1. REFERENCE – PROJECTS
№ Project, Location Employer Date
1 Mounting and installation works for additional diesel generators for
each unit of single consumers – according to measure 31,321
- NPP " Kozloduy"
Framatome ANP Gmbh –
Germany
04.03.2004
2 Dismantling of BAZTV of the third block , II stage and fourth
block of " Kozloduy NPP "
Kozloduy NPP 06.02.2004
3 Manufacture, delivery and installation of steelstructures for the
unloading of concentrate
- Pirdop
„Umicore Med” 25.10.03 до
15.03.04
4 Construction of heat exchange station for heating of consumers
from BU Kozloduy 5 & 6
Kozloduy NPP 06.12.03 до
06.02.04
5 Reconstruction and restoration of the trestle , overloaded junction 5
and 6 to the project zone 150 for unloading and storage of copper
concentrates.
„Umicore Med” 05.04.2004
6 Construction of water supply to the square . " Mladenovo " g . Lom
- 2nd stage
Municipality “Lom” 28.07.2004
7 CMP project " Temple " Assumption " g . Lom" Beautiful Bulgaria
project.
Municipality “Lom” 8.10.2004
8 Engineering for energy saving measures at the site " Kindergarten "
Little Red Riding Hood " - Lom. "
Municipality “Lom” 06.08.2004
9 Water-supply system. Staliyska neighborhood Stage III Municipality “Lom” 08.09.2004
10 Construction works on the construction ofa staircase and a partition
wall to the building of the Bank DSK- Kozloduy, part design and
construction
„Eco Invest Holding” 23.09.2004
11 Installing the filter ventilation system- Measure 26391 ‘Framatome ANP Gmbh 2003-2005
12 Seismic strengthening ofair ducts and suspended ceilings in the
area of 2-12 axes cross EETU , premises of the MCR , ECR , SPCs
and NR elevation of 9.60 Units 3 and 4 .
Kozloduy NPP 31.05.2004
13 Implementation of engineering service project " Building of the
kindergarten " in . Bardarski Geran - energy audit
Kozloduy NPP 07.12.2004
14 Reconstruction of the systemblowdown PG Units 5 and 6 part
Hermetic
Kozloduy NPP 12.01.2005
15 Order : Making ceilings of rooms C- 509 and C -510 in IAS SC -3;
EP2
Kozloduy NPP 01.02.2005
16 Engineering EPC project " Kindergarten" Nightingale "in the city .
Krivodol.
Община Криводол 29.04.2005
17 "Replacing sections of pipeline makeup of the spray pools " Kozloduy NPP 22.06.05
18 Repair Building Municipal Administration - Lom Municipality “Lom” 28.07.05
19 Design, manufacturing , testing , assembly, completion and
commissioning of objects of Lot 1 ; Sub- projects / Energy
Efficiency Measures
Министерство на
енергетиката и
енергийните ресурси на
Република България
16.08.05
20 " Engineering for energy-saving measures with a guaranteed
outcome of a project " Kindergarten " Zdravts " Harlets Kozloduy
Municipality
Municipality “Kozloduy” 02.09.2005
21 Perform electrical installation activities associated with equipment
of SKU in the project " Heat exchange station for heating of
consumers of Kozloduy from BU on 5th and 6th block
Kozloduy NPP 22.06.2005
22 CMP project : "Repair of the roof waterproofing of CPS- 4 "
Kozloduy
ET " Slaveyko Maev -
ISOLA -RM "
2005
23 "Improving the seismic stability of the supporting structures of " Atomenergoremont " EAD 28.04.2006
2. buildings EP2 ", " NPP Kozloduy"
24 Construction of heating plant based on woody biomass and connect
to warm transmission network in the town . Bansko
" Bul Eco Energy " LTD 08.05.2006
25 Contract for design and construction of a facility for secondary
purification of process gases in Pirdop
" Cumerio Med " JSC 11.05.2006
26 Replacing windows, partial repairs and additional thermal
insulation of facades subject : COF " HEALTH " - city . Bankya
Rehabilitation hospital"
HEALTH" EAD
06.11.2006
27 Repair works on the subject : Professional School of Electrical and
Automation Sofia
Ministry of Labour and
Social Policy
2006
28 Technical project external power supply sewerage ; Coordination of
existing external power project on water supply ; Technical project
part Road Construction and Development of technical project part
Electro
" Construction Aplikeyshan
KonAp " Ltd.
