SlideShare a Scribd company logo
1 of 1
2nd production meeting
Notes taken by Rose Bishay

Meeting Record Sheet
Date
26/11/13

Time
11:27am

Place
Student Area

Present

Rose Bishay, Shannon Orr, Reece Cordingley

Apologies

Skye Nel

Agenda

Deciding the copy of the final script.

Minutes

Reece changed the first 60 seconds of the script so that the ‘masked
figure’ was featured more. He also added two more camera shots.
Shannon changed the featured ‘box’ to just a single photo. She also
changed when they were walking, to them running.
Rose changed that when there running into slow motion, to make it
appear more dramatic.
In the overlook of all of the scripts we decided that Reece’s script was
most suitable and more enhanced.

Meeting Closed at: 11:36am

More Related Content

More from ShannonOrr

Final major project production diary template 2014 2015
Final major project production diary template 2014 2015Final major project production diary template 2014 2015
Final major project production diary template 2014 2015ShannonOrr
 
CCUnit 51 pr9 sourcing images
CCUnit 51 pr9 sourcing imagesCCUnit 51 pr9 sourcing images
CCUnit 51 pr9 sourcing imagesShannonOrr
 
3 news stories
 3 news stories 3 news stories
3 news storiesShannonOrr
 
Over the past 3 years
Over the past 3 years Over the past 3 years
Over the past 3 years ShannonOrr
 
Over the past 3 year
Over the past 3 yearOver the past 3 year
Over the past 3 yearShannonOrr
 
Interview prep sheet2
Interview prep sheet2Interview prep sheet2
Interview prep sheet2ShannonOrr
 
The cheshire show final script
The cheshire show final scriptThe cheshire show final script
The cheshire show final scriptShannonOrr
 
Cheshire show research
Cheshire show researchCheshire show research
Cheshire show researchShannonOrr
 
Interview prep sheet
Interview prep sheetInterview prep sheet
Interview prep sheetShannonOrr
 

More from ShannonOrr (20)

My research
My researchMy research
My research
 
Final major project production diary template 2014 2015
Final major project production diary template 2014 2015Final major project production diary template 2014 2015
Final major project production diary template 2014 2015
 
Doc1chagesss
Doc1chagesssDoc1chagesss
Doc1chagesss
 
Doc2
Doc2Doc2
Doc2
 
Doc2ju
Doc2juDoc2ju
Doc2ju
 
CCUnit 51 pr9 sourcing images
CCUnit 51 pr9 sourcing imagesCCUnit 51 pr9 sourcing images
CCUnit 51 pr9 sourcing images
 
swReviews
swReviewsswReviews
swReviews
 
Review
ReviewReview
Review
 
review
reviewreview
review
 
3 news stories
 3 news stories 3 news stories
3 news stories
 
Researcxh
ResearcxhResearcxh
Researcxh
 
Over the past 3 years
Over the past 3 years Over the past 3 years
Over the past 3 years
 
Over the past 3 year
Over the past 3 yearOver the past 3 year
Over the past 3 year
 
Interview prep sheet2
Interview prep sheet2Interview prep sheet2
Interview prep sheet2
 
universit
 universit universit
universit
 
The cheshire show final script
The cheshire show final scriptThe cheshire show final script
The cheshire show final script
 
Pr7
Pr7 Pr7
Pr7
 
Final script
Final scriptFinal script
Final script
 
Cheshire show research
Cheshire show researchCheshire show research
Cheshire show research
 
Interview prep sheet
Interview prep sheetInterview prep sheet
Interview prep sheet
 

2nd production meeting script changes

  • 1. 2nd production meeting Notes taken by Rose Bishay Meeting Record Sheet Date 26/11/13 Time 11:27am Place Student Area Present Rose Bishay, Shannon Orr, Reece Cordingley Apologies Skye Nel Agenda Deciding the copy of the final script. Minutes Reece changed the first 60 seconds of the script so that the ‘masked figure’ was featured more. He also added two more camera shots. Shannon changed the featured ‘box’ to just a single photo. She also changed when they were walking, to them running. Rose changed that when there running into slow motion, to make it appear more dramatic. In the overlook of all of the scripts we decided that Reece’s script was most suitable and more enhanced. Meeting Closed at: 11:36am