CONTENTS :
1) Equipment Qualification
2) Types
3) Validation Of Cone Blender
4) Validation Of Fluidized Bed Dryer
5) References
Equipment Qualification (EQ)
Equipment Qualification is a formal process that
provides documented evidence that an
instrument is fit for it intended purpose and kept
in safe of maintenance and calibration consistent
with its use.
EQ is mainly divided into four types;
1) Design Qualification
2) Installation Qualification
3) Operation Qualification
4) Performance Qualification
Equipment
Validation
Design
Qualification
(DQ)
Installation
Qualificatio
n (IQ)
Operational
Qualification
(OQ)
Performance
Qualification
(PQ)
Stages of qualification
Design qualification
Installation qualification
Operational qualification
Performance qualification Change control
Typical process flow of
solid dosage form
Addition of
raw
material
-active
excipients
Preble
bending
-high speed
mixer
granulator
Granulatin
g
- high
speed
mixer
granulator
Drying
-fluid bed
dryer
-tray dryer
Tableting
-high speed
rotary
Blending
-v-blender
Addition of
raw material
-lubricant
-
disintegrants
Sizing
-mill/sieve
Validation For Conical Blender
Validation of Dry Powder
Mixers
It is defined as documented act which
provide the high degree of the assurance that
Powder Mixer equipment actually leads to the
desired mixing or blending.
Why it is essential
The mixing of the API and excipients is
the critical step in the solid dosage form
preparations that affect the content uniformity
at great extent.
Types of the powder
blenders
• V cone blenders
• Double cone blenders
• Drum mixer
• Ribbon blenders
• Conical screw mixer
• Tumble blender
9
Variable and monitoring
Variable
• RPM
• Mixing time
• Mixing load
Monitoring
• Blend uniformity
10
Installation qualification(IQ)
Details of the Equipment:
• Equipment name, made by & model No. shall be noted
down.
• Location for the installation equipment shall be checked.
• Utilities required shall be listed down.
• Any deviation observed while following above procedure
should be informed for corrective action.
Installation Procedure:
• After checking all the specifications as mentioned in the
selection criteria, service engineer shall commission the
equipment.
• Authorized validation team shall carry out installation
checks. 11
Sr
no.
Description Specifications Method of
evaluation
Observation
1. Equipment type Check
visually
2. Capacity (L)
3. Dimensions H
L
W
Measure tape
4. Surface finish Check
visually
5. Driving motor Made by
RPM
Voltage
Phase
Check
visually
6. Gear box Made by
Type
Check
visually
7. Control panel &
buttons
Check
visually
Operational
qualification(OQ)
• After completions of successful installation
qualification, initiate the actual operation of to
ensure that machine is operating within
specification.
• Check the operation qualification parameters
against their specifications.
• Document the deviation details
• The Quality head and the department head shall
decide whether deviation is acceptable or not.
13
Sr no. Description Specifications Method of evaluation Observation
1. On/off
switch
Lift the switch to ON
position & ensure that
power supply gets ON &
drum/cone starts
rotating.
Lower the switch to OFF
position & ensure that
power supply gets OFF
2. RPM
Measure the actual
RPM using stop-watch
3. Gross
capacity
Fill the drum/cone
with potable water
using measuring
cylinder & record
Performance
qualification(PQ)
• Load the materials to be mixed in the mixer
• Start the mixer and rotate it for the time as
mentioned.
• After completion of mixing switch OFF the mixer
and separate out the drum.
• Collect the sample as per sampling procedure.
• Send the samples to Quality control dept. for
content uniformity, bulk density and sieve