2007
29 Engineering to reduce energy costs with a guaranteed result object
industrial systems owned by " Pirin Tex" LTD
" Pirin Tex" LTD 30.03.2007
30 Ground axial lighting of taxiways for Sofia Airport Project - Lot B1 " Strabag International"
GmbH
10.5.2007
31 Delivery, installation and commissioning of diesel - generator
MitsubishiAG, including architectural works in the formation of
the space object: COF " HEALTH " - city . Bankya
Rehabilitation hospital"
HEALTH" EAD
25.04.2007
32 Engineering EPC and repair and restoration works of the building
of the school" Prof. . Zlatarov " -gr.Godech
Municipality Godech 23.05.2007
33 Delivery, installation and commissioning of the electrical
installation of the site: " APARTMENT AND HOTEL COMPLEX
" , located in the PI 65231.919.51 / 150 sketch N 569 / 27.12.2005g
. In the " Gyurovi gardens " of common land . Samokov sub : Body
N 4 "
" Installation " EAD - Sofia -
Pernik branch
14.06.2007
34 Tripartite agreement between the SCC of Bulgaria, the Ministry of
Justice and "Enemona " AD for the transfer of rights and
obligations. SCC RB with the consent of " Enemona" AD
transferred to the Ministry of Justice all of its rights and obligations
outstanding undera contract concluded №5 of 13.06.2001g . and
signed Annex №1 / 27.11.2001 . , Annex№2 / 01.12.2002g . ,
Annex №3 / 09.12.2003g . , Annex №4 / 16.12.2004g . , Annex №5
/ 18.12.2006g . Implementation of works on the project: "
Reconstruction of the Courthouse - c. Sofia "
Ministry of Justice (Supreme
Court of Cassation of the
Republic of Bulgaria )
13.06.2007
35 Engineering with a guaranteed outcome of a building used for the
needs of the school" Sv. Sv. Cyril and Methodius" -gr.Strelcha ,
bul. " Bulgaria " №69
Municipality Strelcha 20.06.2007
36 Contract for Mechanical -tech part "Reconstruction of Tablet
workshop № 2 "
" Balkanpharma Dupnitsa "
EAD
26.06.2007
37 Reconstruction of fuel systemAggregate continuous galvanizing (
ANGP ) - PTP ST
" Kremikovtzi" JSC 05.07.2007
38 Engineering (design and construction)to build - an extension of the
platform to the southwest ,including the continuation of the
existing taxiway "J" in the section of the platform to the anti-icing
playground west, including the installation of a light systemand
taxiway De-icing platforms from the west to the existing taxiway
"N", togetherwith the accompanying infrastructure , demolition of
the old taxiway "D" and implement pre-asphalted way "N"
"GBS - Infrastructure
Construction " AD
13.07.2007
3. 39 Electrical installation work site " rolling mill with oven in " Steel
Industry " Jsc. - Pernik "
" Installation " EAD - Sofia -
Pernik branch
28.05.2007
40 Execution of construction works on the project: " Substation "
STOLNIK " - rehabilitation of 220 kV switchyard "
" NEC " EAD 06.06.2007
41 Engineering gasification buildings owned by " Bulgarian Posts" /
Position 1 - RPS Petrich, Kyustendil PS 2 , PS 4 Kyustendil "
" Bulgarian Posts" 15.11.2007
42 Renovation works on the building on the street . "Prof . Giovanni
Gorini " №2, jk Geometry - c. Sofia the project " Demonstration
Renovation of many family residential buildings "
United Nations
Development Programme
27.11.2007
43 CMP building project " Gas Regulating and supply point - town .
Gotse Delchev.
"Enemona Utilities" AD 30.11.2007
44 Extension of the Sofia metro , subsite " Metro tunnel section 13 and
MC 12 and MC 13 km . 14 + 650 to km . 15 + 444 840 " - part
Electro
" Start Engineering" JSC 02.04.2008
45 Construction works on the project " Reconstruction of hostel"
Chavdar 1 "- g . Sofia
Executive Agency " Social
Activities of the Ministry of
Defence "
12.11.2008
46 Engineering, design and implementation , including design and
construction of facilities , design,reconstruction,repair and
upgrading of warehouses owned by the State Agency "State
Reserve and War-time Stocks " in accordance with the
requirements of the European and Bulgarian legislation. Sub : Grain
bases Krivodol and Altimir , Mixed base Lom and Botevgrad
Medical bases and Troyan Granary Granary city of Shumen city .
