SYMMETRICAL COMPONENTS IN FAULT
STUDIES
Paper Name: POWERSYSTEM II
Paper Code: PC-EE 601
CO Number : (CO1 & CO II)
Module Number: 1
Bloom’s Level of Taxonomy : (Understanding)
CONTENT
 Introduction
 Symmetrical component theory
 Calculation
 Conclusion
Introduction
• A fault in a power system or circuit is a failure which interferes with the normal flow of current. In
general faults occur in power system networks due to insulation failure of equipment, flashover of
lines initiated by a lightning stroke, or due to accidental faulty operation
• Symmetrical Fault = This is also called balance fault. After failure the fault currents in various
lines are still balance (i.e. equal fault currents in the lines with 1200 displacement). 3 phase fault
(LLL) is the example of this category.
• Unsymmetrical Fault = This is also called unbalanced fault. After failure the fault current in
various lines are not balance (i.e. not same in magnitude and not displaced by 120°).
Unsymmetrical faults are three types;
• (1) Single line to Ground fault (LG)
• (2) Double line fault (LL)
• (3) Double line to ground fault (LLG)
• An unbalanced system consisting of ‘n’ number of phasors can be divided into ‘n’ systems of
balanced phasor. These ‘n’ systems of balanced systems are known as symmetrical
components.
SYMMETRICAL COMPONENT THEORY
In 1918, Dr. C.L. Fortescue, an American scientist, shown that any unbalanced system of 3-
phase currents (or voltages) may be regarded as being composed of three separate sets of
balanced vectors. This has come to be known as symmetrical component theory. This is a
general theory and is applicable to any n vector system whose resultant is zero.
Positive sequence components = Three phasors equal in magnitude and displaced each
other by 1200 and has the same phase sequence as the original phasors.
Negative sequence components = Three phasors equal in magnitude and displaced each
other by 1200 and has the opposite phase sequence as the original phasors.
Zero sequence components = consisting of thee phasors equal in magnitude and has zero
phase displacement from each other.
CALCULATION
Since each of the original unbalanced phasors are the sum of its positive, negative and zero
sequence components defined above.
CALCULATION
Matrix form of the equations
CONCLUSIO
N
 We can see those symmetrical components are a way of analyzing
unbalanced phasors which arise due to faults. Converting a set of
unbalanced phasors into sets of balanced components greatly simplifies our
analysis and is helpful in performing fault calculations, power flow studies,
and stability studies.
 Moreover, we can calculate sequence impedances using symmetrical
components, from which we can derive sequence circuits of transmission
lines and transformers and ultimately sequence networks of a complete
power system. This helps us analyze the behavior of our power system
under different types of faults.

More Related Content

Similar to SUBHADIP POWER SYSTEM.pptx

Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?Power System Operation
 
Symmetrical components......
Symmetrical components......Symmetrical components......
Symmetrical components......Santhi Anumula
 
Lecture_ 03 ( updated with maths).pdf
Lecture_ 03 ( updated with maths).pdfLecture_ 03 ( updated with maths).pdf
Lecture_ 03 ( updated with maths).pdfSadiqulIslamShihab
 
FAULT ANALYSIS AND FAULT MATRIX DEVELOPMENT
FAULT ANALYSIS  AND  FAULT MATRIX DEVELOPMENTFAULT ANALYSIS  AND  FAULT MATRIX DEVELOPMENT
FAULT ANALYSIS AND FAULT MATRIX DEVELOPMENTKaransinh Parmar
 
power system 1 unit 5 contains for various faults & circuit breakers
power system 1 unit 5 contains for various faults & circuit breakerspower system 1 unit 5 contains for various faults & circuit breakers
power system 1 unit 5 contains for various faults & circuit breakersmonikavardia
 
4.three phase circuits
4.three phase circuits 4.three phase circuits
4.three phase circuits Ekeeda
 
POWER SYSTEM ANALYSIS_254ppt.pdf
POWER SYSTEM ANALYSIS_254ppt.pdfPOWER SYSTEM ANALYSIS_254ppt.pdf
POWER SYSTEM ANALYSIS_254ppt.pdfMillionAlemayehu2
 
unit-1-Three phase circuits and power systems.pptx
unit-1-Three phase circuits and power systems.pptxunit-1-Three phase circuits and power systems.pptx
unit-1-Three phase circuits and power systems.pptxdeepaMS4
 
Unit -1 Introdcution to PSA.pptx
Unit -1  Introdcution to PSA.pptxUnit -1  Introdcution to PSA.pptx
Unit -1 Introdcution to PSA.pptxSanjeevKumarkumar11
 

Similar to SUBHADIP POWER SYSTEM.pptx (20)

Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
 
dstatcom
dstatcomdstatcom
dstatcom
 
Symmetrical components......
Symmetrical components......Symmetrical components......
Symmetrical components......
 
