Funding Infrastructure
by Public-Private Partnerships (PPP)
and Private Finance Initiatives (PFI):
Ghana
The Project Company (Ghana) Ltd
Tony Hagan BSc MSc CEng MICE
Contact:
TonyHagan@talk21.com
Issues Considered
• Public-Private Partnerships (PPP)
• Ghana: Economic and Social Infrastructure
• Ghana: PPP Opportunity Areas
• The Benefits of PPP Schemes
• The Differences between the Public and Private Sectors
• Delivering Infrastructure Projects for Ghana
• Financing PPP Schemes and Role of Banks
• Keys to Successful PPP Schemes
• The Project Company (Ghana) Ltd
Public-Private Partnerships (PPP)
What are PPPs?
Key feature of a PPP is that it involves a risk
sharing relationship between Public and
Private Promoters, based on a shared
commitment to achieve a desired public
policy outcome
What are the aims of a PPP?
• PPPs aim to introduce Private Sector Resources
and/or Expertise in order to help provide and
deliver Public sector Assets and Services
• The term PPP is used to describe a wide variety
of working arrangements from loose, informal
and strategic partnerships, to design, build,
finance and operate (DBFO) type service
contracts and formal joint venture companies
How are PPPs Structured?
What are the steps?
Project Preparation Service Provider Selection Contract Management
• Service Need
(Output specs over time)
2. Option Appraisal
(Report on options)
3. Business Case
(affrdblty./public interest)
4. Project Dev.
(team, PSC, plan)
5. Bid Preparation
(EOI/ Short listing, RFP)
6. Bid Evaluation
(prf. bidder, value for $)
7. Final Negotiation
(sign contract, finc. close)
8. Contract Mgmt.
(construction,
commissioning,
monitoring,
dispute settlement,
continuing
communications
Project/
Funding
Approval
Bid Doc
Approval
Project
Finalization
Review
What are the Steps in PPPs?
What characteristics have PPPs got?
Characterised by the Public Sector:
• Entering into contracts to acquire services, rather than procuring an
asset
• Specifying the service requirement on the basis of outputs, not
inputs
• Linking payments to the private sector to the level and quality
services actually delivered
• Often requiring a ‘whole life’ approach to the design, building and
operation of project assets
• Seeking optimal risk transfer to the private sector
• Requiring private partner to be responsible for raising some, or all,
of investment finance required
• Utilising diverse payment mechanisms, such as market revenue,
shadow tolls, capacity availability payments and so on
What are the ingredients of a good PPP?
Contractual arrangement should be based on:
• Substantial risk transfer
– allocation of risks to parties best able to
manage them
4. Quality of service & output specification
– focus on services associated with procured
assets
5. Performance-related rewards
– payment only if performance standards met
6. M&E plan over life of contract
– achievement of whole-life performance
PPPs and Value For Money (VFM)
• Key consideration in launching a PPP
programme should be ensuring Value For
Money (VFM)
• PPPs facilitate and create incentives for
On-time and On-budget Projects
• Achieving optimal allocation of risk is the
most important factor in structuring a PPP
What are the Pre-requisites?
Clear policy and legal frameworks
– Rationale for use of PPPs & legal powers to contract out services
– Dispute resolution procedures
– Oversight of fiscal costs
Oversight procedures providing checks & balances
1) Project preparation – business case & value-for-money
2) Provider selection – guidelines for pre-qualification & tender
3) Contract management – M&E, performance-linked
payments/penalties
Support functions
1) Information dissemination – data, networking, training
2) Guidance – model contracts, tools, case studies
3) Catalytic functions – political/advisory support, funding
Needed: Transparency, Competition, Monitoring,
Empowered Public
PPPs Need:
• Appropriate selection of projects ( a PPP
will never cure a weak project)
• A clear and stable legal framework
• Skilled and experienced people in the
public sector
• Experienced and creditworthy private
sector partners
What are the Benefits of PPPs?
• Risk transfer to private sector
– Commercial know-how & managerial skills
– Best-practice technologies & innovation
• Enhanced government accountability
• Entrepreneurship & local enterprise development
• Private finance
– Government payments can be leveraged by citizen user fees
and/or government cost savings
Result: Faster deployment of better services
How have PPPs developed elsewhere?
• New investment in public infrastructure via PPPs has
included:
- Airports
- Railways
- Roads
- Bridges
- Tunnels
- Environmental facilities (waste incinerators and water
treatment plants)
- Public Buildings (offices, schools, hospitals and prisons)
The PPP Outsourcing Path
Infrastructure Provision and ManagementInfrastructure Provision and Management
Identification
Interaction
CitizenCitizen CompanyCompany LandLand VehicleVehicle LegalLegal
TaxationTaxation
Procur.Procur.
OtherOther
PolicyPolicy
Legis.Legis.
Reg.Reg. Enfor.Enfor.
Electoral
Electoral
W
ebsite
ServicesServices
NaturalOutsourcingPath
Database
Judic.Judic.
Infrastructure Provision and ManagementInfrastructure Provision and Management
Identification
Interaction
CitizenCitizen CompanyCompany LandLand VehicleVehicle LegalLegal
TaxationTaxation
Procur.Procur.
OtherOther
PolicyPolicy
Legis.Legis.
Reg.Reg. Enfor.Enfor.
Electoral
Electoral
W
ebsite
ServicesServices
NaturalOutsourcingPathNaturalOutsourcingPath
Database
Judic.Judic.
Pattern of PPPs and Experience to Date
• PPPs sectorally concentrated – transport
(road, rail, estuarial crossings) as well as
Education and Health
• Other sectors (waste, environment, ports,
energy and social housing) yet to reach
‘critical mass’ for competitive market to
emerge
Experience to Date
• Most countries commence PPP in the
transport sector but develop into other
scetors as VFM is proven and PPP
expertise established
• PPP structures demonstrate considerable
national variations – PPP techniques
succeed because they can be adaptable
to specific financial, political and socio-
economic priorities of each country
Ghana: Economic and Social Sector Infrastructure
Agriculture and Infrastructure: Priority Policies and Targets, 2007 – 2009…1
• Agriculture modernization: The aim is to go beyond subsistence
agriculture and increase agricultural productivity
• Close the Infrastructure Gap:
– Roads; The target is to have more than 55% of the entire
national road network in good condition by 2009 up from
the current (2006) indicator level of 45%
– Energy; The target is (I) to install a total of about 300
Megawatts of additional capacity (approximately 17% of
installed capacity) in 2007; (II) To develop and construct
new power stations, (II) Explore alternative sources of
energy
– ICT; Increase teledensity by at least 27% annually, and
increase internet access by an annual rate of not less than
2%.
Education: Priority Policies and Targets, 2007 – 2009…2
• In Education the objectives are:
– increase access to and participation in education and training at
all levels
– bridge gender gaps in access to education in all districts
– improve the quality of teaching and learning;
– improve efficiency in the delivery of education services
– promote science and technology education at all levels with
particular attention to increased participation of girls.
Consequently, the target is to:
- achieve literacy rate (i.e. proportion of adult population able to
read and write) of about 68.20%;