analysis.
15
Sampling
Drum mixer Double cone blender V cone blender
Top
Middle
Bottom
Revalidation Criteria
• Location of the equipment is changed.
• There is change of spare/ parts that have a
direct effect on the performance of the
equipment
• At normal revalidation schedule.
17
Validation
of
Fluidized Bed
Dryer
Fixed Variable
(monitor)
Response
(Test)
Bowl change
Porosity of
filter bags
Bowl sieve
Inlet/exhaust air
temperature
Product temperature
Drying time
Air volume
Humidity of incoming air
Humidity of exhaust air
Particle size
distribution
Densities
Loss on drying
Assay
FBD control parameters
Installation Qualification(IQ)
Installation Procedure:
Authorized validation team shall carry out
installation.
Department Head of production, QA &
engineering shall evaluate installation report
Acceptance Criteria For Installation
Qualification:
The equipment shall fulfill the selection criteria &
its purpose of Application.
Name of the manufacturer & supplier shall be as
mentioned in the Purchase order
The manufacturer/supplier shall provide
complete equipment manual along with the
equipment
Revalidation Criteria:
The equipment shall be revalidated if;
 Location of the equipment is changed.
 There is change of spare/parts, major maintenance o
breakdown.
Operational Qualification (OQ)
Training record:
Before initiating OQ ensure that SOP for
Cleaning and operation of FBD is available.
• Purpose: To train the qualification team for
performing OQ
23
Procedure:
Initiate the actual operation of the FBD to
ensure that machine is operating within
specification.
Check the OQ parameters against their
specifications.
Observe the functioning of all controls
available on control panel
Record the observation
Perform and attach report of heat
distribution study as per ` Heat distribution
study procedure’
Acceptance criteria:
All operating inputs provided on the
equipment when tested shall-successfully
comply
-meet tolerance limit
The equipment should successfully perform
when operated as per SOP
 Critical gauges provided on the equipment---
calibrated
 The equipment when operated shall not
- produce abnormal sound
- show any discrepancy in its smooth
Performance Qualification(PQ)
To check Heat Distribution by placing 10
thermocouples in geometric pattern with the
FBD Shell and empty Product Container
without any load to ensure heat distribution
in the drying chamber
Heat distribution study will be performed at
65 ± 5°C for two hour after achieving the
temperature on the controlling sensors to
ensure proper heat distribution.
26
Procedure for Drying Efficiency:
After completion of OQ initiate the PQ of
FBD.
The effectiveness of drying will be qualified by
determining reduction of % moisture content
in drying process.
3 batches/ lots of any product will be taken
for PQ of FBD.
At least 2.0 gm of sample is sampled for %
MC check from the top, middle and bottom
and will be reported
In case of any deviation inform to
department head for necessary action
Document the deviation details
Deviation is acceptable or not will be decided
-if yes
-if not
Acceptance criteria:
The reduction in moisture content after drying
should be as per the specification.
 % RSD of LOD should not be more than 6 %
The equipment should produce intended
outputs with respect to quality & quantity
consistently
References :
1)http://www.hachlange.pt/countrysites/action_q/download%3Bdocume
nt/DOK_ID/14788116/type/pdf/lkz/PT/spkz/pt/TOKEN/Hd-
dpwCWfH3lq-8TDM8aiE315Z8/M/CliuUg
2) http://www.validationonline.net/Mixer.html
3) Berry I.R., and Nash R.A., ”Pharmaceutical Process validation” second
edition, revised and expanded; Marcel Dekker series; 83-110.
4) www.usvalidationservices.com
IQ-OQ-PQ-for-FBD.pptx

