SlideShare a Scribd company logo
1 of 7
Download to read offline
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural and Built Environments
ELEMENTS IN NATURAL AND BUILT ENVIRONMENT (ARC30105)
PROJECT 2 – BUILT ENVIRONMENT : BETTER TOWN OF THE FUTURE
20% Individual work + 20% Group work
Presentation Part A (Individual) : 6th November 2014
Presentation Part B ( Group ) : 4th December 2014
3. Part A : (Individual 20%) – Submission Date and Presentation : 6th November 2014
4. Part B : (Group 20%) – Submission Date and Presentation : 4th December 2014
Part A : A4 report (Individual 20%) – Submission Date: 6th November 2014
Part A : Video Presentation – Submission Date: 6th November 2014
g. Leaders of each tutorial group should collect all of the video on 5th November and prepare it for
the presentation.
Part B : The Model – Presentation & Submission – 4th December 2014
a. The size of the model should not exceed A2 size board as the base. The height should not
Exceed 600mm. There is no minimum size.
b. Students are free to choose any materials to make the model, however you can consider to use
any recyclable materials integrated in your model such as straws, metal wire etc. You may have
different colours in your model as for certain reason i.e as identification of different zoning and
functions etc. Do get advices from your respective tutor regarding the scale, colour and materials
for the model. However, students are encouraged to look for inspiration first prior to build up the
model.
c. Please prepare a casing for the model for storage purposes and safety during construction.
d. Please label your model with your group member’s name, lecturer’s name, batch and Taylor’s
University logo (Digitally prepared)
e. You are given 5 minutes to give a verbal presentation.
f. Please document the process, the final product and the presentation session and upload it in
your E-portfolio.
The A2 Presentation Boards & Submission – 4th December 2014
Enbeproject2 141217092213-conversion-gate01

More Related Content

Viewers also liked

enbep1brief.pdf
enbep1brief.pdfenbep1brief.pdf
enbep1brief.pdfTeoViVien
 
The life of robert
The life of robertThe life of robert
The life of robertTeoViVien
 
Business plan Fabrican
Business plan FabricanBusiness plan Fabrican
Business plan FabricanTeoViVien
 
Psycho final
Psycho finalPsycho final
Psycho finalTeoViVien
 
Drawing project 3(brief 2014)
Drawing project 3(brief 2014)Drawing project 3(brief 2014)
Drawing project 3(brief 2014)TeoViVien
 
English 2 essay
English 2 essayEnglish 2 essay
English 2 essayTeoViVien
 

Viewers also liked (8)

Enbep1brief
Enbep1briefEnbep1brief
Enbep1brief
 
enbep1brief.pdf
enbep1brief.pdfenbep1brief.pdf
enbep1brief.pdf
 
The life of robert
The life of robertThe life of robert
The life of robert
 
Enbe report
Enbe reportEnbe report
Enbe report
 
Business plan Fabrican
Business plan FabricanBusiness plan Fabrican
Business plan Fabrican
 
Psycho final
Psycho finalPsycho final
Psycho final
 
Drawing project 3(brief 2014)
Drawing project 3(brief 2014)Drawing project 3(brief 2014)
Drawing project 3(brief 2014)
 
English 2 essay
English 2 essayEnglish 2 essay
English 2 essay
 

Similar to Enbeproject2 141217092213-conversion-gate01

Design project one - brief- feb intake (1)
Design   project one - brief- feb intake (1)Design   project one - brief- feb intake (1)
Design project one - brief- feb intake (1)suehwa533
 
Design project one - brief- feb intake (2)
Design   project one - brief- feb intake (2)Design   project one - brief- feb intake (2)
Design project one - brief- feb intake (2)karolinabondarenko
 
Drawing project 1 july 2015_integration
Drawing project 1 july 2015_integrationDrawing project 1 july 2015_integration
Drawing project 1 july 2015_integrationHanis A.Badri
 
Drawing project 1 july 2015_integration(1)
Drawing project 1 july 2015_integration(1)Drawing project 1 july 2015_integration(1)
Drawing project 1 july 2015_integration(1)Sarah Esa
 
Drawing project 1 july 2015_integration (1)
Drawing project 1 july 2015_integration (1)Drawing project 1 july 2015_integration (1)
Drawing project 1 july 2015_integration (1)Flenny Wong
 
Drawing project 1 july 2015_integration
Drawing project 1 july 2015_integrationDrawing project 1 july 2015_integration
Drawing project 1 july 2015_integration瑞田 吳
 

Similar to Enbeproject2 141217092213-conversion-gate01 (7)

Design project one - brief- feb intake (1)
Design   project one - brief- feb intake (1)Design   project one - brief- feb intake (1)
Design project one - brief- feb intake (1)
 
Design project one - brief- feb intake (2)
Design   project one - brief- feb intake (2)Design   project one - brief- feb intake (2)
Design project one - brief- feb intake (2)
 
Drawing project 1 july 2015_integration
Drawing project 1 july 2015_integrationDrawing project 1 july 2015_integration
Drawing project 1 july 2015_integration
 
Drawing project 1 july 2015_integration(1)
Drawing project 1 july 2015_integration(1)Drawing project 1 july 2015_integration(1)
Drawing project 1 july 2015_integration(1)
 
ITD PROJECT 1
ITD PROJECT 1ITD PROJECT 1
ITD PROJECT 1
 
Drawing project 1 july 2015_integration (1)
Drawing project 1 july 2015_integration (1)Drawing project 1 july 2015_integration (1)
Drawing project 1 july 2015_integration (1)
 
Drawing project 1 july 2015_integration
Drawing project 1 july 2015_integrationDrawing project 1 july 2015_integration
Drawing project 1 july 2015_integration
 

Enbeproject2 141217092213-conversion-gate01

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural and Built Environments ELEMENTS IN NATURAL AND BUILT ENVIRONMENT (ARC30105) PROJECT 2 – BUILT ENVIRONMENT : BETTER TOWN OF THE FUTURE 20% Individual work + 20% Group work Presentation Part A (Individual) : 6th November 2014 Presentation Part B ( Group ) : 4th December 2014
  • 2.
  • 3.
  • 4. 3. Part A : (Individual 20%) – Submission Date and Presentation : 6th November 2014 4. Part B : (Group 20%) – Submission Date and Presentation : 4th December 2014
  • 5. Part A : A4 report (Individual 20%) – Submission Date: 6th November 2014 Part A : Video Presentation – Submission Date: 6th November 2014 g. Leaders of each tutorial group should collect all of the video on 5th November and prepare it for the presentation.
  • 6. Part B : The Model – Presentation & Submission – 4th December 2014 a. The size of the model should not exceed A2 size board as the base. The height should not Exceed 600mm. There is no minimum size. b. Students are free to choose any materials to make the model, however you can consider to use any recyclable materials integrated in your model such as straws, metal wire etc. You may have different colours in your model as for certain reason i.e as identification of different zoning and functions etc. Do get advices from your respective tutor regarding the scale, colour and materials for the model. However, students are encouraged to look for inspiration first prior to build up the model. c. Please prepare a casing for the model for storage purposes and safety during construction. d. Please label your model with your group member’s name, lecturer’s name, batch and Taylor’s University logo (Digitally prepared) e. You are given 5 minutes to give a verbal presentation. f. Please document the process, the final product and the presentation session and upload it in your E-portfolio. The A2 Presentation Boards & Submission – 4th December 2014