2. Copyright, Confidential, Tata Motors Limited
c
The Need for Change in Organizations. Change as a survival tactic -- if the organization does not keep pace
the changing technology, consumer demands, and effective business processes, they will lose their competitive edge.
If we do not do proper Change Management then we will not only loose the business, but will incur additional cost and
Risks.
Change
3. Copyright, Confidential, Tata Motors Limited
c
•Start on a solution before the underlying problem [that requires the change] is fully understood
•Don’t spend time on systematically analysing the people and styles that are involved
•Jump to a solution to the problem(s)
•Don’t validate the proposed solutions
•Don’t plan for certainty
•Don’t communicate what is happening and why
•Don’t define measurable outcomes and way-points
•Don’t put strong governance in place, particularly around dependencies
•Don’t deal properly with Risk and Contingency
Change management is defined as the methods and manners in which a company describes and implements change
within both its internal and external processes.
Significant organizational change can be challenging. It often requires many levels of cooperation and may involve
different independent entities within an organization. Developing a structured approach to change is critical to help
ensure a beneficial transition while mitigating disruption.
Some of the common Reasons for failures
Change Management – Common reasons for failures
5. Copyright, Confidential, Tata Motors Limited
c
Do not just induct person. Verify atleast basic qualification and match with your
requirements.
Train for sometime for quality system requirements related to that operation
Handhold for some time by supervisor
In between supervision is mandatory
Process qualification for special process operators eg welding, painting, Heat
treatment etc
Alert to in process and final Quality inspectors
Man
Speak out
for every change
6. Copyright, Confidential, Tata Motors Limited
c
If only similar machine( VMC- VMC or HMC- HMC) is added/ changed
Ensure axis calibration
Ensure same program is copied
Ensure same tools are loaded
If some other machine is added/ changed (eg.-VMC- HMC)
Ensure axis calibration
Redo FMEA and establish required controls and checks
Validation of entire operation in terms of consistency is must (Cp/Cpk)
Machine
Speak out
for every change
7. Copyright, Confidential, Tata Motors Limited
c
If only same fixture/ Tooling is added/ changed
Ensure the calibration of Tooling before use- Add history card
Ensure validation by conducting Cp/Cpk
If some other fixture/ Tooling is added
Ensure the calibration of Tooling before use- Add history card
Redo FMEA and establish required controls and checks
Validation of entire operation in terms of consistency is must (Cp/Cpk)
Method- Tooling
Speak out
for every change
8. Copyright, Confidential, Tata Motors Limited
c
If only same gauge/ inspection fixture is added/ changed
Ensure the calibration of gauge/ inspection fixture before use- Add history
card
Ensure validation by conducting MSA
If some other gauge/ inspection fixture is added
Ensure the calibration of gauge/ inspection fixture before use- Add history
card
Redo MSA and establish required controls and checks
Ensure measurement correlation with TML
Method- Inspection gauge/ inspection fixture
Speak out
for every change
9. Copyright, Confidential, Tata Motors Limited
c
Validation of entire operation in terms of consistency is must (Cp/Cpk)
Do layout inspection to ascertain effect on other parameters
Additional points for sub supplier change
1.Sub-supplier’s quality system audit plan, Actual, Closure of actions.
2.Machined part process audit plan, Actual, Closure of actions at sub-suppliers end.
3.Quality gate implementation at sub-supplier end.
4.Incoming inspection at your end and corrective actions
Method- Layout/ Process Sequence/ Sub supplier
Speak out
for every change
10. Copyright, Confidential, Tata Motors Limited
c
Method- Packaging & Logistics
Validate before finalizing the change in the mode of packaging or transportation
Get the revised packaging sign off
Speak out
for every change
11. Copyright, Confidential, Tata Motors Limited
c
Get the raw material from approved/ recognized sources
Get the raw material certification
100% inspection of crack before use +spark and spectra for Bars
Do not use alternate/ similar grade without complete metallurgy check
Material
Speak out
for every change
13. Copyright, Confidential, Tata Motors Limited
c
Alert to every person within organisation
Alert to TML by submitting 4M change request form
Do not proceed without approvals
Check at every stage
Add special check at Quality gate/ Firewall
Separate identification is must
Use SRM Collaboration portal for uploading PDIR
Additional Precautions
Speak out
for every change
14. Copyright, Confidential, Tata Motors Limited
c
• PRR (< 15 days for closure)
- Problem Resolution & Reporting
• MSA Score (>80)
-Manufacturing Site Assessment
• PPM ( <100)
-Parts Per Million
•Strategic
Supplier