WARNING: If there are conflicts between a stated word and the number/
amount/ figure described, the stated / spelled word shall prevail. Should there
be conflicts between two (2.0) stated quantities, the higher figure shall prevail.
Republic of the Philippines
Professional Regulation Commission (PRC)
Professional Regulatory BOARD of ARCHITECTURE (PRBoA)
Architecture Licensure Examinations (ALE)
SUBJECT : ARCHITECTURAL DESIGN AND SITE PLANNING
DATE : July 1, 2007 (Sunday, 8:00 a.m. through
6:00 p.m.)
___________________________________________________________________
WARNING: If there are conflicts between a stated word and the number/
amount/ figure described, the stated / spelled word shall prevail. Should there
be conflicts between two (2.0) stated quantities, the higher figure shall prevail.
I. PROJECT TITLE (and General Description):
A Proposed Low-Rise (WALK-UP) APARTMENT Project
[development with Basement (optional parking)
component on a site having a 5.0% slope]]
II. STATEMENT OF THE PROBLEM:
A development company has decided that its two thousand
square meter (2,000.0 Sq.M.) property located somewhere in the
better parts of Quezon City shall be developed to host a low-
rise (walk-up) apartment building (the “Project”).
page 2 of 8
___________________________________________________________________
WARNING: If there are conflicts between a stated word and the number/
amount/ figure described, the stated / spelled word shall prevail. Should there
be conflicts between two (2.0) stated quantities, the higher figure shall prevail.
Only two (2.0) types of apartment units shall be provided
by the Developer and these are:
1) Studio-Type units with a thirty square meter (30.0
Sq.M.) Gross Floor Area (GFA); and
2) One (1.0) - Bedroom (BR) units with a GFA of fifty
(50.0) Sq.M.
For greater market acceptance, the minimum parking
requirements for the Project under the 2004 Revised
Implementing Rules and Regulations (R-IRR) of the National
Building Code of the Philippines (NBCP, otherwise known as PD
1096 of 1977), should be exceeded.
III. DESIGN OBJECTIVES:
a. To design a low-rise (walk-up) residential apartment
(R-3) building, marketable and attractive to middle-
income renters/ lessees;
b. To design the apartment building in a way that can
maximize profits for the Developer; the ratio of
saleable versus non-saleable spaces be as follows:
1. up to eighty percent (80.0%) of the GFA per floor
shall consist of rentable/ leasable spaces (the
apartment units);
2. the remaining twenty (20.0)% GFA per floor shall
consist of non-rentable/ non-leasable (common) areas
such as elevator lobbies, utility rooms, stairs,
fire exits and the like; and
3. the overall rentable/ leaseable areas for the
building shall be at approximately seventy five
percent (75.0)% of the Total Gross Floor Area
(TGFA), which excludes the floor area at the
basement, if introduced.
c. To design a building that shall serve as a landmark in
the Project area.
IV. DESIGN CONSIDERATIONS:
a. Function and efficiency;
b. Vertical and horizontal circulation patterns;
c. Architectural character and form;
d. Aesthetics and landmark quality;
e. Solar, wind, noise, odor and view orientations;
f. Amenities, Facilities, Services and Utilities (AFSU)
introduced;
g. Security and Safety Features;
h. Compliance with prevailing laws on high density low-
rise residential development i.e. including the NBCP,
the Fire Code and the Accessibility Law;
i. natural and artificial ventilation where applicable;
and
j. the Developer’s market research group has determined
that the building exterior shall be along classical,
page 3 of 8
___________________________________________________________________
WARNING: If there are conflicts between a stated word and the number/
amount/ figure described, the stated / spelled word shall prevail. Should there
be conflicts between two (2.0) stated quantities, the higher figure shall prevail.
neo-classical or stylized classical lines combined
with modern features.
V. PROJECT SITE FEATURES:
The 2,000.0 Sq.M. Total Lot Area or TLA (reference Figure
1) is rectangular and is an inside (or regular) lot. It is
located along a fifteen meter (15.0 m) wide street i.e. the
road right-of-way or RROW. The lot (or Project site) has a
forty (40.0) m wide frontage that faces the south and a depth
of fifty (50.0) m. The lot slopes at five percent (5.0%)
towards the street [with two point four (2.4) m wide sidewalks
on either side]. The surface of the sidewalk adjoining the lot
shall be considered as elevation 0.0 m.
To the left of the Project site is a private high school
building. To its right is a residential condominium building
and directly across the street are two (2.0) videoke bars and
a restaurant-bar with live band performances. To the rear of
the Project site are two (2.0)-storey single-detached
residences.
VI. APPLICABLE DEVELOPMENT CONTROLS:
The following development controls apply to the Project
site:
a. zoning classification is R-3 (high density
residential);
b. based on Developer-imposed restrictions (mainly
arising from market research results) and partly based
on the 1977 NBCP and its 2004 R-IRR, the Project site
has the following development limitations:
1. a Building Footprint of fifty five percent (55.0%)
of the TLA; the desired minimum setbacks at ground
floor are at six (6.0) m at the front of the lot and
three (3.0) m at the sides and rear of the lot; the
same setbacks apply for all basement levels if
introduced;
2. a Building Height Limit (BHL) of sixteen (16.0) m,
measured from the surface of the sidewalk adjoining
the lot; a maximum six (6.0) m tall spire or tower
may still be erected above the roof for a total
structure height of twenty two (22.0) m;