- Gross Enrolment Rate (GER) at the Primary level of 97.80%, JSS of
80.40% and SSS of 31% by 2009.
- In doing this, effort will be made at achieving Gender Parity Index
(GPI) for gross enrolment of 1 at all levels (i.e. KG, Primary, JSS
and SSS)
Health: Priority Policies and Targets, 2007 – 2009…3
• Health
– Expand and sustain high coverage of quality interventions
and services, particularly malaria, infant & maternal
mortality, HIV/AIDS etc
– Target for HIV/AIDS: 50% ARVs coverage from the current
3.2%;
– HIV/AIDS prevalence reduced to 2.0% by 2009 from 3.2%
now
• Water supply: The target is to increase access to above 60% by
2009.
• Good Governance: The focus will be on
- Strengthening the process of decentralization
- Improve existing institutional capacities including
Parliament
- Fostering greater civic responsibility
Challenges to the attainment of the Overall Objective of the Medium Term
Development Framework (GPRS II)…1
• One of the key assumptions underlying the attainment of
the minimum GDP growth of 8% and per capita GDP of
US$686 over the medium term (by 2009) is increased
investment in the key sectors of the economy,
particularly in the area of infrastructure (i.e. energy,
roads and railways, ICT, etc)
• The recent analysis of the investment needs for the key
sectors of the economy indicates a total investment
requirements of about US$10,555.5 million over the
period 2007-2009, of which GOG revenue projections
amounts to US$3,115.7 million (about 30% of the
estimated requirement).
• This leaves an average financing gap of about
US$3,518.5 million per annum.
Challenges to the attainment of the Overall Objective of the
Medium Term Development Framework (GPRS II)…2
This gap is expected to be filled by:
• Resource mobilization through grant finance and budget
support.
• external loans on concessional terms with a minimum
grant element of 35%.
• Non-concessional loans to be limited by specific projects
in any specific year.
• The implication of this is that development partners have
to scale up resource support to Ghana which currently
stands at about US$1,306.25 million per annum.
Global Partnership for Development...1
• Strengthening the partnership between Ghana and her
Development Partners has been central to the formulation,
implementation and monitoring of the GPRS.
• The principles of the partnership are based on the Paris Declaration
and include:
• strengthening country’s ownership of the development
process,
• ensuring the alignment of development partner support on
national priority,
• ensuring harmonisation of donor procedures and country
systems
• and use information to improve decision making.
• ensuring mutual accountability in relation to resource flow
and results achieved through the implementation of national
strategy
Global Partnership for Development...2
• Within this framework GOG expect an increased in the
current level of donor support over the next 3 years.
• The GOG expect more loans on concessional terms with
a minimum grant element of 35% as against non-
concessional loans.
• The GOG expects more budget support instead of
projects loans which is difficult to coordinate and
manage. This will allow for integration of aid flows into
the planning, implementation, monitoring and evaluation
phases of the budget cycle.
Conclusions
• Achieving an accelerated growth, with employment creation
and poverty reduction, will require massive investment in
priority sectors of the economy.
• The country has come far with the help of its Development
Partners and fiscal prudence on the part of Government in the
achievement of some remarkable progress which makes the
future bright.
• There is the need to maintain the momentum of growth and
the achievement of the Millennium Development Goals.
• To do this concerted efforts must be made towards investing
in some key areas of the economy.
• This will require scaling up of resources on the part of
Government and its Development Partners to make it feasible.
Ghana: Economic Sector
Economic Sector Overview...1
• Well endowed with Natural Resources (gold, timber, industrial
diamonds, bauxite, manganese, fish, rubber, hydropower, petroleum,
silver, salt and limestone)
• Ghana has roughly twice the per capita output of the poorest countries
in West Africa
• Heavily dependent on international financial and technical assistance
• Gold and cocoa production, and individual remittances, are major
sources of foreign exchange
• The domestic economy continues to revolve around agriculture, which
accounts for about 35% of GDP and employs about 55% of the work
force, mainly small landholders
• Ghana signed a Millennium Challenge Corporation (MCC) Compact in
2006, which aims to assist in transforming Ghana's agricultural sector
Economic Sector Overview...2
• Ghana opted for debt relief under the Heavily Indebted Poor
Country (HIPC) program in 2002, and is also benefiting from the
Multilateral Debt Relief Initiative that took effect in 2006
• Thematic priorities under its current Growth and Poverty Reduction
Strategy (GPRS-II), which also provides the framework for
development partner assistance, are:
- Macroeconomic stability;
- Private sector competitiveness;
- Human resource development;
- Good governance and civic responsibility
• Sound macro-economic management along with high prices for gold
and cocoa helped sustain GDP growth in 2008
Economic Sector Overview...3
Industries:
• Mining
• Lumbering
• Light Manufacturing
• Aluminium Smelting
• Food Processing
• Cement
• Small Commercial Ship-Building
Economic Sector Infrastructure
• Energy and Bio-Energies (Power Plants, Hydro-
electric Plants, Networks and Renewable
Energies)
• Environment (Water Networks, sewage
Facilities, Sanitation and De-salination)
• Information and Communications Technologies
(Backbones, Regional Inter-connections..)
• Transport (Roads, Highways, Railways, Ports
and Airports)
Economic Sector Infrastructure: Energy and Bio-Energies
ELECTRICITY
Electricity - production: 8.204 billion kWh (2006 est.)
Electricity - consumption: 6.76 billion kWh (2006 est.)
Electricity - exports: 755 million kWh (2006 est.)
Electricity - imports: 629 million kWh (2006 est.)
WHY EXPORT 755 TO THEN IMPORT 629??????????????
PARTICULARLY AS PRODUCING MORE THAN COMSUME
WHY ARE ELECTRICITY CUTS SO PREVALENT??????????
Economic Sector Infrastructure: Energy and Bio-Energies
OIL
Oil - production: 7,571 bbl/day (2007 est.)
Oil - consumption: 49,300 bbl/day (2006 est.)
Oil - exports: 5,709 bbl/day (2005)
Oil - imports: 45,520 bbl/day (2005)
Oil - proved reserves: 15 million bbl (1 January 2008 est.)
CONSUME DAILY ABOUT 7 TIMES AS MUCH OIL AS PRODUCE DAILY
AND HAVE TO IMPORT MASSIVE AMOUNTS YET HAVE OIL (PROVED
RESERVES) OF 15 MILLION BBL???????????
Economic Sector Infrastructure: Energy and Bio-Energies
NATURAL GAS
Natural gas - production: 0 cu m (2007 est.)
Natural gas - consumption: 0 cu m (2007 est.)
Natural gas - exports: 0 cu m (2007 est.)
Natural gas - imports: 0 cu m (2007 est.)
Natural gas - proved reserves: 22.65 billion cu m (1 January 2008 est.)
MASSIVE AMOUNT OF NATURAL GAS RESERVES YET ZERO
CONSUMPTION AND PRODUCTION????????
Economic Sector Infrastructure: Energy and Bio-Energies
Comment
• Growth in electricity production averaged 4.2 percent a year between 1980 and 1996.
In 1998 electricity production was 6.206 billion kilowatt-hours (kWh), 99.9 percent of
which was from hydroelectric sources. In the same year, electricity consumption was
5.437 billion kWh and exports were 400 million kWh, while 65 kWh of electricity were
