SlideShare a Scribd company logo
1 of 23
Axis of Rotation of
mandrel
Traversing
carriage
Resin-
impregnated fiber
Mandrel
Threaded Port Liner Helical winding Hoop winding
Split disk holding part
Pin
Split disk upper half
Split disk lower half
Lock Pin
Grip nut
Grip nut
Split disk holding part
Lock Pin Pin
Split disk upper half
Split disk upper half
HTS test specimen
PVC liner
HTS sample PVC lin
Ø198
Ø206
2
3
Ø192
Ø198
2
3
HTS TEST
SPECIMEN
PVC LINER
φ198
23
φ192
φ198
φ206
FIXTURE FOR
PECIMEN HOLDING
UPPER CROSS HEAD
MOVABLE CROSS HEAD
LOWER CROSS HEAD
AW LOCKING HANDLE
LOAD INDICATOR
MOVABLE CROSS
HEAD CONTROL UNIT
LOAD CONTROL
UNIT
SIDE VIEW
FRONT VIEW
NOTCH
a b c d e
PVC
LINER
HTS
SAMPLE
Grip nut
Split disk holding part
Lock Pin
Pin
Split disk upper half
Split disk lower half
HTS test specimen
PVC liner
MOVABLE JAW END
PVC MANDREL
FIXED JAW END
CONTROL
PANEL
DRY
WINDING
WET
WINDING
FRONT VIEW
TOP VIEW
RESIN
BATH
Fabricated Cylinders
Glass fiber bobbins Glass fiber Filament
EPOXY RESIN
HARDENER LENGTH = 360 mm
DIA
=
192
mm
EPOXY RESIN
HARDENER
E-GLASS
FIBER DIRECT
ROVING LENGTH = 360 mm
DIA
=
192
mm
GLASS FIBER BOBBINS
GLASS FIBER FILAMENT
FRONT VIEW
TOP VIEW
RESIN
BATH
DRY
WINDING
WET
WINDING
FABRICATED CYLINDERS
MOVABLE JAW END
PVC MANDREL
FIXED JAW END
CONTROL
PANEL
SEA WATER
COLLECTION FROM
ARABIAN SEA
CONTROL PANEL
SAMPLE CONTAINER CONTROL PANEL
HOT OIL BATH
SEA WATER COLLECTION
FROM ARABIAN SEA
CONTROL PANEL
CONTROL PANEL
HOT OIL BATH
TEST COUPONS IN TRAY
BEFORE START OF AGEING
TEST COUPONS IN TRAY
DURING AGEING
TEST COUPONS INSIDE HOT
OIL BATH DURING AGEING
CONTROL PANEL
INSIDE VIEW OF HOT OIL
BATH
FRONT VIEW SIDE VIEW
NOTCH
UPPER HOLDER
LOWER HOLDER
a b c d
Unaged
SW aged
TWO aged
g
f
e3
e2
e1
Failed at random angle
Delamination
failure
Failed
at
notch
4/6/2022
Dept. of Mechanical Engineering, NITK 20
Fiber volume fraction,
Vf
Winding angle,
WA(φ)
Stacking Sequence, SS
Vf = 0.45
Vf = 0.55
Vf = 0.65
Vf = 0.75
±45°
±55°
±75°
±60°
±65°
±70°
±50°
-Do-
SS1 = (90°2/±φ°2/90°/±φ°2/90°/90°2)
SS2 = (90°4/φ°2/90°2/-φ°2/90°4)
SS3 = (90°2/ ±φ°2/90°2/±φ°2/ 90°2)
SS4 = (90°2 /(±φ°/90°)3/φ°/90°2)
SS5 = (90°2 /(φ°/90°)/(±φ°/90°) 2/(90°/φ°)/90°2)
SS6 = (90°2/φ°2/90°/(-φ°4)/90°/φ°2/90°2)
-Do-
-Do-
FE Analysis
Selection of
Element Type
Assigning Material
Properties
Defining the
number layers in
section
Modelling
Meshing
Applying B.C’s and
Load
4/6/2022 Dept. of Mechanical Engineering, NITK 21
4/6/2022
Dept. of Mechanical Engineering, NITK
22
Optimization of obtained FE simulation results (CONT..)
FEA (168
SIMULATIONS
WITH LINER)
Based on VIKOR method: TOP
RANKED ATTRIBUTE or FE
simulation data is short listed
for experimental studies
Few Additional
attributes(total 6) nearer
to top rank are also taken
for experimental studies
COUNT
ENERGY (keV)

