1. Game stalls were a hit with all age groups.
The varied selection of shows included
freestyle dancing by a young Omani group
that got everyone’s feet tapping. Other
highlights included an Omani rapper, a
Latino acrobat show, magic show and the
Flydubai, Dubai’s innovative airline,
today announced the start of its new
route to Salalah, expanding its presence
in the Sultanate of Oman. Flights to
Salalah will begin on 21st
May 2013
and operate three times a week on
Tuesdays, Thursdays and Saturdays.
Flydubai started operations to the
capital, Muscat, in 2010. The new route
expands Flydubai’s GCC network to 14
destinations, underlining the carrier’s
commitment to supporting business ties
and leisure traffic between Dubai and the
neighbouring region.
Flight Information
Flights to Salalah will operate three
times a week and will commence on
21st
May 2013. FZ093 departs Dubai
Terminal 2 on Tuesdays, Thursdays
and Saturdays at 1620hrs, landing in
Salalah Airport at 1820hrs local time.
The return flight, FZ040, departs at
1920hrs, arriving in Dubai at 2130hrs
local time. Round trip fares from Dubai
to Salalah start at AED 1000 and fares
from Salalah to Dubai start at OMR 105.
NE WS
Muriya
JEBEL SIFAH CARNIVAL:
ANASTOUNDINGSUCCESS
Business News
Features
Entertainment
April 2013 Official Newspaper of Muriya Tourism Development www.muriya.om Issue 02
2013 promises to be a pivotal year for our
fellow Orascom Development Holding
project in Switzerland, Andermatt Swiss
Alps. Culminating in the opening of its
inaugural 5 superior hotel The Chedi
Andermatt in December, the months
ahead also herald the completion of the
first chalet and 18-hole golf course.
The Andermatt Swiss Alps’ vision
is unique; with an aim to create an
exclusive year-round destination, which
is in keeping with the existing village. On
completion the real estate and lifestyle
offerings at Andermatt will be substantial,
consisting of six hotels in the 4 and 5
sector, 490 apartments in 42 buildings,
Juweira boutique hotel is extending its
wing, 18 apartments that are adjacent
to the hotel and facing the marina will
be opening up soon by the end of Aug
2013. Finishing work is ongoing and will
be completed by June. These apartments
will be operated and serviced by Juweira.
Jebel Sifah was the venue for a spectacular,
one-of-a-kind event over the weekend
drawing close to 2500 people. The evening
was a total entertainer with shows and
activities that kept everyone enthralled
complete with music and food.
MORE INSIDE
Unbelievable Weekend Getaways
popular clown show that encouraged the
children to get on the stage to dance. ‘Pirates
of Arabia’ drew a lot of interest and the stilt
walkers and clown on a tricycle added to
the festive ambience. The atmosphere was
electric, the crowd turnout fantastic and the
ANDERMATT SWISS ALPS Juweira Hotel to open 18 fully serviced
Apartments in August 2013
We are very interested in receiving your comments, suggestions and questions regarding the contents of our newspaper. Pls write to us at feedback@muriya.om
FLYDUBAI ADDS
SALALAH TO GCC
PORTFOLIO
25 bespoke private chalets, in addition to
retail units and conference facilities for
up to 600 delegates.
For any further enquiries, please email
info@andermatt-swissalps.ch or call
+41 41 874 88 88
+968 24 749 111 | reservations@sifawyhotel.com
WATER TAXI
SERVICES
AVAILABLE TO
JEBEL SIFAH
Call 24 749 111
feedback we have received so far has been
very positive. Comments ranged from the
event being very well organised to ‘pure
fun’ that makes all the work and effort that
has gone into organising an event of such
magnitude, worthwhile.
The fully furnished apartments will
come with the option of 1, 2 and 3
bedrooms and balconies. The area of
these apartments will range from 80 to
175m2
and will be available on short and
long term lease. For more information
contact info@muriya.om.
2. The office is located
on the ground floor of
the Bay view block on
the marina front and
will serve as both an
information and sales
center.
Working hours will
be from 9 am to 5pm
on weekdays and
weekends.
SALES CENTER AT
SALALAH BEACH IS
NOW OPEN
DELIVERY OF PROPERTIES
Completed in February/March/April 2013
Work has started on the new road
connecting Yiti and Sifah with a total length
of 20 km. “Construction
started in June 2012
and is expected to be
completed by Dec 2014.