imported. Hydroelectricity is generated at the Akasombo and Kpong power plants,
which traditionally supply virtually all of the country's electricity needs, as well as
provide exports to Benin and Togo.
• Total dependence on hydroelectricity makes Ghana vulnerable to variations in
rainfall, and power shortages reached crisis-point in 1998. This has stiffened resolve
to provide alternative sources of electric power, including a recently built oil-and gas-
fired power station. There are also plans for a number of gas-fired plants, using
imported gas and gas from the Tano fields. The Tama oil refinery was being
expanded and prepared for privatization in 1997-99. The U.S. Export-Import Bank is
to provide guarantees to cover drilling in the Tano off-shore natural gas fields and
construction of pipelines, plus loan financing for operations and maintenance work.
Economic Sector Infrastructure: Environment
Environment - current issues:
• recurrent drought in north severely affects agricultural
activities;
• deforestation;
• overgrazing;
• soil erosion;
• poaching and habitat destruction threatens wildlife
populations;
• water pollution;
• inadequate supplies of potable water
Economic Sector Infrastructure: Information and Communication Technologies
Telephones - main lines in use: 376,500 (2007)
Telephones - mobile cellular: 7.604 million (2007)
Telephone system:
general assessment:
• outdated and unreliable fixed-line infrastructure heavily concentrated in
Accra; competition among multiple mobile-cellular providers has spurred
growth with subscribership about 35 per 100 persons and rising
domestic:
• primarily microwave radio relay;
• wireless local loop has been installed
Economic Sector Infrastructure: Information and Communication Technologies
international: country code - 233;
• landing point for the SAT-3/WASC fibre-optic submarine cable that provides
connectivity to Europe and Asia;
• satellite earth stations - 4 Intelsat (Atlantic Ocean);
• microwave radio relay link to Panaftel system connects Ghana to its
neighbours (2007)
Radio broadcast stations: AM 0, FM 86, shortwave 3 (2007)
Television broadcast stations: 7 (2007)
Internet country code: .gh
Internet hosts: 24,018 (2008)
Economic Sector Infrastructure: Transport...1
Airports: 11 (2008)
Airports - with paved runways:
• total: 7
over 3,047 m: 1
2,438 to 3,047 m: 1
1,524 to 2,437 m: 3
914 to 1,523 m: 2 (2008)
Airports - with unpaved runways:
• total: 4
914 to 1,523 m: 3
under 914 m: 1 (2008)
Pipelines:
• oil 5 km; refined products 309 km (2008)
Economic Sector Infrastructure: Transport...2
Railways:
• total: 953 km
narrow gauge: 953 km 1.067-m gauge (2006)
Roadways:
• total: 62,221 km
paved: 9,955 km
unpaved: 52,266 km (2006)
Waterways:
• 1,293 km
note: 168 km for launches and lighters on Volta, Ankobra, and Tano rivers; 1,125 km
of arterial and feeder waterways on Lake Volta (2008)
Merchant marine:
• total: 4
by type: petroleum tanker 1, refrigerated cargo 3
foreign-owned: 1 (Brazil 1) (2008)
Ports and terminals:
• Tema
Ghana National Transport Policy
Economic Sector Infrastructure: Transport
Comment
• There are 39,409 kilometres (24,490 miles) of roads, of which 11,653
kilometres (7,241 miles) were paved in 1997. In 1997 there was a 953-
kilometer (592-mile) railway network (currently undergoing major
rehabilitation) of narrow gauge. The railway connects Accra, Kumasi, and
Takoradi, the major mining areas, to the sea ports. The railway network also
provides passenger services from the interior of Ghana to the main sea
ports at Tema (near Accra) and Takoradi.
• The main waterways include the Volta, Ankobra, and Tano Rivers, which
provide 168 kilometers (104 miles) of year-round navigation, and Lake
Volta, which provides 1,125 kilometres (699 miles) of arterial and feeder
waterways. The main ports are at Takoradi and Tema. There were 12
airports in 1999, 6 of which had paved runways.
Ghana: Social Sector
Social Sector Infrastructure
• Health (Urban and Rural Hospitals)
• Education (Schools, High Schools and
Universities, Cultural centres, Libraries..)
• Social Housing
• Leisure and Sport (Stadiums..)
Social Sector Infrastructure: Health
Social Sector Infrastructure: Education
Social Sector Infrastructure: Social Housing
Social Sector Infrastructure: Leisure and Sport
Ghana: Economic and Social Stimulus Plan...1
This plan is suggesting aims to stimulate employment,
certain critical economic sectors, and government spending
in Ghana
•"You've got to look at the whole picture"
•Focus stimulus spending on infrastructure development
•Front-end investments for longer-term benefits
•Job creation and tax cuts in the country
•Stimulate vital sectors of the economy such as energy and
health care
•Make consumption easier/cheaper for everybody
•Infrastructure investments could help make the economy
and Ghanaian more competitive internationally.
Ghana: Economic and Social Stimulus Plan...2
The Implementation of the Stimulus Plan
•The stimulus plan again would again boast the country's
Infrastructure, including the highways;
•Need to modernize government buildings and other public
infrastructure;
•Need to provide clean water, flood control, and other environmental
investments; there would also be public transit and rail infrastructure
improvement.
•Local school districts would be increased to prevent educational
service cutbacks and also to help modernize higher education
programs
•Need to transform the Ghanaian energy by pumping money into the
sector to make it more efficient
•Need to repair public housing and make it affordable for the low
income earners
PPP Opportunity Areas
PPP Sector Highlights around the World
PPP Infrastructure Projects in Africa 1996-2006
Infrastructure Development in Africa…1
Infrastructure Development in Africa…2
Infrastructure Development in Africa…3
The Benefits of PPP Schemes
The Benefits of PPP Schemes
Opportunity Sectors in Ghana
PPP Opportunity Sectors in Ghana
•
Concessive and Non-Concessive PPPs
Ghana: Possible Infrastructure Sectors for PPP
Infrastructure Meets Business
Ghana: Possible Infrastructure Sectors for PPP
Asset Procurement Options under PPP
The Differences between
The Public and Private Sectors
Differences between the Public Sector and
Private Sector
PPPs and PFI
Delivering Infrastructure
Projects to Ghana
Selecting an Appropriate PPP / PFI Model
Government / Public Sector Authority
and The Project Company (Ghana) Ltd
Parties Involved in PPP Projects
Key Phases of the PPP Project Process
Outline of the Procurement Process
Contractual Structure of The PPP
Contract Management Structure
Structure of Project Governance
Financing Infrastructure Projects
Stages of Project Selection
Financing PPP Schemes
Public versus Private Contract Costs
Public Sector Costs vs. Private Sector Costs
Breakdown of Total Costs
Different PFI Cost Structures
Comparing Costs of PPP and Government Debt Finance
Typical PPP / PFI Bidding Process Costs
Cashflows to Shareholders
Role of Banks in PPP....1
Role of Banks...2
Role of Banks...3
Role of Banks...4
Keys to Successful PPP Schemes
Key to Successful PPP Schemes...1
Key to Successful PPP Schemes...2
The Project Company (Ghana) Ltd
The Project Company (Ghana) Ltd
The Private Finance Initiative (PFI) Model
Decision Tree for PPP
The Project Company (Ghana) Ltd
PPP Structure
The Project Company (Ghana) Ltd
Services We Deliver
Our Company Aims
Our Business Profile
We Look Forward to Working with You
The Project Company (Ghana) Ltd
End of Presentation
Thank You

