SlideShare a Scribd company logo
1 of 6
Download to read offline
A Synopsis on
"A Study on Enhancement of Productivity of A Component Using Lean Manufacturing
Concept in BTEC PVT. LTD."
Submitted to
The Director,
School of Commerce and Management
YCMOU, Nashik
In partial fulfillment of the Requirement for the award of the degree of
Master of Business Administration (MBA)
By: Tanmay S. Bhatt
PRN: 2014017001209766
Under the Guidance of
Mr. - Nitin S. Bhende
Through
The Coordinator
Study Center – Chetana College of Commerce [3133A]
1. Introduction
The company undertaken for the study is Bombay Transportation Electrical Components
Private Limited (BTECPL). It is an old manufacturing company which manufactures various
components. Since manufacturing plays important sector in Indian business, it also plays
role in contribution of Gross Domestic Product (GDP) which is vital for economic progress.
Engineering goods and transport equipment are fastest growing areas. There is constant
change in customer’s attitude towards purchasing of goods. Customer’s demands have
made the manufacturing industries to work with excellence. The competitiveness has
increased many folds. This has also increased the scope for trying new techniques for
improving process in the manufacturing industries. This has made MNC’s to invest in Indian
manufacturing industries since they consider our country as low cost manufacturing base
with abundance labour availability. The Indian government also favours FDI which can
contribute towards generation of employment, raise productivity, share skills and
techniques. This will boost sales and help in economic performance of our country. Thus
Government of India has realised the significance of the manufacturing industry to the
country’s industrial development and is taking necessary steps to increase investment in
this sector.
India has an advantage to attract investments with proper use of Manufacturing tools
and growing technology. Therefore keeping in mind demand and supply of goods,
productivity improvement is the need of the hour with suitable manufacturing tools and
techniques.
2. Importance and Significance of the Study
The increasing demands of manufacturing units will lead to possible development of
volume in manufacturing. So, Lean manufacturing tools are necessary to improve process of
manufacturing components. This will lead to improved efficiency in reaching of goods from
one place to another.
The study and implementation of lean manufacturing in BTECPL will help us to
understand the value of time and eliminates waste in processes. This will help to improve
quality. Improvement in quality means fewer defects. The usage of multiple machines is
reduced, so there will be fewer breakdowns in processes. This will lead to higher efficiency,
where morale and output of man per hour improves due to their enhanced involvement in
the processes. Application of lean manufacturing will also help to reduce inventory levels
which will help to save space. The turnover of stock will increase which will improve the
delivery performance of the company. Thus, with better customer satisfaction, relations
with customers will improve which will benefit in higher profits and increased business. This
increase in business relations will also help in attracting new customers in business.
3. Objectives of the Study
The topic of study is selected keeping in mind the scenario of increasing competitiveness
in manufacturing companies. Achieving faster outputs with enhanced inputs is the key to
attain goal of sustaining the place in industry. This indeed will help in quality improvement
with lower costs.
The main objectives of the study are as follows:
A). To reduce material& employee movement by 20%.
B). To increase productivity of component by 10%.
C). To lower inventory level/work in process of component.
4. Hypotheses
A). Availability of gauges, tools and fixtures for manufacturing of component will help in
growth of productivity.
B). The application of Kaizen, JIT will help to lower inventory level and material
movement/work in process by 10% respectively.
5. Research Methodology
A). Sample- The quantity of samples required for this study is 4000 nos. of components.
B). Sources of data collection:-
a). Primary source of data- Motion Study, Time Study, Taqt time calculation, Cycle
time calculation.
b). Secondary source of data- Quality tools
C). Method of processing the data collected- The data collected will be processed and
used to compare with the previous available data.
6. Expected Contribution
This study project will be beneficial in understanding flow of components. It will help
BTECPL management to recognise the non-value added activities. Non-value added
activities are just burden to any organisation and attacking the same will help in lean way of
thinking within organisation. The quality of human resource will increase by fuelling their
morale with the benefits. The capacity and capability of the organisation will increase which
will have direct effect on sales. Customer satisfaction and their involvement will increase
when they come to know the measures the organisation is taking to improve progress. This
study will help in optimum use of resources with reduced costs. It will also help to improve
development activities which will help in expanding customer base to develop more
businesses. This will trigger the accountability and profitability of the organisation.
7. Chapterisation
Chapter- I: Introduction and overview of company
Chapter- II: Importance and objectives of study
Chapter- III: Methodology and description of study
Chapter- IV: Study report and its presentation
Chapter- V: Conclusions, limitations and recommendations
Bibliography
Appendix
Sign of Research Candidate Sign of Research Supervisor
CERTIFICATE OF ORIGINALITY
I, Tanmay Sandeep Bhatt, PRN-2014017001209766 a bonafide student of MBA from
Yashavantrao Chavan Maharashtra Open University (YCMOU), Nashik.
I hereby certify that this project work carried by me (A Study on Enhancement of
Productivity of A Component Using Lean Manufacturing Concept in BTEC PVT. LTD.) is a
fulfillment of the requirement of the programme, is an original work of mine under
guidance of Mr. - Nitin S. Bhende and is not been reproduced from any existing work of any
other person and has not been submitted anywhere else at any time.
Tanmay S. Bhatt
Date: 9th
march 2015