A part of the new road
will pass through the
Jebel Sifah project with
a total length of 4,150
meters. This road will
follow the track of the
mountain road, and will
be providing access to the Four Seasons,
1. What is a Maliki Visa?
Maliki (Owner) Visa: This type is issued
directly by the Government to the
expatriate who owns a constructed unit
registered under his/her name in one of
the Integrated Tourism Complexes.
• A Maliki Visa holder has the right
to bring in a housemaid, open bank
accounts, buy vehicles and boats etc.
• The Maliki Visa is issued with a two-
year validity, renewed automatically, but
is immediately terminated on the sale of
the property by the expatriate.
2. Is there an inheritance
tax applicable?
No taxes are applied on inheritance,
regulations of the country of origin of the
owner will apply.
3. Can a homeowner have a
villa design of his choice?
Apartments
handed over in
Jebel Sifah
1 in block 18
1 in block 15
1 in block 13
1 in block 9
1 in block 1
6 in block 15
Villas handed over in
Jebel Sifah
1 villa in zone E
The apartments in both Jebel Sifah and Salalah
Beach are based in the Marina Town overlooking
the marina and provide for a spectacular view
any time of the day. It is at the heart of the busy
township, in proximity to two boutique hotels in
Salalah Beach and one boutique hotel in Jebel Sifah.
The following are the listing of properties
delivered in Jebel Sifah and Salalah Beach during
February and March 2013
The Polony family of four are
residents of Switzerland, and
frequented Oman to visit their
close friends every now and then.
Little did they envision that one
day they would become a part
of Oman. It was during one of
these visits, out of politeness they
decided to visit Jebel Sifah.
During that time the destination
was very much a construction site,
but despite that Brigitte and André
Polony saw the immense potential
and fell in love with the location.
Jebel Sifah has since then become
their second home. They now own
a two bedroom apartment facing
the Gulf of Oman and with a view
to the beautiful marina. They were
the second home owners to move
into Jebel Sifah in October 2011.
Polony’s family visits Jebel Sifah
two to three times a year.
“I enjoy the space and quietness of this
destination; it is so unlike the country I
come from. I also love the fact that the
maintenancestaffonsitearesoprompt
and helpful; it’s a privilege that I
wouldn’t experience in my hometown.
We love the peacefulness and yet love
the fact that all the amenities will soon
be available at the stretch of a hand. At
Jebel Sifah, we hope to have the best of
bothworlds”,saidAndréPolony.
INBUSINESS
LOVE AT FIRST SIGHT
Testimony from Jebel Sifah homeowner
Apartments handed
over in Salalah Beach
2 in west block
2 in East block
CONSTRUCTION
ON YITI- SIFAH
ROAD STARTED
Banyan Tree & Angsana hotels. It will follow
all the way to the end of the development
and further to the local
Sifah village.
The scenic road will
enable the traveller to
experience both the
mountains and the
coast in a single journey
as it will cut across the
Jebels dividing Muscat
and Sifah and will also
hug the coast when it
passes Bandar Khairan.
No, you have to choose from one of our
designs, amendments to these can be
made after approval from our design
department.
4. On purchasing a home
at Jebel Sifah or Salalah
Beach would my kids get
residency, is there age limit?
Yes, the kids would get residency
irrespective of their age limit.
5.Whenwillthegolfcourse,
hotels, shops open in Jebel
Sifah and Salalah Beach?
Timeline for Jebel Sifah
• Golf course – 2015
• Missoni and Angsana Hotel - 2015
• Few shops - 2013
Timeline for Salalah Beach
• Golf course – 2014
• Opening of marina - 2013
• Rotana Hotel - end of 2013
• Few shops - 2013
3. SPONSORSHIPS & EVENTS
Rotana Hotel when completed
will consist of 399 rooms (256
standard, 120 superior, 10 junior
suites, 10 executive suites and 3
ambassador suites). There will
be three restaurants, an all day
dining, a speciality restaurant
(Teatro) and a beach restaurant.
The Hotel will also have meeting
facilities with 4 meeting rooms,
the largest with a size of 400m2
.