More Related Content

What's hot

ALYSSA MASON - PORTFOLIO - SCDC
ALYSSA MASON - PORTFOLIO - SCDCALYSSA MASON - PORTFOLIO - SCDC
ALYSSA MASON - PORTFOLIO - SCDC
Jonathan Mohabir
 
Chapter 30
Chapter 30Chapter 30
Chapter 30
mcfalltj
 

What's hot (20)

Manual de-instalacao-e-manutencao-de-valvula-gaveta-aco-fundido
Manual de-instalacao-e-manutencao-de-valvula-gaveta-aco-fundidoManual de-instalacao-e-manutencao-de-valvula-gaveta-aco-fundido
Manual de-instalacao-e-manutencao-de-valvula-gaveta-aco-fundido
 
Recommendation for Soda Ash Plant - Double Eccentric Half Ball Valve
Recommendation for Soda Ash Plant - Double Eccentric Half Ball ValveRecommendation for Soda Ash Plant - Double Eccentric Half Ball Valve
Recommendation for Soda Ash Plant - Double Eccentric Half Ball Valve
 
ALYSSA MASON - PORTFOLIO - SCDC
ALYSSA MASON - PORTFOLIO - SCDCALYSSA MASON - PORTFOLIO - SCDC
ALYSSA MASON - PORTFOLIO - SCDC
 
Chapter 30
Chapter 30Chapter 30
Chapter 30
 
C.3.7 ladders
C.3.7 laddersC.3.7 ladders
C.3.7 ladders
 
Mechanical seal
Mechanical sealMechanical seal
Mechanical seal
 
Valve general requirements
Valve general requirementsValve general requirements
Valve general requirements
 
Installation Manual
Installation ManualInstallation Manual
Installation Manual
 
Third Year Surgery Project
Third Year Surgery ProjectThird Year Surgery Project
Third Year Surgery Project
 
201 pump condition evaluation
201 pump condition evaluation201 pump condition evaluation
201 pump condition evaluation
 
Instalação em terminais _ Milton Roy
Instalação em terminais _ Milton RoyInstalação em terminais _ Milton Roy
Instalação em terminais _ Milton Roy
 
OzLinc Industries Valves Catalogue
OzLinc Industries Valves CatalogueOzLinc Industries Valves Catalogue
OzLinc Industries Valves Catalogue
 
BIMETECH PRESENTATION 2015
BIMETECH PRESENTATION 2015BIMETECH PRESENTATION 2015
BIMETECH PRESENTATION 2015
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elements
 
Gedore Tools For Life
Gedore Tools For LifeGedore Tools For Life
Gedore Tools For Life
 
Zipblock inst
Zipblock instZipblock inst
Zipblock inst
 
Hyundai hl770 7 wheel loader service repair manual
Hyundai hl770 7 wheel loader service repair manualHyundai hl770 7 wheel loader service repair manual
Hyundai hl770 7 wheel loader service repair manual
 
Replacing windows step by step
Replacing windows step by stepReplacing windows step by step
Replacing windows step by step
 
The specs of container house
The specs of container houseThe specs of container house
The specs of container house
 
CATU Lockout / Tagout Solutions - Valve Lockers
CATU Lockout / Tagout Solutions - Valve LockersCATU Lockout / Tagout Solutions - Valve Lockers
CATU Lockout / Tagout Solutions - Valve Lockers
 

Similar to Image maker ppt

Oxi documentation -with_compressor
Oxi documentation  -with_compressorOxi documentation  -with_compressor
Oxi documentation -with_compressor
ShamimMehboob
 

Similar to Image maker ppt (20)

BULK-FLOW Straight Mass Flow Hopper brochure
BULK-FLOW Straight Mass Flow Hopper brochureBULK-FLOW Straight Mass Flow Hopper brochure
BULK-FLOW Straight Mass Flow Hopper brochure
 