More Related Content

What's hot

Enhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm conceptsEnhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm conceptseSAT Journals
 
INDUSTRIAL ENGINEERING DESIGN PROJECT
INDUSTRIAL ENGINEERING DESIGN PROJECTINDUSTRIAL ENGINEERING DESIGN PROJECT
INDUSTRIAL ENGINEERING DESIGN PROJECTAmir Mohammad Redzuan
 
Analysis of ship to use program stu a case study to investigate the effective
Analysis of ship to use program  stu  a case study to investigate the effectiveAnalysis of ship to use program  stu  a case study to investigate the effective
Analysis of ship to use program stu a case study to investigate the effectiveIAEME Publication
 
An Applied Research and a Lean Manufacturing Process Construction for Garment...
An Applied Research and a Lean Manufacturing Process Construction for Garment...An Applied Research and a Lean Manufacturing Process Construction for Garment...
An Applied Research and a Lean Manufacturing Process Construction for Garment...Business, Management and Economics Research
 
summer training on Customer Satisfaction at Shri Krishna Rolling Mills Ltd.
summer training on Customer Satisfaction at Shri Krishna Rolling Mills Ltd.summer training on Customer Satisfaction at Shri Krishna Rolling Mills Ltd.
summer training on Customer Satisfaction at Shri Krishna Rolling Mills Ltd.Aparna Sharma
 
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...IAEME Publication
 
Supply chain management and sustainibility
Supply chain management and sustainibilitySupply chain management and sustainibility
Supply chain management and sustainibilityMdGolamMortuzaLimon
 
Toc Approach for Supply Chain Performance Enhancement
Toc Approach for Supply Chain Performance EnhancementToc Approach for Supply Chain Performance Enhancement
Toc Approach for Supply Chain Performance EnhancementWaqas Tariq
 
CV - Be Thi Thu Hien
CV - Be Thi Thu HienCV - Be Thi Thu Hien
CV - Be Thi Thu HienHien Be
 
Effect of Quality of Service and Location on Satisfaction Customer at Pt. Per...
Effect of Quality of Service and Location on Satisfaction Customer at Pt. Per...Effect of Quality of Service and Location on Satisfaction Customer at Pt. Per...
Effect of Quality of Service and Location on Satisfaction Customer at Pt. Per...YogeshIJTSRD
 
10.5923.j.scit.20160603.02
10.5923.j.scit.20160603.0210.5923.j.scit.20160603.02
10.5923.j.scit.20160603.02anisur_rehman
 
Total Quality Management & Innovation
Total Quality Management & InnovationTotal Quality Management & Innovation
Total Quality Management & InnovationDarshit Paun
 
Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorRakibul Hasan
 
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYMPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYSharif Mrh
 
Understanding the Need of Implementation of Lean Techniques in Manufacturing ...
Understanding the Need of Implementation of Lean Techniques in Manufacturing ...Understanding the Need of Implementation of Lean Techniques in Manufacturing ...
Understanding the Need of Implementation of Lean Techniques in Manufacturing ...ijtsrd
 