More Related Content

What's hot

Public Private Partnership Brochure May2012
Public Private Partnership Brochure May2012Public Private Partnership Brochure May2012
Public Private Partnership Brochure May2012Ezzedin Tago
 
State aid Modernisation and its impact on broadband
State aid Modernisation and its impact on broadbandState aid Modernisation and its impact on broadband
State aid Modernisation and its impact on broadbandgaalnorb
 
Citizens' budgets - Anna BELENCHUK, Russian Federation
Citizens' budgets - Anna BELENCHUK, Russian FederationCitizens' budgets - Anna BELENCHUK, Russian Federation
Citizens' budgets - Anna BELENCHUK, Russian FederationOECD Governance
 
Public Private partnership
Public Private partnershipPublic Private partnership
Public Private partnershipRayhan Mia
 
PPP for regional development - Dorothée ALLAIN-DUPRE, OECD Secretariat
PPP for regional development - Dorothée ALLAIN-DUPRE, OECD SecretariatPPP for regional development - Dorothée ALLAIN-DUPRE, OECD Secretariat
PPP for regional development - Dorothée ALLAIN-DUPRE, OECD SecretariatOECD Governance
 
Prioritisation and selection of public investment projects - Laurence CARTER...
 Prioritisation and selection of public investment projects - Laurence CARTER... Prioritisation and selection of public investment projects - Laurence CARTER...
Prioritisation and selection of public investment projects - Laurence CARTER...OECD Governance
 
New developments in the infrastructure space in OECD countries - Isabel RIAL,...
New developments in the infrastructure space in OECD countries - Isabel RIAL,...New developments in the infrastructure space in OECD countries - Isabel RIAL,...
New developments in the infrastructure space in OECD countries - Isabel RIAL,...OECD Governance
 
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTORPUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTORfarhad240669
 
Artba p3 policy recommendations
Artba p3 policy recommendations Artba p3 policy recommendations
Artba p3 policy recommendations artba
 
Strategic Technology Sourcing in the Public Sector
Strategic Technology Sourcing in the Public SectorStrategic Technology Sourcing in the Public Sector
Strategic Technology Sourcing in the Public SectorAlex Lal
 
PPP Bangladesh
PPP BangladeshPPP Bangladesh
PPP BangladeshBPSA
 
Mobilizing Private Sector Investment into GMS Infrastructure
Mobilizing Private Sector Investment into GMS InfrastructureMobilizing Private Sector Investment into GMS Infrastructure
Mobilizing Private Sector Investment into GMS InfrastructurePratish Halady
 
Private financial initiative (PFI)
Private financial initiative (PFI)Private financial initiative (PFI)
Private financial initiative (PFI)zyra Nia
 
Public Private-Partnerships Reference Guide
Public Private-Partnerships Reference GuidePublic Private-Partnerships Reference Guide
Public Private-Partnerships Reference GuideGiovanni Sandes
 
Public Private Partnership in Civil Engineering
Public Private Partnership in Civil EngineeringPublic Private Partnership in Civil Engineering
Public Private Partnership in Civil Engineeringvivatechijri
 
Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...
Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...
Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...IJMERJOURNAL
 

What's hot (20)

Public Private Partnership Brochure May2012
Public Private Partnership Brochure May2012Public Private Partnership Brochure May2012
Public Private Partnership Brochure May2012
 
State aid Modernisation and its impact on broadband
State aid Modernisation and its impact on broadbandState aid Modernisation and its impact on broadband
State aid Modernisation and its impact on broadband
 
Citizens' budgets - Anna BELENCHUK, Russian Federation
Citizens' budgets - Anna BELENCHUK, Russian FederationCitizens' budgets - Anna BELENCHUK, Russian Federation
Citizens' budgets - Anna BELENCHUK, Russian Federation
 
Public Private partnership
Public Private partnershipPublic Private partnership
Public Private partnership
 
Abt ppp
Abt pppAbt ppp
Abt ppp
 
PPP for regional development - Dorothée ALLAIN-DUPRE, OECD Secretariat
PPP for regional development - Dorothée ALLAIN-DUPRE, OECD SecretariatPPP for regional development - Dorothée ALLAIN-DUPRE, OECD Secretariat
PPP for regional development - Dorothée ALLAIN-DUPRE, OECD Secretariat
 
Prioritisation and selection of public investment projects - Laurence CARTER...
 Prioritisation and selection of public investment projects - Laurence CARTER... Prioritisation and selection of public investment projects - Laurence CARTER...
Prioritisation and selection of public investment projects - Laurence CARTER...
 
Bangladesh
BangladeshBangladesh
Bangladesh
 
New developments in the infrastructure space in OECD countries - Isabel RIAL,...
New developments in the infrastructure space in OECD countries - Isabel RIAL,...New developments in the infrastructure space in OECD countries - Isabel RIAL,...
New developments in the infrastructure space in OECD countries - Isabel RIAL,...
 
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTORPUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
 
Improving the efficiency of public procurement
Improving the efficiency of public procurementImproving the efficiency of public procurement
Improving the efficiency of public procurement
 
Artba p3 policy recommendations
Artba p3 policy recommendations Artba p3 policy recommendations
Artba p3 policy recommendations
 
Strategic Technology Sourcing in the Public Sector
Strategic Technology Sourcing in the Public SectorStrategic Technology Sourcing in the Public Sector
Strategic Technology Sourcing in the Public Sector
 
PPP Bangladesh
PPP BangladeshPPP Bangladesh
PPP Bangladesh
 
Introduction to the African Property Tax Initiative
Introduction to the African Property Tax InitiativeIntroduction to the African Property Tax Initiative
Introduction to the African Property Tax Initiative
 
Mobilizing Private Sector Investment into GMS Infrastructure
Mobilizing Private Sector Investment into GMS InfrastructureMobilizing Private Sector Investment into GMS Infrastructure
Mobilizing Private Sector Investment into GMS Infrastructure
 
Private financial initiative (PFI)
Private financial initiative (PFI)Private financial initiative (PFI)
Private financial initiative (PFI)
 
Public Private-Partnerships Reference Guide
Public Private-Partnerships Reference GuidePublic Private-Partnerships Reference Guide
Public Private-Partnerships Reference Guide
 
Public Private Partnership in Civil Engineering
Public Private Partnership in Civil EngineeringPublic Private Partnership in Civil Engineering
Public Private Partnership in Civil Engineering
 
Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...
Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...
Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...
 