Four swimming pools will be part
of the leisure facility. A dedicated
section of the hotel will serve
as the kids club which will be
located on the island, surrounded
by the lagoon. The main building,
which holds the lobby, meeting
rooms, spa and two restaurants,
will also be on this island. The
hotel has three different clusters
including the main building.
Construction on the main
building is 100% completed
and work is ongoing on the
wooden structures. Progress
on the other clusters is as per
plan. Rotana Hotel is expected
to open in Dec 2013.
INFEATURES
SHADE FOR STUDENTS
STUDYING IN SIFAH
SCHOOL
Muriya extended its goodwill by
building shades and seating benches
in the local Omani school in Sifah. A
completely shaded area was built for
the kids to sit and rest during their
break time at school; this has been
done in time before the intense heat of
summer kicked in.
COMPUTERSDONATED
TO THE HANDICAPPED
ASSOCIATION
Muriya firmly believes that differently
abled individuals can be fruitful
members of society and can help in the
growth of their communities and also
the country. To help them further their
usefulness, four desktop computers were
donated by Muriya to help facilitate
computer education at the Handicapped
Association. This gesture of goodwill was
much appreciated by them.
SPONSORSHIP OF OER
CEO GOLF
The 9th edition of the OER CEO Golf
took place on the 7th and 8th of Feb and
was a resounding success. Muriya was on
board as the support sponsor.
Describing the reasons for Muriya’s
partnership with OER CEO Golf 2013,
CEO Chandra Lahiri adds, “Muriya will
be building three world-class golf courses
in Oman over the next few years, which
Top: recent view of the site at Salalah Beach. Below: plan view in relation to the development
ROTANA ON TRACK FOR
COMPLETION
will actually double the country’s golf
courses from the current three, pioneered
by the Muscat Hills Course. We expect to
be a very significant player on the Oman
golf scene – hence our partnership with
OER CEO Golf is all but natural.”
MURIYA AT THE BOAT
SHOW IN DUBAI
Dubai International Boat Show is
the largest, most important and most
established event of its kind in the
region and as one of the fastest growing
leisure marine industry exhibitions in
the world, the 21st edition of the event
took place from 5th till 9th of March.
Muriya participated in the show to
showcase the now operational Jebel
Sifah marina, and the destinations itself
besides its other project Salalah Beach.
Air Arabia announced the increase in
frequency of flights to Salalah from
Sharjah. Effective 8 May, the airline
will offer three flights per week, an
addition of one flight to the existing
schedule. The new flight will depart
on Wednesdays.
Adel Ali, Group Chief Executive
Officer, Air Arabia said: “We will
continue to further expand our
network in the Arab world and beyond,
providing customers with a wider
choice.” During the Salalah Tourism
Festival, the city is frequented by
visitors from all over the world. The
beautiful beaches and coastline are
also major attractions for scuba diving
and bird watching.
AIR ARABIA
INCREASING FLIGHTS
TO SALALAH
2 BDR, prime marina
apartment in Jebel Sifah
with access to a balcony
and roof terrace. Two
bathrooms and an open
kitchen plan.
Call +968 965 032 52
Easy payment plans available
HOT PROPERTY
FOR SALE
READY
TO
MOVE
IN
4. Muriya’s destination Salalah Beach
will be the venue for a one-of-a-kind
fiesta during May, it will host various
activities planned for all ages with
non-stop fun and games. The event
will be an incessant flow of shows
and entertainment, heightened by the
beautiful outdoor location. This family
oriented festival will be organized
around the beautiful marina of Salalah
Beach and will be a treat visually. The
entry to this event will be free for all
to encourage everyone to visit this
beautiful destination.
Salalah Beach known as the only true
tropical destination of the region
attracts tourists from all over the GCC
during the Khareef (monsoon) season
due to its greenery and cool weather
during summer.
Every now and then we all need a
break, away from the busy schedules
and the humdrum of the city life. We
need to get away to a place where we
feel rejuvenated and all set to start the
week again. The perfect place awaits
you at Jebel Sifah, the experience of this
unique new destination begins on the
magical 45 minute journey from the
modernity of Muscat travelling through
the serenity and untouched natural
beauty of the surrounding landscape.
Around every corner are hidden secrets
from the traditional Omani villages to
the hidden coves and beaches where the
local fishermen practice their art in time
honoured fashion.