2014 the plandocheckact-cycle-of-value-addition-2169-0316.1000124
2014 the plandocheckact-cycle-of-value-addition-2169-0316.10001242014 the plandocheckact-cycle-of-value-addition-2169-0316.1000124
2014 the plandocheckact-cycle-of-value-addition-2169-0316.1000124Kassu Jilcha (PhD)
 

What's hot (20)

Enhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm conceptsEnhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm concepts
 
INDUSTRIAL ENGINEERING DESIGN PROJECT
INDUSTRIAL ENGINEERING DESIGN PROJECTINDUSTRIAL ENGINEERING DESIGN PROJECT
INDUSTRIAL ENGINEERING DESIGN PROJECT
 
Analysis of ship to use program stu a case study to investigate the effective
Analysis of ship to use program  stu  a case study to investigate the effectiveAnalysis of ship to use program  stu  a case study to investigate the effective
Analysis of ship to use program stu a case study to investigate the effective
 
An Applied Research and a Lean Manufacturing Process Construction for Garment...
An Applied Research and a Lean Manufacturing Process Construction for Garment...An Applied Research and a Lean Manufacturing Process Construction for Garment...
An Applied Research and a Lean Manufacturing Process Construction for Garment...
 
summer training on Customer Satisfaction at Shri Krishna Rolling Mills Ltd.
summer training on Customer Satisfaction at Shri Krishna Rolling Mills Ltd.summer training on Customer Satisfaction at Shri Krishna Rolling Mills Ltd.
summer training on Customer Satisfaction at Shri Krishna Rolling Mills Ltd.
 
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
 
Opsworld 6 12
Opsworld 6 12Opsworld 6 12
Opsworld 6 12
 
I04402058062
I04402058062I04402058062
I04402058062
 
Supply chain management and sustainibility
Supply chain management and sustainibilitySupply chain management and sustainibility
Supply chain management and sustainibility
 
Toc Approach for Supply Chain Performance Enhancement
Toc Approach for Supply Chain Performance EnhancementToc Approach for Supply Chain Performance Enhancement
Toc Approach for Supply Chain Performance Enhancement
 
CV - Be Thi Thu Hien
CV - Be Thi Thu HienCV - Be Thi Thu Hien
CV - Be Thi Thu Hien
 
Effect of Quality of Service and Location on Satisfaction Customer at Pt. Per...
Effect of Quality of Service and Location on Satisfaction Customer at Pt. Per...Effect of Quality of Service and Location on Satisfaction Customer at Pt. Per...
Effect of Quality of Service and Location on Satisfaction Customer at Pt. Per...
 
TABLE OF CONTENTS
TABLE OF CONTENTSTABLE OF CONTENTS
TABLE OF CONTENTS
 
10.5923.j.scit.20160603.02
10.5923.j.scit.20160603.0210.5923.j.scit.20160603.02
10.5923.j.scit.20160603.02
 
Total Quality Management & Innovation
Total Quality Management & InnovationTotal Quality Management & Innovation
Total Quality Management & Innovation
 
Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floor
 
The Credibility and Plausibility of the Modified Usage of the Activity Based ...
The Credibility and Plausibility of the Modified Usage of the Activity Based ...The Credibility and Plausibility of the Modified Usage of the Activity Based ...
The Credibility and Plausibility of the Modified Usage of the Activity Based ...
 
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYMPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
 
Understanding the Need of Implementation of Lean Techniques in Manufacturing ...
Understanding the Need of Implementation of Lean Techniques in Manufacturing ...Understanding the Need of Implementation of Lean Techniques in Manufacturing ...
Understanding the Need of Implementation of Lean Techniques in Manufacturing ...
 
