Development Plan
 Identify the exact problem /gaps in ELC
warehousing operation
 Suggest & implement quick solution to
resolve major issues
 Implement a continues Improvement
plan
2
Problem Statement
Agility Unable to deliver agreed /
required volume of 1500 pick lines a day.
As a result, client ELC is unhappy with
Agility operational performance and
possible threat to lose the client by end
of 2008 means within a month time.
3
PRESENT OPERATION LEVEL Vs REQUIRED LEVEL
11
eeee
CAPACITYCAPACITY
Present capacityPresent capacity
900 pick lines a day900 pick lines a day
Required CapacityRequired Capacity
1500 pick lines a day1500 pick lines a day
ImprovementImprovement
RequiredRequired
byby
By 600 lines a dayBy 600 lines a day
ImprovementImprovement
RequiredRequired
byby
66 %66 %
4
How the situation become critical
1. There were no improvements happened in
the operation against the demand that
significantly improved over a period.15,444
23,851
13,513
20,742
29,415
33,953
33,400
44,552
0
10,000
20,000
30,000
40,000
50,000
July August Sept Oct
Throughput in lines from July to Oct'08
Thp Order lines
Thp Picked lines
Info: from ELC picking analyzes reportInfo: from ELC picking analyzes report
5
2. There were no additional manpower & / or
other resources added to meet the demand
that increased significantly.
Staff Utilization
0
5
10
15
20
25
30
35
40
Jan-08
Mar-08
May-08
Jul-08
Sep-08
Nov-08
Month
staff
15,444
23,851
13,513
20,742
29,415
33,953
33,400
44,552
0
10,000
20,000
30,000
40,000
50,000
July August Sept Oct
ThroughputinlinesfromJulytoOct'08
ThpOrderlines
ThpPickedlines
Workload IncreasedWorkload Increased Staff UtilizationStaff Utilization
6How the situation become critical
Vs
3. No homework done to keep the operation
up to date.
 No clear strategy defined for pick-face location &
replenishment process. Also does not integrated to
WMS as well.
 No pick face locations assigned for 1475 SKUs that
arrived newly within last 5 months time.
 More than 1200 SKUs that assigned pick-faces were
dead (Out of stock). Also 550 dead SKUs (SKUs not
moved in last 90 days) laying on PF locations.
 Poor location accuracy due to lack of cycle-count
process in place.
7
How the situation become critical
Best Possible Solution to OvercomeBest Possible Solution to Overcome
 Implementing 3 shifts to ELC operation
Capability in 2 shiftsCapability in 2 shifts
450 pick lines a shift450 pick lines a shift
900 a day900 a day
Capability in 3 shiftsCapability in 3 shifts
450 pick lines a shift450 pick lines a shift
1350 a day1350 a day
OTBOUND / At PresentOTBOUND / At Present FutureFuture -- After ImplementingAfter Implementing
Capacity ImprovementCapacity Improvement
450 Pick Lines a day450 Pick Lines a day
Capacity ImprovementCapacity Improvement
50%50%
(Based on present average volume 0f - 30 pieces, 0.022 CBM per pick line)(Based on present average volume 0f - 30 pieces, 0.022 CBM per pick line)
8
Additional Staff Requirement
At Present
 WH Supervisor 02
 Coordinator 01
 Team Leader 02
 Inventory Asst: 04
 Pickers & QC 12
 Inbounds 04
 DGR 02
Total 27
Requirement
 WH Supervisor 01
 Snr. Stock Controller 01
 Team Leader 03
 Stock Controller 01
 Inventory Asst: 03
 Pickers & QC 18
 Inbound Staff 06
Total 33
Total no of permanent Staff requiredTotal no of permanent Staff required
additionally - 06 (22% Increase)additionally - 06 (22% Increase)
((It is also important to properly allocate the existing personnel to this integrated structure, with clearlyIt is also important to properly allocate the existing personnel to this integrated structure, with clearly
defined and communicated job responsibilities to achieve the objectives of this proposal)defined and communicated job responsibilities to achieve the objectives of this proposal)
9
Additional Cost Involvement for 3
Shift Operation
MHE – NO
2 additional batteries for MHE = AED 39,000.00 – Fixed
(AED 19,500 Per Unit X 2)
Staff – 01 Team leader, = AED 4000.00 – Monthly
(Approximately: AED 4000.00 Per Head)
06 Pickers = AED 12,000.00 – Monthly
(Approximately: AED 2000.00 per head x 6)
Total Additional Cost = AED 16,000.00 – Monthly
10
Proposed Organization Chart for ELC – WH
Annexure 01
Major Change in Operation &
Staff Allocation
Only 01 shift inbound ReceiptOnly 01 shift inbound Receipt
(3 staff)(3 staff)
Expecting 100% ImprovementExpecting 100% Improvement
byby
adding a full inbound receiptadding a full inbound receipt
team to the 2team to the 2ndnd
shiftshift
(3 staff)(3 staff)
11
More Improvement Requires
by
16 %
(Total Required 66 % - 50 %)
12
Have we reach the goal?
No
Increase efficiency in PICK-FACE picking
TargetedTargeted
EfficiencyEfficiency
of PF pickingof PF picking
70 %70 %
PresentPresent
Efficiency ofEfficiency of
PF pickingPF picking
52 %52 %
13Possible Solutions to Increase Productivity
Actions to Increase Pick Face Efficiency
To Operations
 Assign pick face locations for 1475 of moving SKUs
 566 SKU’s which was assigned to pick face but no
transactions for last 90 days, to be moved out
physically to non pick face locations.
 550 dead SKUs (no inventory or movements for last 90
days) to be removed from Pick-Face.
14
15
Actions to Increase Pick Face Efficiency
To WMS
 Redefine the replenishment process in the WMS to pick
from PF, first.
 Assign pick face locations for 1475 of moving SKUs
 Adjust the minimum & maximum quantity in PF according to
pack-keys.
 Implement full pack replenishment process instead of
present piece unit replenishment.
 Work to avoid replenishing expired products in to pick face.
Cycle Count
 Implement Cycle Count with immediate effect with a forecast plan to
complete a count cycle in every 78 days. (3 months)
 Clean-up PF area according to the cycle count results.
Immediately Actions Taken
 Up to now there are 864 PF locations checked & removed miss located
goods.
 New cycle count plan has been created & will implement from 1st of
December 2008. (Annexure 2)
16Actions to Increase Location Accuracy
To WMS
1. Report of “SKUs did not assigned pick face location”
2. Pick face location with 0 quantity in any given time
3. Order commodity and / or quantity not allocated or
partially allocated
4. Outbound operations & performance monitoring report
with actual pick-lines (Currently monitors only order
lines)
17
New Reports to be generated
CONCLUSION
 This will be Agility’s final chance to win this
client ELC.
 By implementing the proposed action plan,
Agility will be able to deliver quick result.
 It shows our dedication and interest on this
account.
 Keeping it up to the level of client’s
expectation, possibly we can avoid
retendering and negotiate for contract
renewal to retain this prestigious client
account.
18

