Division 16 Electrical: Parking Lot Lighting
1. Main Service Disconnecting Means and Lighting Controls
A specific listing of the number and sizes of the new 480v 3ph disconnect means, the
480v 3ph lighting contactors and photo eyes needed for the project, and all there
locations need to be, shown clearly on the project blueprints.
2. Underground Conduit
A specific listing of the number of conduit runs, the size of the schedule 40 PVC conduit
runs, the number and size of pull boxes, the number and size of the THWN circuit
conductors that are to be install for the parking lot lighting and all the conduit runs,
locations need to be, shown clearly on the project blueprints.
3. Sono Tube Bases
A specific list of the number of sono tube bases. The size of the sono tube bases, the
number and size of the rebar cages for the sono tube bases, the size and total number of
galvanized anchor bolts, washers and nuts for securing the parking lot lighting poles, and
the locations of the sono tube bases need to be, shown clearly on the project blueprints.
4. Equipment and Material To Be Furnished Including Quantity and Time
Requirements
Material purchase orders need to show exactly what items have been, purchased
(the conduit size and number of feet, the size and number of bell end, male and female
adapters, the size and number of rigid 90’s, the number and size of pull boxes, the size
and number of sono tubes, wire type, size and number of feet, number of waterproof
splice kits etc.) What supplier will supply the concrete for the sono tube bases for the
light standards? How much concrete will be required for all the sono tube bases? What
rental equipment is required, for how long is it need, and what does it, cost?
Smith
2
5. Parking Lot Light Poles
Who is the supplier for the parking lot light poles? What is the lead-time for ordering the
parking lot light poles to make sure they are, delivered in enough time that they can be,
installed on time according to the project schedule? Where can they be stored on site
once they have been, delivered prior to installation to prevent them from being damaged
or stolen?
6. Unit Pricing Schedule
If, the owner asks for any additional parking lot lighting features to be installed other then
what is, shown on the project blueprints once the contract is, signed by the owner. Then a
change order signed by the owner will be required for the work, the material or the
equipment that are, needed to complete the project and unit pricing schedule needs to be,
completed.

More Related Content

Similar to Project Managers Checklist Paper Final Draft

178680732 pipe-hanger-design
178680732 pipe-hanger-design178680732 pipe-hanger-design
178680732 pipe-hanger-designTiago Farinhas
 
Steel Shelving Rack Case Study by Dragon Sourcing
Steel Shelving Rack Case Study by Dragon SourcingSteel Shelving Rack Case Study by Dragon Sourcing
Steel Shelving Rack Case Study by Dragon SourcingJohn William
 
riopipeline2015_1094_ibp1094_15
riopipeline2015_1094_ibp1094_15riopipeline2015_1094_ibp1094_15
riopipeline2015_1094_ibp1094_15Monica Riccio
 
Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a
Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_aEd0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a
Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_addmozsubasi
 
Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017Frank Lemus
 
Rainbo Supplies Brochure Oil & Gas
Rainbo Supplies Brochure Oil & GasRainbo Supplies Brochure Oil & Gas
Rainbo Supplies Brochure Oil & GasMiguel Angelo Vieira
 
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)Rittiporn Pinrod
 
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)Rittiporn Pinrod
 
Using Conquest Ground Penetrating Radar (GPR) to locate embedments in concret...
Using Conquest Ground Penetrating Radar (GPR) to locate embedments in concret...Using Conquest Ground Penetrating Radar (GPR) to locate embedments in concret...
Using Conquest Ground Penetrating Radar (GPR) to locate embedments in concret...Sensors & Software Inc.
 
Company catalogue
Company catalogue Company catalogue
Company catalogue Emily Chan
 
DARGEANGRIX BUSINESS SCENARIO  DargeanGrix, Inc. is a fict
DARGEANGRIX BUSINESS SCENARIO  DargeanGrix, Inc. is a fictDARGEANGRIX BUSINESS SCENARIO  DargeanGrix, Inc. is a fict
DARGEANGRIX BUSINESS SCENARIO  DargeanGrix, Inc. is a fictOllieShoresna
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guideram111eg
 
Ductile Iron Pipe Fittings Production for Water & Sewage
Ductile Iron Pipe Fittings Production for Water & SewageDuctile Iron Pipe Fittings Production for Water & Sewage
Ductile Iron Pipe Fittings Production for Water & SewageAjjay Kumar Gupta
 
ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)Kenneth Thompson
 
PipeFab For Revit_AU_LasVegas_2018
PipeFab For Revit_AU_LasVegas_2018PipeFab For Revit_AU_LasVegas_2018
PipeFab For Revit_AU_LasVegas_2018Ibrahem Naeem
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorJayson Ang
 
Specification for stud bolts
Specification for stud boltsSpecification for stud bolts
Specification for stud boltsehsan ataei
 

Similar to Project Managers Checklist Paper Final Draft (20)