2014 the plandocheckact-cycle-of-value-addition-2169-0316.1000124
2014 the plandocheckact-cycle-of-value-addition-2169-0316.10001242014 the plandocheckact-cycle-of-value-addition-2169-0316.1000124
2014 the plandocheckact-cycle-of-value-addition-2169-0316.1000124
 

Viewers also liked

Sbi mutual fund products
Sbi mutual fund productsSbi mutual fund products
Sbi mutual fund productsBAVNEET91
 
Sbi life insurance distributuion channel
Sbi life insurance distributuion channelSbi life insurance distributuion channel
Sbi life insurance distributuion channelsahilmonga001
 
SBI Magnum Multicap Fund: An Equity Fund By SBI Mutual Fund - Jul 2016
SBI Magnum Multicap Fund: An Equity Fund By SBI Mutual Fund - Jul 2016SBI Magnum Multicap Fund: An Equity Fund By SBI Mutual Fund - Jul 2016
SBI Magnum Multicap Fund: An Equity Fund By SBI Mutual Fund - Jul 2016SBI Mutual Fund
 
Mutual fund project sbi mutual funds
Mutual fund project  sbi mutual fundsMutual fund project  sbi mutual funds
Mutual fund project sbi mutual fundsssskcollege
 
Analytical Study of SBI Mutual Fund By Sachin Kakde
Analytical Study of SBI Mutual Fund  By   Sachin KakdeAnalytical Study of SBI Mutual Fund  By   Sachin Kakde
Analytical Study of SBI Mutual Fund By Sachin KakdeSachin Kakde
 
Customer awareness @ sbi mutual fund project report mba marketing
Customer awareness @ sbi mutual fund project report mba marketingCustomer awareness @ sbi mutual fund project report mba marketing
Customer awareness @ sbi mutual fund project report mba marketingBabasab Patil
 
A Project report on MUTUAL FUND AND BANK ASSURANCE SBI BANKS
A Project report on MUTUAL FUND AND BANK ASSURANCE SBI BANKSA Project report on MUTUAL FUND AND BANK ASSURANCE SBI BANKS
A Project report on MUTUAL FUND AND BANK ASSURANCE SBI BANKSpratikrvyas007
 
Project on mutual funds is the better investments plan
Project on mutual funds is the better investments planProject on mutual funds is the better investments plan
Project on mutual funds is the better investments planProjects Kart
 
Project report a study of sbi mutual funds up
Project report a study of sbi mutual funds upProject report a study of sbi mutual funds up
Project report a study of sbi mutual funds uprangeshsatna
 
Full Project Report on SBI mutual funds.
Full Project Report on SBI mutual funds.Full Project Report on SBI mutual funds.
Full Project Report on SBI mutual funds.AKSHAY TYAGI
 
Study on Mutual Fund
Study on Mutual FundStudy on Mutual Fund
Study on Mutual FundVivek Saha
 
Project Report On Mutual fund
Project Report On Mutual fund Project Report On Mutual fund
Project Report On Mutual fund Amit Dazz
 
Project on Mutual Funds
Project on  Mutual FundsProject on  Mutual Funds
Project on Mutual FundsRavindra Jeet
 
A project report on comparative study of mutual funds in india
A project report on comparative study of mutual funds in indiaA project report on comparative study of mutual funds in india
A project report on comparative study of mutual funds in indiaProjects Kart
 

Viewers also liked (15)

Sbi mutual fund products
Sbi mutual fund productsSbi mutual fund products
Sbi mutual fund products
 
Sbi life insurance distributuion channel
Sbi life insurance distributuion channelSbi life insurance distributuion channel
Sbi life insurance distributuion channel
 
SBI Magnum Multicap Fund: An Equity Fund By SBI Mutual Fund - Jul 2016
SBI Magnum Multicap Fund: An Equity Fund By SBI Mutual Fund - Jul 2016SBI Magnum Multicap Fund: An Equity Fund By SBI Mutual Fund - Jul 2016
SBI Magnum Multicap Fund: An Equity Fund By SBI Mutual Fund - Jul 2016
 
Mutual fund project sbi mutual funds
Mutual fund project  sbi mutual fundsMutual fund project  sbi mutual funds
Mutual fund project sbi mutual funds
 
sbi mutual fund
sbi mutual fundsbi mutual fund
sbi mutual fund
 
Analytical Study of SBI Mutual Fund By Sachin Kakde
Analytical Study of SBI Mutual Fund  By   Sachin KakdeAnalytical Study of SBI Mutual Fund  By   Sachin Kakde
Analytical Study of SBI Mutual Fund By Sachin Kakde
 