3. a desired Maximum TGFA (enclosed spaces only) of
only five thousand five hundred (5,500.0) Sq.M. i.e.
inclusive of all AFSU areas but excluding the floor
area at the basement if introduced; and
4. one (1.0) pooled parking space/slot as a minimum for
every six (6.0) apartment units with a GFA of 23.0 -
50.0 SqM; or a maximum of one (1.0) parking slot for
each apartment unit; these may be located at the
basement level, if introduced.
page 4 of 8
___________________________________________________________________
WARNING: If there are conflicts between a stated word and the number/
amount/ figure described, the stated / spelled word shall prevail. Should there
be conflicts between two (2.0) stated quantities, the higher figure shall prevail.
VII. IDENTIFIED DEVELOPMENT POTENTIAL:
Based on the Developer’s self-imposed restrictions and
partly on the BHL, the Project site has the following
development potentials:
a. up to two (2.0) basement levels at two point eight
(2.8) m floor to floor height;
b. a maximum five (5.0) level development i.e. at three
(3.0) m floor to floor height.
Note that compliance with the TGFA of 5,500.0 Sq.M.
(excluding basement and deck roof levels) and the BHL of 16.0
m are major requirements to be satisfied by the Architect.
VIII. DESIGN REQUIREMENTS:
The stated Project requirements are as follows. Should
the requirements exceed the development controls and
potentials under items VI and VII above, the necessary
adjustments have to be made to fully comply with the stated
development controls.
a. Basement level/s (only if introduced):
1. Facilities
i) parking (below grade or lower than the
elevation of the sidewalk/ street); driveways,
ramps, etc.;
ii) common toilets (male and female);
iii) Apartment Superintendent’s quarters; and
iv) fire exits;
2. Service Areas
i) Building Administration office;
ii) Building Safety and Security office;
Safety/Security Staff Quarters, Locker &
Shower; and
iii) Building & Common Facilities/ Amenities
maintenance room & workshop.
3. Utilities
i) domestic water cistern;
ii) fire reserve tank;
iii) utility rooms (electrical, machine, pump,
etc.);
iv) garbage chute room and solid waste storage; and
v) sewage treatment plant (STP).
b. Ground floor:
1. Amenities (concessionaire-operated commercial or
recreational spaces for lease):
i) cafeteria for thirty (30.0) persons;
ii) convenience store/s;
iii) business center;
iv) internet café (20 stations);
v) gym;
vi) laundry service;
vii) groom shops (barbershop and/or beauty parlor);
viii)bar for twenty (20.0) persons; and
ix) gameroom for twenty (20.0) persons.
page 5 of 8
___________________________________________________________________
WARNING: If there are conflicts between a stated word and the number/
amount/ figure described, the stated / spelled word shall prevail. Should there
be conflicts between two (2.0) stated quantities, the higher figure shall prevail.
2. Facilities
i) parking (grade/ ground level); driveways,
ramps, etc.;
ii) main lobby, reception area elevator lobby and
service stairs;
iii) common toilets (male and female);
iv) wells for natural light and ventilation (as
applicable); and
v) fire exits.
3. Utilities
i) generator room;
ii) transformer room;
iii) utility rooms (electrical, mechanical, etc.);
iv) garbage chute room;
c. Second (2nd
) through Fourth (4th
) Floors:
1. the 30.0 Sq.M. Studio-type Apartment units shall
each contain the following:
i) living area which shall double as the sleeping
area;
ii) dining area/ dinette;
iii) toilet and bath (T&B);
iv) kitchen area/ kitchenette;
v) utility area;
vi) balconies are optional but considered part of
the 30.0 Sq.M. GFA; and
vii) drying terrace also possible but considered
part of the 30.0 Sq.M. GFA.
2. common areas such as corridors/ hallways, lobby and
service stairs; common balconies are optional but
considered part of the GFA for the common areas;
3. utility rooms (electrical, mechanical, etc.);
4. fire exits;
5. garbage chute room; and
6. wells for natural light and ventilation (as
applicable).
d. Fifth (5th
) Floor:
1. the 50.0 Sq.M. GFA 1.0-BR Apartment units shall each
contain the following:
i) living area which may be combined with the
dining area;
ii) bedroom;
iii) toilet and bath (T&B);
iv) kitchen;
v) utility area;
vi) balconies are optional but considered part of
the 50.0 Sq.M. GFA; and
vii) drying terrace also possible but considered
part of the 50.0 Sq.M. GFA.
IX. DRAWING REQUIREMENTS:
a. Site Development Plan at scale 1 : 200 Meters (M) and
showing the following key information:
1. outline of the building footprint;
page 6 of 8
___________________________________________________________________
WARNING: If there are conflicts between a stated word and the number/
amount/ figure described, the stated / spelled word shall prevail. Should there
be conflicts between two (2.0) stated quantities, the higher figure shall prevail.
2. accessibility features (provisions for the
disabled);
3. site perimeter security features e.g. perimeter
wall/ fence, gate, pedestrian/ vehicular barriers,
guard outpost (as necessary), etc.;
4. pedestrian access systems;
5. open parking, driveway and parking ramps (as
needed);
6. ground-mounted signage locations (if any);
7. call out/indicate areas to be landscaped (hard-scape
and soft-scape);
8. the area of the building footprint and its
percentage with respect to the 2,000.0 SqM TLA;
9. the street, particularly the sidewalks and street
furniture (at the front of the building);
10.the adjoining land uses; and
11.indicate the northing and the directions of the
sunpath, the major winds (habagat and amihan),
sources of noise and odors and available views (if
any are clearly identifiable).
