Submit Search
Upload
Activity Planning Scheduling 2-compressed (1).ppt
•
Download as PPT, PDF
•
0 likes
•
27 views
Z
ZeeShan312113
Follow
Software project management
Read less
Read more
Software
Report
Share
Report
Share
1 of 18
Download now
Recommended
Spm
Spm
Suresh Kumar
Activity planning
Activity planning
tumetr1
Ch06_Activity_planning.ppt
Ch06_Activity_planning.ppt
radhesham12
Pb602 operation management chapter 7
Pb602 operation management chapter 7
Akihisa Akimoto
Cpm n pert lecture 1
Cpm n pert lecture 1
adeelmunir158
PMP Project Management Basics Tutorial For Beginners
PMP Project Management Basics Tutorial For Beginners
IIMSE Edu
CPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource management
Amit Kumbar
PROJECT SCHEDULING
PROJECT SCHEDULING
Shahrukh Vahora
Recommended
Spm
Spm
Suresh Kumar
Activity planning
Activity planning
tumetr1
Ch06_Activity_planning.ppt
Ch06_Activity_planning.ppt
radhesham12
Pb602 operation management chapter 7
Pb602 operation management chapter 7
Akihisa Akimoto
Cpm n pert lecture 1
Cpm n pert lecture 1
adeelmunir158
PMP Project Management Basics Tutorial For Beginners
PMP Project Management Basics Tutorial For Beginners
IIMSE Edu
CPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource management
Amit Kumbar
PROJECT SCHEDULING
PROJECT SCHEDULING
Shahrukh Vahora
Critical Path Method
Critical Path Method
Ghanshyam Prakash
13 lecture project management
13 lecture project management
Ahmad Basim Hamza
Day 2 Revision
Day 2 Revision
Joyce Wong
Chapter 12(cpm pert)
Chapter 12(cpm pert)
Debanjan15
PM-Problems.pptx
PM-Problems.pptx
ShwetaMahdole
المحاضرة السادسة: إعداد جدول المشروع
المحاضرة السادسة: إعداد جدول المشروع
Egypt Scholars Inc.
Unit 3 PERT.pptx in related to supply chain
Unit 3 PERT.pptx in related to supply chain
tanishkagupta907
Cpm and pert
Cpm and pert
Vignesh Jayakumar
chapter 6.ppt
chapter 6.ppt
DejeneDay
Lec 9 & 10 chapter 5 project scheduling
Lec 9 & 10 chapter 5 project scheduling
Syed Hamza
Introduction to schedule management
Introduction to schedule management
Essam Lotffy, PMP®, CCP®
Extension of time Analysis
Extension of time Analysis
Farhan Moosa
L2_Project_Management.pdf
L2_Project_Management.pdf
JerryHung19
Critical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel Template
SHAZEBALIKHAN1
DEFINITION OF TERMS IN A NETWORK.pdf
DEFINITION OF TERMS IN A NETWORK.pdf
ssuserc9c6261
chapter 8 examples of networks.pdf
chapter 8 examples of networks.pdf
ssuserc9c6261
EXAMPLES OF THE USE OF DUMMYACTIVITY.pdf
EXAMPLES OF THE USE OF DUMMYACTIVITY.pdf
ssuserc9c6261
Scheduling, PERT, Critical Path Analysis.pdf
Scheduling, PERT, Critical Path Analysis.pdf
ssuserc9c6261
network techniquies.pdf
network techniquies.pdf
ssuserc9c6261
Activity, duration, ES, EF, LS, LF–.pdf
Activity, duration, ES, EF, LS, LF–.pdf
ssuserc9c6261
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStack
VICTOR MAESTRE RAMIREZ
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Christina Lin
More Related Content
Similar to Activity Planning Scheduling 2-compressed (1).ppt
Critical Path Method
Critical Path Method
Ghanshyam Prakash
13 lecture project management
13 lecture project management
Ahmad Basim Hamza
Day 2 Revision
Day 2 Revision
Joyce Wong
Chapter 12(cpm pert)
Chapter 12(cpm pert)
Debanjan15
PM-Problems.pptx
PM-Problems.pptx
ShwetaMahdole
المحاضرة السادسة: إعداد جدول المشروع
المحاضرة السادسة: إعداد جدول المشروع
Egypt Scholars Inc.