Customer awareness @ sbi mutual fund project report mba marketing
Customer awareness @ sbi mutual fund project report mba marketingCustomer awareness @ sbi mutual fund project report mba marketing
Customer awareness @ sbi mutual fund project report mba marketing
 
A Project report on MUTUAL FUND AND BANK ASSURANCE SBI BANKS
A Project report on MUTUAL FUND AND BANK ASSURANCE SBI BANKSA Project report on MUTUAL FUND AND BANK ASSURANCE SBI BANKS
A Project report on MUTUAL FUND AND BANK ASSURANCE SBI BANKS
 
Project on mutual funds is the better investments plan
Project on mutual funds is the better investments planProject on mutual funds is the better investments plan
Project on mutual funds is the better investments plan
 
Project report a study of sbi mutual funds up
Project report a study of sbi mutual funds upProject report a study of sbi mutual funds up
Project report a study of sbi mutual funds up
 
Full Project Report on SBI mutual funds.
Full Project Report on SBI mutual funds.Full Project Report on SBI mutual funds.
Full Project Report on SBI mutual funds.
 
Study on Mutual Fund
Study on Mutual FundStudy on Mutual Fund
Study on Mutual Fund
 
Project Report On Mutual fund
Project Report On Mutual fund Project Report On Mutual fund
Project Report On Mutual fund
 
Project on Mutual Funds
Project on  Mutual FundsProject on  Mutual Funds
Project on Mutual Funds
 
A project report on comparative study of mutual funds in india
A project report on comparative study of mutual funds in indiaA project report on comparative study of mutual funds in india
A project report on comparative study of mutual funds in india
 

Similar to Synopsis on Productivity

Application of Quality Tools to Reduce Failure Identification in an Automotiv...
Application of Quality Tools to Reduce Failure Identification in an Automotiv...Application of Quality Tools to Reduce Failure Identification in an Automotiv...
Application of Quality Tools to Reduce Failure Identification in an Automotiv...IJAEMSJORNAL
 
F444652
F444652F444652
F444652aijbm
 
To Analyze the Use of Statistical Tool/S for Cost Effectiveness and Quality o...
To Analyze the Use of Statistical Tool/S for Cost Effectiveness and Quality o...To Analyze the Use of Statistical Tool/S for Cost Effectiveness and Quality o...
To Analyze the Use of Statistical Tool/S for Cost Effectiveness and Quality o...iosrjce
 
A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)Avijeet Suryavanshi
 
Importance of Production Planning and Control in Small Manufacturing Enterprises
Importance of Production Planning and Control in Small Manufacturing EnterprisesImportance of Production Planning and Control in Small Manufacturing Enterprises
Importance of Production Planning and Control in Small Manufacturing Enterprisesinventionjournals
 
OPERATIONS MANAGEMENT Chapter 1 5
OPERATIONS MANAGEMENT Chapter 1 5OPERATIONS MANAGEMENT Chapter 1 5
OPERATIONS MANAGEMENT Chapter 1 5yared ayele
 
Lakshya corporate prz
Lakshya corporate przLakshya corporate prz
Lakshya corporate przpradeep sale
 
aritel-reliance-info-ion
 aritel-reliance-info-ion aritel-reliance-info-ion
aritel-reliance-info-ionSandeep Kumar
 
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...IRJET Journal
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringAmanuzzaman Aman
 
Vinay and Anup siit phase 1 final report-Pragati Engineering Belgaum
Vinay and Anup siit phase 1  final report-Pragati Engineering BelgaumVinay and Anup siit phase 1  final report-Pragati Engineering Belgaum
Vinay and Anup siit phase 1 final report-Pragati Engineering BelgaumVinay Lokesh
 
Facility Capacity Planning & its Measurement[1].pptx
Facility Capacity Planning & its Measurement[1].pptxFacility Capacity Planning & its Measurement[1].pptx
Facility Capacity Planning & its Measurement[1].pptxMeetLalcheta
 
