Bangor Maine Waterfront Park Updated 2010
1. Bangor Waterfront Park
Waterfront Park
March 17, 2010
Prepared By:
City of Bangor
&
Shadley Associates, P.C.
Shadley Associates,
P.C.
2. Bangor Waterfront Park
Presentation Agenda
•Summary of Waterfront Master Plan
and completed work
•Waterfront Park Master Plan
•Phase I Work
•Next Steps
Shadley Associates,
P.C.
3. Bangor Waterfront Park
Waterfront Master Plan
And
Completed Work
Shadley Associates,
P.C.
5. Bangor Waterfront Park
Open Space Railroad Street
Improvements, 2003 Improvements, 2004
Phase I Park
Improvements, 2009 - 2010
Coal Tar Remediation, 2009
Water’s Edge Front Street
Improvements, 2005 Improvements, 2003
Shadley Associates,
P.C.
Built Work
10. Bangor Waterfront Park
Park Program Summary of Program Elements:
14 Acre Linear Park • Open green space
• Jogging and walking trails
• Bike trails
• Strong connections with other destinations
• Spaces for events, performances and
open-air markets (supported by utilities)
• Cross-country skiing
• Ice skating
• Parking
• Playground: Tot Lot and Water Play
• Picnic Spaces
• Noteworthy Design / Visually Distinct
• Lighting and Planting
Shadley Associates,
P.C.
11. Bangor Waterfront Park
Connections with the
Shadley Associates, Surrounding Community
P.C.
13. Bangor Waterfront Park
Railroad Street Parking Lot
Fencing and planting along
with drainage chambers, lights
RR Right of Way
Trail connection to Dutton
Street with lights
Multiuse trails and grading
for amphitheater
Compass
Rose
Waterfront Parking Lot with
drainage chambers, lights
and access drive
Phase I Park Under
Shadley Associates, Construction, 2009 -
P.C.
14. Bangor Waterfront Park
Stormwater Treatment as approved by the
DEP
Shadley Associates,
P.C.
15. Bangor Waterfront Park
Waterfront Park Existing Conditions
Looking north from hotel December 2008
Shadley Associates,
P.C.
21. Bangor Waterfront Park
Area to be loamed and seeded, and
later planted
Shadley Associates,
P.C.
Coal Tar Remediation, Fall 2009
22. Bangor Waterfront Park
Construction work to be completed this Spring:
- Dutton Street end: paving, lights, rain gardens
- Amphitheater grading and multi-use trails
- Finish paving, including Compass Rose
- Planting, seeding and rain gardens
- Car top boat access
Shadley Associates,
P.C.
23. Bangor Waterfront Park
8’
Boat Access on Master Plan -
Future
Car top boat access
Shadley Associates,
P.C. Boat Access on Current Construction
24. Bangor Waterfront Park
Work Remaining to
Complete the Park Master Plan
Shadley Associates,
P.C.
26. Bangor Waterfront Park
Area 1 – East of Waterfront
Parking Lot:
• New Building
• Wet and Dry Playgrounds
• Shoreline Walkway and
Restoration
THIS AREA HAS 90%
COMPLETE DRAWINGS
AND SPECIFICATIONS
Shadley Associates,
P.C.
27. Bangor Waterfront Park
New Building:
• Public Restrooms
• Equipment Room to both Equipment
replace existing building and Restrooms
to house the sprayground
equipment
Shadley Associates,
P.C.
32. Bangor Waterfront Park
Area 2 – Waterfront Lot to
South of Amphitheater:
• Green Space for Passive
Recreation
• Finished Amphitheater
• Shade Shelters,
Walkways, Rain Gardens,
Planting
THIS AREA HAS BEEN
DEVELOPED TO THE
MASTER PLAN LEVEL
Shadley Associates,
P.C.
34. Bangor Waterfront Park
Area 3 – South of
Amphitheater to Pike
Industries:
• Great Lawn
• Butterfly Garden
•Walkway to Dutton Street
THIS AREA HAS BEEN
DEVELOPED TO THE
MASTER PLAN LEVEL
Shadley Associates,
P.C.
35. Bangor Waterfront Park
Area 3: Area 2: Area 1:
• Construction Cost • Construction Cost • Construction Cost
Estimate: $675,000 Estimate: $1,350,000 Estimate: $1,770,700
Total Estimated Construction Cost:
$3,795,700
Plus Fees, Expenses and Permit
Shadley Associates, Amendment Applications
P.C.