor a good reputation in themarketplace? (m)Does the vendor have ISO 9000 certification?
  • 6. CONSTRUCTION MANAGEMENT Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 6 ii. It promotes good business practices by ensuring transparency and objectivity while eliminating negative practices such as nepotism, favouritism and corruption. iii. Vendor rating puts the company on a good standing with vendors and otherbusinesses. iv. It provides the opportunity to find the best available vendor using a wide range of assessment tools. v. It provides the right platform to appreciate vendors who supply quality items and improves the relationship between the buyer and the supplier. vi. Competition is ignited between suppliers to promote qualityimprovements. vii. It is the best method of fairly distributing businesses orcontracts. viii.Vendor rating provides a fairer platform to discriminate between classes of vendors when making decisions. ix. Vendors can learn about the effectiveness of their business models by comparing their performances with their competitors in terms of lead times, technical assistance, pricing, etc. Regular updating of the vendor rating system is required and vendors should be notified of any changes to the system. Vendor information should be kept confidential. Vendor Rating Methods Several methods exist but, generally, a vendor will be assigned a plus, neutral or negative rating, depending on the performance. The one with the most plus ratings is chosen as the best vendor to supply the items. Due to the large amount of data involved, computers are used to store rating data securely. Rating Methods include: (a) Weighted Pointed Plan (based on quality, price and delivery schedule) (b) Cost Ratio Method (based on identifiable purchasing and receiving costs to the value of shipments received from supplier) (c) Eavston’s Vendor Selection Method (selecting the ideal standards and diluting them till one or two vendors qualify) (d) Forced DecLion Matrix Method (using relative weights attributable to factors such as price, quality, lead time, service etc.) (e) Dowst's Key Questions Method (asking key questions about the vendor such as why, who, how etc., helps to build a vendor profile) (f) Spear Supplier Evaluation Method (macro level factors used for analysis include management, engineering, finance, material, manufacturing, quality and reliabilityetc.) (g) IBM Quality Rating (uses factors such as desired inspection costs to actual inspection costs) (h) Bell Quality Rating System (uses factors such as acceptable to rejectedmaterial)
  • 7. CONSTRUCTION MANAGEMENT Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 7 Parameters of Vendor Rating Table 10.1 shows factors used for assessing vendors. The factors have been classified into four different categories: Table 7.1: Parameters of vendor rating Learning Cycle and Training Aspects of tasks whose importance and relevance change with time include the following: (a) Defining the task (b) Finding solutions to tasks (c) Determination of the most suitable tool to carry outsolutions (d) Learning how to use tools to carry out solutions (e) Actual work on the job
  • 8. CONSTRUCTION MANAGEMENT Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 8 (f) Realising proficiency in the use of the tools (g) Discovering innovative ways of problem-solving (h) Performing smooth steady-state operations The learning cycle shows that, when tackling a task for the first time, it takes longer to find solutions or accomplish the task. After some time has elapsed, the person performing the task becomes more proficient at executing the task and the time taken reduces considerably. Figure 10.2 shows a graph of the time spent on tasks versus the number of times the tasks have been performed. Figure: 7.2 The Learning Curve Learning about material management follows a similar pattern to the curve. The beginning is usually slow but with experience all aspects begin to function more efficiently and shorter times are required to accomplish objectives. The curve is applicable to individual working at the department and can also be applied to the entire management department by summing up individual curves. Pitfalls of the Learning Curve A learning curve is expected to be applied not to items and actions but to ‘situations, attitudes, problems or negotiations’. A material manager’s duties include consideration of the following: (a) In what ways can the learning process reduce material costs? (b) In what ways can the learning process be used to negotiate prices withvendors? (c) At what point might a new recruit be allowed to perform tasks withoutsupervision? (d) How can one shorten the learning curve? (e) What is the time taken by new systems to attain steadystate?