Similar to Ghana: PPP and PFI

Private sector’s role in cities regeneration drive, by Noël Chalamanda
Private sector’s role in cities regeneration drive, by Noël ChalamandaPrivate sector’s role in cities regeneration drive, by Noël Chalamanda
Private sector’s role in cities regeneration drive, by Noël ChalamandaIFPRIMaSSP
 
170925 inca creating-collaborative-projects-bop-consulting
170925 inca creating-collaborative-projects-bop-consulting170925 inca creating-collaborative-projects-bop-consulting
170925 inca creating-collaborative-projects-bop-consultingJames Saunby
 
E govt Strategy in aspect of Cloud Computing
E govt Strategy in aspect of Cloud ComputingE govt Strategy in aspect of Cloud Computing
E govt Strategy in aspect of Cloud ComputingKhurram Shehzad
 
2019 ASEAN PPP Summit MPG Opening
2019 ASEAN PPP Summit MPG Opening2019 ASEAN PPP Summit MPG Opening
2019 ASEAN PPP Summit MPG OpeningLuca Bernardinetti
 
What is ppp and when to use ppp
What is ppp and when to use pppWhat is ppp and when to use ppp
What is ppp and when to use pppcec9
 
Towards an integrated governance framework for infrastructure - Ian Hawkeswor...
Towards an integrated governance framework for infrastructure - Ian Hawkeswor...Towards an integrated governance framework for infrastructure - Ian Hawkeswor...
Towards an integrated governance framework for infrastructure - Ian Hawkeswor...OECD Governance
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnershipDivyajit Kumar
 
The Role of Governance and Public Institutions in Fulfilling Vision 2030: Re...
The Role of Governance and Public Institutions in Fulfilling Vision 2030:  Re...The Role of Governance and Public Institutions in Fulfilling Vision 2030:  Re...
The Role of Governance and Public Institutions in Fulfilling Vision 2030: Re...SDGsPlus
 
Public Private Partnership: Solution to Electricity Transmission Challenges i...
Public Private Partnership: Solution to Electricity Transmission Challenges i...Public Private Partnership: Solution to Electricity Transmission Challenges i...
Public Private Partnership: Solution to Electricity Transmission Challenges i...Jide Usman
 
Digital engagement (content)
Digital engagement (content)Digital engagement (content)
Digital engagement (content)Adrian Hall
 
Alejandro saenzcore digital artifact (resource)_june 23 2015
Alejandro saenzcore digital artifact (resource)_june 23 2015Alejandro saenzcore digital artifact (resource)_june 23 2015
Alejandro saenzcore digital artifact (resource)_june 23 2015Alejandro S. Core
 
Saudi mega transport and infrastructure projects
Saudi mega transport and infrastructure projectsSaudi mega transport and infrastructure projects
Saudi mega transport and infrastructure projectsIbrahim Al-Hudhaif
 
Capital and infrastructure solution brochure Single FINAL
Capital and infrastructure solution brochure Single FINALCapital and infrastructure solution brochure Single FINAL
Capital and infrastructure solution brochure Single FINALChristopher Matthews
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private Partnershiprajeshrvth60
 
Papua New Guinea - Strategy & Project Outline (Oct 23 2008)
Papua New Guinea - Strategy & Project Outline (Oct 23 2008)Papua New Guinea - Strategy & Project Outline (Oct 23 2008)
Papua New Guinea - Strategy & Project Outline (Oct 23 2008)amuente
 
Public-Private Partnerships - Business & Legal Issues
Public-Private Partnerships - Business & Legal IssuesPublic-Private Partnerships - Business & Legal Issues
Public-Private Partnerships - Business & Legal IssuesLou Milrad
 
Getting public-private partnerships going: good practices from the MENA region
Getting public-private partnerships going: good practices from the MENA regionGetting public-private partnerships going: good practices from the MENA region
Getting public-private partnerships going: good practices from the MENA regionOECDglobal
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfSeshukumar53
 

Similar to Ghana: PPP and PFI (20)

Private sector’s role in cities regeneration drive, by Noël Chalamanda
Private sector’s role in cities regeneration drive, by Noël ChalamandaPrivate sector’s role in cities regeneration drive, by Noël Chalamanda
Private sector’s role in cities regeneration drive, by Noël Chalamanda
 
170925 inca creating-collaborative-projects-bop-consulting
170925 inca creating-collaborative-projects-bop-consulting170925 inca creating-collaborative-projects-bop-consulting
170925 inca creating-collaborative-projects-bop-consulting
 
E govt Strategy in aspect of Cloud Computing
E govt Strategy in aspect of Cloud ComputingE govt Strategy in aspect of Cloud Computing
E govt Strategy in aspect of Cloud Computing
 
2019 ASEAN PPP Summit MPG Opening
2019 ASEAN PPP Summit MPG Opening2019 ASEAN PPP Summit MPG Opening
2019 ASEAN PPP Summit MPG Opening
 
What is ppp and when to use ppp
What is ppp and when to use pppWhat is ppp and when to use ppp
What is ppp and when to use ppp
 
Towards an integrated governance framework for infrastructure - Ian Hawkeswor...
Towards an integrated governance framework for infrastructure - Ian Hawkeswor...Towards an integrated governance framework for infrastructure - Ian Hawkeswor...
Towards an integrated governance framework for infrastructure - Ian Hawkeswor...
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
 
Smart republic 2018
Smart republic 2018Smart republic 2018
Smart republic 2018
 
The Role of Governance and Public Institutions in Fulfilling Vision 2030: Re...
The Role of Governance and Public Institutions in Fulfilling Vision 2030:  Re...The Role of Governance and Public Institutions in Fulfilling Vision 2030:  Re...
The Role of Governance and Public Institutions in Fulfilling Vision 2030: Re...
 
Financing for Sustainable Development
Financing for Sustainable DevelopmentFinancing for Sustainable Development
Financing for Sustainable Development
 
Public Private Partnership: Solution to Electricity Transmission Challenges i...
Public Private Partnership: Solution to Electricity Transmission Challenges i...Public Private Partnership: Solution to Electricity Transmission Challenges i...
Public Private Partnership: Solution to Electricity Transmission Challenges i...
 
Digital engagement (content)
Digital engagement (content)Digital engagement (content)
Digital engagement (content)
 
Alejandro saenzcore digital artifact (resource)_june 23 2015
Alejandro saenzcore digital artifact (resource)_june 23 2015Alejandro saenzcore digital artifact (resource)_june 23 2015
Alejandro saenzcore digital artifact (resource)_june 23 2015
 
Saudi mega transport and infrastructure projects
Saudi mega transport and infrastructure projectsSaudi mega transport and infrastructure projects
Saudi mega transport and infrastructure projects
 
Capital and infrastructure solution brochure Single FINAL
Capital and infrastructure solution brochure Single FINALCapital and infrastructure solution brochure Single FINAL
Capital and infrastructure solution brochure Single FINAL
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private Partnership
 
Papua New Guinea - Strategy & Project Outline (Oct 23 2008)
Papua New Guinea - Strategy & Project Outline (Oct 23 2008)Papua New Guinea - Strategy & Project Outline (Oct 23 2008)
Papua New Guinea - Strategy & Project Outline (Oct 23 2008)
 