178680732 pipe-hanger-design
178680732 pipe-hanger-design178680732 pipe-hanger-design
178680732 pipe-hanger-design
 
Steel Shelving Rack Case Study by Dragon Sourcing
Steel Shelving Rack Case Study by Dragon SourcingSteel Shelving Rack Case Study by Dragon Sourcing
Steel Shelving Rack Case Study by Dragon Sourcing
 
riopipeline2015_1094_ibp1094_15
riopipeline2015_1094_ibp1094_15riopipeline2015_1094_ibp1094_15
riopipeline2015_1094_ibp1094_15
 
Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a
Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_aEd0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a
Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a
 
Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017
 
SAR JUNE 2014
SAR JUNE 2014SAR JUNE 2014
SAR JUNE 2014
 
Rainbo Supplies Brochure Oil & Gas
Rainbo Supplies Brochure Oil & GasRainbo Supplies Brochure Oil & Gas
Rainbo Supplies Brochure Oil & Gas
 
Pius Okukpe CV
Pius Okukpe CVPius Okukpe CV
Pius Okukpe CV
 
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
 
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
 
Fittings suppliers
Fittings suppliersFittings suppliers
Fittings suppliers
 
Using Conquest Ground Penetrating Radar (GPR) to locate embedments in concret...
Using Conquest Ground Penetrating Radar (GPR) to locate embedments in concret...Using Conquest Ground Penetrating Radar (GPR) to locate embedments in concret...
Using Conquest Ground Penetrating Radar (GPR) to locate embedments in concret...
 
Company catalogue
Company catalogue Company catalogue
Company catalogue
 
DARGEANGRIX BUSINESS SCENARIO  DargeanGrix, Inc. is a fict
DARGEANGRIX BUSINESS SCENARIO  DargeanGrix, Inc. is a fictDARGEANGRIX BUSINESS SCENARIO  DargeanGrix, Inc. is a fict
DARGEANGRIX BUSINESS SCENARIO  DargeanGrix, Inc. is a fict
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guide
 
Ductile Iron Pipe Fittings Production for Water & Sewage
Ductile Iron Pipe Fittings Production for Water & SewageDuctile Iron Pipe Fittings Production for Water & Sewage
Ductile Iron Pipe Fittings Production for Water & Sewage
 
ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)
 
PipeFab For Revit_AU_LasVegas_2018
PipeFab For Revit_AU_LasVegas_2018PipeFab For Revit_AU_LasVegas_2018
PipeFab For Revit_AU_LasVegas_2018
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th Floor
 
Specification for stud bolts
Specification for stud boltsSpecification for stud bolts
Specification for stud bolts
 

Project Managers Checklist Paper Final Draft

  • 1. Smith 1 Thomas R. Smith Const 220 Summer 2015 Project Managers Checklist Paper Group Project Division 16 Electrical: Parking Lot Lighting 1. Main Service Disconnecting Means and Lighting Controls A specific listing of the number and sizes of the new 480v 3ph disconnect means, the 480v 3ph lighting contactors and photo eyes needed for the project, and all there locations need to be, shown clearly on the project blueprints. 2. Underground Conduit A specific listing of the number of conduit runs, the size of the schedule 40 PVC conduit runs, the number and size of pull boxes, the number and size of the THWN circuit conductors that are to be install for the parking lot lighting and all the conduit runs, locations need to be, shown clearly on the project blueprints. 3. Sono Tube Bases A specific list of the number of sono tube bases. The size of the sono tube bases, the number and size of the rebar cages for the sono tube bases, the size and total number of galvanized anchor bolts, washers and nuts for securing the parking lot lighting poles, and the locations of the sono tube bases need to be, shown clearly on the project blueprints. 4. Equipment and Material To Be Furnished Including Quantity and Time Requirements Material purchase orders need to show exactly what items have been, purchased (the conduit size and number of feet, the size and number of bell end, male and female adapters, the size and number of rigid 90’s, the number and size of pull boxes, the size and number of sono tubes, wire type, size and number of feet, number of waterproof splice kits etc.) What supplier will supply the concrete for the sono tube bases for the light standards? How much concrete will be required for all the sono tube bases? What rental equipment is required, for how long is it need, and what does it, cost?
  • 2. Smith 2 5. Parking Lot Light Poles Who is the supplier for the parking lot light poles? What is the lead-time for ordering the parking lot light poles to make sure they are, delivered in enough time that they can be, installed on time according to the project schedule? Where can they be stored on site once they have been, delivered prior to installation to prevent them from being damaged or stolen? 6. Unit Pricing Schedule If, the owner asks for any additional parking lot lighting features to be installed other then what is, shown on the project blueprints once the contract is, signed by the owner. Then a change order signed by the owner will be required for the work, the material or the equipment that are, needed to complete the project and unit pricing schedule needs to be, completed.