Facility Capacity Planning & its Measurement[1] - Copy.pptx
Facility Capacity Planning & its Measurement[1] - Copy.pptxFacility Capacity Planning & its Measurement[1] - Copy.pptx
Facility Capacity Planning & its Measurement[1] - Copy.pptxMeetLalcheta
 
A project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan KumarA project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan KumarAbhinandan Kumar
 

Similar to Synopsis on Productivity (20)

Application of Quality Tools to Reduce Failure Identification in an Automotiv...
Application of Quality Tools to Reduce Failure Identification in an Automotiv...Application of Quality Tools to Reduce Failure Identification in an Automotiv...
Application of Quality Tools to Reduce Failure Identification in an Automotiv...
 
Jagdishsodha
JagdishsodhaJagdishsodha
Jagdishsodha
 
F444652
F444652F444652
F444652
 
To Analyze the Use of Statistical Tool/S for Cost Effectiveness and Quality o...
To Analyze the Use of Statistical Tool/S for Cost Effectiveness and Quality o...To Analyze the Use of Statistical Tool/S for Cost Effectiveness and Quality o...
To Analyze the Use of Statistical Tool/S for Cost Effectiveness and Quality o...
 
Resume_sneha
Resume_snehaResume_sneha
Resume_sneha
 
A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)
 
Importance of Production Planning and Control in Small Manufacturing Enterprises
Importance of Production Planning and Control in Small Manufacturing EnterprisesImportance of Production Planning and Control in Small Manufacturing Enterprises
Importance of Production Planning and Control in Small Manufacturing Enterprises
 
OPERATIONS MANAGEMENT Chapter 1 5
OPERATIONS MANAGEMENT Chapter 1 5OPERATIONS MANAGEMENT Chapter 1 5
OPERATIONS MANAGEMENT Chapter 1 5
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
Lakshya corporate prz
Lakshya corporate przLakshya corporate prz
Lakshya corporate prz
 
aritel-reliance-info-ion
 aritel-reliance-info-ion aritel-reliance-info-ion
aritel-reliance-info-ion
 
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
 
Vinay and Anup siit phase 1 final report-Pragati Engineering Belgaum
Vinay and Anup siit phase 1  final report-Pragati Engineering BelgaumVinay and Anup siit phase 1  final report-Pragati Engineering Belgaum
Vinay and Anup siit phase 1 final report-Pragati Engineering Belgaum
 
PPC-3-Math.pdf
PPC-3-Math.pdfPPC-3-Math.pdf
PPC-3-Math.pdf
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Facility Capacity Planning & its Measurement[1].pptx
Facility Capacity Planning & its Measurement[1].pptxFacility Capacity Planning & its Measurement[1].pptx
Facility Capacity Planning & its Measurement[1].pptx
 
Facility Capacity Planning & its Measurement[1] - Copy.pptx
Facility Capacity Planning & its Measurement[1] - Copy.pptxFacility Capacity Planning & its Measurement[1] - Copy.pptx
Facility Capacity Planning & its Measurement[1] - Copy.pptx
 
A project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan KumarA project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan Kumar
 