More Related Content

What's hot

Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
RavichandraNadagouda
 
Qualification of membrane filtration apparatus
Qualification of membrane filtration apparatusQualification of membrane filtration apparatus
Qualification of membrane filtration apparatus
PRAVADA
 

What's hot (20)

Qualification of laboratory equipments
Qualification of laboratory equipmentsQualification of laboratory equipments
Qualification of laboratory equipments
 
Quality by design (QbD) and process analytical technology (PAT)
Quality by design (QbD) and process analytical technology (PAT)Quality by design (QbD) and process analytical technology (PAT)
Quality by design (QbD) and process analytical technology (PAT)
 
Ipqc and fpqc test for suppositories
Ipqc and fpqc test for suppositoriesIpqc and fpqc test for suppositories
Ipqc and fpqc test for suppositories
 
Ampule filling and_sealing_machine.ppt1
Ampule filling and_sealing_machine.ppt1Ampule filling and_sealing_machine.ppt1
Ampule filling and_sealing_machine.ppt1
 
Qualification Of HPTLC
Qualification Of HPTLCQualification Of HPTLC
Qualification Of HPTLC
 
QUALIFICATION OF TAP DENSITY TESTER & DISINTEGRATION TESTER
QUALIFICATION OF TAP DENSITY TESTER & DISINTEGRATION TESTERQUALIFICATION OF TAP DENSITY TESTER & DISINTEGRATION TESTER
QUALIFICATION OF TAP DENSITY TESTER & DISINTEGRATION TESTER
 
Pharmaceutical validation of water system
Pharmaceutical validation of  water system Pharmaceutical validation of  water system
Pharmaceutical validation of water system
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTS
 
Ampule filling and_sealing_machine
Ampule filling and_sealing_machineAmpule filling and_sealing_machine
Ampule filling and_sealing_machine
 
Equipment qualification
Equipment qualificationEquipment qualification
Equipment qualification
 
Equipment Qualification
Equipment QualificationEquipment Qualification
Equipment Qualification
 
Qualification of membrane filtration apparatus
Qualification of membrane filtration apparatusQualification of membrane filtration apparatus
Qualification of membrane filtration apparatus
 
Validation utility system
Validation utility systemValidation utility system
Validation utility system
 
Validation utility system
Validation utility systemValidation utility system
Validation utility system
 
Veterinary master file (vmf)
Veterinary master file (vmf)Veterinary master file (vmf)
Veterinary master file (vmf)
 
Validation of mixing, granulation, lubrication, compression and coating
Validation of mixing, granulation, lubrication, compression and coatingValidation of mixing, granulation, lubrication, compression and coating
Validation of mixing, granulation, lubrication, compression and coating
 
Water system validation
Water system validationWater system validation
Water system validation
 
Process Validation of Liquid Orals
Process Validation of Liquid OralsProcess Validation of Liquid Orals
Process Validation of Liquid Orals
 
Validation of utility system (water system)
Validation of utility system (water system)Validation of utility system (water system)
Validation of utility system (water system)
 

Similar to IQ-OQ-PQ-for-FBD.pptx

3.ICH &WHO Guidelines for Calibration And Validation of Equipments.pptx
3.ICH &WHO Guidelines for Calibration And Validation of Equipments.pptx3.ICH &WHO Guidelines for Calibration And Validation of Equipments.pptx
3.ICH &WHO Guidelines for Calibration And Validation of Equipments.pptx
GayuMahe
 

Similar to IQ-OQ-PQ-for-FBD.pptx (20)

Validatn of fbd
Validatn of fbdValidatn of fbd
Validatn of fbd
 
Validation of dry_powder_mixer_ .
Validation of dry_powder_mixer_ .Validation of dry_powder_mixer_ .
Validation of dry_powder_mixer_ .
 
Qualification of manufacturing equipment.
Qualification of manufacturing equipment.Qualification of manufacturing equipment.
Qualification of manufacturing equipment.
 
Qualification of Manufacturing Equipments.
Qualification of Manufacturing Equipments. Qualification of Manufacturing Equipments.
Qualification of Manufacturing Equipments.
 
Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)
 
Powder mixer
Powder mixerPowder mixer
Powder mixer
 
Validation and qualification
Validation and qualificationValidation and qualification
Validation and qualification
 
Cleanroom Qualification
Cleanroom QualificationCleanroom Qualification
Cleanroom Qualification
 
solid tablet validation
solid tablet validationsolid tablet validation
solid tablet validation
 
Validation of equipments
Validation of equipmentsValidation of equipments
Validation of equipments
 
instrument validation
instrument validationinstrument validation
instrument validation
 
Heating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationHeating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC Qualification
 
Dr. ajmal nasir
Dr. ajmal nasirDr. ajmal nasir
Dr. ajmal nasir
 
Doc1 copy
Doc1   copyDoc1   copy
Doc1 copy
 
3.ICH &WHO Guidelines for Calibration And Validation of Equipments.pptx
3.ICH &WHO Guidelines for Calibration And Validation of Equipments.pptx3.ICH &WHO Guidelines for Calibration And Validation of Equipments.pptx
3.ICH &WHO Guidelines for Calibration And Validation of Equipments.pptx
 
