I have served as contamination control programmanagerat some of the most diverse yet cutting edge
facilities in the Semiconductor and Pharmaceutical industry.For the past 18 years I have been
responsible forImplementation and Management of Clean Build Protocol programs of more than 10
cutting edge Technology Centers.Below are some highlights of those experiences.
Bio: Tarrah Holland - Project History
Mar 1996 - Aug 1997
Dominion Semiconductor/Micron - Manassas, VA
180,000 sq ft new construction Sub Micron class 1 FAB. First sub micron FAB built in
the world for D-RAM technology. IBM/Toshiba joint venture ULPA FFU design by
MW Zander using Japanese style construction techniques. Self contained facility
included Chemical Wash Plant and 10,000 sq ft gowning room. Employed new Gortex
gowning system. International training program for base trades and tool install vendors
alike. Slab to Tool Hookup Cleanroom cleaning and Protocol monitoring program.
Implemented facility contamination control maintenance program. Estimated project cost
$720 million
Jan 1998 - Oct 1998
Lucent Technologies - Atlanta, GA
350,000 sq ft retro fit expansion Class 10,000 Cleanroom for fiber optic production and
R&D. Instituted contamination control programs for entire facility during pre and post
construction. Trade training program with Local Union bodies to ensure Best Practices
as respects cleanroom construction. Complete decontamination of facility. Estimated
project cost $60 million
Nov 2001 - June 2003
Wyeth Ayerst Immunex/Amgen - Warrick, RI
270,000 sq ft renovation Class 100 Bio Pharm manufacturing facility. Production of
Rheumatoid Arthritis drug. Start up facility three level process and fermentation suits.
Provided biological cleaning and contamination control in preparation of r FDA
certification. Provided ongoing daily contamination wipe downs in all process suits both
pre and post construction. Exceed all FDA testing requirements for new facility.
Estimated project cost $292 million
March 2006 – July 2007
Duke University - Durham, NC
Cleanroom project with the advent of Nanotechnology for Duke Univ. 6,000 total sq ft
cleanroom protocol and cleaning managed, all training for site personnel performed.
October 2013 - April 2014
Global Foundries FAB Extension 8.1 - Malta, NY
PMSI started the project by creating the program for the protocol training and protocol
implementation on the site. Managed 90,000 sq ft expansion of SubFAB, FAB and
Interstitial space. Began the hiring process to have a crew of protocol monitors to control
the work being done by contractors. Trained all contractors on site in each level of
protocol as it progressed and initiated gowning procedures for each new level. Attended
all management meetings with the owner and general contractor to make sure we were in
line with the project schedule. Handed off the project to a new project manager and
continued to monitor progress through weekly/bi-weekly visits.
April 2014 - May 2014
West Pharmaceutical - Kinston, NC
Was responsible for managing the cleaning and protocol management of the construction
of 10,000 sq ft of ISO 5 and ISO 8 pharmaceutical cleanrooms. PMSI performed a super
clean at the beginning of our time onsite, and then performed daily maintenance cleaning,
before completing one final super clean prior to certification. PMSI supplied all the
cleanroom consumables on the jobsite and during the super clean we oversaw all of the
personnel in the cleanroom for protocol and safety, including hazard mitigation, when
performing cleanings.
May 2014 - August 2014
Numark Assembly Room - Richmond, VA
Created and implemented a Cleanroom protocol program for a company having none.
Managed on a daily basis the protocol program and cleaning for the 15,000 sq ft
Cleanroom and surrounding areas called the clean envelope. Trained all personnel
working in that space on the protocol levels in place. Initiated gowning procedures at
each level of protocol and supplied all gowning attire for project.
August 2014 - Present
Princeton Andlinger Center for Energy and the Environment - Princeton, NJ
Created and implemented the Protocol program for this project. It's approximately
12,000 sq ft of classified cleanroom space ranging from ISO 5-ISO 8 as well as another
8,000 sq ft of unclassified clean area. I am responsible for all training of personnel
working on the project and monitoring the activity of those working in the cleanroom to
make sure protocol requirements are being followed. Will be responsible for maintaining
the cleanliness and gowning supplies for the cleanroom entry points throughout the
duration of the construction clean-build process.
Various short/long term cleaning projects managedincluding the
following projects from March 2006 - Present:
Merck Pharmaceuticals, Elkton, VA as well as Merck Pharmaceuticals, Durham, NC
cleanroom cleaning projects (Multiple phase pharmaceutical cleanrooms under cGMP
process from base build to FDA audit)
AZ Electronic Materials USA cleanroom/lab cleaning and certification in Branchburg, NJ
BE&K lab space cleaning projects for Cel Sci in Elkridge, MD and ATCC in Manassas,
VA
University of Maryland cleaning project in Shady Grove, MD
Advance Tec protocol and cleaning management project for Hemlock Semiconductor in
Saginaw, MI
Advance Tec cleanroom cleaning project for NASA in Greenbelt, MD
Advance Tec lab/unclassified space cleaning project for CB Fleet in Lynchburg, VA
Gilbane Co. cleaning project for Doctors Hospital expansion in Lanham, MD
Norfolk State University cleanroom cleaning and certification in Norfolk, VA
Advance Tec cleanroom cleaning project for CP Films/Solutia in Martinsville, VA
Gilbane Co. BL4 Lab cleanroom cleaning project NIAD in Ft. Detrick, Frederick, MD
Gilbane Co. hospital renovation cleaning project at NIH in Bethesda, MD
UTC cleanroom protocol management and cleaning project in Princeton, NJ
Advance Tec cleanroom cleaning project for University of Alabama in Tuscaloosa, AL
Whiting-Turner RAF and final cleaning project N316 Fit-Up in Jessup, MD
Hodess Construction/Draper Labs cleanroom cleaning project in Cambridge, MA
Mrs. Holland has been quite extensively involved in various specialty cleanrooms for many different
industrial applicationsincluding but not limited to Semiconductor,Pharmaceutical, Animal Testing,Food
Processing, Nanotechnology, Bio-Medical,Telecommunication and Information Technology.