Synopsis on Productivity

  • 1. A Synopsis on "A Study on Enhancement of Productivity of A Component Using Lean Manufacturing Concept in BTEC PVT. LTD." Submitted to The Director, School of Commerce and Management YCMOU, Nashik In partial fulfillment of the Requirement for the award of the degree of Master of Business Administration (MBA) By: Tanmay S. Bhatt PRN: 2014017001209766 Under the Guidance of Mr. - Nitin S. Bhende Through The Coordinator Study Center – Chetana College of Commerce [3133A]
  • 2. 1. Introduction The company undertaken for the study is Bombay Transportation Electrical Components Private Limited (BTECPL). It is an old manufacturing company which manufactures various components. Since manufacturing plays important sector in Indian business, it also plays role in contribution of Gross Domestic Product (GDP) which is vital for economic progress. Engineering goods and transport equipment are fastest growing areas. There is constant change in customer’s attitude towards purchasing of goods. Customer’s demands have made the manufacturing industries to work with excellence. The competitiveness has increased many folds. This has also increased the scope for trying new techniques for improving process in the manufacturing industries. This has made MNC’s to invest in Indian manufacturing industries since they consider our country as low cost manufacturing base with abundance labour availability. The Indian government also favours FDI which can contribute towards generation of employment, raise productivity, share skills and techniques. This will boost sales and help in economic performance of our country. Thus Government of India has realised the significance of the manufacturing industry to the country’s industrial development and is taking necessary steps to increase investment in this sector. India has an advantage to attract investments with proper use of Manufacturing tools and growing technology. Therefore keeping in mind demand and supply of goods, productivity improvement is the need of the hour with suitable manufacturing tools and techniques.
  • 3. 2. Importance and Significance of the Study The increasing demands of manufacturing units will lead to possible development of volume in manufacturing. So, Lean manufacturing tools are necessary to improve process of manufacturing components. This will lead to improved efficiency in reaching of goods from one place to another. The study and implementation of lean manufacturing in BTECPL will help us to understand the value of time and eliminates waste in processes. This will help to improve quality. Improvement in quality means fewer defects. The usage of multiple machines is reduced, so there will be fewer breakdowns in processes. This will lead to higher efficiency, where morale and output of man per hour improves due to their enhanced involvement in the processes. Application of lean manufacturing will also help to reduce inventory levels which will help to save space. The turnover of stock will increase which will improve the delivery performance of the company. Thus, with better customer satisfaction, relations with customers will improve which will benefit in higher profits and increased business. This increase in business relations will also help in attracting new customers in business. 3. Objectives of the Study The topic of study is selected keeping in mind the scenario of increasing competitiveness in manufacturing companies. Achieving faster outputs with enhanced inputs is the key to attain goal of sustaining the place in industry. This indeed will help in quality improvement with lower costs.
  • 4. The main objectives of the study are as follows: A). To reduce material& employee movement by 20%. B). To increase productivity of component by 10%. C). To lower inventory level/work in process of component. 4. Hypotheses A). Availability of gauges, tools and fixtures for manufacturing of component will help in growth of productivity. B). The application of Kaizen, JIT will help to lower inventory level and material movement/work in process by 10% respectively. 5. Research Methodology A). Sample- The quantity of samples required for this study is 4000 nos. of components. B). Sources of data collection:- a). Primary source of data- Motion Study, Time Study, Taqt time calculation, Cycle time calculation. b). Secondary source of data- Quality tools C). Method of processing the data collected- The data collected will be processed and used to compare with the previous available data.
  • 5. 6. Expected Contribution This study project will be beneficial in understanding flow of components. It will help BTECPL management to recognise the non-value added activities. Non-value added activities are just burden to any organisation and attacking the same will help in lean way of thinking within organisation. The quality of human resource will increase by fuelling their morale with the benefits. The capacity and capability of the organisation will increase which will have direct effect on sales. Customer satisfaction and their involvement will increase when they come to know the measures the organisation is taking to improve progress. This study will help in optimum use of resources with reduced costs. It will also help to improve development activities which will help in expanding customer base to develop more businesses. This will trigger the accountability and profitability of the organisation. 7. Chapterisation Chapter- I: Introduction and overview of company Chapter- II: Importance and objectives of study Chapter- III: Methodology and description of study Chapter- IV: Study report and its presentation Chapter- V: Conclusions, limitations and recommendations Bibliography Appendix Sign of Research Candidate Sign of Research Supervisor
  • 6. CERTIFICATE OF ORIGINALITY I, Tanmay Sandeep Bhatt, PRN-2014017001209766 a bonafide student of MBA from Yashavantrao Chavan Maharashtra Open University (YCMOU), Nashik. I hereby certify that this project work carried by me (A Study on Enhancement of Productivity of A Component Using Lean Manufacturing Concept in BTEC PVT. LTD.) is a fulfillment of the requirement of the programme, is an original work of mine under guidance of Mr. - Nitin S. Bhende and is not been reproduced from any existing work of any other person and has not been submitted anywhere else at any time. Tanmay S. Bhatt Date: 9th march 2015