Equipment validation
Equipment validationEquipment validation
Equipment validation
 
Validation
ValidationValidation
Validation
 
EQUIPMENT VALIDATION
EQUIPMENT VALIDATIONEQUIPMENT VALIDATION
EQUIPMENT VALIDATION
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
 

Recently uploaded

College Call Girls in Haridwar 9667172968 Short 4000 Night 10000 Best call gi...
College Call Girls in Haridwar 9667172968 Short 4000 Night 10000 Best call gi...College Call Girls in Haridwar 9667172968 Short 4000 Night 10000 Best call gi...
College Call Girls in Haridwar 9667172968 Short 4000 Night 10000 Best call gi...
perfect solution
 

Recently uploaded (20)

College Call Girls in Haridwar 9667172968 Short 4000 Night 10000 Best call gi...
College Call Girls in Haridwar 9667172968 Short 4000 Night 10000 Best call gi...College Call Girls in Haridwar 9667172968 Short 4000 Night 10000 Best call gi...
College Call Girls in Haridwar 9667172968 Short 4000 Night 10000 Best call gi...
 
Top Rated Bangalore Call Girls Richmond Circle ⟟ 9332606886 ⟟ Call Me For Ge...
Top Rated Bangalore Call Girls Richmond Circle ⟟  9332606886 ⟟ Call Me For Ge...Top Rated Bangalore Call Girls Richmond Circle ⟟  9332606886 ⟟ Call Me For Ge...
Top Rated Bangalore Call Girls Richmond Circle ⟟ 9332606886 ⟟ Call Me For Ge...
 
Call Girls Horamavu WhatsApp Number 7001035870 Meeting With Bangalore Escorts
Call Girls Horamavu WhatsApp Number 7001035870 Meeting With Bangalore EscortsCall Girls Horamavu WhatsApp Number 7001035870 Meeting With Bangalore Escorts
Call Girls Horamavu WhatsApp Number 7001035870 Meeting With Bangalore Escorts
 
Call Girls Cuttack Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Cuttack Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Cuttack Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Cuttack Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Coimbatore Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Coimbatore Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Coimbatore Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Coimbatore Just Call 9907093804 Top Class Call Girl Service Available
 
Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...
Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...
Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...
 
Best Rate (Patna ) Call Girls Patna ⟟ 8617370543 ⟟ High Class Call Girl In 5 ...
Best Rate (Patna ) Call Girls Patna ⟟ 8617370543 ⟟ High Class Call Girl In 5 ...Best Rate (Patna ) Call Girls Patna ⟟ 8617370543 ⟟ High Class Call Girl In 5 ...
Best Rate (Patna ) Call Girls Patna ⟟ 8617370543 ⟟ High Class Call Girl In 5 ...
 
Best Rate (Guwahati ) Call Girls Guwahati ⟟ 8617370543 ⟟ High Class Call Girl...
Best Rate (Guwahati ) Call Girls Guwahati ⟟ 8617370543 ⟟ High Class Call Girl...Best Rate (Guwahati ) Call Girls Guwahati ⟟ 8617370543 ⟟ High Class Call Girl...
Best Rate (Guwahati ) Call Girls Guwahati ⟟ 8617370543 ⟟ High Class Call Girl...
 
Top Rated Bangalore Call Girls Mg Road ⟟ 9332606886 ⟟ Call Me For Genuine S...
Top Rated Bangalore Call Girls Mg Road ⟟   9332606886 ⟟ Call Me For Genuine S...Top Rated Bangalore Call Girls Mg Road ⟟   9332606886 ⟟ Call Me For Genuine S...
Top Rated Bangalore Call Girls Mg Road ⟟ 9332606886 ⟟ Call Me For Genuine S...
 
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any TimeTop Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
 
Bangalore Call Girls Nelamangala Number 9332606886 Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 9332606886  Meetin With Bangalore Esc...Bangalore Call Girls Nelamangala Number 9332606886  Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 9332606886 Meetin With Bangalore Esc...
 