Public-Private Partnerships - Business & Legal Issues
Public-Private Partnerships - Business & Legal IssuesPublic-Private Partnerships - Business & Legal Issues
Public-Private Partnerships - Business & Legal Issues
 
Getting public-private partnerships going: good practices from the MENA region
Getting public-private partnerships going: good practices from the MENA regionGetting public-private partnerships going: good practices from the MENA region
Getting public-private partnerships going: good practices from the MENA region
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
 

Recently uploaded

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 

Recently uploaded (20)

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 

Ghana: PPP and PFI

  • 1. Funding Infrastructure by Public-Private Partnerships (PPP) and Private Finance Initiatives (PFI): Ghana The Project Company (Ghana) Ltd Tony Hagan BSc MSc CEng MICE
  • 3. Issues Considered • Public-Private Partnerships (PPP) • Ghana: Economic and Social Infrastructure • Ghana: PPP Opportunity Areas • The Benefits of PPP Schemes • The Differences between the Public and Private Sectors • Delivering Infrastructure Projects for Ghana • Financing PPP Schemes and Role of Banks • Keys to Successful PPP Schemes • The Project Company (Ghana) Ltd
  • 5. What are PPPs? Key feature of a PPP is that it involves a risk sharing relationship between Public and Private Promoters, based on a shared commitment to achieve a desired public policy outcome
  • 6. What are the aims of a PPP? • PPPs aim to introduce Private Sector Resources and/or Expertise in order to help provide and deliver Public sector Assets and Services • The term PPP is used to describe a wide variety of working arrangements from loose, informal and strategic partnerships, to design, build, finance and operate (DBFO) type service contracts and formal joint venture companies
  • 7. How are PPPs Structured?
  • 8. What are the steps? Project Preparation Service Provider Selection Contract Management • Service Need (Output specs over time) 2. Option Appraisal (Report on options) 3. Business Case (affrdblty./public interest) 4. Project Dev. (team, PSC, plan) 5. Bid Preparation (EOI/ Short listing, RFP) 6. Bid Evaluation (prf. bidder, value for $) 7. Final Negotiation (sign contract, finc. close) 8. Contract Mgmt. (construction, commissioning, monitoring, dispute settlement, continuing communications Project/ Funding Approval Bid Doc Approval Project Finalization Review What are the Steps in PPPs?
  • 9. What characteristics have PPPs got? Characterised by the Public Sector: • Entering into contracts to acquire services, rather than procuring an asset • Specifying the service requirement on the basis of outputs, not inputs • Linking payments to the private sector to the level and quality services actually delivered • Often requiring a ‘whole life’ approach to the design, building and operation of project assets • Seeking optimal risk transfer to the private sector • Requiring private partner to be responsible for raising some, or all, of investment finance required • Utilising diverse payment mechanisms, such as market revenue, shadow tolls, capacity availability payments and so on
  • 10. What are the ingredients of a good PPP? Contractual arrangement should be based on: • Substantial risk transfer – allocation of risks to parties best able to manage them 4. Quality of service & output specification – focus on services associated with procured assets 5. Performance-related rewards – payment only if performance standards met 6. M&E plan over life of contract – achievement of whole-life performance
  • 11. PPPs and Value For Money (VFM) • Key consideration in launching a PPP programme should be ensuring Value For Money (VFM) • PPPs facilitate and create incentives for On-time and On-budget Projects • Achieving optimal allocation of risk is the most important factor in structuring a PPP
  • 12. What are the Pre-requisites? Clear policy and legal frameworks – Rationale for use of PPPs & legal powers to contract out services – Dispute resolution procedures – Oversight of fiscal costs Oversight procedures providing checks & balances 1) Project preparation – business case & value-for-money 2) Provider selection – guidelines for pre-qualification & tender 3) Contract management – M&E, performance-linked payments/penalties Support functions 1) Information dissemination – data, networking, training 2) Guidance – model contracts, tools, case studies 3) Catalytic functions – political/advisory support, funding Needed: Transparency, Competition, Monitoring, Empowered Public
  • 13. PPPs Need: • Appropriate selection of projects ( a PPP will never cure a weak project) • A clear and stable legal framework • Skilled and experienced people in the public sector • Experienced and creditworthy private sector partners
  • 14. What are the Benefits of PPPs? • Risk transfer to private sector – Commercial know-how & managerial skills – Best-practice technologies & innovation • Enhanced government accountability • Entrepreneurship & local enterprise development • Private finance – Government payments can be leveraged by citizen user fees and/or government cost savings Result: Faster deployment of better services
  • 15. How have PPPs developed elsewhere? • New investment in public infrastructure via PPPs has included: - Airports - Railways - Roads - Bridges - Tunnels - Environmental facilities (waste incinerators and water treatment plants) - Public Buildings (offices, schools, hospitals and prisons)
  • 16. The PPP Outsourcing Path Infrastructure Provision and ManagementInfrastructure Provision and Management Identification Interaction CitizenCitizen CompanyCompany LandLand VehicleVehicle LegalLegal TaxationTaxation Procur.Procur. OtherOther PolicyPolicy Legis.Legis. Reg.Reg. Enfor.Enfor. Electoral Electoral W ebsite ServicesServices NaturalOutsourcingPath Database Judic.Judic. Infrastructure Provision and ManagementInfrastructure Provision and Management Identification Interaction CitizenCitizen CompanyCompany LandLand VehicleVehicle LegalLegal TaxationTaxation Procur.Procur. OtherOther PolicyPolicy Legis.Legis. Reg.Reg. Enfor.Enfor. Electoral Electoral W ebsite ServicesServices NaturalOutsourcingPathNaturalOutsourcingPath Database Judic.Judic.
  • 17. Pattern of PPPs and Experience to Date • PPPs sectorally concentrated – transport (road, rail, estuarial crossings) as well as Education and Health • Other sectors (waste, environment, ports, energy and social housing) yet to reach ‘critical mass’ for competitive market to emerge
  • 18. Experience to Date • Most countries commence PPP in the transport sector but develop into other scetors as VFM is proven and PPP expertise established • PPP structures demonstrate considerable national variations – PPP techniques succeed because they can be adaptable to specific financial, political and socio- economic priorities of each country
  • 19. Ghana: Economic and Social Sector Infrastructure
  • 20.
  • 21. Agriculture and Infrastructure: Priority Policies and Targets, 2007 – 2009…1 • Agriculture modernization: The aim is to go beyond subsistence agriculture and increase agricultural productivity • Close the Infrastructure Gap: – Roads; The target is to have more than 55% of the entire national road network in good condition by 2009 up from the current (2006) indicator level of 45% – Energy; The target is (I) to install a total of about 300 Megawatts of additional capacity (approximately 17% of installed capacity) in 2007; (II) To develop and construct new power stations, (II) Explore alternative sources of energy – ICT; Increase teledensity by at least 27% annually, and increase internet access by an annual rate of not less than 2%.