b. Ground-level (man’s eye view) Exterior Perspective at
any convenient scale;
c. Unit Floor Plans at scale 1 : 50 M; furniture/
equipment layouts are required; highlight access to or
location of fire exits;
1. Typical Plan of a 1.0-BR Apartment unit; and
2. Typical Plan of a Studio-Tye Apartment unit.
d. Floor Plans at scale 1 : 200 M; provide furniture/
equipment layouts only as necessary; if rooms/areas
are typical, provide furniture layout only for a
representative room/area to save time; highlight all
introduced accessibility features and fire exits;
1. Typical Basement Level Plan (Parking Spaces,
Services and Utilities only), only if introduced;
2. Ground Floor Plan;
3. 5th
Floor Plan (showing all 1.0-BR Apartment units);
do not detail the individual plans to save time;
4. Typical 2nd
through 4th
Floor Plan (showing all
Studio-Type Apartment units per floor); do not
detail the individual unit plans to save time; and
5. Roof Plan showing position of overhead domestic
water supply tank and overhead fire reserve tank.
e. Longitudinal Section (at long axis of the building) at
scale 1 : 200 M (referencing the 0.0 m sidewalk
elevation adjoining the Project site); and
f. Finished floor-level (worm’s eye view) Architectural
Interior Perspective at any convenient scale for the
following areas:
1. Main Lobby;
2. Living-Dining area of the 1.0-BR Apartment Unit; and
3. Bedroom of the Studio-Type Apartment Unit.
g. Detail Plan, Elevation and Section of Kitchen/
Kitchenette of the Studio-Type Apartment Unit at scale
1:20 M.
page 7 of 8
___________________________________________________________________
WARNING: If there are conflicts between a stated word and the number/
amount/ figure described, the stated / spelled word shall prevail. Should there
be conflicts between two (2.0) stated quantities, the higher figure shall prevail.
h. Detail Plan, Elevation and Section of the Closet of
the Studio-Type Apartment Unit at scale 1:20 M.
i. Detail Plan, Elevation and Section of the Toilet and
Bath (T&B) of the Studio-Type Apartment Unit at scale
1:20 M.
j. Detail Plan, Elevation and Section of the Standard
Partition between the Studio-Type Apartment Units at
scale 1:20 M.
k. Typical Architectural Interior Details for mouldings,
door casings and other trim/ millwork for the Studio-
Type Apartment Units at scale 1:10 M.
l. Total Gross Floor Area (TGFA) Computations/Breakdown
(show tabulation on the tracing paper only):
1. Parking (open and covered, if introduced);
2. Total Gross Floor Area (TGFA) covering all enclosed
areas at all floors; provide a separate computation
for the basement level(if introduced).
X. BASES OF GRADING (IN ORDER OF PRIORITY):
a. Functionality (including full satisfaction of the
prescribed building use/s per floor or level, the
provision of vertical and horizontal access systems,
proximities, TGFA compliance and the like), space
planning (including furniture or equipment layouts if/
where required, TGFA and parking computations and the
like) and inter-relationships of exterior and interior
activity areas (including orientations, relationship/s
between the road right-of-way (RROW), yards and the
building, treatment of transition spaces such as
sidewalks and yards, general environmental design
solutions and the like);
b. Full conformity to examination instructions (where
non-compliance/s by the examinee can result in point
deduction/s), completeness of the plan and design
solution/s (showing all of the prescribed/ required
architectural and/ or engineering and allied design
elements) and completeness of drawing requirements
(with no extra drawings which shall not be awarded
points);
c. General compliance with accepted architectural plan
and design standards (including height clearances,
door and window sizes, parking slot sizes, corridor
and ramp widths, toilet and kitchen layouts and the
like), site development planning standards (including
building foot-printing/ basement-printing as
prescribed/ roof-printing as applicable, setbacks and
yards, sidewalk and carriageway elements/dimensions,
turning radii, ramp inclines, use and placement of
trees and greenery, use of slopes, street furniture
where applicable, drainage/ waste management features,
security/ safety features and the like) and building
construction standards (includes material selection,
modular material sizes and the like);
page 8 of 8
___________________________________________________________________
WARNING: If there are conflicts between a stated word and the number/
amount/ figure described, the stated / spelled word shall prevail. Should there
be conflicts between two (2.0) stated quantities, the higher figure shall prevail.
d. Architectural character (includes matching the
required architectural character with the intended
use/ function) and aesthetics (includes the good use
of form/ scale/ proportion/ balance, the general
satisfaction of basic architectural design principles
and the like);
e. Structural concept (including bay sizes, framing and
alignment of columns, beams or other structural
members, creative and workable use of non-conventional
structural forms/ solutions and the like); and
f. Compliances with national building laws that are in
full effect, including:
1. the 2004 Revised Implementing Rules and Regulations
(R-IRR) of the 1977 National Building Code of the
Philippines or NBCP (otherwise known as P.D. No.
1096);
2. the Law to Enhance the Mobility of Disabled Persons
(otherwise known as B.P. No. 344) and its IRR; and
3. The Fire Code (otherwise known as P.D. No. 1185) and
its IRR.
Figure 1. Lot Plan
(refer to page 9)
Scratch Papers on pages 10 through 16 follow
(to be returned together with pages 1 through 9).