The first glimpses of the stunning
destination nestled on the shores of the
Gulf of Oman and framed by the ever
changing hues of the Hajjar mountain
range, guarantee you that a unique
experience awaits. We have tailored an
itinerary for you to experience nature
at its best
A DAY AT JEBEL SIFAH
• Wake up to the serene sunrise and
have a walk with nature on the
marina promenade
• A relaxed and refreshing breakfast at
Al Sabla restaurant
• Take a picnic basket to indulge in
a coastal tour, dolphin watching,
snorkelling at Bandar Khairan or
even diving
• Spend the afternoon soaking in
the sun on the pool side or on the
private beach of Sifawy hotel
• Sum up the relaxed day by having a
candle lit dinner at the As Sammak
seafood restaurant located on the
Sifah beach
Contact us to experience Jebel Sifah at
+968 24749111
In the inaugural fishing challenge
organized by the Jebel Sifah Marina, 14
teams tested their skills and vied to haul in
the biggest catch. A total of 50 contestants,
including a team from Holland, competed
as per the IGFA (International Game
Fishing Association) rules, with the
support of the MGFA (Muscat Game
Fishing Association).
Ray Montoya clinched the first spot with
a 7.4kg grouper in the IGFA category
while Hani Macki and Mazin Al Asfoor
landed a 6kg dorado and 5.2kg hammour
respectively. While the teams were very
competitive, it was the fun of the sport and
good spirits that were the highlight of the
competition.
29 year old, Ali Ahmed Yosuf has been
with Muriya as the office boy since 2009
and has been exceptional in his work. Ali
in his years of service has always gone that
extra mile to make things happen.
He has earned a name for being prompt
and finishing a task to perfection. He is
one of those indispensable people. Kudos
to Ali for being our star employee.
SALALAH BEACH
FESTIVAL
TO TAKE PLACE
IN MAY
WINNERS OF
JEBEL SIFAH
FISHING
CHALLENGE
2013
INENTERTAINMENT
STAR
EMPLOYEE CONGRATULATIONS..
Devender on the birth
of a baby boy
Amal Al Rahbi & Majid Al Rahbi
on tying the knot
NEWLY ENGAGED
Mohamed Siyabi &
Arfa
Juweira Boutique Hotel Salalah Beach Marina, Sultanate of Oman
+968 23 239 600 | reservations@juweirahotel.com | www.juweirahotel.com
Celebrate the happiest
moment in your life...
Honeymoon in our tropical paradise
Complimentary upgrade to a Marina Suite**
• Complimentary airport transfer & welcome drink on arrival
Fresh fruits and flowers placed in the room •Romantic breakfast in bed • Late check-out until 18:00 hrs
15% discount on all food & beverages*
Special Honeymoon Package OMR 150*
A RELAXED
DAY AT
JEBEL SIFAH
An overnight stay at Bandar Khairan was
arranged by Muriya for it’s staff. The event
was an occasion to spend time together,
develop more inter-personal skills and
get competitive with some games and
challenges while camping on the beach.
Evening saw the team around a bonfire,
having a meal, sharing stories and dancing
the night away. The next day was action
packed with games like tug-of-war and
kayaking and later a visual treat with
the dolphins on the boat trip back. It is
moments like these that bring the Muriya
staff even closer as a team.