  • 22. Education: Priority Policies and Targets, 2007 – 2009…2 • In Education the objectives are: – increase access to and participation in education and training at all levels – bridge gender gaps in access to education in all districts – improve the quality of teaching and learning; – improve efficiency in the delivery of education services – promote science and technology education at all levels with particular attention to increased participation of girls. Consequently, the target is to: - achieve literacy rate (i.e. proportion of adult population able to read and write) of about 68.20%; - Gross Enrolment Rate (GER) at the Primary level of 97.80%, JSS of 80.40% and SSS of 31% by 2009. - In doing this, effort will be made at achieving Gender Parity Index (GPI) for gross enrolment of 1 at all levels (i.e. KG, Primary, JSS and SSS)
  • 23. Health: Priority Policies and Targets, 2007 – 2009…3 • Health – Expand and sustain high coverage of quality interventions and services, particularly malaria, infant & maternal mortality, HIV/AIDS etc – Target for HIV/AIDS: 50% ARVs coverage from the current 3.2%; – HIV/AIDS prevalence reduced to 2.0% by 2009 from 3.2% now • Water supply: The target is to increase access to above 60% by 2009. • Good Governance: The focus will be on - Strengthening the process of decentralization - Improve existing institutional capacities including Parliament - Fostering greater civic responsibility
  • 24. Challenges to the attainment of the Overall Objective of the Medium Term Development Framework (GPRS II)…1 • One of the key assumptions underlying the attainment of the minimum GDP growth of 8% and per capita GDP of US$686 over the medium term (by 2009) is increased investment in the key sectors of the economy, particularly in the area of infrastructure (i.e. energy, roads and railways, ICT, etc) • The recent analysis of the investment needs for the key sectors of the economy indicates a total investment requirements of about US$10,555.5 million over the period 2007-2009, of which GOG revenue projections amounts to US$3,115.7 million (about 30% of the estimated requirement). • This leaves an average financing gap of about US$3,518.5 million per annum.
  • 25. Challenges to the attainment of the Overall Objective of the Medium Term Development Framework (GPRS II)…2 This gap is expected to be filled by: • Resource mobilization through grant finance and budget support. • external loans on concessional terms with a minimum grant element of 35%. • Non-concessional loans to be limited by specific projects in any specific year. • The implication of this is that development partners have to scale up resource support to Ghana which currently stands at about US$1,306.25 million per annum.
  • 26. Global Partnership for Development...1 • Strengthening the partnership between Ghana and her Development Partners has been central to the formulation, implementation and monitoring of the GPRS. • The principles of the partnership are based on the Paris Declaration and include: • strengthening country’s ownership of the development process, • ensuring the alignment of development partner support on national priority, • ensuring harmonisation of donor procedures and country systems • and use information to improve decision making. • ensuring mutual accountability in relation to resource flow and results achieved through the implementation of national strategy
  • 27. Global Partnership for Development...2 • Within this framework GOG expect an increased in the current level of donor support over the next 3 years. • The GOG expect more loans on concessional terms with a minimum grant element of 35% as against non- concessional loans. • The GOG expects more budget support instead of projects loans which is difficult to coordinate and manage. This will allow for integration of aid flows into the planning, implementation, monitoring and evaluation phases of the budget cycle.
  • 28. Conclusions • Achieving an accelerated growth, with employment creation and poverty reduction, will require massive investment in priority sectors of the economy. • The country has come far with the help of its Development Partners and fiscal prudence on the part of Government in the achievement of some remarkable progress which makes the future bright. • There is the need to maintain the momentum of growth and the achievement of the Millennium Development Goals. • To do this concerted efforts must be made towards investing in some key areas of the economy. • This will require scaling up of resources on the part of Government and its Development Partners to make it feasible.
  • 30. Economic Sector Overview...1 • Well endowed with Natural Resources (gold, timber, industrial diamonds, bauxite, manganese, fish, rubber, hydropower, petroleum, silver, salt and limestone) • Ghana has roughly twice the per capita output of the poorest countries in West Africa • Heavily dependent on international financial and technical assistance • Gold and cocoa production, and individual remittances, are major sources of foreign exchange • The domestic economy continues to revolve around agriculture, which accounts for about 35% of GDP and employs about 55% of the work force, mainly small landholders • Ghana signed a Millennium Challenge Corporation (MCC) Compact in 2006, which aims to assist in transforming Ghana's agricultural sector
  • 31. Economic Sector Overview...2 • Ghana opted for debt relief under the Heavily Indebted Poor Country (HIPC) program in 2002, and is also benefiting from the Multilateral Debt Relief Initiative that took effect in 2006 • Thematic priorities under its current Growth and Poverty Reduction Strategy (GPRS-II), which also provides the framework for development partner assistance, are: - Macroeconomic stability; - Private sector competitiveness; - Human resource development; - Good governance and civic responsibility • Sound macro-economic management along with high prices for gold and cocoa helped sustain GDP growth in 2008
  • 32. Economic Sector Overview...3 Industries: • Mining • Lumbering • Light Manufacturing • Aluminium Smelting • Food Processing • Cement • Small Commercial Ship-Building
  • 33. Economic Sector Infrastructure • Energy and Bio-Energies (Power Plants, Hydro- electric Plants, Networks and Renewable Energies) • Environment (Water Networks, sewage Facilities, Sanitation and De-salination) • Information and Communications Technologies (Backbones, Regional Inter-connections..) • Transport (Roads, Highways, Railways, Ports and Airports)
  • 34. Economic Sector Infrastructure: Energy and Bio-Energies ELECTRICITY Electricity - production: 8.204 billion kWh (2006 est.) Electricity - consumption: 6.76 billion kWh (2006 est.) Electricity - exports: 755 million kWh (2006 est.) Electricity - imports: 629 million kWh (2006 est.) WHY EXPORT 755 TO THEN IMPORT 629?????????????? PARTICULARLY AS PRODUCING MORE THAN COMSUME WHY ARE ELECTRICITY CUTS SO PREVALENT??????????
  • 35. Economic Sector Infrastructure: Energy and Bio-Energies OIL Oil - production: 7,571 bbl/day (2007 est.) Oil - consumption: 49,300 bbl/day (2006 est.) Oil - exports: 5,709 bbl/day (2005) Oil - imports: 45,520 bbl/day (2005) Oil - proved reserves: 15 million bbl (1 January 2008 est.) CONSUME DAILY ABOUT 7 TIMES AS MUCH OIL AS PRODUCE DAILY AND HAVE TO IMPORT MASSIVE AMOUNTS YET HAVE OIL (PROVED RESERVES) OF 15 MILLION BBL???????????