More Related Content

Similar to project resume

Michael_K_Roberts_Resume_2014
Michael_K_Roberts_Resume_2014Michael_K_Roberts_Resume_2014
Michael_K_Roberts_Resume_2014Mike Roberts
 
Michael_K_Roberts_Resume_2014
Michael_K_Roberts_Resume_2014Michael_K_Roberts_Resume_2014
Michael_K_Roberts_Resume_2014Mike Roberts
 
PRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - CopyPRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - CopyPRAVEENKUMAR MANE
 
R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015Ray Chapa
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan
 
Industrial Internship Report - OLNG
Industrial Internship Report - OLNGIndustrial Internship Report - OLNG
Industrial Internship Report - OLNGAl Motasim Al-Siyabi
 
Mike Resume January 2015
Mike Resume January 2015Mike Resume January 2015
Mike Resume January 2015Mike Berry
 
Pharmaceutical Cleanroom Technology Europe 2019
Pharmaceutical Cleanroom Technology Europe 2019Pharmaceutical Cleanroom Technology Europe 2019
Pharmaceutical Cleanroom Technology Europe 2019Dale Butler
 
Facility Upgrade V2
Facility Upgrade V2Facility Upgrade V2
Facility Upgrade V2Rose Buot
 
09 reynolds 7th salt workshop (trr)
09 reynolds 7th salt workshop (trr)09 reynolds 7th salt workshop (trr)
09 reynolds 7th salt workshop (trr)leann_mays
 
The power of pH neutral enzyme cleaning EC 660
The power of pH neutral enzyme cleaning  EC 660The power of pH neutral enzyme cleaning  EC 660
The power of pH neutral enzyme cleaning EC 660Jeff Grames
 
The Power of pH Neutral Enzyme Cleaning - EC 660
The Power of pH Neutral Enzyme Cleaning - EC 660The Power of pH Neutral Enzyme Cleaning - EC 660
The Power of pH Neutral Enzyme Cleaning - EC 660Jeff Grames
 

Similar to project resume (20)

Michael_K_Roberts_Resume_2014
Michael_K_Roberts_Resume_2014Michael_K_Roberts_Resume_2014
Michael_K_Roberts_Resume_2014
 
