1. THE IMPORTANCE OF OPERATIONAL
PERFORMANCE OVER THE NEXT 5 YEARS
CHAIR:
ALEXANDER MADDAN, AGRIVERT LTD
PANEL:
CHARLES BANKS, UNIVERSITY OF SOUTHAMPTON
KYRONE DODD, TAMAR ENERGY
NEIL HUNTER, LOCAL GENERATION LTD
STEPHEN IVANEC, VIRIDOR
RAY NATTRASS, SHANKS WASTE MANAGEMENT
2. The importance of operational performance over the next five yearsKyrone Dodd, Head of Operations kyrone.dodd@tamar-energy.com
3. www.tamar-energy.com Copyright Tamar Energy Ltd 3
Background on Tamar Energy
๏ง Vision: to build a UK-wide network of AD facilities to
generate 100MW of renewable energy
๏ง REAโs โRenewable Energy Company 2014โ
๏ง Established in 2012. Today:
โ 4 x operational facilities (Basingstoke, Halstead, Holbeach,
Retford), combined capacity 8 MWe
โ 1 x facility in construction (Hoddesdon, 3 MWe)
โ 3 x development projects with planning consent (Greater
London, Somerset and Tyne and Wear)
โ Full pipeline of development projects in strategic locations
4. 4
www.tamar-energy.com
Copyright Tamar Energy Ltd
Maximising operational performance
Why?
๏งEnergy generation and revenue at stake
๏งOperational performance underpins:
โeconomic viability of projects
โconfidence in the sectorโs health and safety record
โquality of outputs and the professionalisationof standards across the industry
How?
๏งNot a straightforward, linear task: complex set of interrelated variables
๏งProcess-led, comprehensive approach to:
โproactive problem-solving
โpreventative action
โcontinuous monitoring
5. www.tamar-energy.com Copyright Tamar Energy Ltd 5
Operations - principles
๏ง Health and safety remains number 1 priority
๏ง Biology can be temperamental โ be patient
๏ง The whole processes has to work as one โ from
waste delivery to digestate disposal
๏ง Stable high power output is the goal
6. 6
www.tamar-energy.com
Copyright Tamar Energy Ltd
How? End to end approach
Fermenter 1
Fermenter 2
Digestatetreatment
Feeding hopper
feedstock
Pasteurisation
Biogas
CHP Engine
electricity
digestate
Boiler
heat
Blending feedstock
Loading rates
Continual monitoring
๏งStable inputs = stable outputs
Preventative action / proactive problem-solving
Long term solutions
7. 7
www.tamar-energy.com
Copyright Tamar Energy Ltd
How? Well-trained and qualified site teams
๏งDedicated roles
๏งOperation management
๏งAbility to evaluate performance and stability
๏งOn-going training
๏งSafety, safety, safety
Gold standard H&S certificate (National Skills Academy)
8. 8
www.tamar-energy.com
Copyright Tamar Energy Ltd
How? โThe 4 Msโ โmeasure, monitor, manage, maintain
๏งPrevent digester upset and potential system failures
๏งKey process parameters (e.g. ammonia concentration, VFAs, temperature, pH, TS/VS)
๏งFlash reports
๏งIdentify and correct source of problem before system fails
๏งRetfordAD facility lab