More Related Content

Similar to 2060589-SAMPLE-DESIGN-PROBLEM.pdf

Item # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 BroadwayItem # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 Broadwayahcitycouncil
 
One code final presentation 8 18_10
One code final presentation 8 18_10One code final presentation 8 18_10
One code final presentation 8 18_10city of dania beach
 
Items # 7&8 - 6401 & 6403 and 6421 Broadway (Replat)
Items # 7&8 - 6401 & 6403 and 6421 Broadway (Replat)Items # 7&8 - 6401 & 6403 and 6421 Broadway (Replat)
Items # 7&8 - 6401 & 6403 and 6421 Broadway (Replat)ahcitycouncil
 
Assisted Living Regulations
Assisted Living RegulationsAssisted Living Regulations
Assisted Living Regulationsgscplanning
 
Development control rules and regulation
Development control rules and regulationDevelopment control rules and regulation
Development control rules and regulationMANINANDANSAHU
 
Development control rules and regulation
Development control rules and regulationDevelopment control rules and regulation
Development control rules and regulationMANINANDANSAHU
 
Item # 6 - 528 Normandy
Item # 6 - 528 NormandyItem # 6 - 528 Normandy
Item # 6 - 528 Normandyahcitycouncil
 
Item # 8 - 5700 Broadway
Item # 8 - 5700 BroadwayItem # 8 - 5700 Broadway
Item # 8 - 5700 Broadwayahcitycouncil
 
Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)SQSY
 
Item # 8 - 203 E. Edgewood
Item # 8 - 203 E. EdgewoodItem # 8 - 203 E. Edgewood
Item # 8 - 203 E. Edgewoodahcitycouncil
 
KPBR.pptx
KPBR.pptxKPBR.pptx
KPBR.pptxMedhaH
 
Building codes and byelaws for duplex house
Building codes and byelaws for duplex houseBuilding codes and byelaws for duplex house
Building codes and byelaws for duplex houseChaitanya Korra
 

Similar to 2060589-SAMPLE-DESIGN-PROBLEM.pdf (20)

Item # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 BroadwayItem # 4 - 6401.6403 and 6421 Broadway
Item # 4 - 6401.6403 and 6421 Broadway
 
One code final presentation 8 18_10
One code final presentation 8 18_10One code final presentation 8 18_10
One code final presentation 8 18_10
 