  • 9. CONSTRUCTION MANAGEMENT Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 9 The learning curve shows that no system or person starts functioning at the optimum level from the beginning of employment. There is a natural learning process that follows the learning curve. The nature of the curve (steeper or shallower) depends on the nature of training policies deployed by an organisation. A steeper learning curve indicates a fast learning process. Conversely, a shallow curve means that a slow leaning process is occurring. Factors that affect the learning process include: i. Personality Traits: it is desirable to have individuals who are keen to learn new things and have a thirst for knowledge ii. The Atmosphere Prevailing in the Company or Department: the influence of the manager on the workers to motivate them for growth, the availability of a well-stocked library, general opportunities to grow with the company iii. Training Programmes: the availability of relevant training programmes shorten the learning curve of the three points mentioned above, training has been found to have more influence on the learning process of employees. The prevailing atmosphere also has a certain effect but not as much as the training aspect. This means that the company has the leeway in promoting these two avenues of learning because they fall under the company’s control, unlike the personality trait which is beyond its control. Training facilitates the shortening of the learning curve more than the other two factors, and managers should focus on providing the best available methods of training staff in order to improve productivity. Systematic Training Needs Analysis The materials manager is expected to: (a) Provide induction training to explain the company’s philosophy on objectives it wants to achieve (b) Provide explanations of all departmental rules and procedures (c) Provide regular and relevant training to all personnel (d) Frequently update training manuals to reflect new and emerging concepts or skillsets (e) Provide an up-to-date library stocked with journals and relevant magazines to enhance the learning experience Improving the materials manager’s ability involves: (a) Development of analytical and problem-solving ability, (b) Providing training on how to use new tools andtechniques (c) Learning from the experience of senior managementpersonnel (d) Focusing on his/her life philosophy (e) Importance of ethics for him/herself, the organisation and the nation’sdevelopment (f) Attending induction programmes to learn more about the organisation’s philosophy, objectives, motives, structure, procedures etc.
  • 10. CONSTRUCTION MANAGEMENT Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 10 Documenting the Processes, Codification and ISO 9000 Questions for Material Management Department (a) How should vendors be rated? (b) Have the purchase orders been typed without any mistakes? (c) Who should approve items to be purchased? (d) What are my accommodation and other entitlements during inspectiontrips? (e) Which location is most suitable for a specific item? (f) Where can I find this particular item? (g) Where can a vendor’s file be found? (h) Which items are fast-moving and which ones areslow-moving? (i) How can items be properly disposed of? (j) What are the procedures for coding new items? Companies need to document their processes and make copies available to all concerned parties to ensure everyone is on the same wavelength. The ISO 9000 standards help to ensure consistency in the products and services that companies produce. To assist in preparing a good document, items must be coded. Coding: The meaning of each code should be self-explanatory and made available to all relevant parties. Materials Management Computerisation Ways in which computerised systems can help the materials manager (a) Efficiency - The processes that save time when you are away from the management, end user, your own staff or the vendor, thus giving you more time to see vendors, end users, your own staff or management efficiently (b) Effectiveness - The processes that make the time with an end user, vendor, your own staff or management more productive (c) Communications - The processes that facilitate the easy transfer of information (usable ī‚ˇ Makes it easy to identify an item ī‚ˇ Avoids long and ambiguous names which are difficult toremember ī‚ˇ Promotes orderly arrangement of similar items ī‚ˇ Eliminates duplication ī‚ˇ Enables bulk ordering of items ī‚ˇ Reduces lead time ī‚ˇ Assists in simplifying and standardising items ī‚ˇ Makes it easy to computerise and transfer stocks betweencompanies
  • 11. CONSTRUCTION MANAGEMENT Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 11 information and not just data) between people throughout the entire organisationalstructure. Today's situation means that the organisation, vendor or customers will want and expect: ī‚ˇ Quick and accurate information about the status of variousactivities ī‚ˇ Quick and dependable answers to questions ī‚ˇ The honouring of commitments within the promisedtimeframe ī‚ˇ Frequent communication through follow-ups Benefits gained by Construction Manager by using computerised system ī‚ˇ Reduces the amount of paperwork ī‚ˇ Gains more face-to-face meeting time ī‚ˇ Promotes effective services ī‚ˇ Reduces time for procurement and delivery ī‚ˇ Provides current status of vendor and user requirements ī‚ˇ Provides instant and professionally prepared proposals andreports ī‚ˇ Provides instant review of all proceedings between the buyer andvendor ī‚ˇ Ensures information is intact even when a staff member in charge of certain aspects of management leaves the organisation ī‚ˇ Automatic generation of reports ī‚ˇ Provides the ability to detect fast-changing inventorytrends ī‚ˇ Can be used to perform inventory controlfunctions ī‚ˇ Enables easier exchange of information between buyers andvendors ī‚ˇ Integrates materials management data into corporate information systems ī‚ˇ Ability to provide forecasting functionality ī‚ˇ Can assist in re-designing layout and location of the store orsite ī‚ˇ Computerised systems are flexible and scalable to match changingtrends ī‚ˇ Can be used to assess the organisation’s strengths and weaknesses in terms of the performance of various departments
  • 12. CONSTRUCTION MANAGEMENT Copyrights Š CPD (Courses for Professional Development). All Rights Reserved. Unit 1059-V1 Page 12 Further Reading: īƒŧ P Gopalakrishnan, M Sundaresan (2018), Materials Management: An Integrated Approach īƒŧ Thomas V. Bonoma, Gerald Zaltman (2019), Organizational Buying Behavior