JIJIN UPDATED CV
JIJIN UPDATED CVJIJIN UPDATED CV
JIJIN UPDATED CV
 
Michael_K_Roberts_Resume_2014
Michael_K_Roberts_Resume_2014Michael_K_Roberts_Resume_2014
Michael_K_Roberts_Resume_2014
 
PRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - CopyPRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - Copy
 
R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015
 
Powell_Bill_2014
Powell_Bill_2014Powell_Bill_2014
Powell_Bill_2014
 
cv1
cv1cv1
cv1
 
Resume Tahir
Resume TahirResume Tahir
Resume Tahir
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016
 
David Walker CV+
David Walker CV+David Walker CV+
David Walker CV+
 
CV_2016_rev_4_RW
CV_2016_rev_4_RWCV_2016_rev_4_RW
CV_2016_rev_4_RW
 
Industrial Internship Report - OLNG
Industrial Internship Report - OLNGIndustrial Internship Report - OLNG
Industrial Internship Report - OLNG
 
Mike Resume January 2015
Mike Resume January 2015Mike Resume January 2015
Mike Resume January 2015
 
RobertKulick2016
RobertKulick2016RobertKulick2016
RobertKulick2016
 
Pharmaceutical Cleanroom Technology Europe 2019
Pharmaceutical Cleanroom Technology Europe 2019Pharmaceutical Cleanroom Technology Europe 2019
Pharmaceutical Cleanroom Technology Europe 2019
 
Facility Upgrade V2
Facility Upgrade V2Facility Upgrade V2
Facility Upgrade V2
 
09 reynolds 7th salt workshop (trr)
09 reynolds 7th salt workshop (trr)09 reynolds 7th salt workshop (trr)
09 reynolds 7th salt workshop (trr)
 
The power of pH neutral enzyme cleaning EC 660
The power of pH neutral enzyme cleaning  EC 660The power of pH neutral enzyme cleaning  EC 660
The power of pH neutral enzyme cleaning EC 660
 
The Power of pH Neutral Enzyme Cleaning - EC 660
The Power of pH Neutral Enzyme Cleaning - EC 660The Power of pH Neutral Enzyme Cleaning - EC 660
The Power of pH Neutral Enzyme Cleaning - EC 660
 