Oxi documentation -with_compressor
Oxi documentation  -with_compressorOxi documentation  -with_compressor
Oxi documentation -with_compressor
 
Stock - Filters.pdf
Stock - Filters.pdfStock - Filters.pdf
Stock - Filters.pdf
 
Magnum Mud Gate Valve, Magnum Mud Gate Valve Manufacturers - WOM Group
Magnum Mud Gate Valve, Magnum Mud Gate Valve Manufacturers - WOM GroupMagnum Mud Gate Valve, Magnum Mud Gate Valve Manufacturers - WOM Group
Magnum Mud Gate Valve, Magnum Mud Gate Valve Manufacturers - WOM Group
 
Model 600 Mud Valve, Mud Valves Manufacturers - WOM Group
Model 600 Mud Valve, Mud Valves Manufacturers - WOM GroupModel 600 Mud Valve, Mud Valves Manufacturers - WOM Group
Model 600 Mud Valve, Mud Valves Manufacturers - WOM Group
 
Model 200M Gate Valve - Worldwide Oilfield Machine
Model 200M Gate Valve - Worldwide Oilfield MachineModel 200M Gate Valve - Worldwide Oilfield Machine
Model 200M Gate Valve - Worldwide Oilfield Machine
 
Magnum Gate Valve with Electric Gear Actuator - WOM Group
Magnum Gate Valve with Electric Gear Actuator - WOM GroupMagnum Gate Valve with Electric Gear Actuator - WOM Group
Magnum Gate Valve with Electric Gear Actuator - WOM Group
 
Magnum Gate Valve - Worldwide Oilfield Machine
Magnum Gate Valve - Worldwide Oilfield MachineMagnum Gate Valve - Worldwide Oilfield Machine
Magnum Gate Valve - Worldwide Oilfield Machine
 
Magnum Mud Gate Valve, Mud Gate Valves - Worldwide Oilfield Machine
Magnum Mud Gate Valve, Mud Gate Valves - Worldwide Oilfield MachineMagnum Mud Gate Valve, Mud Gate Valves - Worldwide Oilfield Machine
Magnum Mud Gate Valve, Mud Gate Valves - Worldwide Oilfield Machine
 
Torque Reducer Gate Valve - Worldwide Oilfield Machine
Torque Reducer Gate Valve - Worldwide Oilfield MachineTorque Reducer Gate Valve - Worldwide Oilfield Machine
Torque Reducer Gate Valve - Worldwide Oilfield Machine
 
Magnum Mud Gate Valve - Worldwide Oilfield Machine
Magnum Mud Gate Valve - Worldwide Oilfield MachineMagnum Mud Gate Valve - Worldwide Oilfield Machine
Magnum Mud Gate Valve - Worldwide Oilfield Machine
 
Maintenance Poster
Maintenance PosterMaintenance Poster
Maintenance Poster
 
Knife gate valve catalogue
Knife gate valve catalogueKnife gate valve catalogue
Knife gate valve catalogue
 
236012844-BCF-Texturizing.ppt
236012844-BCF-Texturizing.ppt236012844-BCF-Texturizing.ppt
236012844-BCF-Texturizing.ppt
 
Artificial Lift Products from Evolution Oil Tools
Artificial Lift Products from Evolution Oil ToolsArtificial Lift Products from Evolution Oil Tools
Artificial Lift Products from Evolution Oil Tools
 
Air & flue gas system
Air & flue gas system Air & flue gas system
Air & flue gas system
 
Specialising in Pneumatic Mining and Plant Equipment
Specialising in Pneumatic Mining and Plant EquipmentSpecialising in Pneumatic Mining and Plant Equipment
Specialising in Pneumatic Mining and Plant Equipment
 
Cryogenic process valves valves manufacturer-Guichon valves
Cryogenic process valves valves manufacturer-Guichon valvesCryogenic process valves valves manufacturer-Guichon valves
Cryogenic process valves valves manufacturer-Guichon valves
 
Jgb industrial cleaning catalog
Jgb industrial cleaning catalogJgb industrial cleaning catalog
Jgb industrial cleaning catalog
 
asahi valve
asahi valveasahi valve
asahi valve
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 