3 (3).pptx
3 (3).pptx3 (3).pptx
3 (3).pptx
 
Electrical power system
Electrical power system Electrical power system
Electrical power system
 
Series circuits
Series circuitsSeries circuits
Series circuits
 
ECE610 IEEE
ECE610 IEEEECE610 IEEE
ECE610 IEEE
 
Lecture_ 03 ( updated with maths).pdf
Lecture_ 03 ( updated with maths).pdfLecture_ 03 ( updated with maths).pdf
Lecture_ 03 ( updated with maths).pdf
 
P.u systems.pptx
P.u systems.pptxP.u systems.pptx
P.u systems.pptx
 
Ijetr012048
Ijetr012048Ijetr012048
Ijetr012048
 
Parallel Circuits
Parallel CircuitsParallel Circuits
Parallel Circuits
 
FAULT ANALYSIS AND FAULT MATRIX DEVELOPMENT
FAULT ANALYSIS  AND  FAULT MATRIX DEVELOPMENTFAULT ANALYSIS  AND  FAULT MATRIX DEVELOPMENT
FAULT ANALYSIS AND FAULT MATRIX DEVELOPMENT
 
power system 1 unit 5 contains for various faults & circuit breakers
power system 1 unit 5 contains for various faults & circuit breakerspower system 1 unit 5 contains for various faults & circuit breakers
power system 1 unit 5 contains for various faults & circuit breakers
 
4.three phase circuits
4.three phase circuits 4.three phase circuits
4.three phase circuits
 
Lecture 3
Lecture 3Lecture 3
Lecture 3
 
POWER SYSTEM ANALYSIS_254ppt.pdf
POWER SYSTEM ANALYSIS_254ppt.pdfPOWER SYSTEM ANALYSIS_254ppt.pdf
POWER SYSTEM ANALYSIS_254ppt.pdf
 
unit-1-Three phase circuits and power systems.pptx
unit-1-Three phase circuits and power systems.pptxunit-1-Three phase circuits and power systems.pptx
unit-1-Three phase circuits and power systems.pptx
 
Unit -1 Introdcution to PSA.pptx
Unit -1  Introdcution to PSA.pptxUnit -1  Introdcution to PSA.pptx
Unit -1 Introdcution to PSA.pptx
 
What is Harmonics ?
What is Harmonics ?What is Harmonics ?
What is Harmonics ?
 
Circuit theory
Circuit theoryCircuit theory
Circuit theory
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...gragchanchal546
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 

Recently uploaded (20)

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 

SUBHADIP POWER SYSTEM.pptx

  • 1. SYMMETRICAL COMPONENTS IN FAULT STUDIES Paper Name: POWERSYSTEM II Paper Code: PC-EE 601 CO Number : (CO1 & CO II) Module Number: 1 Bloom’s Level of Taxonomy : (Understanding)
  • 2. CONTENT  Introduction  Symmetrical component theory  Calculation  Conclusion
  • 3. Introduction • A fault in a power system or circuit is a failure which interferes with the normal flow of current. In general faults occur in power system networks due to insulation failure of equipment, flashover of lines initiated by a lightning stroke, or due to accidental faulty operation • Symmetrical Fault = This is also called balance fault. After failure the fault currents in various lines are still balance (i.e. equal fault currents in the lines with 1200 displacement). 3 phase fault (LLL) is the example of this category. • Unsymmetrical Fault = This is also called unbalanced fault. After failure the fault current in various lines are not balance (i.e. not same in magnitude and not displaced by 120°). Unsymmetrical faults are three types; • (1) Single line to Ground fault (LG) • (2) Double line fault (LL) • (3) Double line to ground fault (LLG) • An unbalanced system consisting of ‘n’ number of phasors can be divided into ‘n’ systems of balanced phasor. These ‘n’ systems of balanced systems are known as symmetrical components.
  • 4. SYMMETRICAL COMPONENT THEORY In 1918, Dr. C.L. Fortescue, an American scientist, shown that any unbalanced system of 3- phase currents (or voltages) may be regarded as being composed of three separate sets of balanced vectors. This has come to be known as symmetrical component theory. This is a general theory and is applicable to any n vector system whose resultant is zero. Positive sequence components = Three phasors equal in magnitude and displaced each other by 1200 and has the same phase sequence as the original phasors. Negative sequence components = Three phasors equal in magnitude and displaced each other by 1200 and has the opposite phase sequence as the original phasors. Zero sequence components = consisting of thee phasors equal in magnitude and has zero phase displacement from each other.
  • 5. CALCULATION Since each of the original unbalanced phasors are the sum of its positive, negative and zero sequence components defined above.
  • 7. CONCLUSIO N  We can see those symmetrical components are a way of analyzing unbalanced phasors which arise due to faults. Converting a set of unbalanced phasors into sets of balanced components greatly simplifies our analysis and is helpful in performing fault calculations, power flow studies, and stability studies.  Moreover, we can calculate sequence impedances using symmetrical components, from which we can derive sequence circuits of transmission lines and transformers and ultimately sequence networks of a complete power system. This helps us analyze the behavior of our power system under different types of faults.