Unit 3 PERT.pptx in related to supply chain
Unit 3 PERT.pptx in related to supply chain
tanishkagupta907
Cpm and pert
Cpm and pert
Vignesh Jayakumar
chapter 6.ppt
chapter 6.ppt
DejeneDay
Lec 9 & 10 chapter 5 project scheduling
Lec 9 & 10 chapter 5 project scheduling
Syed Hamza
Introduction to schedule management
Introduction to schedule management
Essam Lotffy, PMP®, CCP®
Extension of time Analysis
Extension of time Analysis
Farhan Moosa
L2_Project_Management.pdf
L2_Project_Management.pdf
JerryHung19
Critical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel Template
SHAZEBALIKHAN1
DEFINITION OF TERMS IN A NETWORK.pdf
DEFINITION OF TERMS IN A NETWORK.pdf
ssuserc9c6261
chapter 8 examples of networks.pdf
chapter 8 examples of networks.pdf
ssuserc9c6261
EXAMPLES OF THE USE OF DUMMYACTIVITY.pdf
EXAMPLES OF THE USE OF DUMMYACTIVITY.pdf
ssuserc9c6261
Scheduling, PERT, Critical Path Analysis.pdf
Scheduling, PERT, Critical Path Analysis.pdf
ssuserc9c6261
network techniquies.pdf
network techniquies.pdf
ssuserc9c6261
Activity, duration, ES, EF, LS, LF–.pdf
Activity, duration, ES, EF, LS, LF–.pdf
ssuserc9c6261
Similar to Activity Planning Scheduling 2-compressed (1).ppt
(20)
Critical Path Method
Critical Path Method
13 lecture project management
13 lecture project management
Day 2 Revision
Day 2 Revision
Chapter 12(cpm pert)
Chapter 12(cpm pert)
PM-Problems.pptx
PM-Problems.pptx
المحاضرة السادسة: إعداد جدول المشروع
المحاضرة السادسة: إعداد جدول المشروع
Unit 3 PERT.pptx in related to supply chain
Unit 3 PERT.pptx in related to supply chain
Cpm and pert
Cpm and pert
chapter 6.ppt
chapter 6.ppt
Lec 9 & 10 chapter 5 project scheduling
Lec 9 & 10 chapter 5 project scheduling
Introduction to schedule management
Introduction to schedule management
Extension of time Analysis
Extension of time Analysis
L2_Project_Management.pdf
L2_Project_Management.pdf
Critical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel Template
DEFINITION OF TERMS IN A NETWORK.pdf
DEFINITION OF TERMS IN A NETWORK.pdf
chapter 8 examples of networks.pdf
chapter 8 examples of networks.pdf
EXAMPLES OF THE USE OF DUMMYACTIVITY.pdf
EXAMPLES OF THE USE OF DUMMYACTIVITY.pdf
Scheduling, PERT, Critical Path Analysis.pdf
Scheduling, PERT, Critical Path Analysis.pdf
network techniquies.pdf
network techniquies.pdf
Activity, duration, ES, EF, LS, LF–.pdf
Activity, duration, ES, EF, LS, LF–.pdf
Recently uploaded
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStack
VICTOR MAESTRE RAMIREZ
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Christina Lin
DNT_Corporate presentation know about us
DNT_Corporate presentation know about us
Dynamic Netsoft
The Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdf
Power Karaoke
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
BradBedford3
Asset Management Software - Infographic
Asset Management Software - Infographic
Hr365.us smith
Project Based Learning (A.I).pptx detail explanation
Project Based Learning (A.I).pptx detail explanation
kaushalgiri8080
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.com
Fatema Valibhai
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
MyIntelliSource, Inc.
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽❤️🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽❤️🧑🏻 89...
gurkirankumar98700
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
Tier1 app
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio, Inc.
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf
Wave PLM
Hand gesture recognition PROJECT PPT.pptx
Hand gesture recognition PROJECT PPT.pptx
bodapatigopi8531
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
MyIntelliSource, Inc.
The Essentials of Digital Experience Monitoring_ A Comprehensive Guide.pdf
The Essentials of Digital Experience Monitoring_ A Comprehensive Guide.pdf
kalichargn70th171
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
soniya singh
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
stazi3110
Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTV
shikhaohhpro
Recently uploaded
(20)
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStack
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
DNT_Corporate presentation know about us
DNT_Corporate presentation know about us
The Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdf
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Asset Management Software - Infographic
Asset Management Software - Infographic
Project Based Learning (A.I).pptx detail explanation
Project Based Learning (A.I).pptx detail explanation
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.com
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽❤️🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽❤️🧑🏻 89...
