2. What is Estimate?
An estimate is the anticipated or probable cost of a
work and is usually prepared before the construction
is taken up..
Preliminary or
(Approximate)
Estimate
Detailed
Estimate
Types of Estimate
3. `Purpose of Estimation
To find out probable cost.
To know the budget.
To know the time required.
To obtain technical sanctions.
Helping in making tenders.
To control the expenditure.
5. `
Introduction
Paint are thin coating useful to surface in a liquid form.
Paint have many uses-
Protection of surface
Sunlight dampness
Dust
Weathering etc….
Paint can change the interiors by the use of colour, light or darkness
6. `Process to calculate
Calculate height & width of all walls. And get sq. footage area.
Room to be painted
LxBxH
20’x20’x10’
7. Choose the type of paint and colour that you like , each paint
say the label and sq. Feet you expect to cover .
asian paints
8. List of what we need , like- rollers, brushes, tape, drop cloth and drip
pans
Roller
Drop cloth
Drip pan
Brushes
Tape
9. Finally the estimation of the total paint and supplies of the
room
S.NO Product Quantity Rate/Unit Amount(Rs)
1. Paint Tin 2 Tins Rs 250 250x2=500
2. Brushes 2 In numbers Rs 50 50x2=100
3. Paint bucket 2 Rs 2500 2500x2=5000
4. Tape 3 Rs 50 50x3=150
5. Drop cloth 3 Rs 20 20x3=60
6. Extra Cost Rs 5000 5000
7. Labour Cost 4 Days Rs 500/ Day
Total =
500x4=2000
12810