OVERNIGHT FUN AT BANDAR KHAIRAN
5. Apartments
Villas
Villa A-17 Finalizing snag list TBA
Villa A-21 Snag list in progress TBA
Villa A-26 Finishing work ongoing Mid Nov
Villa A-27 Finishing work is ongoing End of June
Villa A-29 Finishing work is ongoing. End of June
work ongoing on landscape
Villa B-11 Finishing work ongoing End of May
Villa B-12 Snag list in progress
Villa B-16 Work on villa is completed End of June
Villa B-17 Work on villa is completed, End of June
Villa B-18 Finishing work and End of June
landscaping ongoing
Villa B-29 Snag list in progress
Villa B-30 Finishing work ongoing End of Sept
Villa R-02 Finishing work ongoing By August
Villa R-03 Finishing work ongoing By August
Villa V-04 In finishing stages End of July
Villa R-05 Finishing work ongoing By August
Villa R-06 Finishing work ongoing End of May
Details Status Anticipated date
of completion
Details Status Anticipated
date of completion
Bay Side - 102 Finishing work ongoing End of April
Bay Side - 107 Snag list in progress
Bay Side - 108 Finishing work ongoing Beginning of Nov
Bay Side - 204 Finishing work ongoing End of Oct
Bay Side - 205 Finishing work ongoing End of Jan
Bay Side - 206 Finishing work ongoing End of June
Bay Side - 207 Finishing work ongoing End of May
Bay Side - 208 Finishing work ongoing Mid Aug
Bay Side - 209 Snag list in progress
Bay Side - 211 Finishing work ongoing Mid Nov
Bay Side - 212 Snag list in progress
Bay Side - 214 Finishing work ongoing Mid Aug
Bay Side - 217 Snag list in progress
Bay Side - 302 Finishing work ongoing End of June
Bay Side - 303 Finishing work ongoing End of June
Bay Side - 305 Snag list in progress
Bay Side - 307 Finishing work ongoing End of June
Bay Side - 313 Finishing work ongoing Beginning of Mar
Bay Side - 314 Finishing work ongoing End of Jun
Bay Side - 315 Finishing work ongoing Beginning of Oct
Bay Side - 316 Snag list in progress
Bay Side - 403 Snag list in progress
Bay Side - 404 Snag list in progress
Bay Side - 407 Finishing work ongoing Mid Sept
Bay Side - 408 Finishing work ongoing Mid Aug
Bay Side - 410 Finishing work ongoing Beginning of Oct
Bay Side - 411 Snag list in progress
East Side - 201 Finishing work ongoing End of Aug
East Side - 202 Finishing work ongoing End of Dec
East Side - 203 Snag list in progress
East Side - 204 Finishing work ongoing End of July
East Side - 206 Finishing work ongoing End of June
East Side - 208 Finishing work ongoing End of April
East Side - 210 Snag list in progress
East Side - 215 Finishing work ongoing End of April
East Side - 301 Snag list in progress
East Side - 302 Finishing work ongoing Mid Sept
East Side - 303 Snag list in progress
Villa A- 16 Finishing work ongoing End of June
swimming pool started
Villa A-03 Work ongoing on foundation End of October
for extra structure
Villa A-05 Blocks are being laid for the End of July
walls of the villa
Villa A-06 Roof slab will be completed by End of the year
end of April and block work to
start beginning May,
Villa B-20 Plaster work ongoing End of June
Villa B-21 Electrical and plumbing work End of June
ongoing. Flooring to start in May
Villa B-24 Finishing work ongoing End of May
Villa B-33 & 34 Finishing work ongoing End of August
Villa C-41 Work on roof and kitchen End of June
ongoing.
Apartments
Villas
Marina block 15-Apt -201 Finishing work ongoing End of April
Marina block 15-Apt -101 Finishing work ongoing End of April
Marina block 15-Apt -102 Finishing work ongoing Beginning of May
Marina block 15-Apt -103 Finishing work ongoing Beginning of May
Marina block 01-Apt -201 Finishing work ongoing End of May
Marina block 01-Apt -301 Finishing work completed
Marina block 03-Apt -202 Finishing work ongoing End of April
Marina block 04-Apt -101 Finishing work ongoing End of June
Marina block 03-Apt -104 Work completed, finalizing
snag list
Details Status Anticipated date
of completion
Details Status Anticipated date
of completion
• Due to redesigning of the central air conditioning units, the multipurpose hall for
Sifawy hotel will now be completed by mid/ end of May
• Due to delay in receiving building permits, work on the fuel tank vault of the Marina
Fuel Station will be completed by mid May
• Road works in zone B have started and work in zone A and E will begin during May
• Work on some of the substations will also start in May
• Work on 3,800 meters of road in Salalah project including the infrastructure
work has been completed
• 5,000 meters of lagoon work has been completed.
CONSTRUCTION
UPDATE 2013
JEBEL SIFAH SALALAH BEACH
JS Villa C-41 JS Villa B-24
SB Villa A-17 SB Villa B-11
6. Muriya Tourism Development LLC
First Floor, Beach One Building. Shatti Al Qurum - Sultanate of Oman
Tel: +968 24 64 90 71/2 Fax +968 24 64 90 73 | info@muriya.om | www.muriya.om
www.jebesifah.com
www.salalahbeach.com