Items # 7&8 - 6401 & 6403 and 6421 Broadway (Replat)
Items # 7&8 - 6401 & 6403 and 6421 Broadway (Replat)Items # 7&8 - 6401 & 6403 and 6421 Broadway (Replat)
Items # 7&8 - 6401 & 6403 and 6421 Broadway (Replat)
 
Chap 3
Chap 3Chap 3
Chap 3
 
Assisted Living Regulations
Assisted Living RegulationsAssisted Living Regulations
Assisted Living Regulations
 
Development control rules and regulation
Development control rules and regulationDevelopment control rules and regulation
Development control rules and regulation
 
AH CCM 5.11.20
AH CCM 5.11.20AH CCM 5.11.20
AH CCM 5.11.20
 
building rules.pptx
building rules.pptxbuilding rules.pptx
building rules.pptx
 
Development control rules and regulation
Development control rules and regulationDevelopment control rules and regulation
Development control rules and regulation
 
Item # 6 - 528 Normandy
Item # 6 - 528 NormandyItem # 6 - 528 Normandy
Item # 6 - 528 Normandy
 
Item #6 Zoning Code Amendments
Item #6   Zoning Code AmendmentsItem #6   Zoning Code Amendments
Item #6 Zoning Code Amendments
 
Building bye-laws-of-amritsar
Building bye-laws-of-amritsarBuilding bye-laws-of-amritsar
Building bye-laws-of-amritsar
 
Development control rules (NBC)
Development control rules (NBC)Development control rules (NBC)
Development control rules (NBC)
 
Item # 8 - 5700 Broadway
Item # 8 - 5700 BroadwayItem # 8 - 5700 Broadway
Item # 8 - 5700 Broadway
 
MA AAB Complaint 66 70 Union Square Plaza Building
MA AAB Complaint 66 70 Union Square Plaza BuildingMA AAB Complaint 66 70 Union Square Plaza Building
MA AAB Complaint 66 70 Union Square Plaza Building
 
AAB Bldg complaint Somerville 66-70 Union Square
AAB Bldg complaint Somerville 66-70 Union SquareAAB Bldg complaint Somerville 66-70 Union Square
AAB Bldg complaint Somerville 66-70 Union Square
 
Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)
 
Item # 8 - 203 E. Edgewood
Item # 8 - 203 E. EdgewoodItem # 8 - 203 E. Edgewood
Item # 8 - 203 E. Edgewood
 
KPBR.pptx
KPBR.pptxKPBR.pptx
KPBR.pptx
 
Building codes and byelaws for duplex house
Building codes and byelaws for duplex houseBuilding codes and byelaws for duplex house
Building codes and byelaws for duplex house
 

Recently uploaded

power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 

Recently uploaded (20)