Call Girls Dehradun Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Dehradun Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Dehradun Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Dehradun Just Call 9907093804 Top Class Call Girl Service Available
 
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
 
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
 
Top Rated Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
Top Rated  Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...Top Rated  Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
Top Rated Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
 
Call Girls Haridwar Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Haridwar Just Call 8250077686 Top Class Call Girl Service AvailableCall Girls Haridwar Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Haridwar Just Call 8250077686 Top Class Call Girl Service Available
 
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
 
(Rocky) Jaipur Call Girl - 09521753030 Escorts Service 50% Off with Cash ON D...
(Rocky) Jaipur Call Girl - 09521753030 Escorts Service 50% Off with Cash ON D...(Rocky) Jaipur Call Girl - 09521753030 Escorts Service 50% Off with Cash ON D...
(Rocky) Jaipur Call Girl - 09521753030 Escorts Service 50% Off with Cash ON D...
 
VIP Call Girls Indore Kirti 💚😋 9256729539 🚀 Indore Escorts
VIP Call Girls Indore Kirti 💚😋  9256729539 🚀 Indore EscortsVIP Call Girls Indore Kirti 💚😋  9256729539 🚀 Indore Escorts
VIP Call Girls Indore Kirti 💚😋 9256729539 🚀 Indore Escorts
 

IQ-OQ-PQ-for-FBD.pptx

  • 1. A Seminar On Equipment Qualification By, B.Rakesh M.Pharm Pharmaceutics Priyadarshini College Of Pharmacy
  • 2. CONTENTS : 1) Equipment Qualification 2) Types 3) Validation Of Cone Blender 4) Validation Of Fluidized Bed Dryer 5) References
  • 3. Equipment Qualification (EQ) Equipment Qualification is a formal process that provides documented evidence that an instrument is fit for it intended purpose and kept in safe of maintenance and calibration consistent with its use. EQ is mainly divided into four types; 1) Design Qualification 2) Installation Qualification 3) Operation Qualification 4) Performance Qualification
  • 5. Stages of qualification Design qualification Installation qualification Operational qualification Performance qualification Change control
  • 6. Typical process flow of solid dosage form Addition of raw material -active excipients Preble bending -high speed mixer granulator Granulatin g - high speed mixer granulator Drying -fluid bed dryer -tray dryer Tableting -high speed rotary Blending -v-blender Addition of raw material -lubricant - disintegrants Sizing -mill/sieve
  • 8. Validation of Dry Powder Mixers It is defined as documented act which provide the high degree of the assurance that Powder Mixer equipment actually leads to the desired mixing or blending. Why it is essential The mixing of the API and excipients is the critical step in the solid dosage form preparations that affect the content uniformity at great extent.
  • 9. Types of the powder blenders • V cone blenders • Double cone blenders • Drum mixer • Ribbon blenders • Conical screw mixer • Tumble blender 9
  • 10. Variable and monitoring Variable • RPM • Mixing time • Mixing load Monitoring • Blend uniformity 10
  • 11. Installation qualification(IQ) Details of the Equipment: • Equipment name, made by & model No. shall be noted down. • Location for the installation equipment shall be checked. • Utilities required shall be listed down. • Any deviation observed while following above procedure should be informed for corrective action. Installation Procedure: • After checking all the specifications as mentioned in the selection criteria, service engineer shall commission the equipment. • Authorized validation team shall carry out installation checks. 11
  • 12. Sr no. Description Specifications Method of evaluation Observation 1. Equipment type Check visually 2. Capacity (L) 3. Dimensions H L W Measure tape 4. Surface finish Check visually 5. Driving motor Made by RPM Voltage Phase Check visually 6. Gear box Made by Type Check visually 7. Control panel & buttons Check visually
  • 13. Operational qualification(OQ) • After completions of successful installation qualification, initiate the actual operation of to ensure that machine is operating within specification. • Check the operation qualification parameters against their specifications. • Document the deviation details • The Quality head and the department head shall decide whether deviation is acceptable or not. 13