More Related Content

Similar to estee lauder - Productivity and Operational Capacity Improvement Plan

Uop ops-571-final-exam-guide- april-2018--new
Uop ops-571-final-exam-guide- april-2018--newUop ops-571-final-exam-guide- april-2018--new
Uop ops-571-final-exam-guide- april-2018--newindi7257
 
OPS 571 Massive Success / snaptutorial.com
OPS 571 Massive Success / snaptutorial.comOPS 571 Massive Success / snaptutorial.com
OPS 571 Massive Success / snaptutorial.comdonaldzs17
 
OPS 571 Massive Success / snaptutorial...com
OPS 571 Massive Success / snaptutorial...comOPS 571 Massive Success / snaptutorial...com
OPS 571 Massive Success / snaptutorial...comdonaldzs25
 
OPS 571 Effective Communication - snaptutorial.com
OPS 571 Effective Communication - snaptutorial.comOPS 571 Effective Communication - snaptutorial.com
OPS 571 Effective Communication - snaptutorial.comdonaldzs45
 
3. capacity planning
3. capacity planning3. capacity planning
3. capacity planningSudipta Saha
 
3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt3. Capacity 22 HR.ppt
3. Capacity 22 HR.pptMehulDatta1
 
Which of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelWhich of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelramuaa129
 
Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...ramuaa128
 
OPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.comOPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.comclaric77
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)shyaminfo00
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingramuaa126
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingyearstart2
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)shyaminfo00
 
Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...ramuaa128
 
Manufacturing's Holy Grail: A Practical Science for Executives and Managers
Manufacturing's Holy Grail: A Practical Science for Executives and ManagersManufacturing's Holy Grail: A Practical Science for Executives and Managers
Manufacturing's Holy Grail: A Practical Science for Executives and ManagersUBMCanon
 
OPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.comOPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.comclaric212
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the followingramuaa126
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the followingyearstart2
 
Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_indi7257
 

Similar to estee lauder - Productivity and Operational Capacity Improvement Plan (20)

Uop ops-571-final-exam-guide- april-2018--new
Uop ops-571-final-exam-guide- april-2018--newUop ops-571-final-exam-guide- april-2018--new
Uop ops-571-final-exam-guide- april-2018--new
 
OPS 571 Massive Success / snaptutorial.com
OPS 571 Massive Success / snaptutorial.comOPS 571 Massive Success / snaptutorial.com
OPS 571 Massive Success / snaptutorial.com
 
OPS 571 Massive Success / snaptutorial...com
OPS 571 Massive Success / snaptutorial...comOPS 571 Massive Success / snaptutorial...com
OPS 571 Massive Success / snaptutorial...com
 
OPS 571 Effective Communication - snaptutorial.com
OPS 571 Effective Communication - snaptutorial.comOPS 571 Effective Communication - snaptutorial.com
OPS 571 Effective Communication - snaptutorial.com
 
3. capacity planning
3. capacity planning3. capacity planning
3. capacity planning
 
Case Study
Case StudyCase Study
Case Study
 
3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt
 
Which of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelWhich of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory model
 
Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...
 
OPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.comOPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.com
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the following
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the following
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...
 
Manufacturing's Holy Grail: A Practical Science for Executives and Managers
Manufacturing's Holy Grail: A Practical Science for Executives and ManagersManufacturing's Holy Grail: A Practical Science for Executives and Managers
Manufacturing's Holy Grail: A Practical Science for Executives and Managers
 
OPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.comOPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.com
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the following
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the following
 
Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_
 

estee lauder - Productivity and Operational Capacity Improvement Plan

  • 1. Productivity & Operational Capacity Improvement Plan FOR ESTEE LAUDER WAREHOUSING ACCOUNT 26 Nov 200826 Nov 2008 Tharanga JayalalTharanga Jayalal 1
  • 2. Development Plan  Identify the exact problem /gaps in ELC warehousing operation  Suggest & implement quick solution to resolve major issues  Implement a continues Improvement plan 2
  • 3. Problem Statement Agility Unable to deliver agreed / required volume of 1500 pick lines a day. As a result, client ELC is unhappy with Agility operational performance and possible threat to lose the client by end of 2008 means within a month time. 3
  • 4. PRESENT OPERATION LEVEL Vs REQUIRED LEVEL 11 eeee CAPACITYCAPACITY Present capacityPresent capacity 900 pick lines a day900 pick lines a day Required CapacityRequired Capacity 1500 pick lines a day1500 pick lines a day ImprovementImprovement RequiredRequired byby By 600 lines a dayBy 600 lines a day ImprovementImprovement RequiredRequired byby 66 %66 % 4
  • 5. How the situation become critical 1. There were no improvements happened in the operation against the demand that significantly improved over a period.15,444 23,851 13,513 20,742 29,415 33,953 33,400 44,552 0 10,000 20,000 30,000 40,000 50,000 July August Sept Oct Throughput in lines from July to Oct'08 Thp Order lines Thp Picked lines Info: from ELC picking analyzes reportInfo: from ELC picking analyzes report 5
  • 6. 2. There were no additional manpower & / or other resources added to meet the demand that increased significantly. Staff Utilization 0 5 10 15 20 25 30 35 40 Jan-08 Mar-08 May-08 Jul-08 Sep-08 Nov-08 Month staff 15,444 23,851 13,513 20,742 29,415 33,953 33,400 44,552 0 10,000 20,000 30,000 40,000 50,000 July August Sept Oct ThroughputinlinesfromJulytoOct'08 ThpOrderlines ThpPickedlines Workload IncreasedWorkload Increased Staff UtilizationStaff Utilization 6How the situation become critical Vs
  • 7. 3. No homework done to keep the operation up to date.  No clear strategy defined for pick-face location & replenishment process. Also does not integrated to WMS as well.  No pick face locations assigned for 1475 SKUs that arrived newly within last 5 months time.  More than 1200 SKUs that assigned pick-faces were dead (Out of stock). Also 550 dead SKUs (SKUs not moved in last 90 days) laying on PF locations.  Poor location accuracy due to lack of cycle-count process in place. 7 How the situation become critical
  • 8. Best Possible Solution to OvercomeBest Possible Solution to Overcome  Implementing 3 shifts to ELC operation Capability in 2 shiftsCapability in 2 shifts 450 pick lines a shift450 pick lines a shift 900 a day900 a day Capability in 3 shiftsCapability in 3 shifts 450 pick lines a shift450 pick lines a shift 1350 a day1350 a day OTBOUND / At PresentOTBOUND / At Present FutureFuture -- After ImplementingAfter Implementing Capacity ImprovementCapacity Improvement 450 Pick Lines a day450 Pick Lines a day Capacity ImprovementCapacity Improvement 50%50% (Based on present average volume 0f - 30 pieces, 0.022 CBM per pick line)(Based on present average volume 0f - 30 pieces, 0.022 CBM per pick line) 8
  • 9. Additional Staff Requirement At Present  WH Supervisor 02  Coordinator 01  Team Leader 02  Inventory Asst: 04  Pickers & QC 12  Inbounds 04  DGR 02 Total 27 Requirement  WH Supervisor 01  Snr. Stock Controller 01  Team Leader 03  Stock Controller 01  Inventory Asst: 03  Pickers & QC 18  Inbound Staff 06 Total 33 Total no of permanent Staff requiredTotal no of permanent Staff required additionally - 06 (22% Increase)additionally - 06 (22% Increase) ((It is also important to properly allocate the existing personnel to this integrated structure, with clearlyIt is also important to properly allocate the existing personnel to this integrated structure, with clearly defined and communicated job responsibilities to achieve the objectives of this proposal)defined and communicated job responsibilities to achieve the objectives of this proposal) 9
  • 10. Additional Cost Involvement for 3 Shift Operation MHE – NO 2 additional batteries for MHE = AED 39,000.00 – Fixed (AED 19,500 Per Unit X 2) Staff – 01 Team leader, = AED 4000.00 – Monthly (Approximately: AED 4000.00 Per Head) 06 Pickers = AED 12,000.00 – Monthly (Approximately: AED 2000.00 per head x 6) Total Additional Cost = AED 16,000.00 – Monthly 10
  • 11. Proposed Organization Chart for ELC – WH Annexure 01 Major Change in Operation & Staff Allocation Only 01 shift inbound ReceiptOnly 01 shift inbound Receipt (3 staff)(3 staff) Expecting 100% ImprovementExpecting 100% Improvement byby adding a full inbound receiptadding a full inbound receipt team to the 2team to the 2ndnd shiftshift (3 staff)(3 staff) 11
  • 12. More Improvement Requires by 16 % (Total Required 66 % - 50 %) 12 Have we reach the goal? No
  • 13. Increase efficiency in PICK-FACE picking TargetedTargeted EfficiencyEfficiency of PF pickingof PF picking 70 %70 % PresentPresent Efficiency ofEfficiency of PF pickingPF picking 52 %52 % 13Possible Solutions to Increase Productivity
  • 14. Actions to Increase Pick Face Efficiency To Operations  Assign pick face locations for 1475 of moving SKUs  566 SKU’s which was assigned to pick face but no transactions for last 90 days, to be moved out physically to non pick face locations.  550 dead SKUs (no inventory or movements for last 90 days) to be removed from Pick-Face. 14
  • 15. 15 Actions to Increase Pick Face Efficiency To WMS  Redefine the replenishment process in the WMS to pick from PF, first.  Assign pick face locations for 1475 of moving SKUs  Adjust the minimum & maximum quantity in PF according to pack-keys.  Implement full pack replenishment process instead of present piece unit replenishment.  Work to avoid replenishing expired products in to pick face.
  • 16. Cycle Count  Implement Cycle Count with immediate effect with a forecast plan to complete a count cycle in every 78 days. (3 months)  Clean-up PF area according to the cycle count results. Immediately Actions Taken  Up to now there are 864 PF locations checked & removed miss located goods.  New cycle count plan has been created & will implement from 1st of December 2008. (Annexure 2) 16Actions to Increase Location Accuracy
  • 17. To WMS 1. Report of “SKUs did not assigned pick face location” 2. Pick face location with 0 quantity in any given time 3. Order commodity and / or quantity not allocated or partially allocated 4. Outbound operations & performance monitoring report with actual pick-lines (Currently monitors only order lines) 17 New Reports to be generated
  • 18. CONCLUSION  This will be Agility’s final chance to win this client ELC.  By implementing the proposed action plan, Agility will be able to deliver quick result.  It shows our dedication and interest on this account.  Keeping it up to the level of client’s expectation, possibly we can avoid retendering and negotiate for contract renewal to retain this prestigious client account. 18