power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

2060589-SAMPLE-DESIGN-PROBLEM.pdf

  • 1. page 1 of 8 ___________________________________________________________________ WARNING: If there are conflicts between a stated word and the number/ amount/ figure described, the stated / spelled word shall prevail. Should there be conflicts between two (2.0) stated quantities, the higher figure shall prevail. Republic of the Philippines Professional Regulation Commission (PRC) Professional Regulatory BOARD of ARCHITECTURE (PRBoA) Architecture Licensure Examinations (ALE) SUBJECT : ARCHITECTURAL DESIGN AND SITE PLANNING DATE : July 1, 2007 (Sunday, 8:00 a.m. through 6:00 p.m.) ___________________________________________________________________ WARNING: If there are conflicts between a stated word and the number/ amount/ figure described, the stated / spelled word shall prevail. Should there be conflicts between two (2.0) stated quantities, the higher figure shall prevail. I. PROJECT TITLE (and General Description): A Proposed Low-Rise (WALK-UP) APARTMENT Project [development with Basement (optional parking) component on a site having a 5.0% slope]] II. STATEMENT OF THE PROBLEM: A development company has decided that its two thousand square meter (2,000.0 Sq.M.) property located somewhere in the better parts of Quezon City shall be developed to host a low- rise (walk-up) apartment building (the “Project”).
  • 2. page 2 of 8 ___________________________________________________________________ WARNING: If there are conflicts between a stated word and the number/ amount/ figure described, the stated / spelled word shall prevail. Should there be conflicts between two (2.0) stated quantities, the higher figure shall prevail. Only two (2.0) types of apartment units shall be provided by the Developer and these are: 1) Studio-Type units with a thirty square meter (30.0 Sq.M.) Gross Floor Area (GFA); and 2) One (1.0) - Bedroom (BR) units with a GFA of fifty (50.0) Sq.M. For greater market acceptance, the minimum parking requirements for the Project under the 2004 Revised Implementing Rules and Regulations (R-IRR) of the National Building Code of the Philippines (NBCP, otherwise known as PD 1096 of 1977), should be exceeded. III. DESIGN OBJECTIVES: a. To design a low-rise (walk-up) residential apartment (R-3) building, marketable and attractive to middle- income renters/ lessees; b. To design the apartment building in a way that can maximize profits for the Developer; the ratio of saleable versus non-saleable spaces be as follows: 1. up to eighty percent (80.0%) of the GFA per floor shall consist of rentable/ leasable spaces (the apartment units); 2. the remaining twenty (20.0)% GFA per floor shall consist of non-rentable/ non-leasable (common) areas such as elevator lobbies, utility rooms, stairs, fire exits and the like; and 3. the overall rentable/ leaseable areas for the building shall be at approximately seventy five percent (75.0)% of the Total Gross Floor Area (TGFA), which excludes the floor area at the basement, if introduced. c. To design a building that shall serve as a landmark in the Project area. IV. DESIGN CONSIDERATIONS: a. Function and efficiency; b. Vertical and horizontal circulation patterns; c. Architectural character and form; d. Aesthetics and landmark quality; e. Solar, wind, noise, odor and view orientations; f. Amenities, Facilities, Services and Utilities (AFSU) introduced; g. Security and Safety Features; h. Compliance with prevailing laws on high density low- rise residential development i.e. including the NBCP, the Fire Code and the Accessibility Law; i. natural and artificial ventilation where applicable; and j. the Developer’s market research group has determined that the building exterior shall be along classical,
  • 3. page 3 of 8 ___________________________________________________________________ WARNING: If there are conflicts between a stated word and the number/ amount/ figure described, the stated / spelled word shall prevail. Should there be conflicts between two (2.0) stated quantities, the higher figure shall prevail. neo-classical or stylized classical lines combined with modern features. V. PROJECT SITE FEATURES: The 2,000.0 Sq.M. Total Lot Area or TLA (reference Figure 1) is rectangular and is an inside (or regular) lot. It is located along a fifteen meter (15.0 m) wide street i.e. the road right-of-way or RROW. The lot (or Project site) has a forty (40.0) m wide frontage that faces the south and a depth of fifty (50.0) m. The lot slopes at five percent (5.0%) towards the street [with two point four (2.4) m wide sidewalks on either side]. The surface of the sidewalk adjoining the lot shall be considered as elevation 0.0 m. To the left of the Project site is a private high school building. To its right is a residential condominium building and directly across the street are two (2.0) videoke bars and a restaurant-bar with live band performances. To the rear of the Project site are two (2.0)-storey single-detached residences. VI. APPLICABLE DEVELOPMENT CONTROLS: The following development controls apply to the Project site: a. zoning classification is R-3 (high density residential); b. based on Developer-imposed restrictions (mainly arising from market research results) and partly based on the 1977 NBCP and its 2004 R-IRR, the Project site has the following development limitations: 1. a Building Footprint of fifty five percent (55.0%) of the TLA; the desired minimum setbacks at ground floor are at six (6.0) m at the front of the lot and three (3.0) m at the sides and rear of the lot; the same setbacks apply for all basement levels if introduced; 2. a Building Height Limit (BHL) of sixteen (16.0) m, measured from the surface of the sidewalk adjoining the lot; a maximum six (6.0) m tall spire or tower may still be erected above the roof for a total structure height of twenty two (22.0) m; 3. a desired Maximum TGFA (enclosed spaces only) of only five thousand five hundred (5,500.0) Sq.M. i.e. inclusive of all AFSU areas but excluding the floor area at the basement if introduced; and 4. one (1.0) pooled parking space/slot as a minimum for every six (6.0) apartment units with a GFA of 23.0 - 50.0 SqM; or a maximum of one (1.0) parking slot for each apartment unit; these may be located at the basement level, if introduced.