  • 14. Sr no. Description Specifications Method of evaluation Observation 1. On/off switch Lift the switch to ON position & ensure that power supply gets ON & drum/cone starts rotating. Lower the switch to OFF position & ensure that power supply gets OFF 2. RPM Measure the actual RPM using stop-watch 3. Gross capacity Fill the drum/cone with potable water using measuring cylinder & record
  • 15. Performance qualification(PQ) • Load the materials to be mixed in the mixer • Start the mixer and rotate it for the time as mentioned. • After completion of mixing switch OFF the mixer and separate out the drum. • Collect the sample as per sampling procedure. • Send the samples to Quality control dept. for content uniformity, bulk density and sieve analysis. 15
  • 16. Sampling Drum mixer Double cone blender V cone blender Top Middle Bottom
  • 17. Revalidation Criteria • Location of the equipment is changed. • There is change of spare/ parts that have a direct effect on the performance of the equipment • At normal revalidation schedule. 17
  • 19.
  • 20. Fixed Variable (monitor) Response (Test) Bowl change Porosity of filter bags Bowl sieve Inlet/exhaust air temperature Product temperature Drying time Air volume Humidity of incoming air Humidity of exhaust air Particle size distribution Densities Loss on drying Assay FBD control parameters
  • 21. Installation Qualification(IQ) Installation Procedure: Authorized validation team shall carry out installation. Department Head of production, QA & engineering shall evaluate installation report Acceptance Criteria For Installation Qualification: The equipment shall fulfill the selection criteria & its purpose of Application. Name of the manufacturer & supplier shall be as mentioned in the Purchase order The manufacturer/supplier shall provide complete equipment manual along with the equipment
  • 22. Revalidation Criteria: The equipment shall be revalidated if;  Location of the equipment is changed.  There is change of spare/parts, major maintenance o breakdown.
  • 23. Operational Qualification (OQ) Training record: Before initiating OQ ensure that SOP for Cleaning and operation of FBD is available. • Purpose: To train the qualification team for performing OQ 23
  • 24. Procedure: Initiate the actual operation of the FBD to ensure that machine is operating within specification. Check the OQ parameters against their specifications. Observe the functioning of all controls available on control panel Record the observation Perform and attach report of heat distribution study as per ` Heat distribution study procedure’
  • 25. Acceptance criteria: All operating inputs provided on the equipment when tested shall-successfully comply -meet tolerance limit The equipment should successfully perform when operated as per SOP  Critical gauges provided on the equipment--- calibrated  The equipment when operated shall not - produce abnormal sound - show any discrepancy in its smooth
  • 26. Performance Qualification(PQ) To check Heat Distribution by placing 10 thermocouples in geometric pattern with the FBD Shell and empty Product Container without any load to ensure heat distribution in the drying chamber Heat distribution study will be performed at 65 ± 5°C for two hour after achieving the temperature on the controlling sensors to ensure proper heat distribution. 26
  • 27. Procedure for Drying Efficiency: After completion of OQ initiate the PQ of FBD. The effectiveness of drying will be qualified by determining reduction of % moisture content in drying process. 3 batches/ lots of any product will be taken for PQ of FBD. At least 2.0 gm of sample is sampled for % MC check from the top, middle and bottom and will be reported
  • 28. In case of any deviation inform to department head for necessary action Document the deviation details Deviation is acceptable or not will be decided -if yes -if not
  • 29. Acceptance criteria: The reduction in moisture content after drying should be as per the specification.  % RSD of LOD should not be more than 6 % The equipment should produce intended outputs with respect to quality & quantity consistently
  • 30. References : 1)http://www.hachlange.pt/countrysites/action_q/download%3Bdocume nt/DOK_ID/14788116/type/pdf/lkz/PT/spkz/pt/TOKEN/Hd- dpwCWfH3lq-8TDM8aiE315Z8/M/CliuUg 2) http://www.validationonline.net/Mixer.html 3) Berry I.R., and Nash R.A., ”Pharmaceutical Process validation” second edition, revised and expanded; Marcel Dekker series; 83-110. 4) www.usvalidationservices.com