  • 36. Economic Sector Infrastructure: Energy and Bio-Energies NATURAL GAS Natural gas - production: 0 cu m (2007 est.) Natural gas - consumption: 0 cu m (2007 est.) Natural gas - exports: 0 cu m (2007 est.) Natural gas - imports: 0 cu m (2007 est.) Natural gas - proved reserves: 22.65 billion cu m (1 January 2008 est.) MASSIVE AMOUNT OF NATURAL GAS RESERVES YET ZERO CONSUMPTION AND PRODUCTION????????
  • 37. Economic Sector Infrastructure: Energy and Bio-Energies Comment • Growth in electricity production averaged 4.2 percent a year between 1980 and 1996. In 1998 electricity production was 6.206 billion kilowatt-hours (kWh), 99.9 percent of which was from hydroelectric sources. In the same year, electricity consumption was 5.437 billion kWh and exports were 400 million kWh, while 65 kWh of electricity were imported. Hydroelectricity is generated at the Akasombo and Kpong power plants, which traditionally supply virtually all of the country's electricity needs, as well as provide exports to Benin and Togo. • Total dependence on hydroelectricity makes Ghana vulnerable to variations in rainfall, and power shortages reached crisis-point in 1998. This has stiffened resolve to provide alternative sources of electric power, including a recently built oil-and gas- fired power station. There are also plans for a number of gas-fired plants, using imported gas and gas from the Tano fields. The Tama oil refinery was being expanded and prepared for privatization in 1997-99. The U.S. Export-Import Bank is to provide guarantees to cover drilling in the Tano off-shore natural gas fields and construction of pipelines, plus loan financing for operations and maintenance work.
  • 38. Economic Sector Infrastructure: Environment Environment - current issues: • recurrent drought in north severely affects agricultural activities; • deforestation; • overgrazing; • soil erosion; • poaching and habitat destruction threatens wildlife populations; • water pollution; • inadequate supplies of potable water
  • 39. Economic Sector Infrastructure: Information and Communication Technologies Telephones - main lines in use: 376,500 (2007) Telephones - mobile cellular: 7.604 million (2007) Telephone system: general assessment: • outdated and unreliable fixed-line infrastructure heavily concentrated in Accra; competition among multiple mobile-cellular providers has spurred growth with subscribership about 35 per 100 persons and rising domestic: • primarily microwave radio relay; • wireless local loop has been installed
  • 40. Economic Sector Infrastructure: Information and Communication Technologies international: country code - 233; • landing point for the SAT-3/WASC fibre-optic submarine cable that provides connectivity to Europe and Asia; • satellite earth stations - 4 Intelsat (Atlantic Ocean); • microwave radio relay link to Panaftel system connects Ghana to its neighbours (2007) Radio broadcast stations: AM 0, FM 86, shortwave 3 (2007) Television broadcast stations: 7 (2007) Internet country code: .gh Internet hosts: 24,018 (2008)
  • 41. Economic Sector Infrastructure: Transport...1 Airports: 11 (2008) Airports - with paved runways: • total: 7 over 3,047 m: 1 2,438 to 3,047 m: 1 1,524 to 2,437 m: 3 914 to 1,523 m: 2 (2008) Airports - with unpaved runways: • total: 4 914 to 1,523 m: 3 under 914 m: 1 (2008) Pipelines: • oil 5 km; refined products 309 km (2008)
  • 42. Economic Sector Infrastructure: Transport...2 Railways: • total: 953 km narrow gauge: 953 km 1.067-m gauge (2006) Roadways: • total: 62,221 km paved: 9,955 km unpaved: 52,266 km (2006) Waterways: • 1,293 km note: 168 km for launches and lighters on Volta, Ankobra, and Tano rivers; 1,125 km of arterial and feeder waterways on Lake Volta (2008) Merchant marine: • total: 4 by type: petroleum tanker 1, refrigerated cargo 3 foreign-owned: 1 (Brazil 1) (2008) Ports and terminals: • Tema
  • 44.
  • 45. Economic Sector Infrastructure: Transport Comment • There are 39,409 kilometres (24,490 miles) of roads, of which 11,653 kilometres (7,241 miles) were paved in 1997. In 1997 there was a 953- kilometer (592-mile) railway network (currently undergoing major rehabilitation) of narrow gauge. The railway connects Accra, Kumasi, and Takoradi, the major mining areas, to the sea ports. The railway network also provides passenger services from the interior of Ghana to the main sea ports at Tema (near Accra) and Takoradi. • The main waterways include the Volta, Ankobra, and Tano Rivers, which provide 168 kilometers (104 miles) of year-round navigation, and Lake Volta, which provides 1,125 kilometres (699 miles) of arterial and feeder waterways. The main ports are at Takoradi and Tema. There were 12 airports in 1999, 6 of which had paved runways.
  • 47. Social Sector Infrastructure • Health (Urban and Rural Hospitals) • Education (Schools, High Schools and Universities, Cultural centres, Libraries..) • Social Housing • Leisure and Sport (Stadiums..)
  • 51. Social Sector Infrastructure: Leisure and Sport
  • 52. Ghana: Economic and Social Stimulus Plan...1 This plan is suggesting aims to stimulate employment, certain critical economic sectors, and government spending in Ghana •"You've got to look at the whole picture" •Focus stimulus spending on infrastructure development •Front-end investments for longer-term benefits •Job creation and tax cuts in the country •Stimulate vital sectors of the economy such as energy and health care •Make consumption easier/cheaper for everybody •Infrastructure investments could help make the economy and Ghanaian more competitive internationally.
  • 53. Ghana: Economic and Social Stimulus Plan...2 The Implementation of the Stimulus Plan •The stimulus plan again would again boast the country's Infrastructure, including the highways; •Need to modernize government buildings and other public infrastructure; •Need to provide clean water, flood control, and other environmental investments; there would also be public transit and rail infrastructure improvement. •Local school districts would be increased to prevent educational service cutbacks and also to help modernize higher education programs •Need to transform the Ghanaian energy by pumping money into the sector to make it more efficient •Need to repair public housing and make it affordable for the low income earners
  • 55. PPP Sector Highlights around the World
  • 56. PPP Infrastructure Projects in Africa 1996-2006
  • 58.
  • 61. The Benefits of PPP Schemes
  • 62. The Benefits of PPP Schemes
  • 64. PPP Opportunity Sectors in Ghana •
  • 70. The Differences between The Public and Private Sectors
  • 71. Differences between the Public Sector and Private Sector
  • 72. PPPs and PFI Delivering Infrastructure Projects to Ghana
  • 73.
  • 74. Selecting an Appropriate PPP / PFI Model
  • 75. Government / Public Sector Authority and The Project Company (Ghana) Ltd
  • 76. Parties Involved in PPP Projects
  • 77. Key Phases of the PPP Project Process
  • 78.
  • 79. Outline of the Procurement Process
  • 82. Structure of Project Governance
  • 84. Stages of Project Selection
  • 85.
  • 86.
  • 87.
  • 88.
  • 90.
  • 91. Public versus Private Contract Costs
  • 92. Public Sector Costs vs. Private Sector Costs
  • 94. Different PFI Cost Structures
  • 95. Comparing Costs of PPP and Government Debt Finance
  • 96. Typical PPP / PFI Bidding Process Costs
  • 98. Role of Banks in PPP....1
  • 102. Keys to Successful PPP Schemes
  • 103. Key to Successful PPP Schemes...1
  • 104. Key to Successful PPP Schemes...2
  • 105. The Project Company (Ghana) Ltd
  • 106. The Project Company (Ghana) Ltd The Private Finance Initiative (PFI) Model
  • 108. The Project Company (Ghana) Ltd PPP Structure
  • 109. The Project Company (Ghana) Ltd Services We Deliver
  • 111.
  • 113. We Look Forward to Working with You The Project Company (Ghana) Ltd