project resume

  • 1. I have served as contamination control programmanagerat some of the most diverse yet cutting edge facilities in the Semiconductor and Pharmaceutical industry.For the past 18 years I have been responsible forImplementation and Management of Clean Build Protocol programs of more than 10 cutting edge Technology Centers.Below are some highlights of those experiences. Bio: Tarrah Holland - Project History Mar 1996 - Aug 1997 Dominion Semiconductor/Micron - Manassas, VA 180,000 sq ft new construction Sub Micron class 1 FAB. First sub micron FAB built in the world for D-RAM technology. IBM/Toshiba joint venture ULPA FFU design by MW Zander using Japanese style construction techniques. Self contained facility included Chemical Wash Plant and 10,000 sq ft gowning room. Employed new Gortex gowning system. International training program for base trades and tool install vendors alike. Slab to Tool Hookup Cleanroom cleaning and Protocol monitoring program. Implemented facility contamination control maintenance program. Estimated project cost $720 million Jan 1998 - Oct 1998 Lucent Technologies - Atlanta, GA 350,000 sq ft retro fit expansion Class 10,000 Cleanroom for fiber optic production and R&D. Instituted contamination control programs for entire facility during pre and post construction. Trade training program with Local Union bodies to ensure Best Practices as respects cleanroom construction. Complete decontamination of facility. Estimated project cost $60 million Nov 2001 - June 2003 Wyeth Ayerst Immunex/Amgen - Warrick, RI 270,000 sq ft renovation Class 100 Bio Pharm manufacturing facility. Production of Rheumatoid Arthritis drug. Start up facility three level process and fermentation suits. Provided biological cleaning and contamination control in preparation of r FDA certification. Provided ongoing daily contamination wipe downs in all process suits both pre and post construction. Exceed all FDA testing requirements for new facility. Estimated project cost $292 million March 2006 – July 2007 Duke University - Durham, NC Cleanroom project with the advent of Nanotechnology for Duke Univ. 6,000 total sq ft cleanroom protocol and cleaning managed, all training for site personnel performed. October 2013 - April 2014 Global Foundries FAB Extension 8.1 - Malta, NY PMSI started the project by creating the program for the protocol training and protocol implementation on the site. Managed 90,000 sq ft expansion of SubFAB, FAB and Interstitial space. Began the hiring process to have a crew of protocol monitors to control the work being done by contractors. Trained all contractors on site in each level of
  • 2. protocol as it progressed and initiated gowning procedures for each new level. Attended all management meetings with the owner and general contractor to make sure we were in line with the project schedule. Handed off the project to a new project manager and continued to monitor progress through weekly/bi-weekly visits. April 2014 - May 2014 West Pharmaceutical - Kinston, NC Was responsible for managing the cleaning and protocol management of the construction of 10,000 sq ft of ISO 5 and ISO 8 pharmaceutical cleanrooms. PMSI performed a super clean at the beginning of our time onsite, and then performed daily maintenance cleaning, before completing one final super clean prior to certification. PMSI supplied all the cleanroom consumables on the jobsite and during the super clean we oversaw all of the personnel in the cleanroom for protocol and safety, including hazard mitigation, when performing cleanings. May 2014 - August 2014 Numark Assembly Room - Richmond, VA Created and implemented a Cleanroom protocol program for a company having none. Managed on a daily basis the protocol program and cleaning for the 15,000 sq ft Cleanroom and surrounding areas called the clean envelope. Trained all personnel working in that space on the protocol levels in place. Initiated gowning procedures at each level of protocol and supplied all gowning attire for project. August 2014 - Present Princeton Andlinger Center for Energy and the Environment - Princeton, NJ Created and implemented the Protocol program for this project. It's approximately 12,000 sq ft of classified cleanroom space ranging from ISO 5-ISO 8 as well as another 8,000 sq ft of unclassified clean area. I am responsible for all training of personnel working on the project and monitoring the activity of those working in the cleanroom to make sure protocol requirements are being followed. Will be responsible for maintaining the cleanliness and gowning supplies for the cleanroom entry points throughout the duration of the construction clean-build process. Various short/long term cleaning projects managedincluding the following projects from March 2006 - Present: Merck Pharmaceuticals, Elkton, VA as well as Merck Pharmaceuticals, Durham, NC cleanroom cleaning projects (Multiple phase pharmaceutical cleanrooms under cGMP process from base build to FDA audit) AZ Electronic Materials USA cleanroom/lab cleaning and certification in Branchburg, NJ BE&K lab space cleaning projects for Cel Sci in Elkridge, MD and ATCC in Manassas, VA
  • 3. University of Maryland cleaning project in Shady Grove, MD Advance Tec protocol and cleaning management project for Hemlock Semiconductor in Saginaw, MI Advance Tec cleanroom cleaning project for NASA in Greenbelt, MD Advance Tec lab/unclassified space cleaning project for CB Fleet in Lynchburg, VA Gilbane Co. cleaning project for Doctors Hospital expansion in Lanham, MD Norfolk State University cleanroom cleaning and certification in Norfolk, VA Advance Tec cleanroom cleaning project for CP Films/Solutia in Martinsville, VA Gilbane Co. BL4 Lab cleanroom cleaning project NIAD in Ft. Detrick, Frederick, MD Gilbane Co. hospital renovation cleaning project at NIH in Bethesda, MD UTC cleanroom protocol management and cleaning project in Princeton, NJ Advance Tec cleanroom cleaning project for University of Alabama in Tuscaloosa, AL Whiting-Turner RAF and final cleaning project N316 Fit-Up in Jessup, MD Hodess Construction/Draper Labs cleanroom cleaning project in Cambridge, MA Mrs. Holland has been quite extensively involved in various specialty cleanrooms for many different industrial applicationsincluding but not limited to Semiconductor,Pharmaceutical, Animal Testing,Food Processing, Nanotechnology, Bio-Medical,Telecommunication and Information Technology.