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf
Hand gesture recognition PROJECT PPT.pptx
Hand gesture recognition PROJECT PPT.pptx
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
The Essentials of Digital Experience Monitoring_ A Comprehensive Guide.pdf
The Essentials of Digital Experience Monitoring_ A Comprehensive Guide.pdf
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTV
Activity Planning Scheduling 2-compressed (1).ppt
1.
Software Project Management 6th Edition Chapter
6 Activity planning 1 ©The McGraw-Hill Companies, 2005
2.
Lagged activities Where there
is a fixed delay between activities e.g. seven days notice has to be given to users that a new release has been signed off and is to be installed 7days Install new release Acceptance testing 1day 20 days 2 ©The McGraw-Hill Companies, 2005
3.
Types of links
between activities Finish to start Software development Acceptance testing Start to start/ Finish to finish Test prototype 2 days 1 day Document Amendments 3 ©The McGraw-Hill Companies, 2005
4.
Types of links
between activities • Start to finish Operate temporary system Cutover to new system Acceptance test of new system 4 ©The McGraw-Hill Companies, 2005
5.
Start and finish
times Latest finish Earliest start activity Earliest finish Latest start • Activity ‘write report software’ • Earliest start (ES) • Earliest finish (EF) = ES + duration • Latest finish (LF) = latest task can be completed without affecting project end Latest start = LF - duration 5 ©The McGraw-Hill Companies, 2005
6.
Example • earliest start
= day • earliest finish = ? 5 • latest start = ? • latest finish = day 30 • duration = 10 days Float = LF - ES - duration What is it in this case? 6 ©The McGraw-Hill Companies, 2005
7.
Float Float = Latest
finish - Earliest start - Duration FLOAT activity LF ES Latest start 7 ©The McGraw-Hill Companies, 2005
8.
Labelling Convention ©The McGraw-Hill
Companies, 2005
9.
PERT vs CPM Do
B PERT CPM Do A Do D Do C Do B Do A Do D Do C 9 ©The McGraw-Hill Companies, 2005
10.
Earliest start date
– Rules of Forward pass • Earliest start date for the current activity = earliest finish date for the previous • When there is more than one previous activity, take the latest earliest finish • Note ‘day 7’ = end of work on day 7 EF = day 7 ES = day10 EF = day10 10 ©The McGraw-Hill Companies, 2005
11.
Latest start dates
– Rules for Backward pass • Start from the last activity • Latest finish (LF) for last activity = earliest finish (EF) • work backwards • Latest finish for current activity = Latest start for the following • More than one following activity - take the earliest LS • Latest start (LS) = LF for activity - duration 11 ©The McGraw-Hill Companies, 2005
12.
CRITICAL PATH METHOD 12 ©The
McGraw-Hill Companies, 2005
13.
CPM - Forward
Pass EF+1 = ES of next activity Take greater value + 1 ES+D-1=EF 13 ©The McGraw-Hill Companies, 2005
14.
CPM – Back
word Pass LF –D + 1 = LS LS-1 = LF of next activity Take lesser value - 1 14 ©The McGraw-Hill Companies, 2005
15.
CPM – Float
and Critical Path LS –ES = Float Critical Path B -> E -> I -> K 11+9+17+3 = 40 Float on CP = 0 Delaying activities on Critical path will delay the project 15 ©The McGraw-Hill Companies, 2005
16.
Critical path • Note
the path through network with zero floats • Critical path: any delay in an activity on this path will delay whole project • Can there be more than one critical path? • Can there be no critical path? • Sub-critical paths 16 ©The McGraw-Hill Companies, 2005
17.
Free and interfering
float A 0 7w B can be up to 3 days late and not affect any 7 9 2 2 other activity = free float B 4w D 1w E 10 10 2w 12 12 0 5 4 9 7 9 8 10 5 2 0 C 10w 0 0 10 10 0 B can be a further 2 days late – affects D but not the project end date = interfering float 17 ©The McGraw-Hill Companies, 2005
18.
Drawing up a
PERT diagram • No looping back is allowed – deal with iterations by hiding them within single activities • milestones – ‘activities’, such as the start and end of the project, which indicate transition points. They have zero duration. 18 ©The McGraw-Hill Companies, 2005