  • 4. page 4 of 8 ___________________________________________________________________ WARNING: If there are conflicts between a stated word and the number/ amount/ figure described, the stated / spelled word shall prevail. Should there be conflicts between two (2.0) stated quantities, the higher figure shall prevail. VII. IDENTIFIED DEVELOPMENT POTENTIAL: Based on the Developer’s self-imposed restrictions and partly on the BHL, the Project site has the following development potentials: a. up to two (2.0) basement levels at two point eight (2.8) m floor to floor height; b. a maximum five (5.0) level development i.e. at three (3.0) m floor to floor height. Note that compliance with the TGFA of 5,500.0 Sq.M. (excluding basement and deck roof levels) and the BHL of 16.0 m are major requirements to be satisfied by the Architect. VIII. DESIGN REQUIREMENTS: The stated Project requirements are as follows. Should the requirements exceed the development controls and potentials under items VI and VII above, the necessary adjustments have to be made to fully comply with the stated development controls. a. Basement level/s (only if introduced): 1. Facilities i) parking (below grade or lower than the elevation of the sidewalk/ street); driveways, ramps, etc.; ii) common toilets (male and female); iii) Apartment Superintendent’s quarters; and iv) fire exits; 2. Service Areas i) Building Administration office; ii) Building Safety and Security office; Safety/Security Staff Quarters, Locker & Shower; and iii) Building & Common Facilities/ Amenities maintenance room & workshop. 3. Utilities i) domestic water cistern; ii) fire reserve tank; iii) utility rooms (electrical, machine, pump, etc.); iv) garbage chute room and solid waste storage; and v) sewage treatment plant (STP). b. Ground floor: 1. Amenities (concessionaire-operated commercial or recreational spaces for lease): i) cafeteria for thirty (30.0) persons; ii) convenience store/s; iii) business center; iv) internet café (20 stations); v) gym; vi) laundry service; vii) groom shops (barbershop and/or beauty parlor); viii)bar for twenty (20.0) persons; and ix) gameroom for twenty (20.0) persons.
  • 5. page 5 of 8 ___________________________________________________________________ WARNING: If there are conflicts between a stated word and the number/ amount/ figure described, the stated / spelled word shall prevail. Should there be conflicts between two (2.0) stated quantities, the higher figure shall prevail. 2. Facilities i) parking (grade/ ground level); driveways, ramps, etc.; ii) main lobby, reception area elevator lobby and service stairs; iii) common toilets (male and female); iv) wells for natural light and ventilation (as applicable); and v) fire exits. 3. Utilities i) generator room; ii) transformer room; iii) utility rooms (electrical, mechanical, etc.); iv) garbage chute room; c. Second (2nd ) through Fourth (4th ) Floors: 1. the 30.0 Sq.M. Studio-type Apartment units shall each contain the following: i) living area which shall double as the sleeping area; ii) dining area/ dinette; iii) toilet and bath (T&B); iv) kitchen area/ kitchenette; v) utility area; vi) balconies are optional but considered part of the 30.0 Sq.M. GFA; and vii) drying terrace also possible but considered part of the 30.0 Sq.M. GFA. 2. common areas such as corridors/ hallways, lobby and service stairs; common balconies are optional but considered part of the GFA for the common areas; 3. utility rooms (electrical, mechanical, etc.); 4. fire exits; 5. garbage chute room; and 6. wells for natural light and ventilation (as applicable). d. Fifth (5th ) Floor: 1. the 50.0 Sq.M. GFA 1.0-BR Apartment units shall each contain the following: i) living area which may be combined with the dining area; ii) bedroom; iii) toilet and bath (T&B); iv) kitchen; v) utility area; vi) balconies are optional but considered part of the 50.0 Sq.M. GFA; and vii) drying terrace also possible but considered part of the 50.0 Sq.M. GFA. IX. DRAWING REQUIREMENTS: a. Site Development Plan at scale 1 : 200 Meters (M) and showing the following key information: 1. outline of the building footprint;
  • 6. page 6 of 8 ___________________________________________________________________ WARNING: If there are conflicts between a stated word and the number/ amount/ figure described, the stated / spelled word shall prevail. Should there be conflicts between two (2.0) stated quantities, the higher figure shall prevail. 