Image maker ppt

  • 1. Axis of Rotation of mandrel Traversing carriage Resin- impregnated fiber Mandrel Threaded Port Liner Helical winding Hoop winding
  • 2. Split disk holding part Pin Split disk upper half Split disk lower half Lock Pin Grip nut
  • 3. Grip nut Split disk holding part Lock Pin Pin Split disk upper half Split disk upper half HTS test specimen PVC liner
  • 4.
  • 5.
  • 6.
  • 7. HTS sample PVC lin Ø198 Ø206 2 3 Ø192 Ø198 2 3
  • 8. HTS TEST SPECIMEN PVC LINER φ198 23 φ192 φ198 φ206 FIXTURE FOR PECIMEN HOLDING UPPER CROSS HEAD MOVABLE CROSS HEAD LOWER CROSS HEAD AW LOCKING HANDLE LOAD INDICATOR MOVABLE CROSS HEAD CONTROL UNIT LOAD CONTROL UNIT SIDE VIEW FRONT VIEW NOTCH a b c d e PVC LINER HTS SAMPLE
  • 9. Grip nut Split disk holding part Lock Pin Pin Split disk upper half Split disk lower half HTS test specimen PVC liner
  • 10. MOVABLE JAW END PVC MANDREL FIXED JAW END CONTROL PANEL
  • 13. Glass fiber bobbins Glass fiber Filament
  • 14. EPOXY RESIN HARDENER LENGTH = 360 mm DIA = 192 mm
  • 15. EPOXY RESIN HARDENER E-GLASS FIBER DIRECT ROVING LENGTH = 360 mm DIA = 192 mm GLASS FIBER BOBBINS GLASS FIBER FILAMENT FRONT VIEW TOP VIEW RESIN BATH DRY WINDING WET WINDING FABRICATED CYLINDERS MOVABLE JAW END PVC MANDREL FIXED JAW END CONTROL PANEL
  • 16. SEA WATER COLLECTION FROM ARABIAN SEA CONTROL PANEL SAMPLE CONTAINER CONTROL PANEL HOT OIL BATH
  • 17. SEA WATER COLLECTION FROM ARABIAN SEA CONTROL PANEL CONTROL PANEL HOT OIL BATH TEST COUPONS IN TRAY BEFORE START OF AGEING TEST COUPONS IN TRAY DURING AGEING TEST COUPONS INSIDE HOT OIL BATH DURING AGEING CONTROL PANEL INSIDE VIEW OF HOT OIL BATH
  • 18. FRONT VIEW SIDE VIEW NOTCH UPPER HOLDER LOWER HOLDER
  • 19. a b c d Unaged SW aged TWO aged g f e3 e2 e1 Failed at random angle Delamination failure Failed at notch
  • 20. 4/6/2022 Dept. of Mechanical Engineering, NITK 20 Fiber volume fraction, Vf Winding angle, WA(φ) Stacking Sequence, SS Vf = 0.45 Vf = 0.55 Vf = 0.65 Vf = 0.75 ±45° ±55° ±75° ±60° ±65° ±70° ±50° -Do- SS1 = (90°2/±φ°2/90°/±φ°2/90°/90°2) SS2 = (90°4/φ°2/90°2/-φ°2/90°4) SS3 = (90°2/ ±φ°2/90°2/±φ°2/ 90°2) SS4 = (90°2 /(±φ°/90°)3/φ°/90°2) SS5 = (90°2 /(φ°/90°)/(±φ°/90°) 2/(90°/φ°)/90°2) SS6 = (90°2/φ°2/90°/(-φ°4)/90°/φ°2/90°2) -Do- -Do-
  • 21. FE Analysis Selection of Element Type Assigning Material Properties Defining the number layers in section Modelling Meshing Applying B.C’s and Load 4/6/2022 Dept. of Mechanical Engineering, NITK 21
  • 22. 4/6/2022 Dept. of Mechanical Engineering, NITK 22 Optimization of obtained FE simulation results (CONT..) FEA (168 SIMULATIONS WITH LINER) Based on VIKOR method: TOP RANKED ATTRIBUTE or FE simulation data is short listed for experimental studies Few Additional attributes(total 6) nearer to top rank are also taken for experimental studies