1. (5.5 points) Diagram their current ordering policy in a sawtooth diagram that clearly labels the order quantity, reorder point, cycle stock, average cycle stock, safety stock and lead time. Start time zero with 450 units on hand (so your first order will be placed at day 1). *Hint Cycle stock is a changing variable while average cycle stock is a constant. They are two different concepts. * NOTE Equations and calculations are tangible ways to implement a.