Parvomai
" Enstroy " DZZD 27.11.2008
47 CMP project : " Multilevel shop on the street . " Gladstone "№34,
kv.331 UPI III - 7A, Main City Centre - G6 - I Part : Part : External
power . Power - power . Transformer private assembly , electrical .
Power MV cables - 10 kV . "
" PSG " JSC 23.03.2009
48 Order for: " Construction of the cabling of the conference room №3
Ground and download computer cables and pom.30 31 Basement 1
of the Courthouse ."
Supreme Court of the
Republic of Bulgaria
02.04.2009
49 Execution of works , delivery of materials and equipment to build
the project: " Construction of Control and studio complex in
NRTTS 1 - BNT " .
Bulgarian national television 28.08.2009
50 CMP project " Anesthesiology and Intensive lecheniev Surgical
Unit of the Hospital" Rahila Angelova " AD Pernik.
Hospital " Rahila Angelova
" JSC
05.10.2009
51 Construction of a new cycle flow technology ( CPA ) for transport
of overburden from mine "Asar" to " West Dump " with capacity
5000 t / h
" Asarel Medet" 29.09.2009
52 Construction of low voltage systems according to designs and
specifications in sub Courthouse in the town . Sofia
" TELETEK " Ltd. 19.10.2009
53 Implementation of works on the project: " Replacement of the
underground part of the ducts spetsventilatsiite B1 and B2
connecting the reactor hall of the ventilation center of IRT - 2000 "
" INRNE BAS " 14.01.2010
54 Biosecurity project Mincho Popov - Novi Han town . Novi han SE " RAW " 21.01.2010
55 Emergency repair the roof of the building №6 in 44,510 - unit Sofia "Department of Defense" 2011
56 Reconstruction , replacement and modernization of installation-
power / high voltage , grounding and malniotvodna , weak / and
expansion of fire in the building of the pre- university center at the
"Medical Faculty at the
Medical University of Sofia"
2011
4. Medical Faculty at the Medical University of Sofia
57 Construction of perimeter lighting of the northern territory of "
Chelopech Mining " EAD "
" Chelopech Mining " EAD" 2011
58 Lot №1: Reconstruction of Kindergarten "Edelweiss" -rayon Trakia
Plovdiv
Municipality of Plovdiv 2011
59 Lot №2: Overhaul of roof of NU " K.Nektariev " and school "
N.Gerov " Incipient course - East region , Plovdiv
Municipality of Plovdiv 2011
60 Lot №4: Overhaul of 33 nursery - old wing - East region , Plovdiv Municipality of Plovdiv 2011
61 Lot №5: Overhaul stock food in the nursery 12 South region ,
Plovdiv
Municipality of Plovdiv 2011
62 " Thermal insulation of room " A- 020 - Tsimentizatsiya and
thermal insulation of the room behind the production hall building
APLC with insulation panels " with . New Inn"
SE " RAW " 2011
63 Reconstruction of substation WECHOLD, 110 - kV - facility.
Renewal of the NE station.
TenneT TSO GmbH
E.ON Netz GmbH
2011
64 Implementation of structural , mechanical parts and pipelines on the
project Modernization of the ventilation systemof the shaft in the
North " Chelopech Mining" EAD "
" Chelopech Mining " EAD" 2011
65 Implementation of activities on installation of the tailings thickener
for the project " Modernization of the processing plant " in "
Chelopech Mining"
" Chelopech Mining " EAD" 2011
66 " Production and delivery platform for access to the engine fan and
service platforms " Chelopech Mining
" Chelopech Mining " EAD" 2011
67 Reconstruction of 400kV switchyard and repair their own account
in s / s Blagoevgrad
"Energy System Operator"
EAD
2012
68 Performing additional works -Rekonstruktsiya of transformer
station and boards HF building of PEC , including reconstruction of
the transformer station "MA - VI " and boards CH temporary
supply of PEC building construction
"Medical Faculty at the
Medical University of Sofia"
2012
69 South West Devon Waste Partnership Treatment Facility Project –
Plymouth, Devon. / Energy from Waste (EfW) facility- CHP Plant
– Plymouth City Council, Torbay Council, Devon County Council
and MVV O&M GmbH
MVV O&M GmbH
/SAR Elektronic GmbH
2013