2. accessibility features (provisions for the disabled); 3. site perimeter security features e.g. perimeter wall/ fence, gate, pedestrian/ vehicular barriers, guard outpost (as necessary), etc.; 4. pedestrian access systems; 5. open parking, driveway and parking ramps (as needed); 6. ground-mounted signage locations (if any); 7. call out/indicate areas to be landscaped (hard-scape and soft-scape); 8. the area of the building footprint and its percentage with respect to the 2,000.0 SqM TLA; 9. the street, particularly the sidewalks and street furniture (at the front of the building); 10.the adjoining land uses; and 11.indicate the northing and the directions of the sunpath, the major winds (habagat and amihan), sources of noise and odors and available views (if any are clearly identifiable). b. Ground-level (man’s eye view) Exterior Perspective at any convenient scale; c. Unit Floor Plans at scale 1 : 50 M; furniture/ equipment layouts are required; highlight access to or location of fire exits; 1. Typical Plan of a 1.0-BR Apartment unit; and 2. Typical Plan of a Studio-Tye Apartment unit. d. Floor Plans at scale 1 : 200 M; provide furniture/ equipment layouts only as necessary; if rooms/areas are typical, provide furniture layout only for a representative room/area to save time; highlight all introduced accessibility features and fire exits; 1. Typical Basement Level Plan (Parking Spaces, Services and Utilities only), only if introduced; 2. Ground Floor Plan; 3. 5th Floor Plan (showing all 1.0-BR Apartment units); do not detail the individual plans to save time; 4. Typical 2nd through 4th Floor Plan (showing all Studio-Type Apartment units per floor); do not detail the individual unit plans to save time; and 5. Roof Plan showing position of overhead domestic water supply tank and overhead fire reserve tank. e. Longitudinal Section (at long axis of the building) at scale 1 : 200 M (referencing the 0.0 m sidewalk elevation adjoining the Project site); and f. Finished floor-level (worm’s eye view) Architectural Interior Perspective at any convenient scale for the following areas: 1. Main Lobby; 2. Living-Dining area of the 1.0-BR Apartment Unit; and 3. Bedroom of the Studio-Type Apartment Unit. g. Detail Plan, Elevation and Section of Kitchen/ Kitchenette of the Studio-Type Apartment Unit at scale 1:20 M.
  • 7. page 7 of 8 ___________________________________________________________________ WARNING: If there are conflicts between a stated word and the number/ amount/ figure described, the stated / spelled word shall prevail. Should there be conflicts between two (2.0) stated quantities, the higher figure shall prevail. h. Detail Plan, Elevation and Section of the Closet of the Studio-Type Apartment Unit at scale 1:20 M. i. Detail Plan, Elevation and Section of the Toilet and Bath (T&B) of the Studio-Type Apartment Unit at scale 1:20 M. j. Detail Plan, Elevation and Section of the Standard Partition between the Studio-Type Apartment Units at scale 1:20 M. k. Typical Architectural Interior Details for mouldings, door casings and other trim/ millwork for the Studio- Type Apartment Units at scale 1:10 M. l. Total Gross Floor Area (TGFA) Computations/Breakdown (show tabulation on the tracing paper only): 1. Parking (open and covered, if introduced); 2. Total Gross Floor Area (TGFA) covering all enclosed areas at all floors; provide a separate computation for the basement level(if introduced). X. BASES OF GRADING (IN ORDER OF PRIORITY): a. Functionality (including full satisfaction of the prescribed building use/s per floor or level, the provision of vertical and horizontal access systems, proximities, TGFA compliance and the like), space planning (including furniture or equipment layouts if/ where required, TGFA and parking computations and the like) and inter-relationships of exterior and interior activity areas (including orientations, relationship/s between the road right-of-way (RROW), yards and the building, treatment of transition spaces such as sidewalks and yards, general environmental design solutions and the like); b. Full conformity to examination instructions (where non-compliance/s by the examinee can result in point deduction/s), completeness of the plan and design solution/s (showing all of the prescribed/ required architectural and/ or engineering and allied design elements) and completeness of drawing requirements (with no extra drawings which shall not be awarded points); c. General compliance with accepted architectural plan and design standards (including height clearances, door and window sizes, parking slot sizes, corridor and ramp widths, toilet and kitchen layouts and the like), site development planning standards (including building foot-printing/ basement-printing as prescribed/ roof-printing as applicable, setbacks and yards, sidewalk and carriageway elements/dimensions, turning radii, ramp inclines, use and placement of trees and greenery, use of slopes, street furniture where applicable, drainage/ waste management features, security/ safety features and the like) and building construction standards (includes material selection, modular material sizes and the like);
  • 8. page 8 of 8 ___________________________________________________________________ WARNING: If there are conflicts between a stated word and the number/ amount/ figure described, the stated / spelled word shall prevail. Should there be conflicts between two (2.0) stated quantities, the higher figure shall prevail. d. Architectural character (includes matching the required architectural character with the intended use/ function) and aesthetics (includes the good use of form/ scale/ proportion/ balance, the general satisfaction of basic architectural design principles and the like); e. Structural concept (including bay sizes, framing and alignment of columns, beams or other structural members, creative and workable use of non-conventional structural forms/ solutions and the like); and f. Compliances with national building laws that are in full effect, including: 1. the 2004 Revised Implementing Rules and Regulations (R-IRR) of the 1977 National Building Code of the Philippines or NBCP (otherwise known as P.D. No. 1096); 2. the Law to Enhance the Mobility of Disabled Persons (otherwise known as B.P. No. 344) and its IRR; and 3. The Fire Code (otherwise known as P.D. No. 1185) and its IRR. Figure 1. Lot Plan (refer to page 9) Scratch Papers on pages 10 through 16 follow (to be returned together with pages 1 through 9).